43
2017/07/12 09:32:54 AM NE GRID VARIOUS SS YARD LIGHTING UPGRADE MIDDLEBURG CLN Item Quantity Rate Amount No BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the Works) FIXED CHARGE ITEMS 1/1/1 Contractual requirements. SUM Establishment of Facilities on the Site Facilities for Engineer 1/1/2 Name boards. (In No. 2). SUM Facilities for Contractor 1/1/3 Offices and storage sheds. SUM 1/1/4 Workshops. SUM 1/1/5 Laboratories SUM 1/1/6 Living accommodation. SUM 1/1/7 Ablution and latrine facilities. SUM 1/1/8 Tools and equipment. SUM 1/1/9 Water supplies, electric power, communications, dealing with water, and access. SUM 1/1/10 Dealing with water SUM 1/1/11 Access SUM 1/1/12 Plant SUM 1/1/13 Density Tests SUM 1/1/14 Concrete Tests SUM 1/1/15 Other fixed charge obligations. SUM Carried Forward R Section No. 1 SECTION 1: PRELIMINARIES AND GENERALS Bill No. 1 PRELIMINARIES AND GENERAL -1-

Upload: truongkhanh

Post on 31-Mar-2018

220 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 1

PRELIMINARY AND GENERAL(Applicable to the whole of the Works)

FIXED CHARGE ITEMS

1/1/1 Contractual requirements. SUM

Establishment of Facilities on the Site

Facilities for Engineer

1/1/2 Name boards. (In No. 2). SUM

Facilities for Contractor

1/1/3 Offices and storage sheds. SUM

1/1/4 Workshops. SUM

1/1/5 Laboratories SUM

1/1/6 Living accommodation. SUM

1/1/7 Ablution and latrine facilities. SUM

1/1/8 Tools and equipment. SUM

1/1/9 Water supplies, electric power, communications, dealing withwater, and access. SUM

1/1/10 Dealing with water SUM

1/1/11 Access SUM

1/1/12 Plant SUM

1/1/13 Density Tests SUM

1/1/14 Concrete Tests SUM

1/1/15 Other fixed charge obligations. SUM

Carried Forward R Section No. 1SECTION 1: PRELIMINARIES AND GENERALSBill No. 1PRELIMINARIES AND GENERAL

- 1 -

Page 2: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Brought Forward R

1/1/16 Complying with Health and Safety Specifications SUM

1/1/17 Complying with Environmental Management Programme Actand all other statutory environmental requirements SUM

1/1/18 Security for the works for duration of the contract SUM

1/1/19 Removal of site establishment. SUM

TIME RELATED ITEMS

1/1/20 Contractual requirements. SUM

Operation and Maintenance of Facilities on Site, for Duration ofConstruction, (unless otherwise stated)

Facilities for Engineer

1/1/21 Nameboards. (In No. 2). SUM

Facilities for Contractor

1/1/22 Offices and storage sheds. SUM

1/1/23 Workshops. SUM

1/1/24 LaboratoriesSUM

1/1/25 Living accommodation. SUM

1/1/26 Ablution and latrine facilities. SUM

1/1/27 Tools and equipment. SUM

1/1/28 Water supplies, electric power, communications, dealing withwater, and access. SUM

1/1/29 Dealing with water SUM

1/1/30 Access SUM

Carried Forward R Section No. 1SECTION 1: PRELIMINARIES AND GENERALSBill No. 1PRELIMINARIES AND GENERAL

- 2 -

Page 3: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Brought Forward R

1/1/31 Plant SUM

1/1/32 Density Tests SUM

1/1/33 Concrete Tests SUM

1/1/34 Supervision for duration of construction. SUM

1/1/35 Complying with Health and Safety Specifications SUM

1/1/36 Company and head office overhead costs for duration ofconstruction. SUM

1/1/37 Other time related obligations. SUM

1/1/38 Complying with Environmental Management Programme Actand all other statutory environmental requirements

SUM

1/1/39 Security for the works for the duration of the contract. SUM

DAYWORK

Existing services.

1/1/40 Supply or hire of specialist equipment for the detection of aparticular service. SUM

1/1/41 The use of equipment referred to in (a) above. SUM

1/1/42 Excavation by hand in soft material to expose Unknownservices m3

1/1/43 Temporary protection, as required in terms of the projectspecification and as directed by the Engineer

SUM

Carried to Final Summary R Section No. 1SECTION 1: PRELIMINARIES AND GENERALSBill No. 1PRELIMINARIES AND GENERAL

- 3 -

Page 4: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 1

YARDSTONE

NOTE: Removing and replacing of yard stone is measured1m beyond outside border of new structures and will bepaid accordingly

2/1/1 Take up yardstone layer 100mm thick and stockpile for reuse. m2 800

2/1/2 Take from stockpile and re-place yardstone layer 100mm thickupon completion of the works, lightly compacted to set levels m2 800

Pitching of Surfaces (Provisional)

