Technical Office
BIM Department
![Page 2: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/2.jpg)
What is “BIM”
A BIM is a digital model of a building in which information about a project is stored. It can be 3D, 4D (integrating time) or even 5D (including cost)
![Page 3: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/3.jpg)
Why “BIM”• BIM communicate design concepts to the owner • BIM can be used as a database throughout the life of the building. • It can generate as-built floor plans and elevations
– Unique outcomes• Clash detection• Heat Analysis• Global Co-ordination and Solar Movement• Constructability of complex geometries…
– Improved Outcomes• Coordinated drawings• Improved prefabrication• More accurate costs…• Code checking
![Page 4: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/4.jpg)
Clash Detection
Why “BIM”
![Page 5: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/5.jpg)
Heat Analysis (Sensible Heat)
Why “BIM”
![Page 6: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/6.jpg)
Solar Analysis (latent Heat)
Why “BIM”
![Page 7: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/7.jpg)
How “BIM” works
• To make “BIM” you have to input data throw a specified software to process the data and make a BIM for the project– Each Discipline inputs data to the project– The BIM co-ordinates all data from each Discipline – Each Discipline extracts the co-ordinated data
needed out of the BIM
![Page 8: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/8.jpg)
How “Revit” worksTo insure that data is fully co-ordinated between all disciplines
BIM is only one file
“A change anywhere is a change everywhere”
- Autodesk
![Page 9: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/9.jpg)
Phasing the BIM - Start with
• ARCHITECTURE / INTERIOR DESIGN
![Page 10: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/10.jpg)
Phasing the BIM - Followed by
• STRUCTURE ENGINEERING
![Page 11: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/11.jpg)
Phasing the BIM - Followed by
• MEP ENGINEERING
![Page 12: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/12.jpg)
Case Study
![Page 13: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/13.jpg)
Architectural Design & Co-ordination
![Page 14: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/14.jpg)
Mechanical Coordination & Schedules
![Page 15: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/15.jpg)
Plumbing Coordination & Schedules
![Page 16: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/16.jpg)
Accurate Exterior & interior
![Page 17: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/17.jpg)
Jeddah Hospital Current BIM Progress
![Page 18: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/18.jpg)
Jeddah Hospital Current BIM Progress
![Page 19: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/19.jpg)
Jeddah Hospital Current BIM Progress
![Page 20: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/20.jpg)
Jeddah Hospital Current Progress
![Page 21: BIM Al Fouzan](https://reader035.vdocuments.mx/reader035/viewer/2022070509/589fab641a28abc04e8b6d01/html5/thumbnails/21.jpg)
Conclusion
• The change to using BIM had significant changes on our projects set up. It encouraged us to re-visit and improve our methods in delivering projects.
• Effective implementation of BIM enabled us to maintain our high quality projects while adding real value to the design and construction process.