Capital Controls India Pvt. Ltd. Bill of Material forRaw Water Chlorination System Prepared By: Bhavesh Panchal Date: 28th April, 2011 Approved By: Nelesh M. Kocha Rev.1 BILL OF MATERIAL Sr.No. Description of Equipment / Item Tag ID. Unit Qty. A CHLORINATION SPECIALITY ITEMS 1 Roller Trunion Assembly RS-1 to 2 A/B Set 2 2 Flexible Copper Coil FC-1 to 2 Nos. 2 3 Chlorine Gas Filter GF-1 to 2 Nos. 2 4 Vacuum Operated Manual Gas Feeder, Capacity 2 Kg/Hr. VR-1 to 2 Set 2 5 O Ring Ejector EJ1 to 2 Nos 2 6 Floor Cabinet Gas Feeder Capacity 2 Kg/hr. CHL-1 to 2 Nos. 2 7 1" Diffuser DF-1 No 1 8 Emergency Kit 'B' for Chlorine Tonner EKB-1 No. 1 9 Filled Chlorine Tonner, capacity 930 kgs. CT-1 to 2 Nos. 2 B VALVES Chorine Service Valves 10 Auxillary Valve with Clamp AVC-1 to 2 Nos 2 11 Header Valve HV-1 to 2 Nos 2 12 Instrument Isolation Valve AV-1 to 2 Nos. 2 Ball Valve 13 1" Socket, 2 Way, uPVC BV-1 to 8 Nos 8 Non Return Valve 14 1" Socket uPVC NRV-1 to 2 Nos 2 Guage Cock - 3 Way for Instrument Pressure Gauge 15 1/2" Threaded, 3 Way, Brass GC-1 to 3 Nos 3 C PIPE, PIPE FITTINGS & FLANGES uPVC 16 1" uPVC Schedule 80 Mtr. 24 D CONTROL & INSTRUMENTATION Pressure Instruments 17 Pressure Gauge Range, 0-7 Kg/cm²g PI-3 to 4 Nos 2 18 Pressure Switch Range 0-7 Kg/cm²g PS 1 No. 1 19 Pressure Gauge with Chemcial Seal Range, 0-16 Kg/cm²g PI-1 to 2 Nos 2 20 1610B Chlorine Gas Detector CLD-1 No. 1 21 Chlorine Residual Analyser 7685 No. 1 22 Chlorine Gas Sensor SN-1 to 2 Nos. 2 23 Amperiometric Titrator No. 1 E SAFETY ITEMS 24 Breathing Apparatus set with oxygen cylinder of 30 minutes BA-1 to 2 Nos 2 25 Moisture Absorbing Breathing Apparatus MAB-1 to 2 Nos 2 26 Weather Cock WC-1 No 1 27 Canister Type Gas Mask GM-1 to 4 Nos 4 28 Ammonia Bottle AB-1 to 8 Nos 8 29 Safety Shower SS-1 No 1 30 First Aid Kit No. 1 31 Ventilation Fan VF-1 to 2 Nos 2 F ROTARY ITEMS 32 Booster Pump, 2 m3/hr @ 46 mt Head BP-1 to 2 Nos 2 33 Electric Motor, 2HP EL-1 to 2 Nos 2 MAIN CONTRACTOR: SUBHASH PROJECTS & MARKETING LTD OWNER: RAJSTHAN RAJYA VIDYUT UTPADAN NIGAM LTD. PROJECT : RAW WATER CHLORINATION FOR RAMGARH SYSTEM : GAS CHLORINATION SYSTEMS SUPPLIER : CAPITAL CONTROLS INDIA PVT. LTD. MUMBAI.

Upload: bhavesh-panchal

Post on 17-Nov-2015

7 views

Category:

Documents


1 download

DESCRIPTION

Bill-of-materials-sample

TRANSCRIPT

Raw Water Chlorination SystemMAIN CONTRACTOR: SUBHASH PROJECTS & MARKETING LTDOWNER: RAJSTHAN RAJYA VIDYUT UTPADAN NIGAM LTD.PROJECT : RAW WATER CHLORINATION FOR RAMGARHSYSTEM : GAS CHLORINATION SYSTEMSSUPPLIER : CAPITAL CONTROLS INDIA PVT. LTD. MUMBAI.BILL OF MATERIALSr.No.Description of Equipment / ItemTag ID.UnitQty.Unit PriceTotal PriceExcise @ 10.3%ACHLORINATION SPECIALITY ITEMS1Roller Trunion AssemblyRS-1 to 2 A/BCapital ControlsSet24500.0009000.000927.0002Flexible Copper CoilFC-1 to 2Nos.23500.0007000.000721.0003Chlorine Gas FilterGF-1 to 2Nos.220000.00040000.0004120.0004Vacuum Operated Manual Gas Feeder, Capacity 2 Kg/Hr.VR-1 to 2Capital ControlsSet225000.00050000.0005150.0005O Ring EjectorEJ1 to 2Nos25000.00010000.0001030.0006Floor Cabinet Gas Feeder Capacity 2 Kg/hr.CHL-1 to 2Capital ControlsNos.250000.000100000.00010300.00071" DiffuserDF-1Capital ControlsNo15000.0005000.000515.0008Emergency Kit 'B' for Chlorine TonnerEKB-1Capital ControlsNo.17500.0007500.000772.5009Filled Chlorine Tonner, capacity 930 kgs.CT-1 to 2ISGECNos.2160000.000320000.000BVALVESChorine Service Valves10Auxillary Valve with ClampAVC-1 to 2Nos22500.0005000.000515.00011Header ValveHV-1 to 2Nos25000.00010000.00012Instrument Isolation ValveAV-1 to 2Nos.25000.00010000.000Ball Valve131" Socket, 2 Way, uPVCBV-1 to 8Hayward, NibcoNos85000.00040000.000Non Return Valve141" Socket uPVCNRV-1 to 2Hayward, NibcoNos220000.00040000.000Guage Cock - 3 Way for Instrument Pressure Gauge151/2" Threaded, 3 Way, BrassGC-1 to 3Hayward, NibcoNos3500.0001500.000CPIPE, PIPE FITTINGS & FLANGESuPVC161" uPVC Schedule 80Mtr.244500.000108000.000DCONTROL & INSTRUMENTATIONPressure Instruments17Pressure Gauge Range, 0-7 Kg/cmgPI-3 to 4WikaNos215000.00030000.00018Pressure Switch Range 0-7 Kg/cmgPS 1No.115000.00015000.00019Pressure Gauge with Chemcial Seal Range, 0-16 Kg/cmgPI-1 to 2Nos210000.00020000.000201610B Chlorine Gas DetectorCLD-1No.150000.00050000.0005150.00021Chlorine Residual Analyser 7685No.150000.00050000.0005150.00022Chlorine Gas SensorSN-1 to 2Nos.25000.00010000.0001030.00023Amperiometric TitratorNo.115000.00015000.000ESAFETY ITEMS24Breathing Apparatus set with oxygen cylinder of 30 minutes durationBA-1 to 2BA-1 to 3Nos245000.00090000.00025Moisture Absorbing Breathing ApparatusMAB-1 to 2Nos25000.00010000.00026Weather CockWC-1No115000.00015000.00027Canister Type Gas MaskGM-1 to 4DraegerNos46000.00024000.00028Ammonia BottleAB-1 to 8Nos85000.00040000.00029Safety ShowerSS-1No115000.00015000.00030First Aid KitNo.15000.0005000.00031Ventilation FanVF-1 to 2Nos210000.00020000.000FROTARY ITEMS32Booster Pump, 2 m3/hr @ 46 mt HeadBP-1 to 2Nos233000.00066000.00033Electric Motor, 2HPEL-1 to 2Nos28300.00016600.000Total:1254600.000Excise @ 10.3%35380.500CST @2%25799.610Total Amount1315780.110Total EXW for RW & CW System7900000.00Total EXW for Hypochlorite Dosing System800000.00Total EXW for Acid Dosing & Inhibitor System2800000.0011500000.000.00Total Excise Payable190653.000.00Total Sales Tax against form C @ 2%233813.06Total FOB Mumbai11924466.060.06Freight200000.00Erection & Commissioning400000.00Total:12524466.060.06

&C&"Arial,Bold"&16Capital Controls India Pvt. Ltd.&"Arial,Regular"&10&"Arial,Bold"&12Bill of Material for&A&LPrepared By: Bhavesh PanchalDate: 28th April, 2011&RApproved By: Nelesh M. KochaRev.1