2/1/3 New yard stones to terrace. m2 240

Rubble disposal. (Provisional)

2/1/4 Transport all rubble from demolitions and the works to a nearbyRegistered Dump Site. Item

BARRICADE FENCING

Barricade fencing to be re-sed to cover the rest of thescope (Provisional)

2/1/5 Make provision for supply and install barricading fence 1.8mhigh around the working area, compliant to Eskom Safetyrequirements. m 100

2/1/6 Make provision for the necessary barricade fencing (shark net)to fence off the approved working area and hand over toSub-station EA after finalising of contract. m 100

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 2 : ARNOT SSBill No. 1SITE CLEARANCE

- 4 -

Page 5: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 2

EARTHWORKS (PROVISIONAL)

Excavation

2/2/1 Excavate in all materials and use for backfill or dispose off asordered. m3 158

Extra over for:

2/2/2 Intermediate excavation m3 19

2/2/3 Hard rock. m3 9

Importation of Materials from Commercial Sources.(Provisional)

2/2/4 G5 Material from commercial sources in accordance with SABS1200 DM compacted to 95% Mod AASHTO density to beapproved by the Engineer. m3 80

Soil Poisoning

2/2/5 Approved weedkiller applied in strict accordance to themanufacturer's instructions. m2 84

Pitching of Surfaces (Provisional)

2/2/6 New yard stones to terrace. m3 84

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 2 : ARNOT SSBill No. 2EARTHWORKS

- 5 -

Page 6: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 3

CONCRETE (SMALL WORKS)

FORMWORK

Smooth

2/3/1 To sides of bases and stub columns m2 27

Boxing in special formwork to form

2/3/2 Form 20 x 20mm chamfer along top edge of exposed stubcolumn or base. m 18

REINFORCEMENT

Steel Bars

Mild steel reinforcement bars

2/3/3 8mm t 0.05

2/3/4 12mmt 1.76

2/3/5 25mm t 0.48

CONCRETE

Blinding layer in 15MPa/19mm concrete

2/3/6 Blinding layer 50mm minimum thickness. m2 84

Strength concrete, 25MPa/19mm

2/3/7 Bases and Stub Columns m3 66

Unformed Surface Finishes

2/3/8 Wood floated finish. m2 4

HOLDING DOWN BOLTS

Carried Forward R Section No. 2SECTION 2 : ARNOT SSBill No. 3CONCRETE,FORMWORK AND REINFORCEMENT

- 6 -

Page 7: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Brought Forward R

All HD bolts to be hot dipped galvanised bolts

Holding down bolts and miscellaneous metalwork (supplied andfixed by the Contractor)

2/3/9 HD bolts including nut and washer cast in position in concrete. kg 54.0

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 2 : ARNOT SSBill No. 3CONCRETE,FORMWORK AND REINFORCEMENT

- 7 -

Page 8: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 4

EARTHMAT (PROVISIONAL)

Earthing

Supply, deliver and lay copper earthmat equipmentearthing, earth straps, including excavation complete withrisks of collapse, bedding, backfill, compaction and testingat depth up to (See earthmat specification). All flat copperto be 50 x 3mm in accordance with BS 1432, picled andannealed black copper ().701 kg/m:

ELECTRICAL ( Provisional)

2/4/1 Clamp connection 50 x 3mm flat to 2 no. x 10mm diameterrods No 100

2/4/2 Crimp joints 10mm round to round (Refer sheets C5 to C8) No 99

2/4/3 1 x 10mm Diameter copper at 1,0m deep. m 99

ELECTRICAL

2/4/4 Excavate, search for and locate existing earthmat, includingexcavations complete with risk of collapse, backfill andcompaction Item

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 2 : ARNOT SSBill No. 4EARTHING

- 8 -

Page 9: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 5

HIGHMAST LIGHTING

Contractor to supply Certificate of Compliance for all electricalwork performed.

Concrete and structural steel measured under relevantsections.

Refer to drawing 0.54/4658 sheet 1-3 rev 0.

ELECTRICAL INSTALLATION (24M) LIGHT MAST

Contractor to supply and hot dipped galvanised 24m lightmast.

2/5/1 Complete electrical installation as per drawing No's26.41/40035 sheets 1 to 3 inclusive of all cabling, circuitbreakers, switches, connections equipment, cables and lightfittings complete to one no 24m flood light mast. No 5

LUMINAIRES AND LAMPS

Contractor to supply and install luminair and lamps fromGenlux Lighting.

2/5/2 400W Clear tubular high pressure Sodium luminaire. No 60

2/5/3 600W Clear tubular high pressure Sodium luminaire. No 60

CABLES

DIisconnecting,removal, Installation & Teminations for allcables required for floodmast .The rate price forterminating must include for all activities and items asspecified in cabling and earthing specification (i.e. earthingof spare cores).

