Bill White

Laser Installation and Commissioning [email protected]

April 20, 20061

Laser Installation and Commissioning

April 20, 2006

•Procedures and Definitions•Safety•Laser Installation•Laser commissioning•Injector commissioning

Page 2: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 20062

Definitions and Procedures

Pre-Installation

Cables

Tables

Table Covers

Racks

LSS hardware

Cooling Water

Infrastructure

Responsibility:

Kathleen Ratcliffe

Laser Installation

Temporary SOP

Thales on Site

Verify specs

Training

Responsibility:

Laser Group

Laser Commissioning

SOP

Characterization

Integration

Beam Transport

Virtual Cathode

Responsibility:

Laser Group

Laser Operation

Commissioning Gun

Characterization

Integration

Responsibility:

Laser GroupIRR

CRR ARR

Departmental Reviews that follow safety committee and technical reviews: Work Authorization

Page 3: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 20063

Safety Reviews

SOC on Feb 22Laser Safety Committee

Temporary SOP

SOP

Electrical Safety CommitteeThales acceptance visit May 15

Earthquake Safety Comm.Tables – done

Covers – in process

Page 4: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 20064

Technical Reviews / MilestonesLaser Design Review at Thales – Oct 18-19

Progress Review Jan 27Bi-weekly phone conferences to track progress

Transport system FDR - Feb 22Parts are in procurement

Timing Workshop with LBNL – March 10LLNL Progress Review – April 5

Parts are in procurementSpatial shaping characterization complete

Going with Newport shaper Streak Camera Install at LLNL – April 19

Will be used to further characterize LLNL shaping workLaser Acceptance Review – May 15

Milestone 3TG FROG Installed – End of MayPDR for Light path to streak camera – Oct 06UV on Photocathode – Dec 06

Page 5: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 20065

SafetyReviews

PDR Laser Safety System Dec 16, 2005FDR Laser Safety System April 12LSC review of Temporary SOP May 2-6, 2006 LSC review of SOP May 30, 2006 Installation Readiness Review for drive laser May 22, 2006 Commissioning Readiness Review for drive laser June 22, 2006 Earthquake review of table enclosures May 1, 2006 Electrical safety review of laser May 15, 2006

Page 6: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 20066

Definitions and Procedures

Pre-Installation

Cables

Tables

Table Covers

Racks

LSS hardware

Cooling Water

Infrastructure

Responsibility:

Kathleen Ratcliffe

Laser Installation

Temporary SOP

Thales on Site

Verify specs

Training

Responsibility:

Laser Group

Laser Commissioning

SOP

Characterization

Integration

Beam Transport

Virtual Cathode

Responsibility:

Laser Group

Laser Operation

Commissioning Gun

Characterization

Integration

Responsibility:

Laser GroupIRR

CRR ARR

Page 7: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 20067

Pre-Installation

Page 8: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 20068

Installation

Page 9: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 20069

Laser Commissioning

Page 10: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 200610

Laser Commissioning

Page 11: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 200611

IssuesCF and pre-install is slipping – 1 monthManpower

WBS for Commissioning1040 hrs optical engineer (6 months)1000 hrs optical tech (5.75 months)440 hrs physicist (11 weeks)Working with Eric on pre-ops needs

Begin in June with Installation through light on cathode Dec 1 (6 months)Laser commissioning will continue beyond Dec1Multiple Shifts will begin Dec 1We need to start posting positions

4 Technician/Operator level by Dec1 Eng/Phys level by Dec

Page 12: Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures

Bill White

Laser Installation and Commissioning [email protected]

April 20, 200612

Issues

InterferenceVirtual Cathode calibration will require very tight coordination with GTL install

Downtime

Installation through roof hatch

Ongoing commissioning beyond December will require close coordination – Paul’s Commissioning schedule