Cooling Water SystemMAIN CONTRACTOR: SUBHASH PROJECTS & MARKETING LTDOWNER: RAJSTHAN RAJYA VIDYUT UTPADAN NIGAM LTD.PROJECT : COOLING WATER CHLORINATION FOR RAMGARHSYSTEM : GAS CHLORINATION SYSTEMSSUPPLIER : CAPITAL CONTROLS INDIA PVT. LTD. MUMBAI.BILL OF MATERIALSr.No.Description of Equipment / ItemTag ID.ManufacturerUnitQty.Unit PriceTotal PriceExcise @10.3%CHLORINE SPECIALITY ITEMS1Filled Chlorine TonnersCT-1 to 4Nos.4160000.000640000.0002Auxilary Valve with ClampAVC-1 to 4Nos.42500.00010000.0001030.0003Roller TrunnionsRS-1A/B to 4A/BSet44500.00018000.0001854.0004Flexible Copper CoilFC-1 to 4Nos.43500.00014000.0001442.0005Motorised Ball valveMBV-1Nos.170000.00070000.0006Chlorine Gas ManifoldMF-1 to 2Nos.2250.000500.00051.5007Expansion ChamberET-1Nos.124000.00024000.0008Rupture Disc Assembly for Liquid Line, 28 barRD-1No.12500.0002500.000257.5009Rupture Disc Assembly for Gas service, 18 barRD-2A to DNos.42500.00010000.0001030.00010Pressure Relief ValvePRV-1A to DNos.410000.00040000.0004120.00011Evaporator, Capacity 75 kg/hrEVP-1 to 4Nos.4125000.000500000.00051500.00012Remote Vacuum Regulator, capacity 75 Kg/Hr.RVR-1 to 4Nos.420000.00080000.0008240.00013Floor Cabinet Gas Feeder Capacity 75 Kg/hr.CHL-1 to 4Nos.4100000.000400000.00041200.00014EjectorEJ-1 to 4Nos.45000.00020000.0002060.00015Chlorine Gas FilterGF -1A/D to 2A/DNos.820000.000160000.00016480.00016Pneumatically operated Pressure Reducing ValvePRDV-1A to DNos.415000.00060000.0006180.00017Tonner Lifting BarTLB-1No.110000.00010000.0001030.0001890mm PN-10 uPVC DiffuserDF-1 to 2Nos.25000.00010000.0001030.00019Manual Trolley, Electrically Operated Hoist, 3 Ton CapNo.190000.00090000.00020Load Indicator, 3 Ton CapNo.190000.00090000.00021Automatic Changeover PanelACP-01No.1250000.000250000.00022Relay Based Control PanelCAP-01No.1614900.000614900.00023Chlorine Gas Leak DetectorCLD-1 to 2Nos.250000.000100000.00010300.00024Chlorine Gas SensorSN-1 to 3Nos.35000.00015000.0001545.00025Chlorine Residual AnalyzerNo.150000.00050000.0005150.000VALVESIS:3224 VALVES26.0Header ValveHV-1 to 4Nos.45000.00020000.00027.0Instrument Isolation ValveAV-1 to 5, AV-6A/D to 11A/DNos.295000.000145000.000BALL VALVES28.01" Ball valve, CS Body, Monel Ball for Chlorine ServiceBV-1A/D to 7A/DNos.285000.000140000.00029.015NB Ball valve, uPVC Body for Chlorine Solution ServiceBV-8A to DNos.43500.00014000.000GATE VALVES30.01/2" Gate Valve for Water Service, Brass BodyGV-1A/D to 5A/DNos.203500.00070000.000NON RETURN VALVES31.01/2" Non-Return Valve for Water Service, Brass BodyNRV-1A/DNos.42500.00010000.00032.0100NB Non-Return Valve for Water Service, CS BodyNRV-3A/DNos.43500.00014000.00033.04" Non-Return Valve for Chlorine Solution Service, PP BodyNRV-2A/DNos.420000.00080000.000BUTTERFLY VALVES34.0Butterfly Valve for Water Service, 100NBBFV-1A/B to 2A/BNos.48000.00032000.00035.0Butterfly Valve for Water Service, 100NBBFV-3A/D to 4A/DNos.88000.00064000.00036.0Butterfly Valve for Chlorine Solution Service, 90mm ODBFV-6A to DNos.412000.00048000.00037.0Butterfly Valve for Water Service, 80NBBFV-5A/DNos.410000.00040000.000GUAGE COCK38.0Gauge Cock, 1/2" Brass BodyGC-1 to 4Nos.4500.0002000.00039.0Gauge Cock, 1/2" Brass BodyGC-5A/DNos.4500.0002000.000STRAINERS40100NB