2/5/4 BVX 4 KCV m 2 400

REFURBISH EXISTING YARD LIGHT MAST

Carried Forward R Section No. 2SECTION 2 : ARNOT SSBill No. 5ELECTRICAL WORK

- 9 -

Page 10: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Brought Forward R

This consist of the Mast distribution board, top of the mastjunction box and all cables.Clean, treat and paint wherenecessary.(Refer to drawing no 0.54/4658 note 4).

2/5/5 18 meter mastNo 5

2/5/6 24 meter mast No 8

Removal

2/5/7 18 meter mast No 1

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 2 : ARNOT SSBill No. 5ELECTRICAL WORK

- 1 0 -

Page 11: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

ItemSABS Unit Quantity Rate AmountNoPay Ref

BILL No. 6

SANS 1200LC CABLE DUCTS

8.2.5 Sundries

2/6/18.2.5 Junction Boxes. All details to be as for thejunction box detail on Drawing 0.54/4713Sheet 1 revision 5,Sheet revision 2, 3 of 3revision 1 and 4 of 4 revision 1.(Provisional) No 1

2/6/28.2.5 New equipped distribution board as detailedin engineering specification 240-63471535. No 1

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 2 : ARNOT SSBill No. 6CABLE DUCTS

- 1 1 -

Page 12: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 7

STRUCTURAL STEELWORK (SMALL WORKS)

Notes to Tenderers:

The tenderer is to allow in the pricing of structuralsteelwork for all steelwork to be erected plumb and toinclude for all necessary steel packing pieces to achievesame.

Preparation of acceptable shop detail drawings:(Refer todrawing no 054/4658)

2/7/1 Prepare and submit to the Engineer acceptable shop detaildrawings and supporting calculations in terms of the projectspecifications.

SUM

Supply and Fabrication of steelwork:

Steelwork to be Hot Dipped Galvanised Grade 300W as perthe standard specifications, complete with all necessarycleats, brackets, gussets, packs, shop fasteners,baseplates and the like, including cleaning of steelwork,shop primming and loading ready for dispatch to site.

2/7/2 Tubular Structural Steelwork for Lightmast t 8.910

Delivery:

2/7/3 Delivery of normal loads of steelwork to site. t 8.910

Offloading and erection of steel on site.

2/7/4 Structural Steelwork. t 8.910

H.D. BOLTS AND MISCELLANEOUS METALWORK.

2/7/5 Grade 4.8 No 470

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 2 : ARNOT SSBill No. 7STRUCTURAL STEELWORK

- 1 2 -

Page 13: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Section No. 2

SECTION 2 : ARNOT SS

SECTION SUMMARY - SECTION 2 : ARNOT SS

Bill Page AmountNo No

1 -4-SITE CLEARANCE

2 -5-EARTHWORKS

3 -7-CONCRETE,FORMWORK AND REINFORCEMENT

4 -8-EARTHING

5 -10-ELECTRICAL WORK

6 -11-CABLE DUCTS

7 -12-STRUCTURAL STEELWORK

Carried to Final Summary R Section No. 2SECTION 2 : ARNOT SS

- 1 3 -

Page 14: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 1

YARDSTONE

NOTE: Removing and replacing of yard stone is measured1m beyond outside border of new structures and will bepaid accordingly

3/1/1 Take up yardstone layer 100mm thick and stockpile for reuse. m2 1 500

3/1/2 Take from stockpile and re-place yardstone layer 100mm thickupon completion of the works, lightly compacted to set levels m2 1 500

Pitching of Surfaces (Provisional)

3/1/3 New yard stones to terrace. m2 1 500

Rubble disposal. (Provisional)

3/1/4 Transport all rubble from demolitions and the works to a nearbyRegistered Dump Site. Item

BARRICADE FENCING

Barricade fencing to be re-sed to cover the rest of thescope (Provisional)

3/1/5 Make provision for supply and install barricading fence 1.8mhigh around the working area, compliant to Eskom Safetyrequirements. m 200

3/1/6 Make provision for the necessary barricade fencing (shark net)to fence off the approved working area and hand over toSub-station EA after finalising of contract. m 200

Carried Forward to Summary of Section No. 3 R Section No. 3SECTION 3: DUVHA SSBill No. 1SITE CLEARANCE

- 1 4 -

Page 15: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 2

EARTHWORKS (PROVISIONAL)

Excavation

3/2/1 Excavate in all materials and use for backfill or dispose off asordered. m3 284

Extra over for:

3/2/2 Intermediate excavation m3 28

3/2/3 Hard rock. m3 14

Importation of Materials from Commercial Sources.(Provisional)

3/2/4 G5 Material from commercial sources in accordance with SABS1200 DM compacted to 95% Mod AASHTO density to beapproved by the Engineer. m3 105

Soil Poisoning

3/2/5 Approved weedkiller applied in strict accordance to themanufacturer's instructions. m2 151

Pitching of Surfaces (Provisional)

