bill fournier nov 2014 systems engineer for non se bill fournier [email protected] 202 255...

18
Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier [email protected] 202 255 0760

Upload: barrie-boone

Post on 05-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Bill FournierNov 2014

Systems Engineer for Non SE Bill Fournier [email protected]

202 255 0760

Page 2: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Agenda•  History/Value/Application

• Definitions

• Whom

• How-–Technical,(user) project (PM & PC) and Agreement(Contracts ), Tailoring, SpE

• CASE

• Job advertisement for SEs

• Recruiters

• Future

• References

Page 3: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

History/Value/Application

• History- SE- Products, Processes, People- use, fix– Pyramids/Greek/Romans/Ren/ British Train/ Model T/ WW I

tank– WW II- too much one person to detail design

• Value - % SE 10-15 knee of curve for cost and schedule control

• Applicable – Government- user need document – Commercial- Marketing / focus groups– International– Services

Bill Fournier

Page 4: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Definitions I• Systems- Products, Processes and People & boundaries, Purpose • 3 SE POVs – interdisciplinary, iterative, and recursive, way of thinking, feedback

loops, top down and bottom up • Requirements- Needs & technical requirements • CONOPS- plans how use system• Functions- verbs things systems must do to do mission• Physical Architecture/Design- nouns products decomposed which expected to meet

requirements and their interrelationships• Implementation- Build & Code development system• Integration- put subsystems and lower together• Verification- Prove by Objective Evidence that the requirement has been met with the

final configuration. TADI• Validation- Assess we meet what user needed• Test- method of assessing progress towards showing system works• Production- Make final hardware built and coded in quantity• Operation and Maintenance- use, maintain • Disposal- retire/recycle

Bill Fournier

Page 5: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Definitions II

• PM- Program/Project/Product Manager• Configuration Management – Plan, ID, control, status, audit the

technical baseline of system• Trade Studies- analyze alternatives trades • Technical /Design Reviews- decide if maturity worth going forward• Risk/Issues- things could go wrong / have gone wrong• TPMs- key early warning indicators of problems• Acquirer- manager the development contract for the stakeholder • Supplier- designs, builds/codes to meet contract(s)• SpE- SE like specialties with narrower focus

Bill Fournier

Page 6: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Whom

• EE• IE• OR• ISE• Technical PM• Requirements Eng’g• Designers• Analyst

Bill Fournier

Page 7: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Stages

• Exploratory Research• Concept• Development• Production• Utilization• Support• Retirement

Bill Fournier

Page 8: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Technical Processes (Users)

• Stakeholder Req. Def. Inputs

• Req. Analysis Source Documents

• Arch. Design Stakeholder Needs

• Implementation Project Constraints

• Integration

• Verification Outputs

• Validation Balanced System

• Operation

• Maintenance

• Disposal

• Cross- Cutting

Bill Fournier

Page 9: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Project Processes (PM & PC)

• Project Planning• Project Assessment and Control• Decision Making- Trade study• Risk & Opportunity Management- Prob. & Impact• Configuration Management• Information Management• Measurement- MOE/MOP/TPM

Bill Fournier

Page 10: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Agreement Processes

Bill Fournier

• Acquisition• Supply

Page 11: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Tailoring

• Cost of formality• Cost of Miss communications• Reduce theoretical overall cost

Bill Fournier

Page 12: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

SpE Analysis

• Logistics- RAM…• Cost effectiveness• EMI• Environmental Impact• Interoperability• LC cost • Manf. and producability• Safety & health hazard• Sustainment• Training needs• Human factors• Value Engineering

Bill Fournier

Page 13: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

CASE

• Computer Aided Systems Engineering• How can computers help ?

Bill Fournier

Page 14: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

SE Job Advertising

Table 1. Systems Engineering Roles

Role Abbr. Short Name

1 RO Requirements Owner

2 SD System Designer

3 SA System Analyst

4 VV Validation/Verification Engr.

5 LO Logistics/Ops Engineer

6 G Glue Among Subsystems

7 CI Customer Interface

8 TM Technical Manager

9 IM Information Manager

10 PE Process Engineer

11 CO Coordinator

12 CA Classified Ads SE Bill Fournier

Page 15: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Future

• Software intensive• Speed of Development• Greater Specialization• Recycle Systems• Interfaces• SE even greater value

Bill Fournier

Page 16: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Processes

• Technical (User)• Project (PM & PC)• Contracting (Contracts)• Tailoring (All) • SpE (SpE)

Bill Fournier

Page 17: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

Related and Overlapping

• ISO 9000• Lean Six Sigma• ITIL• CMMI

Bill Fournier

Page 18: Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier billfournier4@gmail.com 202 255 0760

References

• INCOSE SE handbook version 3.2.2 October 2011 ( version 4 will come out in 2015)

• INCOSE.org – CASE tool survey, certification, chapters• ISO/IEC 15288:2008• DAU.edu• Linkedin my group, my TR book• Honourcode• http://www.incose.org/educationcareers/PDF/12-

roles.pdf

Bill Fournier