bill of material/routing - jaas...
TRANSCRIPT
Benefits: Multi-level Bill of Material/Routing presents both engineering and financial view of product structure
Efficiently plan and manage your inventories, costs, and manufacturing processes Flexible date sensitive capabilities allow for viewing past and future versions of the product Visual representation of your product and components
Bill of Material/Routing
“When Manufacturing is Your Business™”
At the core of JAMS is the Bill of Material/Routing module. This module not only creates production specifications, but is the framework for the planning functionality in other JAMS modules.
Cost summaries for the Bill of Material.
The Visual Bill of Material/Routing Maintenance screen allows for the creation and maintenance of key fields.
Identify optimal manufacturing run size.
Bill of Material/Routing Module
About JAMS JAMS is a series of manufacturing modules that directly integrates with Microsoft Dynamics® SL. Designed and built around Microsoft SQL Server, the system accommodates powerful reporting and customer inquiry capabilities. JAMS provides your company with detailed visibility into the manufacturing functions of your business. For more information about JAMS please visit www.jaas.net.
Microsoft Dynamics, Microsoft Dynamics SL, and the Microsoft Dynamics logo are either registered trademarks or trademarks of Microsoft Corporation in the United States and/or other countries. JAAS Advanced Manufacturing Software, the JAMS logo, the JAAS logo, and JAMS are the trademarks of JAAS Systems, LTD. 1999-2009 JAAS Systems, LTD. All Rights Reserved All features/functions mentioned within are subject to change. This document is for information purposes only. JAAS Systems, LTD., makes no warranties, expressed, or implied in this document.
555 Lancaster Ave. Reynoldsburg, Ohio 43068 Office: 614-759-4167 Fax: 614-866-9946 www.jaas.net
Specify various overhead allocations and costs.
Multi-Site BOM Revision Control Reference Designators Multi-Level Drill Down
Phantoms Unlimited Overheads Supports Multiple Costing Methods
Bill of Material/Routing Comparison
Unit Cost Analysis
Flexible Copy BOM Options
Engineering Change Notice (ECN) Control
Effective/Expiration Dates
Track Outside Processes
Define Variable and Fixed Overheads
Attach Images/Documents *with JAMS View Module
Establish the basis for capacity and scheduling.
Plan for scheduled machine down time.