3/2/6 New yard stones to terrace. m3 200

Carried Forward to Summary of Section No. 3 R Section No. 3SECTION 3: DUVHA SSBill No. 2EARTHWORKS

- 1 5 -

Page 16: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 3

CONCRETE (SMALL WORKS)

FORMWORK

Smooth

3/3/1 To sides of bases and stub columns m2 48

Boxing in special formwork to form

3/3/2 Form 20 x 20mm chamfer along top edge of exposed stubcolumn or base. m 32

REINFORCEMENT

Steel Bars

Mild steel reinforcement bars

3/3/3 8mm t 0.10

3/3/4 12mmt 3.16

3/3/5 25mm t 0.86

CONCRETE

Blinding layer in 15MPa/19mm concrete

3/3/6 Blinding layer 50mm minimum thickness. m2 151

Strength concrete, 25MPa/19mm

3/3/7 Bases and Stub Columns m3 120

Unformed Surface Finishes

3/3/8 Wood floated finish. m2 7

HOLDING DOWN BOLTS

Carried Forward R Section No. 3SECTION 3: DUVHA SSBill No. 3CONCRETE,FORMWORK AND REINFORCEMENT

- 1 6 -

Page 17: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Brought Forward R

All HD bolts to be hot dipped galvanised bolts

Holding down bolts and miscellaneous metalwork (supplied andfixed by the Contractor)

3/3/9 HD bolts including nut and washer cast in position in concrete. kg 97.2

Carried Forward to Summary of Section No. 3 R Section No. 3SECTION 3: DUVHA SSBill No. 3CONCRETE,FORMWORK AND REINFORCEMENT

- 1 7 -

Page 18: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 4

EARTHMAT (PROVISIONAL)

Earthing

Supply, deliver and lay copper earthmat equipmentearthing, earth straps, including excavation complete withrisks of collapse, bedding, backfill, compaction and testingat depth up to (See earthmat specification). All flat copperto be 50 x 3mm in accordance with BS 1432, picled andannealed black copper ().701 kg/m:

ELECTRICAL ( Provisional)

3/4/1 Clamp connection 50 x 3mm flat to 2 no. x 10mm diameterrods No 100

3/4/2 Crimp joints 10mm round to round (Refer sheets C5 to C8) No 99

3/4/3 1 x 10mm Diameter copper at 1,0m deep. m 99

ELECTRICAL

3/4/4 Excavate, search for and locate existing earthmat, includingexcavations complete with risk of collapse, backfill andcompaction Item

Carried Forward to Summary of Section No. 3 R Section No. 3SECTION 3: DUVHA SSBill No. 4EARTHING

- 1 8 -

Page 19: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 5

HIGHMAST LIGHTING

Contractor to supply Certificate of Compliance for all electricalwork performed.

Concrete and structural steel measured under relevantsections.

Refer to drawing 0.54/4658 sheet 1-3 rev 0.

ELECTRICAL INSTALLATION (24M) LIGHT MAST

Contractor to supply and hot dipped galvanised 24m lightmast.

3/5/1 Complete electrical installation as per drawing No's 0.08/18596sheets 1 to 3 inclusive of all cabling, circuit breakers, switches,connections equipment, cables and light fittings complete toone no 24m flood light mast. No 9

LUMINAIRES AND LAMPS

Contractor to supply and install luminair and lamps fromGenlux Lighting.

3/5/2 400W Clear tubular high pressure Sodium luminaire. No 78

CABLES

DIisconnecting,removal, Installation & Teminations for allcables required for floodmast.The rate price forterminating must include for all activities and items asspecified in cabling and earthing specification (i.e. earthingof spare cores).

3/5/3 BVX 4 HCV m 1 700

REFURBISH EXISTING YARD LIGHT MAST

Carried Forward R Section No. 3SECTION 3: DUVHA SSBill No. 5ELECTRICAL WORK

- 1 9 -

Page 20: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Brought Forward R

This consist of the Mast distribution board, top of the mastjunction box and all cables.Clean, treat and paint wherenecessary.(Refer to drawing no 0.54/4658 note 4).

3/5/4 24 meter mast No 5

Removal

3/5/5 14 meter mast No 1

Carried Forward to Summary of Section No. 3 R Section No. 3SECTION 3: DUVHA SSBill No. 5ELECTRICAL WORK

- 2 0 -

Page 21: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

ItemSABS Unit Quantity Rate AmountNoPay Ref

BILL No. 6

SANS 1200LC CABLE DUCTS

8.2.5 Sundries

3/6/18.2.5 Junction Boxes. All details to be as for thejunction box detail on Drawing 0.54/4713Sheet 1 revision 5,Sheet revision 2, 3 of 3revision 1 and 4 of 4 revision 1. No 1

3/6/28.2.5 New equipped distribution board. No 1

Carried Forward to Summary of Section No. 3 R Section No. 3SECTION 3: DUVHA SSBill No. 6CABLE DUCTS

- 2 1 -

Page 22: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 7

STRUCTURAL STEELWORK (SMALL WORKS)

Notes to Tenderers:

The tenderer is to allow in the pricing of structuralsteelwork for all steelwork to be erected plumb and toinclude for all necessary steel packing pieces to achievesame.