Strainer for Water LineST-1 to 2Nos.225000.00050000.000411" Strainer for Water Line, Brass BodyST-3No.15000.0005000.000PIPES4225 NB CS for Chlorine LineMtr.121000.00012000.0004315 NB CS for Water LineMtr.12500.0006000.0004425 NB for Gas LineMtr.12500.0006000.0004580 NB MS for Water LineMtr.122000.00024000.00046100 NB MS for Water LineMtr.123000.00036000.00047125 NB for Water LineMtr.123500.00042000.0004890 OD PN 10 uPVC for Chlorine SolutionMtr.121500.00018000.000491-1/2" uPVC Schedule 80, Vacuum LineMtr.12750.0009000.000CONTROL & INSTRUMENTATION50Pressure Indicator with Chemical Seal on ManifoldPI-1A to 1BNos.210000.00020000.00051Pressure Indicator with Chemical Seal on Chlorine Liquid LinePI - 2Nos.110000.00010000.00052Pressure Indicator with Chemical Seal on Gas LinePI-3A/D TO 5A/DNos.1210000.000120000.00053Pressure Indicator on water linePI-6 TO 8Nos.35000.00015000.00054Pressure IndicatorPI-9A TO DNos.45000.00020000.00055Pressure Indicator with Chemical Seal on Chlorine Solution LinePI-10A to DNos.47500.00030000.00056Pressure Switch with Chemical seal on ManifoldPS-1A to 1BNos.215000.00030000.00057Pressure Switch with Chemical seal on Liquid LinePS-2Nos.215000.00030000.00058Pressure Switch with Chemical seal on Gas LinePS-3A/D to 5A/DNos.1215000.000180000.00059Pressure Switch on Water LinePS - 6No.110000.00010000.00060Soleniod ValveSV-1A to DNos.43000.00012000.00061Flow Indicator Assembly Range 9-45 m3/hrFI-1/A to DNos.425000.000100000.000ROTARY ITEMS62Booster Pump 43m3/hr @ 50 m headBP-1 to 4Nos.465000.000260000.00063Electric MotorM-1 to 4Nos.425000.000100000.000SAFETY ITEMS64Cannister Type Gas MaskGM-1 to 4Nos.46000.00024000.00065Oxygen Breathing Apparatus, 30 Minutes durationBA-1 to 2Nos.245000.00090000.00066Ammonia BottlesAB-1 to 8Nos.85000.00040000.00067Moisture Absorbing Breathing ApparatusMBA-1 to 2Nos.25000.00010000.00068Weather CockWC-1No.115000.00015000.00069Ventilation FanVF-1 to 2No.210000.00020000.00070Safety ShowerSS-1No.115000.00015000.00071Emergency Kit BNo.17500.0007500.000772.500ABSORPTION SYSTEM72Caustic Solution TankCSTNo.1450000.000450000.00073Caustic Solution TowerABTNo.1300000.000300000.00074Caustic Recirculation pumpCCP-1 to 2Nos.275000.000150000.00075PP + FRP BlowerBLW-1 to 2Nos.255000.000110000.00076PP + FRP DuctingDCTMtr.123000.00036000.00077DampnerDP-1A/B to 2A/BNos.47500.00030000.000783" PP Diaphragm ValveDV-1No.16000.0006000.000793" PP Diaphragm ValveDV-2A/B to 3A/BNos.46000.00024000.000803" PP Diaphragm ValveDV-4 to 6Nos.36000.00018000.000811/2" PP Diaphragm ValveDV-7 to 8Nos.22500.0005000.000822" Gate Valve, Brass Body for water serviceGV-6No.11500.0001500.000831/2" Ball Valve for Water LineBV-9A/B to 11A/BNos.61500.0009000.000843" PP Non Return ValveNRV-4 to 5Nos.24500.0009000.000853" PP StrainerST-4A to BNos.24500.0009000.00086Level GuageLG-1No.13500.0003500.00087Pressure IndicatorPI-11A/B to 12A/BNos.45000.00020000.000883" PP Pipe for Caustic LineMtr.125500.00066000.000891/2" GI for Pump Cooling LineMtr.122500.00030000.000902" GI for Tank Inlet / MakeupMtr.123500.00042000.000780.000790.000800.000810.000820.000830.000840.000Total:6645400.000Excise @ 10.3%155272.500CST @2%136013.450Total Amount6936685.950vv