Preparation of acceptable shop detail drawings:(Refer todrawing no 054/4658)

3/7/1 Prepare and submit to the Engineer acceptable shop detaildrawings and supporting calculations in terms of the projectspecifications.

SUM

Supply and Fabrication of steelwork:

Steelwork to be Hot Dipped Galvanised Grade 300W as perthe standard specifications, complete with all necessarycleats, brackets, gussets, packs, shop fasteners,baseplates and the like, including cleaning of steelwork,shop primming and loading ready for dispatch to site.

3/7/2 Tubular Structural Steelwork for Lightmast t 16.038

Delivery:

3/7/3 Delivery of normal loads of steelwork to site. t 16.038

Offloading and erection of steel on site.

3/7/4 Structural Steelwork. t 16.038

H.D. BOLTS AND MISCELLANEOUSMETALWORK(provisional)

3/7/5 Grade 4.8 No 846

Carried Forward to Summary of Section No. 3 R Section No. 3SECTION 3: DUVHA SSBill No. 7STRUCTURAL STEELWORK

- 2 2 -

Page 23: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Section No. 3

SECTION 3: DUVHA SS

SECTION SUMMARY - SECTION 3: DUVHA SS

Bill Page AmountNo No

1 -14-SITE CLEARANCE

2 -15-EARTHWORKS

3 -17-CONCRETE,FORMWORK AND REINFORCEMENT

4 -18-EARTHING

5 -20-ELECTRICAL WORK

6 -21-CABLE DUCTS

7 -22-STRUCTURAL STEELWORK

Carried to Final Summary R Section No. 3SECTION 3: DUVHA SS

- 2 3 -

Page 24: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 1

YARDSTONE

NOTE: Removing and replacing of yard stone is measured1m beyond outside border of new structures and will bepaid accordingly

4/1/1 Take up yardstone layer 100mm thick and stockpile for reuse. m2 100

4/1/2 Take from stockpile and re-place yardstone layer 100mm thickupon completion of the works, lightly compacted to set levels m2 100

Pitching of Surfaces (Provisional)

4/1/3 New yard stones to terrace. m2 100

Rubble disposal. (Provisional)

4/1/4 Transport all rubble from demolitions and the works to a nearbyRegistered Dump Site. Item

BARRICADE FENCING

Barricade fencing to be re-sed to cover the rest of thescope (Provisional)

4/1/5 Make provision for supply and install barricading fence 1.8mhigh around the working area, compliant to Eskom Safetyrequirements. m 150

4/1/6 Make provision for the necessary barricade fencing (shark net)to fence off the approved working area and hand over toSub-station EA after finalising of contract. m 150

Carried Forward to Summary of Section No. 4 R Section No. 4SECTION 4: HENDRINA SSBill No. 1SITE CLEARANCE

- 2 4 -

Page 25: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 2

EARTHWORKS (PROVISIONAL)

Excavation

4/2/1 Excavate in all materials and use for backfill or dispose off asordered. m3 41

Extra over for:

4/2/2 Intermediate excavation m3 3

4/2/3 Hard rock. m3 3

Importation of Materials from Commercial Sources.(Provisional)

4/2/4 G5 Material from commercial sources in accordance with SABS1200 DM compacted to 95% Mod AASHTO density to beapproved by the Engineer. m3 20

Soil Poisoning

4/2/5 Approved weedkiller applied in strict accordance to themanufacturer's instructions. m2 35

Pitching of Surfaces (Provisional)

4/2/6 New yard stones to terrace. m3 100

Carried Forward to Summary of Section No. 4 R Section No. 4SECTION 4: HENDRINA SSBill No. 2EARTHWORKS

- 2 5 -

Page 26: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 3

CONCRETE (SMALL WORKS)

FORMWORK

Smooth

4/3/1 To sides of bases and stub columns m2 5

Boxing in special formwork to form

4/3/2 Form 20 x 20mm chamfer along top edge of exposed stubcolumn or base. m 2

REINFORCEMENT

Steel Bars

Mild steel reinforcement bars

4/3/3 8mm t 0.01

4/3/4 12mmt 0.35

4/3/5 25mm t 0.10

CONCRETE

Blinding layer in 15MPa/19mm concrete

4/3/6 Blinding layer 50mm minimum thickness. m2 17

Strength concrete, 25MPa/19mm

4/3/7 Bases and Stub Columns m3 9

Unformed Surface Finishes

4/3/8 Wood floated finish. m2 2

HOLDING DOWN BOLTS

Carried Forward R Section No. 4SECTION 4: HENDRINA SSBill No. 3CONCRETE,FORMWORK AND REINFORCEMENT

- 2 6 -

Page 27: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Brought Forward R

All HD bolts to be hot dipped galvanised bolts

Holding down bolts and miscellaneous metalwork (supplied andfixed by the Contractor)

4/3/9 HD bolts including nut and washer cast in position in concrete. kg 10.2

Carried Forward to Summary of Section No. 4 R Section No. 4SECTION 4: HENDRINA SSBill No. 3CONCRETE,FORMWORK AND REINFORCEMENT

- 2 7 -

Page 28: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 4

EARTHMAT (PROVISIONAL)

Earthing

Supply, deliver and lay copper earthmat equipmentearthing, earth straps, including excavation complete withrisks of collapse, bedding, backfill, compaction and testingat depth up to (See earthmat specification). All flat copperto be 50 x 3mm in accordance with BS 1432, picled andannealed black copper ().701 kg/m:

ELECTRICAL ( Provisional)

4/4/1 Clamp connection 50 x 3mm flat to 2 no. x 10mm diameterrods No 100

4/4/2 Crimp joints 10mm round to round (Refer sheets C5 to C8) No 99

4/4/3 1 x 10mm Diameter copper at 1,0m deep. m 99

ELECTRICAL

4/4/4 Excavate, search for and locate existing earthmat, includingexcavations complete with risk of collapse, backfill andcompaction Item

Carried Forward to Summary of Section No. 4 R Section No. 4SECTION 4: HENDRINA SSBill No. 4EARTHING

- 2 8 -

Page 29: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 5

HIGHMAST LIGHTING

Contractor to supply Certificate of Compliance for all electricalwork performed.

Concrete and structural steel measured under relevantsections.

Refer to drawing 0.54/4658 sheet 1-3 rev 0.

ELECTRICAL INSTALLATION (24M) LIGHT MAST

Contractor to supply and hot dipped galvanised 24m lightmast.

4/5/1 Complete electrical installation as per drawing No's 0.15/8318sheets 1 to 3 inclusive of all cabling, circuit breakers, switches,connections equipment, cables and light fittings complete toone no 24m flood light mast. No 1

LUMINAIRES AND LAMPS

Contractor to supply and install luminair and lamps fromGenlux Lighting.

4/5/2 600W Clear tubular high pressure Sodium luminaire. No 82

CABLES

DIisconnecting,removal, Installation & Teminations for allcables required for floodmast.The rate price forterminating must include for all activities and items asspecified in cabling and earthing specification (i.e. earthingof spare cores).(Provisional)

4/5/3 BVX 4 HCV m 60

4/5/4 BVX 4 LCV m 1 300

REFURBISH EXISTING YARD LIGHT MAST

Carried Forward R Section No. 4SECTION 4: HENDRINA SSBill No. 5ELECTRICAL WORK

- 2 9 -

Page 30: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Brought Forward R

This consist of the Mast distribution board, top of the mastjunction box and all cables.Clean, treat and paint wherenecessary.(Refer to drawing no 0.54/4658 note 4).

4/5/5 14 meter mast No 2

4/5/6 24 meter mast No 12

Carried Forward to Summary of Section No. 4 R Section No. 4SECTION 4: HENDRINA SSBill No. 5ELECTRICAL WORK

- 3 0 -

Page 31: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

ItemSABS Unit Quantity Rate AmountNoPay Ref

BILL No. 6

SANS 1200LC CABLE DUCTS

8.2.5 Sundries

4/6/18.2.5 Junction Boxes. All details to be as for thejunction box detail on Drawing 0.54/4713Sheet 1 revision 5,Sheet revision 2, 3 of 3revision 1 and 4 of 4 revision 1. No 1

4/6/28.2.5 New equipped distribution board. No 1

Carried Forward to Summary of Section No. 4 R Section No. 4SECTION 4: HENDRINA SSBill No. 6CABLE DUCTS

- 3 1 -

Page 32: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 7

STRUCTURAL STEELWORK (SMALL WORKS)

Notes to Tenderers:

The tenderer is to allow in the pricing of structuralsteelwork for all steelwork to be erected plumb and toinclude for all necessary steel packing pieces to achievesame.

Preparation of acceptable shop detail drawings:(Refer todrawing no 054/4658)

4/7/1 Prepare and submit to the Engineer acceptable shop detaildrawings and supporting calculations in terms of the projectspecifications.

SUM

Supply and Fabrication of steelwork:

Steelwork to be Hot Dipped Galvanised Grade 300W as perthe standard specifications, complete with all necessarycleats, brackets, gussets, packs, shop fasteners,baseplates and the like, including cleaning of steelwork,shop primming and loading ready for dispatch to site.

4/7/2 Tubular Structural Steelwork for Lightmast t 1.782

Delivery:

4/7/3 Delivery of normal loads of steelwork to site. t 1.782

Offloading and erection of steel on site.

4/7/4 Structural Steelwork. t 1.782

H.D. BOLTS AND MISCELLANEOUS METALWORK.

4/7/5 Grade 4.8 No 94

Carried Forward to Summary of Section No. 4 R Section No. 4SECTION 4: HENDRINA SSBill No. 7STRUCTURAL STEELWORK

- 3 2 -

Page 33: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Section No. 4

SECTION 4: HENDRINA SS

SECTION SUMMARY - SECTION 4: HENDRINA SS

Bill Page AmountNo No

1 -24-SITE CLEARANCE

2 -25-EARTHWORKS

3 -27-CONCRETE,FORMWORK AND REINFORCEMENT

4 -28-EARTHING

5 -30-ELECTRICAL WORK

6 -31-CABLE DUCTS

7 -32-STRUCTURAL STEELWORK

Carried to Final Summary R Section No. 4SECTION 4: HENDRINA SS

- 3 3 -

Page 34: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 1

YARDSTONE

NOTE: Removing and replacing of yard stone is measured1m beyond outside border of new structures and will bepaid accordingly

5/1/1 Take up yardstone layer 100mm thick and stockpile for reuse. m2 900

5/1/2 Take from stockpile and re-place yardstone layer 100mm thickupon completion of the works, lightly compacted to set levels m2 900

Pitching of Surfaces (Provisional)

5/1/3 New yard stones to terrace. m2 900

Rubble disposal. (Provisional)

5/1/4 Transport all rubble from demolitions and the works to a nearbyRegistered Dump Site. Item

BARRICADE FENCING

Barricade fencing to be re-sed to cover the rest of thescope (Provisional)

5/1/5 Make provision for supply and install barricading fence 1.8mhigh around the working area, compliant to Eskom Safetyrequirements. m 100

5/1/6 Make provision for the necessary barricade fencing (shark net)to fence off the approved working area and hand over toSub-station EA after finalising of contract. m 95

Carried Forward to Summary of Section No. 5 R Section No. 5SECTION 5: ROCKDALE SSBill No. 1SITE CLEARANCE

- 3 4 -

Page 35: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 2

EARTHWORKS (PROVISIONAL)

Excavation

5/2/1 Excavate in all materials and use for backfill or dispose off asordered. m3 284

Extra over for:

5/2/2 Intermediate excavation m3 28

5/2/3 Hard rock. m3 14

Importation of Materials from Commercial Sources.(Provisional)

5/2/4 G5 Material from commercial sources in accordance with SABS1200 DM compacted to 95% Mod AASHTO density to beapproved by the Engineer. m3 105

Soil Poisoning

5/2/5 Approved weedkiller applied in strict accordance to themanufacturer's instructions. m2 151

Pitching of Surfaces (Provisional)

5/2/6 New yard stones to terrace. m3 100

Carried Forward to Summary of Section No. 5 R Section No. 5SECTION 5: ROCKDALE SSBill No. 2EARTHWORKS

- 3 5 -

Page 36: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 3

CONCRETE (SMALL WORKS)

FORMWORK

Smooth

5/3/1 To sides of bases and stub columns m2 48

Boxing in special formwork to form

5/3/2 Form 20 x 20mm chamfer along top edge of exposed stubcolumn or base. m 324

REINFORCEMENT

Steel Bars

Mild steel reinforcement bars

5/3/3 8mm t 0.10

5/3/4 12mmt 3.16

5/3/5 25mm t 0.86

CONCRETE

Blinding layer in 15MPa/19mm concrete

5/3/6 Blinding layer 50mm minimum thickness. m2 151

Strength concrete, 25MPa/19mm

5/3/7 Bases and Stub Columns m3 120

Unformed Surface Finishes

5/3/8 Wood floated finish. m2 7

HOLDING DOWN BOLTS

Carried Forward R Section No. 5SECTION 5: ROCKDALE SSBill No. 3CONCRETE,FORMWORK AND REINFORCEMENT

- 3 6 -

Page 37: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Brought Forward R

All HD bolts to be hot dipped galvanised bolts

Holding down bolts and miscellaneous metalwork (supplied andfixed by the Contractor)

5/3/9 HD bolts including nut and washer cast in position in concrete. kg 91.8

Carried Forward to Summary of Section No. 5 R Section No. 5SECTION 5: ROCKDALE SSBill No. 3CONCRETE,FORMWORK AND REINFORCEMENT

- 3 7 -

Page 38: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 4

EARTHMAT (PROVISIONAL)

Earthing

Supply, deliver and lay copper earthmat equipmentearthing, earth straps, including excavation complete withrisks of collapse, bedding, backfill, compaction and testingat depth up to (See earthmat specification). All flat copperto be 50 x 3mm in accordance with BS 1432, picled andannealed black copper ().701 kg/m:

ELECTRICAL ( Provisional)

5/4/1 Clamp connection 50 x 3mm flat to 2 no. x 10mm diameterrods No 100

5/4/2 Crimp joints 10mm round to round (Refer sheets C5 to C8) No 99

5/4/3 1 x 10mm Diameter copper at 1,0m deep. m 99

ELECTRICAL

5/4/4 Excavate, search for and locate existing earthmat, includingexcavations complete with risk of collapse, backfill andcompaction Item

Carried Forward to Summary of Section No. 5 R Section No. 5SECTION 5: ROCKDALE SSBill No. 4EARTHING

- 3 8 -

Page 39: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 5

HIGHMAST LIGHTING

Contractor to supply Certificate of Compliance for all electricalwork performed.