&C&"Arial,Bold"&16Capital Controls India Pvt. Ltd.&12Bill of Materials for &A&LPrepared By: Bhavesh A. PanchalDate: 28th April 2011&RApproved By: Nelesh M. KochaRev. 1

HypoChlorite Dosing SystemMAIN CONTRACTOR: SUBHASH PROJECTS & MARKETING LTDOWNER: RAJSTHAN RAJYA VIDYUT UTPADAN NIGAM LTD.PROJECT : HYPOCHLORITE DOSING SYSTEM FOR RAMGARHSYSTEM : GAS CHLORINATION SYSTEMSSUPPLIER : CAPITAL CONTROLS INDIA PVT. LTD. MUMBAI.BILL OF MATERIALSr.No.Description of Equipment / ItemTag ID.ManufacturerUnitQty.Unit PriceTotal Price1Sodium Hypochlorite solution preparation tank, 100 Ltr capacityHT-1No.11750001750002Sodium Hypochlorite Dosing tank, 100 Ltr capacityADT-1No.11750001750003Sodium Hypochlorite Dosing pump, 5 LPHPD-1No.125000025000043/4" Injection QuillIN-1No.150000500005Agitator for solution tankAG-1No.150000500006Ball valve uPVC 1/2" socketBV-1 to 2No.27000200007Pressure Guage, Chemically Sealed Range, 0-7 Kg/cm2PG-1No.1100001500073/4" uPVC SCH.80Mtr.125026.1465000EXW Total:800000CST @2%16000Total Amount816000.00

&C&"Arial,Bold"&16Capital Controls India Pvt. Ltd.&12Bill Of Materials for &A&LPrepared By: Bhavesh PanchalDate: 28th April, 2011&RApproved By: Nelesh M. KochaRev. 1

Chemical Dosing SystemMAIN CONTRACTOR: SUBHASH PROJECTS & MARKETING LTDOWNER: RAJSTHAN RAJYA VIDYUT UTPADAN NIGAM LTD.PROJECT : CHEMICAL DOSING SYSTEM FOR RAMGARHSYSTEM : GAS CHLORINATION SYSTEMSSUPPLIER : CAPITAL CONTROLS INDIA PVT. LTD. MUMBAI.Sr.No.Description of Equipment / ItemTag ID.ManufacturerUnitQty.Unit PriceTotal PriceExcise @ 10.3%ACHEMICAL DOSING SYSTEM198.9% Sulphuric Acid Storage Tank, MS 15 m3 CapacityST-1Nos.1600000600000298.9% Sulphuric Acid Day Tank, MS 2.5 m3 CapacityAT-1 to 2Nos.2300000600000398.9% Sulphuric Acid Unloading Pumps, 10 m3/ hr at 15 mWC headCP-1 TO 2Nos.2150000300000498.9% Sulphuric Acid Dosing Pumps, 75 lph at 20 mlcMP-1 to 2Nos.2500001000005Scale Inhibitor Tank PP + FRP, 1m3 CapacitySIT-1Nos.11000001000006Scale Inhibitor Injection Pumps, Rating 50 LPH, 40 MLCMP-3 to 4Nos.2500001000007Corrosion Inhibitor Tank P + FRP, 1m3 CapacityCIT-1Nos.11000001000008Corrosion Inhibitor Injection Pumps, Rating 50 LPH, 40 MLCMP-5 to 6Nos.2500001000009MS Diffuser for Sulphuric Acid 98.9%DF-3Nos.1150001500010PP Diffuser for Corrosion InhibitorDF-1 to 2Nos.22000040000BPIPES & FITTINGS1165 NB MS PipeMtr.126000720001250 NB MS PipeMtr.12500060000131/2" NB MS PipeMtr.12200024000141/2" NB uPVC PipeMtr.12100012000CVALVESBall Valve1565 NB Ball Valve, CS BodyBV-1 to BV-3Hayward, NibcoNos.37000210001650 NB Ball Valve, CS BodyBV-4,5,11,12,6,7VanazNos.66000360001715 NB Ball Valve, CS BodyBV-8,9,10,13-28VanazNos.19250047500181/2" Ball Valve, PPBV-29 to BV-49Nos.21200042000Non Return ValveVanaz, Capital Controls192" Non Return Valve, CS BodyNRV-1 to 2Nos.2600012000202-1/2" Strainer, CS BodyST-1 to 2Nos.2750015000211/2" Strainer, CS Body,ST-3 to 4Nos.225005000221/2" Strainer, PVC BodyST-5 to 8Nos.4250010000DCONTROL & INSTRUMENTATION23Level SwitchLS-1 to 4Nos.44000016000024Pressure GaugePG-1 to 8Nos.860004800025Level gaugeLG-1 to 5Nos.575003750026Control PanelCAP-1Nos.1100500.0010050027pH Meter (Desk type)PH-1Nos.125000.0025000ESAFETY ITEMS28Safety Shower with Eye WashSS-1Nos.115000.001500029First Aid KitNos.12500.002500Total:2800000CST @2%56000Total Amount2856000.00