Concrete and structural steel measured under relevantsections.

Refer to drawing 0.54/4658 sheet 1-3 rev 0.

ELECTRICAL INSTALLATION (24M) LIGHT MAST

Contractor to supply and hot dipped galvanised 24m lightmast.

5/5/1 Complete electrical installation as per drawing No's 0.08/20503sheets 1 to 3 inclusive of all cabling, circuit breakers, switches,connections equipment, cables and light fittings complete toone no 24m flood light mast. No 9

LUMINAIRES AND LAMPS

Contractor to supply and install luminair and lamps fromGenlux Lighting.

5/5/2 400W Clear tubular high pressure Sodium luminaire. No 63

CABLES

DIisconnecting,removal, Installation & Teminations for allcables required for floodmast.The rate price forterminating must include for all activities and items asspecified in cabling and earthing specification (i.e. earthingof spare cores).

5/5/3 BVX 4 HCV m 20

5/5/4 BVX 4 LCV m 1 000

Carried Forward to Summary of Section No. 5 R Section No. 5SECTION 5: ROCKDALE SSBill No. 5ELECTRICAL WORK

- 3 9 -

Page 40: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

ItemSABS Unit Quantity Rate AmountNoPay Ref

BILL No. 6

SANS 1200LC CABLE DUCTS

8.2.5 Sundries

5/6/18.2.5 Junction Boxes. All details to be as for thejunction box detail on Drawing 0.54/4713Sheet 1 revision 5,Sheet revision 2, 3 of 3revision 1 and 4 of 4 revision 1. No 1

5/6/28.2.5 New equipped distribution board. No 1

Carried Forward to Summary of Section No. 5 R Section No. 5SECTION 5: ROCKDALE SSBill No. 6CABLE DUCTS

- 4 0 -

Page 41: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Item Quantity Rate AmountNo

BILL No. 7

STRUCTURAL STEELWORK (SMALL WORKS)

Notes to Tenderers:

The tenderer is to allow in the pricing of structuralsteelwork for all steelwork to be erected plumb and toinclude for all necessary steel packing pieces to achievesame.

Preparation of acceptable shop detail drawings:(Refer todrawing no 054/4658)

5/7/1 Prepare and submit to the Engineer acceptable shop detaildrawings and supporting calculations in terms of the projectspecifications.

SUM

Supply and Fabrication of steelwork:

Steelwork to be Hot Dipped Galvanised Grade 300W as perthe standard specifications, complete with all necessarycleats, brackets, gussets, packs, shop fasteners,baseplates and the like, including cleaning of steelwork,shop primming and loading ready for dispatch to site.

5/7/2 Tubular Structural Steelwork for Lightmast t 16.038

Delivery:

5/7/3 Delivery of normal loads of steelwork to site. t 16.038

Offloading and erection of steel on site.

5/7/4 Structural Steelwork. t 16.038

H.D. BOLTS AND MISCELLANEOUS METALWORK.

5/7/5 Grade 4.8 No 846

Carried Forward to Summary of Section No. 5 R Section No. 5SECTION 5: ROCKDALE SSBill No. 7STRUCTURAL STEELWORK

- 4 1 -

Page 42: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

Section No. 5

SECTION 5: ROCKDALE SS

SECTION SUMMARY - SECTION 5: ROCKDALE SS

Bill Page AmountNo No

1 -34-SITE CLEARANCE

2 -35-EARTHWORKS

3 -37-CONCRETE,FORMWORK AND REINFORCEMENT

4 -38-EARTHING

5 -39-ELECTRICAL WORK

6 -40-CABLE DUCTS

7 -41-STRUCTURAL STEELWORK

Carried to Final Summary R Section No. 5SECTION 5: ROCKDALE SS

- 4 2 -

Page 43: BILL No. 1 PRELIMINARY AND GENERAL (Applicable to … · BILL No. 1 PRELIMINARY AND GENERAL (Applicable to the whole of the ... EARTHWORKS - 5 - ... Preparation of acceptable shop

2017/07/12 09:32:54 AM

NE GRID VARIOUS SS YARD LIGHTING UPGRADEMIDDLEBURG CLN

FINAL SUMMARY

Section Page AmountNo No

1 -3-SECTION 1: PRELIMINARIES AND GENERALS

2 -13-SECTION 2 : ARNOT SS

3 -23-SECTION 3: DUVHA SS

4 -33-SECTION 4: HENDRINA SS

5 -42-SECTION 5: ROCKDALE SS

Carried to Form of Tender R

- 4 3 -