&C&"Arial,Bold"&16Capital Controls India Pvt. Ltd.&12Bill Of Materials for &A&LPrepared By: Bhavesh PanchalDate: 28th April, 2011&RApproved By: Nelesh M. KochaRev. 1

Chemical dosing sys.PROJECT TITLE:1 X 160 MW, CHLORINATION & CHEMICAL DOZING SYSTEM FOR GAS BASED CCPP, RRVUNL, RAMGARH, RAJASTHANVENDORS NAME:CAPITAL CONTROLS INDIA PVT. LTD.DOCUMENT TITLE:SIZING & CALCULATION For CHEMICAL DOSING SYSTEMVENDORS DOCUMENT NO:3059-E04-004-00VENDORS REVISION NO:0Supplier Document ReviewPermission to proceed does not constitute acceptance or approval of Design Detail, Calculations, Analysis, Test Methods or Materials developed OR selected by SUPPLIER, and does NOT relieve SUPPLIER from FULL compliance with Contractual Obligations1Work May Proceed2aRevise & Resubmit. Work may Proceed2bRevise - Work may Proceed do notsubject to incorporation of changesresubmit until final3Revise & Resubmit. Work may not Proceed4Review not required. Work may proceedBy:Date:

RW ChlorinationPROJECT TITLE:1 X 160 MW, CHLORINATION & CHEMICAL DOZING SYSTEM FOR GAS BASED CCPP, RRVUNL, RAMGARH, RAJASTHANVENDORS NAME:CAPITAL CONTROLS INDIA PVT. LTD.DOCUMENT TITLE:P & I DIAGRAM For RW CHLORINATION SYSTEMVENDORS DOCUMENT NO:3059-C04-001-01VENDORS REVISION NO:0Supplier Document ReviewPermission to proceed does not constitute acceptance or approval of Design Detail, Calculations, Analysis, Test Methods or Materials developed OR selected by SUPPLIER, and does NOT relieve SUPPLIER from FULL compliance with Contractual Obligations1Work May Proceed2aRevise & Resubmit. Work may Proceed2bRevise - Work may Proceed do notsubject to incorporation of changesresubmit until final3Revise & Resubmit. Work may not Proceed4Review not required. Work may proceedBy:Date:

CW ChlorinationPROJECT TITLE:1 X 160 MW, CHLORINATION & CHEMICAL DOZING SYSTEM FOR GAS BASED CCPP, RRVUNL, RAMGARH, RAJASTHANVENDORS NAME:CAPITAL CONTROLS INDIA PVT. LTD.DOCUMENT TITLE:P& I DIAGRAM For CW CHLORINATION SYSTEMVENDORS DOCUMENT NO:3059-C04-002-01VENDORS REVISION NO:0Supplier Document ReviewPermission to proceed does not constitute acceptance or approval of Design Detail, Calculations, Analysis, Test Methods or Materials developed OR selected by SUPPLIER, and does NOT relieve SUPPLIER from FULL compliance with Contractual Obligations1Work May Proceed2aRevise & Resubmit. Work may Proceed2bRevise - Work may Proceed do notsubject to incorporation of changesresubmit until final3Revise & Resubmit. Work may not Proceed4Review not required. Work may proceedBy:Date:

Sodium HypochloritePROJECT TITLE:1 X 160 MW, CHLORINATION & CHEMICAL DOZING SYSTEM FOR GAS BASED CCPP, RRVUNL, RAMGARH, RAJASTHANVENDORS NAME:CAPITAL CONTROLS INDIA PVT. LTD.DOCUMENT TITLE:SIZING & CALULATION For SODIUM HYPOCHLORITE DOSING SYSTEMVENDORS DOCUMENT NO:3059-E04-003-00VENDORS REVISION NO:0Supplier Document ReviewPermission to proceed does not constitute acceptance or approval of Design Detail, Calculations, Analysis, Test Methods or Materials developed OR selected by SUPPLIER, and does NOT relieve SUPPLIER from FULL compliance with Contractual Obligations1Work May Proceed2aRevise & Resubmit. Work may Proceed2bRevise - Work may Proceed do notsubject to incorporation of changesresubmit until final3Revise & Resubmit. Work may not Proceed4Review not required. Work may proceedBy:Date: