1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General 1. Project information: Project Name: : Bihar Panchayat Strengthening Project Country : India Project Code : P102627 Implementing agency for this Procurement Plan : Bihar Gram Swaraj Yojana Society 2. Bank’s approval Date of the procurement Plan Procurement Plan dated : Revision 1 : Revision 2 : Approved by the Bank on : 3. Date of General Procurement Notice: 4. Period covered by this : 18 months II. Goods and Works and Non-consulting services. 1 a) Procurement Methods and Thresholds Category Method of Procurement Threshold (US$ Equivalent) ICB > 40,000,000 NCB Up to 40,000,000 Works Shopping Up to 100,000 ICB > 3,000,000 NCB 100,000 to 3,000,000 Shopping Up to 100,000 Goods and non-consulting services Direct Subject to 3.7 of the guidelines 1 b) Prior Review Threshold - Works : First two contracts irrespective of value and all contracts exceeding US$ 5,000,000. - Goods : First two contracts irrespective of value and all contracts exceeding US$ 500,000 - Direct Contracting: All contracts estimated to cost more than US$ 10,000 2. Pre-qualification. Not Applicable Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: dodiep

Post on 03-Apr-2018

243 views

Category:

Documents


12 download

TRANSCRIPT

Page 1: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

1

1

BIHAR PANCHYAT STRENGTHENING PROJECTPROCUREMENT PLAN FOR 18 MONTHS

I. General1. Project information:

Project Name: : Bihar Panchayat Strengthening Project Country : India Project Code : P102627 Implementing agency for this Procurement Plan : Bihar Gram Swaraj Yojana Society

2. Bank’s approval Date of the procurement Plan

Procurement Plan dated :Revision 1 :Revision 2 :Approved by the Bank on

:

3. Date of General Procurement Notice:

4. Period covered by this : 18 months

II. Goods and Works and Non-consulting services.

1 a) Procurement Methods and Thresholds

Category Method of Procurement

Threshold(US$ Equivalent)

ICB > 40,000,000 NCB Up to 40,000,000WorksShopping Up to 100,000ICB > 3,000,000 NCB 100,000 to 3,000,000Shopping Up to 100,000Goods and non-consulting servicesDirect Subject to 3.7 of the

guidelines1 b) Prior Review Threshold

- Works : First two contracts irrespective of value and all contracts exceeding US$ 5,000,000.- Goods : First two contracts irrespective of value and all contracts exceeding US$ 500,000- Direct Contracting: All contracts estimated to cost more than US$ 10,000

2. Pre-qualification. Not Applicable

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

2

2

3. Reference to (if any) Project Operational/Procurement Manual: BGSYS has prepared a

Procurement Manual and agreed with the Bank. All the contracts issued under the project will follow the World Bank’s Guidelines: Procurement under IBRD Loans and IDA Credits” dated January 2011. In case of any inconsistency between the Procurement Manual or Bihar Government Procurement Procedures and the Bank Guidelines, the latter shall prevail.

4. Any Other Special Procurement Arrangements:

A. National Competitive Bidding (NCB) method for procurement and goods and works as per the above value thresholds will be conducted in accordance with paragraph 3.3 and 3.4 of the World Bank Procurement Guidelines and the following provisions:

Only the model bidding documents for NCB agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding;

Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids;

No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state owned enterprises, small scale enterprises or enterprises from any given state;

Extension of bid validity shall not be allowed with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/ Employer).

Re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a pre-determined margin or “bracket” of prices shall not be used in the project;

Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures unless agreed with the Bank on case to case basis. Such contracts will be acceptable however for any procurement under the Shopping procedures. Framework Agreements using DGS&D rate contracts can be used to procure goods up to NCB threshold subject to incorporation of right to audit and Fraud & Corruption clauses.

Two or three envelope system will not be used (except when using e-Procurement system assessed and agreed by the Bank);

No negotiations are conducted even with the lowest evaluated responsive bidders.

Foreign bidders shall not be precluded from bidding.

5. Procurement Packages with Methods and Time Schedule –

Page 3: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

3

3

Refer Table - 1 for Works & Goods and Table - 2 for Consulting Services.

III. Selection of Consultants

1 a) Selection Methods and Thresholds

Method of Procurement Threshold (US$ Equivalent)(a) Quality cum cost Based Selection No threshold(b) Quality Based Selection No threshold(c) Selection Made Under a Fixed Budget No threshold(d) Least Cost Selection No threshold(e) Selection Based on Consultant’s Qualifications

< 300,000

(f) Single Source Selection As per Consultant Guidelines Para 3.8 to 3.11

(g) Selection of Individual Consultants As per Consultant Guidelines Para 5.1 to 5.6

1 b) Prior Review Threshold

Consultancy Services: > US$ 200,000 equivalent for firms; and > US$ 100,000 equivalent for individuals All single source selections of value exceeding US $ 10,0002. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: NA 4. Reference to (if any) Project Operational/Procurement Manual: BGSYS has prepared the Project Procurement Manual and agreed with the Bank. All the contracts issued under the project will follow the “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated January 2011. In case of any inconsistency between the Procurement Manual or Bihar Government Procurement Procedures and the Bank Guidelines, the latter shall prevail.

Page 4: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

4

4

Reallocation of Project Funds by Component

Project ComponentsAllocation (USD in Million)

New Allocation (INR in Lakhs)

(Rs.66 = 1USD)

As per the procurement plan (Amount

in Rs Lakh)

Non Consult

ancy services

(on DAVP Rate

Contract)

Balance Amount (INR in Lakhs)

Component 1: 65 42900 33700 92001.(a) Construction of Panchayat Sarkar

Bhawans. 50 33000 33000 0

1.(b) Functional Panchayats-DLI based 15 9900 700 9200

Component 2: Capacity Building for Panchayati Raj Institutions 32.5 21450 9310 900 11240

2.1 PRI Institutional Strengthening 29.7 19602 9280 103222.1 (a) Core Institutional Capacity 6.7 4422 1825 25972.1 (b) Community Engagement 5 3300 1200 2100

2.1 (c) Communications and Mass Media 8 5280 3105 900 1275

2.1 (d) Building GP FM capacity 10 6600 3150 3450

2.2 PRI Capacity development (sanitation, drinking water) 2.8 1848 30 1818

Component 3: Strengthen the capacity to manage

decentralization (state wise)7.5 4950 3950 1000

(Dropped) Component 4 : Panchayat Performance Grants 0 0 0 0

Component 5: Project Management 15 9900 2465 7435

Total Project Funding 120 79200 50325 28875

Page 5: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

5

5

PROCUREMENT SCHEDULE FOR CONSULTANCY FOR 18 MONTHS

COUNTRY : INDIABORROWER : GOVERNMENT OF INDIA PROJECT : BIHAR PANCHAYAT STRENGTHENING PROJECTDATED : September 20, 2016. [The plan has been prepared by breaking the format in 2 parts: Table-1A & Table-1B]

TABLE – 1A

Package No.

DescriptionMethod of Procureme

nt

Procurement

Authority

Procurement

Instances

Estimated Cost

(Lakhs in INR)

Estimated Cost (Lakhs

in USD)(1USD

= Rs.66)1 2 3 4 5 6 7

BH/BPSP/C-001

Third Party Quality Audit of the

Construction of 330 PSBs under the Project

QCBS BGSYS 1 100 1.52

BH/BPSP/C-002

Third party audit for the evaluation of 330 functional gram

panchayat

QCBS BGSYS 1 300 4.56

BH/BPSP/C-003

Environment Management Plan Preparation and

Monitoring for 330 PSBs

QCBS BGSYS 1 300 4.56

BH/BPSP/C-004

Hiring of Individual Consultants -

Panchayat Facilitation Experts

Selection of Individual

Consultants (10

individuals)

BGSYS 10 125 1.89

BH/BPSP/C-005

Citizens' Engagement Platform

CQS after approval by

the BankBGSYS 1 400 6.06

BH/BPSP/C-006

Integrated Mobile Van Awareness Camaign

for the Pallate basis on two Project Panchayats

Districts - Integrated Information Delivery

System

QCBS BGSYS 1 1200 10.61

BH/BPSP/C-007

Development of the Scripts for the Audio

and Audio-Visual Materials to be Produced for

Awareness Generation

Selection of Individual

ConsultantsBGSYS 1 100 1.52

Page 6: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

6

6

Package No.

DescriptionMethod of Procureme

nt

Procurement

Authority

Procurement

Instances

Estimated Cost

(Lakhs in INR)

Estimated Cost (Lakhs

in USD)(1USD

= Rs.66)1 2 3 4 5 6 7

BH/BPSP/C-008

Designs for Training / Awareness Generation

Materials including Content Generation and Ready to Print Designs of Monthly

Newsletters in the Print Formats

QCBS BGSYS 1 250 3.03

BH/BPSP/C-009

Production of Audio Jingles & Fictional

Radio SerialsQCBS BGSYS 1 125 1.89

BH/BPSP/C-010

Production of a Series of Two Short Films QCBS BGSYS 1 700 9.09

BH/BPSP/C-011

Hiring of Experienced Professional for Training of Local

Cultural Troupes for Street Plays

Selection of Individual

ConsultantsBGSYS 1 30 0.45

BH/BPSP/C-012

Individual Economist with expertise in Public

Finance

Selection of Individual

Consultants (3 individuals

consultants)

BGSYS 3 75 1.14

BH/BPSP/C-013

Hiring of 800 Accountants for Hand-Holding Support to the GPs under 12 Project

Districts

QCBS BGSYS 1 3,000 45.45

BH/BPSP/C-014

Three Individual Consultants for

Developing the Code of Ethics for the Water-

Sanitation Programs for Bihar & Do's & Don'ts for Community with respect to Water-

Sanitation Program Implementation /

Management

Selection of Individuals

Consultants (3 individuals

consultants) /CQS- Firm

BGSYS 3 30 0.45

BH/BPSP/C-015

PMU for State Wide PFM Roll Out CQS BGSYS Multiple 400 6.06

BH/BPSP/C-016

PFM Software for the GPs

SSS after approval of

BankBGSYS 1 50 0.76

Page 7: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

7

7

Package No.

DescriptionMethod of Procureme

nt

Procurement

Authority

Procurement

Instances

Estimated Cost

(Lakhs in INR)

Estimated Cost (Lakhs

in USD)(1USD

= Rs.66)1 2 3 4 5 6 7

BH/BPSP/C-017

Statutory Financial Audit Support for the

Project GPsQCBS BGSYS 1 800 12.12

BH/BPSP/C-018

Accounting Support for the Project GPs QCBS BGSYS 1 1,000 15.15

BH/BPSP/C-019

Accountant for Hand-Holding Support to GPs

for the Rest of the 26 Non-Project Districts in

Bihar

QCBS BGSYS 1 1,200 18.18

BH/BPSP/C-020

PMU for e-Panchayat Implementation

SSS after approval of

BankBGSYS 1 500 7.58

BH/BPSP/C-021

Base Line & End Line Surveys for Measuring

ProgressQCBS BGSYS 1 125 1.89

BH/BPSP/C-022

Internal Audit for the BGSYS Project

Management UnitsCQ (Firms) BGSYS 1 8 0.12

BH/BPSP/C-023

Statutory Audit to BGSYS Project

Implementation UnitsCQ (Firms) BGSYS 1 5 0.08

BH/BPSP/C-024

HR agency for Recruitment QCBS BGSYS 1 175 2.65

BH/BPSP/C-025

Admin ConsultantSelection of Individuals Consultants

BGSYS 1 50 0.76

BH/BPSP/C-026

Individual Consultant for Support to the

Procurement Unit of BGSYS

Selection of Individuals Consultants

BGSYS 1 20 0.30

BH/BPSP/C-027

Integrated Web Portal for BGSYS CQS BGSYS 1 125 1.89

BH/BPSP/C-028

Hiring of HR Support Agency QCBS BGSYS 1 130 1.97

Page 8: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

8

8

PROCUREMENT SCHEDULE FOR GOODS FOR 18 MONTHS

COUNTRY : INDIABORROWER : GOVERNMENT OF INDIA PROJECT : BIHAR PANCHAYAT STRENGTHENING PROJECTDATED : September 20, 2016. [The plan has been prepared by breaking the format in 2 parts: Table-2A & Table-2B]

TABLE – 2A

Package No. Description

Method of

Procurement

Procurement

Authority

Procurement

Instances

Estimated Cost

(Lakhs in INR)

Estimated Cost (Lakhs

in USD)(1U

SD = Rs.66)

1 2 3 4 5 6 7BH/BPSP/

G-001

Pilot on Information Seeking Behavior of the Citizens with Information

KiosksNCB BGSYS 1 300 4.55

BH/BPSP/G-002

Printing of training modules for Capacity Building for Core

Institutional Strengthening (Induction)NCB BGSYS 1 400 6.06

BH/BPSP/G-003

Printing of training modules for Capacity Building Program under

Water-SanitationNCB BGSYS 1 300 4.55

BH/BPSP/G-004

Printing of training modules for Capacity Building for Core Institutional Strengthening

(Refresher)

NCB BGSYS 1 300 4.55

BH/BPSP/G-005

Printing of Pamphlets / Posters / Primers/ Banner for State Events NCB BGSYS 1 200 3.03

BH/BPSP/G-006

Monthly Printing and Circulation of Newsletters in the Newspaper format

for the GPsNCB BGSYS 1 600 9.09

BH/BPSP/G-007

Wall Paintings on the Aims & Objects of the Project NCB BGSYS 1 150 2.27

BH/BPSP/G-008

Hoadings, Kiosk and Wallwrap on the Aims & Objects of the Project NCB BGSYS 1 200 3.03

BH/BPSP/G-009

Print IEC material for integrated mobile complain in two pilot districts

and rest of the 10 project districtsNCB BGSYS 1 500 7.58

BH/BPSP/G-010

State Level Awareness Competitions on Promotion of the Objectives of the Project (Non-Consultancy Services)

NCB BGSYS 1 100 1.52

BH/BPSP/G-011

Project POPs , Calendar, Danglers, Posters, Gift Items, Sinages NCB BGSYS 1 150 2.27

BH/BPSP/G-012

Printing Training modules on Panchayat Financial Management NCB BGSYS 1 75 1.14

BH/BPSP/G-013 Office Furniture for DPMUs National

Shopping BGSYS 1 60 0.91

Page 9: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

9

9

Package No. Description

Method of

Procurement

Procurement

Authority

Procurement

Instances

Estimated Cost

(Lakhs in INR)

Estimated Cost (Lakhs

in USD)(1U

SD = Rs.66)

1 2 3 4 5 6 7BH/BPSP/

G-014 Office Furniture for BPMUs NCB BGSYS 1 612 9.27

BH/BPSP/G-015 Power Back-Up System for SPMU National

Shopping BGSYS 1 15 0.23

BH/BPSP/G-016

Power Back-Up System for DPMUs & BPMUs NCB BGSYS 1 110 1.67

BH/BPSP/G-017

Laptops for DPMUs & BPMUs Level Positions NCB BGSYS 1 350 5.30

BH/BPSP/G-018

Desktops for SPMUs, DPMUs & BPMUs

National Shopping BGSYS 1 30 0.45

BH/BPSP/G-019

Mini-Laptops/Tablet for Community Resource Persons (Field Staff tagged

with BPMUs)NCB BGSYS 1 160 2.42

BH/BPSP/G-020 Printers for DPMUs & BPMUs National

Shopping BGSYS 1 50 0.76

BH/BPSP/G-021 Colour Printers for DPMUs National

Shopping BGSYS 1 30 0.45

BH/BPSP/G-022

Procurement of Consumables and Stationery Items

National Shopping BGSYS 1 40 0.61

BH/BPSP/G-023

Housekeeping services (Non-Consultancy Services)

National Shopping BGSYS 1 10 0.15

BH/BPSP/G-024

MS Office Licence for the Desktops / Laptops/Mini-laptop/Tablet at SPMU,

DPMUs, BPMUs & CRPs (Gram Panchayat Project Coordinators)

NCB BGSYS 1 300 4.55

Page 10: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

10

10

PROCUREMENT SCHEDULE FOR CONSULTANCY FOR 18 MONTHS[The plan has been prepared by breaking the format in 2 parts: Table-1A & Table-1B]

Date : September 20, 2016. TABLE – 1B

Sl. N

o.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of th

e A

ctiv

ity

Component

PP/R

1/R

2/R

3

ToR

Estim

ated

Cos

t (IN

R in

La

khs)

Met

hods

of S

elec

tion

@

**Pr

ior R

evie

w/P

ost r

evie

w

Adv

ertis

ing

for E

OI (

Dat

e)

Shor

t lis

ting

of E

OI

(Dat

e)

No

Obj

ectio

n fr

om

Ban

k/In

tern

al A

utho

rity

(Dat

e)

**R

FP F

inal

Dra

ft to

be

App

rove

d

RFP

Issu

ed (D

ate)

Prop

osal

Sub

mis

sion

by

bidd

ers

(Dat

e)

Tech

nica

l Eva

luat

ion

(Dat

e)

Ban

k/in

tern

al n

o ob

ject

ion

for T

echn

ical

Eva

luat

ion

No

obje

ctio

n by

B

ank/

inte

rnal

for c

ombi

ned

Eval

uatio

n / d

raft

cont

ract

Con

trac

t sig

ning

Dat

e

Con

trac

t Val

ue (i

nclu

sive

of

all a

pplic

able

taxe

s)N

ame

of C

onsu

ltant

/ N

atio

nalit

y &

Zip

Cod

e, if

U

SASe

rvic

es to

be

Com

plet

ed

(Dat

e).

**W

BR

No.

(onl

y in

cas

e of

pr

ior r

evie

w)

Exp.

Incu

rred

to D

ate

in

Lakh

s (IN

R) (

incl

. of t

axes

)

Sub Component

Comment

s

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

PP

30 October 2016

100 QCBS Prior

11/14/2016

12/29/2016

1/13/2017

1/23/2017

1/28/2017

2/27/2017

3/9/2017

3/24/2017

4/8/2017

4/15/2017

R

1

BH/BPSP/C-001

Third Party Quality Audit

of the Construction of 330 PSBs

under the Project

Hiring of Consultancy Services of a firm for third party quality monitoring of the

construction of 330 Panchayat Sarkar Bhawan Construction under the Project (Phase wise) –

Comp 1 (a): Construction of PSBs

Component-

1

A

Component

-1(a)

SN Jha

(SPM -

Finance)

PP

15 October 2016

300 QCBS Prior

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/2017

R 2

BH/BPSP/C-002

Third party audit for the evaluation of

330 functional

gram panchayat

The Third Party auditor shall be responsible for time to time visit the sites with pre-determined

purposes and submit reports accordingly

Component-

1A

Component

-1(b)

SN Jha

(SPM -

Finance)

PP

15 October 2016

300 QCBS Prior

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/2017

R 3

BH/BPSP/C-003

Environment Management

Plan Preparation

and Monitoring

for 330 PSBs

Implementation of environment management framework (EMF) and natural resource and

resettlement policy framework (RPF) for construction of 330 panchayat sarkar bhawans

Component-

1

A

Component

-1(b)

Mrinal

Sisodia

(SPM -HR &

Admin)

Component 1 (Consultancy Services) Proposed Expenditure as per the Procurement Plan 700

PP

30 October 2016

125

Selection of Individ

ual Consultants (10

individuals)

Prior

11/14/2016

12/9/2016

12/19/2016

12/24/2016

12/29/2016

1/28/2017

2/7/2017

2/17/2017

3/4/2017

3/11/2017

R

4

BH/BPSP/C-004

Hiring of Individual

Consultants - Panchayat Facilitation

Experts

Hiring of Panchayat Facilitation Experts for Policy Guidance (Acts, Rules & Manuals) /

Development and/or Upgradation Panchayat Financial Management Rules & Manuals with

Subsequent Development of Training Modules for Panchayat Finance Management Program /

Development of Case Studies / Success Stories/Background Materials - (10 individuals)

Component-

2

A

Component

-2.1(a)

Om Prakash

(SPM- CB)

5

BH/BPSP/C-005

Citizens' Engagement

Platform

Use of technologies for recording social audit reports of the vigilance committees, sharing

knowledge, expression of point of view with the provision restricted to Panchayati Raj & Rural Development Departments, Govt. of Bihar for

the 12 Project Districts. The platform shall facilitate to and fro flow of accurate and precise

Component-

2

PP

01 October 2016

400

CQS after

approval by

the Bank

Prior

10/16/2016

10/31/2016

11/10/2016

11/15/2016

11/20/2016

12/5/2016

12/15/2016

12/25/2016

1/9/2017

1/16/2017

Component

-2.1(a)

Sharad

Kumar

(PM- IT) & Om

Page 11: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

11

11 Sl

. No.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of th

e A

ctiv

ity

Component

PP/R

1/R

2/R

3

ToR

Estim

ated

Cos

t (IN

R in

La

khs)

Met

hods

of S

elec

tion

@

**Pr

ior R

evie

w/P

ost r

evie

w

Adv

ertis

ing

for E

OI (

Dat

e)

Shor

t lis

ting

of E

OI

(Dat

e)

No

Obj

ectio

n fr

om

Ban

k/In

tern

al A

utho

rity

(Dat

e)

**R

FP F

inal

Dra

ft to

be

App

rove

d

RFP

Issu

ed (D

ate)

Prop

osal

Sub

mis

sion

by

bidd

ers

(Dat

e)

Tech

nica

l Eva

luat

ion

(Dat

e)

Ban

k/in

tern

al n

o ob

ject

ion

for T

echn

ical

Eva

luat

ion

No

obje

ctio

n by

B

ank/

inte

rnal

for c

ombi

ned

Eval

uatio

n / d

raft

cont

ract

Con

trac

t sig

ning

Dat

e

Con

trac

t Val

ue (i

nclu

sive

of

all a

pplic

able

taxe

s)N

ame

of C

onsu

ltant

/ N

atio

nalit

y &

Zip

Cod

e, if

U

SASe

rvic

es to

be

Com

plet

ed

(Dat

e).

**W

BR

No.

(onl

y in

cas

e of

pr

ior r

evie

w)

Exp.

Incu

rred

to D

ate

in

Lakh

s (IN

R) (

incl

. of t

axes

)

Sub Component

Comment

s

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

R

information for meaningful citizens' engagement. Under this activity the Society

shall establish a call center manned with appropriate number of experts and human resources with technical know-how for the

center to function effectively. This activity shall be outsourced. This shall include development of Mobile Apps for panchayat with necessary software solution to maintain the back-end activities at the state level call center. The package shall also include the MIS for the

ongoing project related programs

A

Prakash

(SPM- I/C- M&E)

PP

15 October 2016

1200 QCBS Prior

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/2017

R

6

BH/BPSP/C-006

Integrated Mobile Van Awareness

Campaign for the Piloted

basis on two Project

Panchayats Districts - Integrated Information

Delivery System

Mobile Awareness Campaign & On Ground activation of BPSP with the help of Trained Cultural Troupes, Narrowcasting of Audio

Jingles & Fictional Serials during the Interlude & Screening of Fictional Films under Comp.

2.1(b) -Civic Engagement [The prime focus of the activities shall be to indulge with audiences through structures set of abundant information on subjects related to participatory planning,

right & entitlements of the individuals & groups, collective decision making & collective action

against collective responsibilities / accountabilities as responsible citizens,

prioritization of the communities needs through engagement of the citizens in logical dialogues and discussions leading to consensus - in the

end leaving citizens with inquisitive minds forever, thereafter] (For Piloted basis on

projected panchayats district). This activity shall be preceded by a Pre-Cursor to Create

Buzz & Necessary Enthusiasm for the Upcoming Awareness Program for the Gram Panchayats. The Precursor Team shall be

Moving in a Branded Four Wheeler Ahead of the Integrated Mobile Van Working to Create

Ripples & Inquisitiveness. The Precursor Team shall handover the baton to the Integrated

Mobile Van over a period of a day on the 1st Day, before moving ahead to the next

Panchayat.

Component-

2

A

Component

-2.1(b)

Vishal

Singh

(SPM-

Communicatio

n)

7

BH/BPSP/C-007

Development of the Scripts for the Audio and Audio-

Visual Materials to be Produced

Selection of Individual Consultant for Development of Scripts for the Radio Jingles & Fictional Radio Serials (Awareness Generation

Materials including 150 Radio Jingles 130 Episodes of Duration of 27 - 30 Minutes of Fictional-Motivational Radio Serials), Two

Short Films (Scripts for Motivational-Fictional

Component-

2

PP

15 October 2016

100

Selection of Individ

ual Consultants

Post

10/30/2016

11/24/2016

12/4/2016

12/9/2016

12/14/2016

1/13/2017

1/23/2017

2/2/2017

2/17/2017

2/24/2017

Component

-2.1©

Om Prakash

(SPM- CB)

Page 12: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

12

12 Sl

. No.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of th

e A

ctiv

ity

Component

PP/R

1/R

2/R

3

ToR

Estim

ated

Cos

t (IN

R in

La

khs)

Met

hods

of S

elec

tion

@

**Pr

ior R

evie

w/P

ost r

evie

w

Adv

ertis

ing

for E

OI (

Dat

e)

Shor

t lis

ting

of E

OI

(Dat

e)

No

Obj

ectio

n fr

om

Ban

k/In

tern

al A

utho

rity

(Dat

e)

**R

FP F

inal

Dra

ft to

be

App

rove

d

RFP

Issu

ed (D

ate)

Prop

osal

Sub

mis

sion

by

bidd

ers

(Dat

e)

Tech

nica

l Eva

luat

ion

(Dat

e)

Ban

k/in

tern

al n

o ob

ject

ion

for T

echn

ical

Eva

luat

ion

No

obje

ctio

n by

B

ank/

inte

rnal

for c

ombi

ned

Eval

uatio

n / d

raft

cont

ract

Con

trac

t sig

ning

Dat

e

Con

trac

t Val

ue (i

nclu

sive

of

all a

pplic

able

taxe

s)N

ame

of C

onsu

ltant

/ N

atio

nalit

y &

Zip

Cod

e, if

U

SASe

rvic

es to

be

Com

plet

ed

(Dat

e).

**W

BR

No.

(onl

y in

cas

e of

pr

ior r

evie

w)

Exp.

Incu

rred

to D

ate

in

Lakh

s (IN

R) (

incl

. of t

axes

)

Sub Component

Comment

s

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

R

for Awareness Generation

Short Films of 1 Hour Duration) on Subjects including Participatory Planning Processes,

Collective Decision Making Processes, Identifying & Fixing Priorities following

Democratic Principles of Consistent Public Dialogues & Discussions, Citizens'

Engagement in Planning, Implementing & Monitoring the Development Projects,

Importance of Understanding the Power vested in Collective Efforts, Whole Hearted

Participation in the Constitutional Bodies - "Gram Sabhas & Ward Sabhas"

A

PP

15 October 2016

250 QCBS Prior

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/2017

R

8

BH/BPSP/C-008

Designs for Training /

Awareness Generation Materials including Content

Generation and Ready to Print Designs

of Monthly Newsletters in the Print

Formats

Hiring of Consultancy Services for Development of Designs for Training Modules, IEC Materials & Monthly Newsletters for Print Formats under Comp 2.1 (c) - Communication

and Mass media.

Component-

2

A 1/23/2014

4/24/2014

2/3/2015

24/5/2015

4/13/2015

5/11/2015

10/14/2015

11/9/2015

Component

-2.1©

Vishal

Singh

(SPM-

Communicatio

n)

PP

15 October 2016

125 QCBS Prior

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/2017

R 9

BH/BPSP/C-009

Production of Audio Jingles

& Fictional Radio Serials

Hiring of Consultancy Services for Production of Radio Jingles & Fictional Radio Serials in Accordance with the Scripts with an Aim &

Object of Providing the Citizens with Necessary Information on their Rights,

Entitlements, Responsibilities as Citizens, Importance of Participatory Planning & Requirements for Collective Actions for

Necessary Changes in the Appalling, Diabolic & Distraughtly Status Quo, Imminent

Requirements for In Practice Administrative & Fiscal Decentralization, et al under comp 2.1

(c) - Communication and Mass Media.

Component-

2

A 1/23/2014

4/24/2014

2/3/2015

24/5/2015

4/13/2015

5/11/2015

10/14/2015

11/9/2015

Component

-2.1©

Vishal

Singh

(SPM-

Communicatio

n)

10

BH/BPSP/C-010

Production of a Series of Two Short

Films

Hiring of Consultancy Services for Production of a Series of two Motivational-Fictional Short Film(s) in Accordance with the Scripts with an

Aim & Object of Providing the Citizens with Necessary Information on their Rights,

Entitlements, Responsibilities as Citizens, Importance of Participatory Planning &

Requirements for Collective Actions for Much Required Changes in the Appalling, Diabolic,

Distraughtly, Grim & Gruesome Social

Component-

2

PP

15 October 2016

700 QCBS Prior

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/2017

Component

-2.1©

Vishal

Singh

(SPM-

Communicatio

n)

Page 13: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

13

13 Sl

. No.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of th

e A

ctiv

ity

Component

PP/R

1/R

2/R

3

ToR

Estim

ated

Cos

t (IN

R in

La

khs)

Met

hods

of S

elec

tion

@

**Pr

ior R

evie

w/P

ost r

evie

w

Adv

ertis

ing

for E

OI (

Dat

e)

Shor

t lis

ting

of E

OI

(Dat

e)

No

Obj

ectio

n fr

om

Ban

k/In

tern

al A

utho

rity

(Dat

e)

**R

FP F

inal

Dra

ft to

be

App

rove

d

RFP

Issu

ed (D

ate)

Prop

osal

Sub

mis

sion

by

bidd

ers

(Dat

e)

Tech

nica

l Eva

luat

ion

(Dat

e)

Ban

k/in

tern

al n

o ob

ject

ion

for T

echn

ical

Eva

luat

ion

No

obje

ctio

n by

B

ank/

inte

rnal

for c

ombi

ned

Eval

uatio

n / d

raft

cont

ract

Con

trac

t sig

ning

Dat

e

Con

trac

t Val

ue (i

nclu

sive

of

all a

pplic

able

taxe

s)N

ame

of C

onsu

ltant

/ N

atio

nalit

y &

Zip

Cod

e, if

U

SASe

rvic

es to

be

Com

plet

ed

(Dat

e).

**W

BR

No.

(onl

y in

cas

e of

pr

ior r

evie

w)

Exp.

Incu

rred

to D

ate

in

Lakh

s (IN

R) (

incl

. of t

axes

)

Sub Component

Comment

s

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

R

Situation, that, off late has become Self-Resistant and Averse in a way that the very

thinking of any change is looked at Scornfully. The devilish Status Quo is now nearly treated as Sacrosanct, Imminent Requirements for In-

Practice Administrative & Fiscal Decentralization, et al as a Step-by-Step Guide

for the Rural Audiences on Righteous Action Required for a nearly Synonym to Golden

Dawn (Communication people for participating Planning) under comp 2.1 (c) -

Communication and Mass media.

A 1/23/2014

4/24/2014

2/3/2015

12/17/2015

5/25/2016

PP

15 October 2016

30

Selection of Individ

ual Consultants

Post

10/30/2016

11/24/2016

12/4/2016

12/9/2016

12/14/2016

1/13/2017

1/23/2017

2/2/2017

2/17/2017

2/24/2017

R 11

BH/BPSP/C-011

Hiring of Experienced Professional for Training

of Local Cultural

Troupes for Street Plays

Hiring of Experienced Professional Performing Art Troupe from Institution Like National School

of Drama, New Delhi or equivalent for necessary research for Developing Scripts for

Plays & Accordingly Training the Locally Identified Cultural Troupes on Subjects like Collective Action through Participation for

Raising Voice Collectively in Public Forums & PRIs Meeting, especially in Gram Sabhas & Ward Sabhas, as the Most Potent Tool for

Creating the Required Pressure on the System to Yield to the Individual & Collective Rights,

Participatory Planning as a Tool for Addressing the Local Needs including the Demonstration of the Processes for Participatory Planning &

Prioritization of Need Comp . 2.1 (c) - Communication and Mass Media.

Component-

2

A 1/23/2014

4/24/2014

2/3/2015

12/17/2015

5/25/2016

Component

-2.1©

Vishal

Singh

(SPM-

Communicatio

n)

PP

15 October 2016

75

Selection of Individ

ual Consultants

(3 individuals

consultants)

Post

10/30/2016

11/24/2016

12/4/2016

12/9/2016

12/14/2016

1/13/2017

1/23/2017

2/2/2017

2/17/2017

2/24/2017

R

12

BH/BPSP/C-012

Individual Economist

with expertise in Public Finance

Consultancy Services of 3 individuals consultants with expertise in Public Finance to

act as Panchayat Finance Coordinator for assisting the state through the Society in

developing understanding on Investments Vs. Outcomes, Smoothening Fund Flow

Mechanism, Conduct Studies on Diversification of Fund Usages & Subsequent Gross

Resultants, Socio-Economic Impacts of the Grant-in-Aids from the Centre & State to the

GPs (Development of Social Capitals, Economic Advancements, Community Assets Creation & Usages, Sustainability Factors for the Positive Changes at the Levels of GPs, et

al)

Component-

2

A

Component

-2.1(d)

SN Jha

(SPM -

Finance)

13

BH/BPSP/C-013

Hiring of 800 Accountants

for Hand-Holding

Support to

Services of qualified manpower (accountants) for panchayat financial management (software

based) in the 12 project districts with 1 for every 4 GPs for a period of 24 months

@Rs.15,000/- per month = 800 accountants X

Component-

2

PP

15 October 2016

3,000 QCBS Prior

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/2017

Component

-2.1(

Sharad

Kumar

(PM-

Page 14: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

14

14 Sl

. No.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of th

e A

ctiv

ity

Component

PP/R

1/R

2/R

3

ToR

Estim

ated

Cos

t (IN

R in

La

khs)

Met

hods

of S

elec

tion

@

**Pr

ior R

evie

w/P

ost r

evie

w

Adv

ertis

ing

for E

OI (

Dat

e)

Shor

t lis

ting

of E

OI

(Dat

e)

No

Obj

ectio

n fr

om

Ban

k/In

tern

al A

utho

rity

(Dat

e)

**R

FP F

inal

Dra

ft to

be

App

rove

d

RFP

Issu

ed (D

ate)

Prop

osal

Sub

mis

sion

by

bidd

ers

(Dat

e)

Tech

nica

l Eva

luat

ion

(Dat

e)

Ban

k/in

tern

al n

o ob

ject

ion

for T

echn

ical

Eva

luat

ion

No

obje

ctio

n by

B

ank/

inte

rnal

for c

ombi

ned

Eval

uatio

n / d

raft

cont

ract

Con

trac

t sig

ning

Dat

e

Con

trac

t Val

ue (i

nclu

sive

of

all a

pplic

able

taxe

s)N

ame

of C

onsu

ltant

/ N

atio

nalit

y &

Zip

Cod

e, if

U

SASe

rvic

es to

be

Com

plet

ed

(Dat

e).

**W

BR

No.

(onl

y in

cas

e of

pr

ior r

evie

w)

Exp.

Incu

rred

to D

ate

in

Lakh

s (IN

R) (

incl

. of t

axes

)

Sub Component

Comment

s

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

R

the GPs under 12 Project Districts

24 months X Rs.15,000/- per month = Rs.28,80,00,000/-

A

d) IT) & Om Prakash

(SPM- I/C- M&E) SN Jha

(SPM -

Finance)

PP

15 Decem

ber 2016

30

Selection of Individuals

Consultants

(3 individuals

consultants) /CQS- Firm

Post

12/30/2016

1/24/2017

2/3/2017

2/8/2017

2/13/2017

3/15/2017

3/25/2017

4/4/2017

4/19/2017

4/26/2017

R

14

BH/BPSP/C-014

Three Individual

Consultants for

Developing the Code of

Ethics for the Water-

Sanitation Programs for Bihar & Do's & Don'ts for Community with respect

to Water-Sanitation Program

Implementation /

Management

Hiring of short term Individual Consultant / Specialist to provide assistance on Developing

Community Training Materials for Water-Sanitation Program understanding and Hard-

Hitting Information for the Communities' Understanding with respect to Water-Sanitation Program Implementation, and Business Code

for the Program Implementation & Management Units at the State & Districts

Component-

2

A

Component-2.2

Om Prakash

(SPM- CB)

Component 2 (Consultancy Services) Proposed Expenditure as per the Procurement Plan 5,385

PP

15 October 2016

400 CQS Prior

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/2017

15

BH/BPSP/C-015

PMU for State Wide

PFM Roll Out (IT expert , Financial

expert and Civil

engineer)

Project Management Unit at the SPMU for the roll out & monitoring of the PFM Program. The consultancy service provider shall provide the services of financial experts and IT experts for

managing PFM related services and civil engineers for support of third party quality audit , training programs for elected representatives (Mukhiya, Upmukhiya & Panchayat Secretary), accountants to be hired under the project for

GPs support, contract management for

Component-

3

R

Component-3

SN Jha

(SPM-

Finance),

RupaShre

e (PM-

Page 15: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

15

15 Sl

. No.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of th

e A

ctiv

ity

Component

PP/R

1/R

2/R

3

ToR

Estim

ated

Cos

t (IN

R in

La

khs)

Met

hods

of S

elec

tion

@

**Pr

ior R

evie

w/P

ost r

evie

w

Adv

ertis

ing

for E

OI (

Dat

e)

Shor

t lis

ting

of E

OI

(Dat

e)

No

Obj

ectio

n fr

om

Ban

k/In

tern

al A

utho

rity

(Dat

e)

**R

FP F

inal

Dra

ft to

be

App

rove

d

RFP

Issu

ed (D

ate)

Prop

osal

Sub

mis

sion

by

bidd

ers

(Dat

e)

Tech

nica

l Eva

luat

ion

(Dat

e)

Ban

k/in

tern

al n

o ob

ject

ion

for T

echn

ical

Eva

luat

ion

No

obje

ctio

n by

B

ank/

inte

rnal

for c

ombi

ned

Eval

uatio

n / d

raft

cont

ract

Con

trac

t sig

ning

Dat

e

Con

trac

t Val

ue (i

nclu

sive

of

all a

pplic

able

taxe

s)N

ame

of C

onsu

ltant

/ N

atio

nalit

y &

Zip

Cod

e, if

U

SASe

rvic

es to

be

Com

plet

ed

(Dat

e).

**W

BR

No.

(onl

y in

cas

e of

pr

ior r

evie

w)

Exp.

Incu

rred

to D

ate

in

Lakh

s (IN

R) (

incl

. of t

axes

)

Sub Component

Comment

s

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27consultancy firms for assisting panchayats in maintaining the books of accounts, statutory

financial audit, software based accounting and its state wide roll out, capacity building on use of the PFM software including troubleshooting

& onsite support as may be required). A

Accountin

g-CB) &

Om Prakash

(SPM-CB)

PP

01 Novem

ber 2016

50

SSS after

approval of Bank

Prior

10/16/2016

10/31/2016

11/10/2016

11/15/2016

11/20/2016

12/5/2016

12/15/2016

12/25/2016

1/9/2017

1/16/2017

R 16

BH/BPSP/C-016

PFM Software for

the GPs

Software for the Accounting and Financial Management System for the Panchayats in

Bihar.

Component-

3

A

Component-3

SN Jha

(SPM -

Finance) & Sharad

Kumar

(PM- IT)

PP

01 Decem

ber 2017

800 QCBS Prior

12/16/2017

1/30/2018

2/14/2018

2/24/2018

3/1/2018

3/31/2018

4/10/2018

4/25/2018

5/10/2018

5/17/2018

R

17

BH/BPSP/C-017

Statutory Financial

Audit Support for the

Project GPs

Hiring of Firm(s) for Annual Audit Coverage for all the Panchayats of the 12 Project Districts (Phase wise)-Selection of multiple agency for

performing task in multiple districts (@Rs.5000/- Per Panchayat Per year for 5

Years, 3191 GPs in 12 Project District) = 3191 GPs X 5 Years X Rs.5000/- per annum =

Rs.7,97,75,000/=

Component-

3

A

Component-3

SN Jha

(SPM -

Finance)

PP

30 October 2016

1,000 QCBS Prior

11/14/2016

12/29/2016

1/13/2017

1/23/2017

1/28/2017

2/27/2017

3/9/2017

3/24/2017

4/8/2017

4/15/2017

R 18

BH/BPSP/C-018

Accounting Support for the Project

GPs

Providing Assistance to the all Panchayats in the 12 Project Districts in Preparing and

Maintaining their Books of Accounts (Phase wise)-Selection of multiple agency for

performing task in multiple districts (@Rs.6000/- Per Panchayat Per year for 5

Years, 3191 panchayats in 12 Project District) = 3191 GPs X 5 Years X Rs.6000/- per annum

= Rs.9,57,30,000/-

Component-

3A

Component-3

SN Jha

(SPM -

Finance)

PP

30 October 2016

1,200 QCBS Prior

11/14/2016

12/29/2016

1/13/2017

1/23/2017

1/28/2017

2/27/2017

3/9/2017

3/24/2017

4/8/2017

4/15/2017

R 19

BH/BPSP/C-019

Accountant for Hand-Holding

Support to GPs for the Rest of the

26 Non-Project

Districts in Bihar

Services of qualified manpower for the panchayat financial management (software based) including hand-holding support for a

period of 12 months. Each of the accountants shall be responsible to help a minimum of 8 panchayats for assisting develop in-house

capacity for panchayat financial management. This assistance shall be applicable for the

remaining 26 districts (38 Districts - 12 Project Districts) with 5200 Gram Panchayats. The

Component-

3

A

Component-3

SN Jha

(SPM-

Finance),

RupaShre

e (PM-

Page 16: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

16

16 Sl

. No.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of th

e A

ctiv

ity

Component

PP/R

1/R

2/R

3

ToR

Estim

ated

Cos

t (IN

R in

La

khs)

Met

hods

of S

elec

tion

@

**Pr

ior R

evie

w/P

ost r

evie

w

Adv

ertis

ing

for E

OI (

Dat

e)

Shor

t lis

ting

of E

OI

(Dat

e)

No

Obj

ectio

n fr

om

Ban

k/In

tern

al A

utho

rity

(Dat

e)

**R

FP F

inal

Dra

ft to

be

App

rove

d

RFP

Issu

ed (D

ate)

Prop

osal

Sub

mis

sion

by

bidd

ers

(Dat

e)

Tech

nica

l Eva

luat

ion

(Dat

e)

Ban

k/in

tern

al n

o ob

ject

ion

for T

echn

ical

Eva

luat

ion

No

obje

ctio

n by

B

ank/

inte

rnal

for c

ombi

ned

Eval

uatio

n / d

raft

cont

ract

Con

trac

t sig

ning

Dat

e

Con

trac

t Val

ue (i

nclu

sive

of

all a

pplic

able

taxe

s)N

ame

of C

onsu

ltant

/ N

atio

nalit

y &

Zip

Cod

e, if

U

SASe

rvic

es to

be

Com

plet

ed

(Dat

e).

**W

BR

No.

(onl

y in

cas

e of

pr

ior r

evie

w)

Exp.

Incu

rred

to D

ate

in

Lakh

s (IN

R) (

incl

. of t

axes

)

Sub Component

Comment

s

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27total financial implication shall thus be = 650 accountants X 12 months X Rs.15000/- per

month = Rs.11,70,00,000/-

Accountin

g-CB) &

Om Prakash

(SPM-CB)

PP

01 Novem

ber 2016

500

SSS after

approval of Bank

Prior

11/16/2016

12/1/2016

12/11/2016

12/16/2016

12/21/2016

1/5/2017

1/15/2017

1/25/2017

2/9/2017

2/16/2017

R 20

BH/BPSP/C-020

PMU for e-Panchayat

Implementation

The Selected Agency shall be responsible for establishing Project Management Unit at the SPMU for the roll out & monitoring of the e-

Panchayat Program. The consultancy service provider shall provide the services of financial

experts and IT experts for managing e-Panchayat Implementation and its integration

with PFM software.

Component-

3

A

Component-3

SN Jha

(SPM -

Finance) & Sharad

Kumar

(PM- IT)

Component 3 (Consultancy Services) Proposed Expenditure as per the Procurement Plan 3,950

PP

15 October 2016

125 QCBS Prior

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/2017

R 21

BH/BPSP/C-021

Base Line & End Line

Surveys for Measuring Progress

Hiring services of survey agency for data collection for Base Line & End-line Studies in accordance with the Results Framework for

BPSP including Report writing .

Component-

4

A

Component-4

Om Prakash

(SPM-

M&E)

PP

30 October 2016

8 CQ

(Firms)

Post

11/14/2016

11/29/2016

12/9/2016

12/14/2016

12/19/2016

1/3/2017

1/13/2017

1/23/2017

2/7/2017

2/14/2017

R 22

BH/BPSP/C-022

Internal Audit for the

BGSYS Project

Management Units

Hiring of CA firm for statutory audit of BGSYS Management Units (SPMU & DPMUs) - The lowest accounting unit under the project shall

be the DPMUs (@rs.30000 for 12 district and 1 SPMU unit per annum)

Component-

4A

Component-4

SN Jha

(SPM -

Finance)

PP

01 Decem

ber 2016

5 CQ

(Firms)

Post

12/16/2016

12/31/2016

1/10/2017

1/15/2017

1/20/2017

2/4/2017

2/14/2017

2/24/2017

3/11/2017

3/18/2017

R

23

BH/BPSP/C-023

Statutory Audit to BGSYS Project

Implementation Units

Hiring of CA (Individual Consultants) for Statutory Audit for BGSYS SPMU & DPMUs

(12,500 per unit per year)

Component-

4

A

Component-4

SN Jha

(SPM -

Finance)

PP

15 October 2016

175 QCBS Post

10/30/2016

12/14/2016

12/29/2016

1/8/2017

1/13/2017

2/12/2017

2/22/2017

3/9/2017

3/24/2017

3/31/201724

BH/BPSP/C-024

HR agency for

Recruitment

Hiring of HR agency for staff recruitment against approx 1500 positions in BGSYS

Component-

4 R

Component-4

Mrinal

Sisodia

Page 17: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

17

17 Sl

. No.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of th

e A

ctiv

ity

Component

PP/R

1/R

2/R

3

ToR

Estim

ated

Cos

t (IN

R in

La

khs)

Met

hods

of S

elec

tion

@

**Pr

ior R

evie

w/P

ost r

evie

w

Adv

ertis

ing

for E

OI (

Dat

e)

Shor

t lis

ting

of E

OI

(Dat

e)

No

Obj

ectio

n fr

om

Ban

k/In

tern

al A

utho

rity

(Dat

e)

**R

FP F

inal

Dra

ft to

be

App

rove

d

RFP

Issu

ed (D

ate)

Prop

osal

Sub

mis

sion

by

bidd

ers

(Dat

e)

Tech

nica

l Eva

luat

ion

(Dat

e)

Ban

k/in

tern

al n

o ob

ject

ion

for T

echn

ical

Eva

luat

ion

No

obje

ctio

n by

B

ank/

inte

rnal

for c

ombi

ned

Eval

uatio

n / d

raft

cont

ract

Con

trac

t sig

ning

Dat

e

Con

trac

t Val

ue (i

nclu

sive

of

all a

pplic

able

taxe

s)N

ame

of C

onsu

ltant

/ N

atio

nalit

y &

Zip

Cod

e, if

U

SASe

rvic

es to

be

Com

plet

ed

(Dat

e).

**W

BR

No.

(onl

y in

cas

e of

pr

ior r

evie

w)

Exp.

Incu

rred

to D

ate

in

Lakh

s (IN

R) (

incl

. of t

axes

)

Sub Component

Comment

s

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

A

(SPM -HR &

Admin)

PP

15 Novem

ber 2016

50

Selection of Individuals

Consultants

Post

11/30/2016

12/25/2016

1/4/2017

1/9/2017

1/14/2017

2/13/2017

2/23/2017

3/5/2017

3/20/2017

3/27/2017

R

25

BH/BPSP/C-025

Admin Consultant

Hiring of short term Individual Consultants / Specialists for assistance to Admin units of

BGSYS

Component-

4

A

Component-4

Mrinal

Sisodia

(SPM -HR &

Admin)

PP

15 October 2016

20

Selection of Individuals

Consultants

Post

10/30/2016

11/24/2016

12/4/2016

12/9/2016

12/14/2016

1/13/2017

1/23/2017

2/2/2017

2/17/2017

2/24/2017

R

26

BH/BPSP/C-026

Individual Consultant

for Support to the

Procurement Unit of BGSYS

Hiring of short term consultants/Specialists to provide assistance of Procurement to support

the respective units of BGSYS

Component-

4

A

Component-4

Jaideo

Sinha

(SPM -

Procurement)

PP

01 March 2016

125 CQS Post

3/16/2016

3/31/2016

4/10/2016

4/15/2016

4/20/2016

5/5/2016

5/15/2016

5/25/2016

6/9/2016

6/16/2016

R

27

BH/BPSP/C-027

Integrated Web Portal for BGSYS

Development and Management of Integrated Web Portal that includes HR – MIS, Training – MIS, Online Biometric Attendance, etc. for the

Society

Component-

4A

04 March 2016

3/15/2016

3/18/2016

3/21/2016

3/29/2016

3/29/2016

4/26/2016

5/2/2016

5/5/2016

5/5/2016

5/19/2016

13039260

CSM

technologies Pvt. Ltd./India/80000

1

Component-4

Sharad

Kumar

(PM- IT) & Om Prakash

(SPM- I/C- M&E)

PP

01 Novem

ber 2016

130 QCBS Prior

11/16/2016

12/31/2016

1/15/2017

1/25/2017

1/30/2017

3/1/2017

3/11/2017

3/26/2017

4/10/2017

4/17/2017

R 28

BH/BPSP/C-028

Hiring of HR Support Agency

Pay Roll & Performance Management of the BGSYS Staff at all levels (1575 employee for 18 Month- @ Rs.450 Per person per month)

Component-

4

A

Component-4

Mrinal

Sisodia

(SPM -HR &

Admin)

Component 4 (Consultancy Services) Proposed Expenditure as per the Procurement Plan 643

Page 18: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

18

18

Page 19: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

19

19

PROCUREMENT SCHEDULE FOR GOODS FOR 18 MONTHS[The plan has been prepared by breaking the format in 2 parts: Table-1A & Table-1B]

Date : September 20, 2016. TABLE – 2B

Bids

SL N

o.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of G

oods

Com

men

ts

PP/A

/R1/

R2/

R3

Estim

ated

Con

trac

t Va

lue

(INR

in la

khs)

Met

hod

of P

rocu

rem

ent

Prio

r Rev

iew

/ Pos

t R

evie

w

Prep

arat

ion

of B

id

D

ocum

ent (

Dat

e)

Ban

k/In

tern

al N

o.

Obj

ectio

n to

Bid

ding

D

ocum

ent (

Dat

e)**

Invi

tatio

n (D

ate)

Ope

ned

on (D

ate)

Bid

eva

luat

ion

Dat

e

Ban

k/in

tern

al N

o ob

ject

ion

Con

trac

t Aw

ard

(Dat

e)

(LoA

)

Con

trac

t Sig

ned

(Dat

e)

Con

trac

t Val

ue

(incl

usiv

e of

all

appl

icab

le ta

xes)

(INR

in

Lakh

s)N

ame

of

Con

trac

tor/N

atio

nalit

y &

ZI

P C

ode

**W

BR

No.

(onl

y in

cas

e of

prio

r rev

iew

)

Dat

e of

com

plet

ion

of

Con

trac

tEx

p. In

cur-

red

to D

ate

(Rs

in L

akhs

) (in

clus

ive

of ta

xes/

Pric

e es

cala

tion)

Com

men

ts/S

ub

Com

pone

nts

Com

men

ts

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

PP 300 NCB Prior October

25, 2016

11/14/2016

12/4/2016

1/3/2017

1/18/2017

1/28/2017

2/17/2017

2/24/2017

R 1BH/BPSP/G-001

Pilot on Information Seeking Behavior of the Citizens with Information

Kiosks

Public Information Kiosk For 100 Panchayats to be made Functional

on Pilot Basis

Component-2

A

Component-2.1(a)

Vishal Singh (SPM-

Communication) & Sharad Kumar (PM-IT)

PP 400 NCB Prior October

25, 2016

11/14/2016

12/4/2016

1/3/2017

1/18/2017

1/28/2017

2/17/2017

2/24/2017

R 2

BH/BPSP/G-002

Printing of training modules for Capacity

Building for Core Institutional

Strengthening (Induction)

Printing of Training Modules under Capacity Building Program

(Induction)

Component-2

A

Component-2.1(a)

Om Prakash

(SPM- CB)

PP 300 NCB Prior Novemb

er 1, 2016

11/21/2016

12/11/2016

1/10/2017

1/25/2017

2/4/2017

2/24/2017

3/3/2017

R 3

BH/BPSP/G-003

Printing of training modules for Capacity

Building Program under Water-Sanitation

Printing of Training Modules under Capacity Building Program

(Capacity Development under Water - Sanitation in12 Project

Districts)

Component-2

A

Component-2.1(a)

Om Prakash

(SPM- CB)

PP 300 NCB Prior April 15, 2017

5/5/2017

5/25/2017

6/24/2017

7/9/2017

7/19/2017

8/8/2017

8/15/2017

R 4BH/BPSP/G-004

Printing of training modules for Capacity

Building for Core Institutional

Strengthening (Refresher)

Printing of Training Modules under Capacity Building Program

(Refresher)

Component-2

A

Component-2.1(a)

Om Prakash

(SPM- CB)

PP 200 NCB Prior January

15, 2017

2/4/2017

2/24/2017

3/26/2017

4/10/2017

4/20/2017

5/10/2017

5/17/2017

R 5BH/BPSP/G-005

Printing of Pamphlets / Posters / Primers/

Banner for State Events

Printing of awareness generation materials on the importance of

participatory planning, participatory planning processes, collective

participation in the meeting of gram sabhas & ward sabhas, collective

decision making processes, achievements under the project,

etc. for the state sponsored events during the course of the project

duration

Component-2

A

Component-2.1©

Vishal Singh (SPM-

Communication)

PP 600 NCB Prior August

15, 2016

9/4/2016

9/24/2016

10/24/2016

11/8/2016

11/18/2016

12/8/2016

12/15/2016

R 6

BH/BPSP/G-006

Monthly Printing and Circulation of

Newsletters in the Newspaper format for

the GPs

Printing of Monthly newsletter as prepared for Awareness Generation Program and delivery of the same

up to the level of block headquarters from where the copies shall be picked up by the authorized

representative by the Head of the Gram Panchayats for distribution in

Component-2

A

Component-2.1©

Vishal Singh (SPM-

Communication)

Page 20: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

20

20

SL N

o.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of G

oods

Com

men

ts

PP/A

/R1/

R2/

R3

Estim

ated

Con

trac

t Va

lue

(INR

in la

khs)

Met

hod

of P

rocu

rem

ent

Prio

r Rev

iew

/ Pos

t R

evie

w

Prep

arat

ion

of B

id

D

ocum

ent (

Dat

e)

Ban

k/In

tern

al N

o.

Obj

ectio

n to

Bid

ding

D

ocum

ent (

Dat

e)**

Bids

Bid

eva

luat

ion

Dat

e

Ban

k/in

tern

al N

o ob

ject

ion

Con

trac

t Aw

ard

(Dat

e)

(LoA

)

Con

trac

t Sig

ned

(Dat

e)

Con

trac

t Val

ue

(incl

usiv

e of

all

appl

icab

le ta

xes)

(INR

in

Lakh

s)N

ame

of

Con

trac

tor/N

atio

nalit

y &

ZI

P C

ode

**W

BR

No.

(onl

y in

cas

e of

prio

r rev

iew

)

Dat

e of

com

plet

ion

of

Con

trac

tEx

p. In

cur-

red

to D

ate

(Rs

in L

akhs

) (in

clus

ive

of ta

xes/

Pric

e es

cala

tion)

Com

men

ts/S

ub

Com

pone

nts

Com

men

ts

Invi

tatio

n (D

ate)

Ope

ned

on (D

ate)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Panchayats .( 20 Pc X Rs. 15 X 8391 Panchayats X 30 Month)

PP 150 NCB PostAugust

15, 2016

9/4/2016

9/24/2016

10/24/2016

11/8/2016

11/18/2016

12/8/2016

12/15/2016

R

7BH/BPSP/G-007

Wall Paintings on the Aims & Objects of the

Project

Wall Painting of 5 Important Location in the Project Panchayats (Each wall painting of 200 sq. ft.).

The subject addressed through this intervention shall be importance of participatory planning, participatory

planning processes, collective participation in the meeting of gram sabhas & ward sabhas, collective

decision making processes, rights / entitlements / responsibilities of citizen, etc. -Component 2.1 ©

Component-2

A

Component-2.1©

Vishal Singh (SPM-

Communication)

PP 200 NCB PostAugust

15, 2016

9/4/2016

9/24/2016

10/24/2016

11/8/2016

11/18/2016

12/8/2016

12/15/2016

R 8BH/BPSP/G-008

Hoadings, Kiosk and Wallwrap on the Aims & Objects of the Project

It is important to keep people reminding of the priorities under the Panchayati Raj System. The best

ways of doing it is hoarding, wallwraps & information kiosks

Component-2

A

Component-2.1©

Vishal Singh (SPM-

Communication)

PP 500 NCB PriorAugust

15, 2016

9/4/2016

9/24/2016

10/24/2016

11/8/2016

11/18/2016

12/8/2016

12/15/2016

R 9BH/BPSP/G-009

Print IEC material for integrated mobile

complain in two pilot districts and rest of the

10 project districts

Printing of Information education and communication material for the distribution in the Panchayats for 12

project districts

Component-2

A

Component-2.1©

Vishal Singh (SPM-

Communication)

PP 100 NCB PostAugust

15, 2016

9/4/2016

9/24/2016

10/24/2016

11/8/2016

11/18/2016

12/8/2016

12/15/2016

R 10BH/BPSP/G-010

State Level Awareness Competitions on Promotion of the

Objectives of the Project (Non-Consultancy

Services)

Marathon, Cycle Competitions tagged with State Level National / International Festivals twice a year

on outsourced arrangements

Component-2

A

Component-2.1©

Vishal Singh (SPM-

Communication)

PP 150 NCB PostNovemb

er 25, 2016

12/15/2016

1/4/2017

2/3/2017

2/18/2017

2/28/2017

3/20/2017

3/27/2017

R 11BH/BPSP/G-011

Project POPs , Calendar, Danglers, Posters, Gift Items,

Sinages

These are important tools for creating brand out of the

commitments from the project to the people. These tools directly / indirectly helps people remain aware of the Project Aims &

Objects.

Component-2

A

Component-2.1(d)

Vishal Singh (SPM-

Communication)

Page 21: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

21

21

SL N

o.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of G

oods

Com

men

ts

PP/A

/R1/

R2/

R3

Estim

ated

Con

trac

t Va

lue

(INR

in la

khs)

Met

hod

of P

rocu

rem

ent

Prio

r Rev

iew

/ Pos

t R

evie

w

Prep

arat

ion

of B

id

D

ocum

ent (

Dat

e)

Ban

k/In

tern

al N

o.

Obj

ectio

n to

Bid

ding

D

ocum

ent (

Dat

e)**

Bids

Bid

eva

luat

ion

Dat

e

Ban

k/in

tern

al N

o ob

ject

ion

Con

trac

t Aw

ard

(Dat

e)

(LoA

)

Con

trac

t Sig

ned

(Dat

e)

Con

trac

t Val

ue

(incl

usiv

e of

all

appl

icab

le ta

xes)

(INR

in

Lakh

s)N

ame

of

Con

trac

tor/N

atio

nalit

y &

ZI

P C

ode

**W

BR

No.

(onl

y in

cas

e of

prio

r rev

iew

)

Dat

e of

com

plet

ion

of

Con

trac

tEx

p. In

cur-

red

to D

ate

(Rs

in L

akhs

) (in

clus

ive

of ta

xes/

Pric

e es

cala

tion)

Com

men

ts/S

ub

Com

pone

nts

Com

men

ts

Invi

tatio

n (D

ate)

Ope

ned

on (D

ate)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

PP 75 NCB PostNovemb

er 25, 2016

12/15/2016

1/4/2017

2/3/2017

2/18/2017

2/28/2017

3/20/2017

3/27/2017

R 12

BH/BPSP/G-012

Printing Training modules on Panchayat Financial Management

Printing of Training Modules on Panchayat Financial Management

in Accordance with the Budget, Accounts & Audit Manual of the

State @ Rs.250/- for the Intensive Training of Mukhiya, Up-Mukhiya & Panchayat Secretary for the Block Training Program (8191 Panchayat

X 3 + 1450 Accountant + 3377 Additional for the District & Block

Level Officials)

Component-2

A

Component-2.1(d)

Om Prakash

(SPM- CB)

Component -2 (Goods) Proposed Expenditure as per the Procurement Plan 3275

PP 60

National

Shopping

PostNovemb

er 1, 2016

11/16/2016

11/24/2016

12/2/2016

12/3/2016

12/8/2016

12/15/2016

12/22/2016

R

13BH/BPSP/G-013

Office Furniture for DPMUs

Purchase of Office Furniture & Fixtures for 12 District Units (5 lakh

per District)

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin)

PP 612 NCB PriorFebruar

y 1, 2017

2/21/2017

3/13/2017

4/12/2017

4/27/2017

5/7/2017

5/27/2017

6/3/2017

R 14

BH/BPSP/G-014

Office Furniture for BPMUs

Purchase of Office Furniture & Fixtures for 204 Block Units (3 Lakh

per block)

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin)

PP 15

National

Shopping

PostSeptember 15, 2016

9/30/2016

10/8/2016

10/16/2016

10/17/2016

10/22/2016

10/29/2016

11/5/2016

R

15BH/BPSP/G-015

Power Back-Up System for SPMU

Purchase of Power Back Up System for State Management

Units

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin)

PP 110 NCB PriorFebruar

y 1, 2016

2/21/2016

3/12/2016

4/11/2016

4/26/2016

5/6/2016

5/26/2016

6/2/2016

R 16

BH/BPSP/G-016

Power Back-Up System for DPMUs & BPMUs

Purchase of Power Back Up System for 12 District and 204 Blocks management Units (50

Thousand per unit)

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin)

PP 350 NCB PriorDecemb

er 15, 2016

1/4/2017

1/24/2017

2/23/2017

3/10/2017

3/20/2017

4/9/2017

4/16/2017

R 17BH/BPSP/G-017

Laptops for DPMUs & BPMUs Level Positions

Purchase of 647-Laptops District & Block Units Against 647 sanction

positions in BGSYS (@ 55 thousand per post)

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin) &

Sharad Kumar (PM-IT)

PP 30

National

Shopping

PostDecemb

er 15, 2016

12/30/2016

1/7/2017

1/15/2017

1/16/2017

1/21/2017

1/28/2017

2/4/2017

R 18

BH/BPSP/G-018

Desktops for SPMUs, DPMUs & BPMUs

Purchase of 56- Desktops for BGSYS Management Unit (@ 53

thousand per Position)

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin) &

Sharad Kumar (PM-IT)

Page 22: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

22

22

SL N

o.

Pack

age

No.

Nam

e of

the

activ

ity

Des

crip

tion

of G

oods

Com

men

ts

PP/A

/R1/

R2/

R3

Estim

ated

Con

trac

t Va

lue

(INR

in la

khs)

Met

hod

of P

rocu

rem

ent

Prio

r Rev

iew

/ Pos

t R

evie

w

Prep

arat

ion

of B

id

D

ocum

ent (

Dat

e)

Ban

k/In

tern

al N

o.

Obj

ectio

n to

Bid

ding

D

ocum

ent (

Dat

e)**

Bids

Bid

eva

luat

ion

Dat

e

Ban

k/in

tern

al N

o ob

ject

ion

Con

trac

t Aw

ard

(Dat

e)

(LoA

)

Con

trac

t Sig

ned

(Dat

e)

Con

trac

t Val

ue

(incl

usiv

e of

all

appl

icab

le ta

xes)

(INR

in

Lakh

s)N

ame

of

Con

trac

tor/N

atio

nalit

y &

ZI

P C

ode

**W

BR

No.

(onl

y in

cas

e of

prio

r rev

iew

)

Dat

e of

com

plet

ion

of

Con

trac

tEx

p. In

cur-

red

to D

ate

(Rs

in L

akhs

) (in

clus

ive

of ta

xes/

Pric

e es

cala

tion)

Com

men

ts/S

ub

Com

pone

nts

Com

men

ts

Invi

tatio

n (D

ate)

Ope

ned

on (D

ate)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

PP 160 NCB PriorDecemb

er 15, 2016

1/4/2017

1/24/2017

2/23/2017

3/10/2017

3/20/2017

4/9/2017

4/16/2017

R 19BH/BPSP/G-019

Mini-Laptops/Tablet for Community Resource Persons (Field Staff tagged with BPMUs)

Purchase of Mini Laptop/Tablet for 797 CRP (@ 20 Thousand per

Position)

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin) &

Sharad Kumar (PM-IT)

PP 50

National

Shopping

PostFebruar

y 1, 2017

2/16/2017

2/24/2017

3/4/2017

3/5/2017

3/10/2017

3/17/2017

3/24/2017

R 20

BH/BPSP/G-020

Printers for DPMUs & BPMUs

Purchase of 216- Printers for Block and District Units (@ 23 Thousand

Per unit)

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin) &

Sharad Kumar (PM-IT)

PP 30

National

Shopping

PostMarch

15, 2017

3/30/2017

4/7/2017

4/15/2017

4/16/2017

4/21/2017

4/28/2017

5/5/2017

R 21

BH/BPSP/G-021

Colour Printers for DPMUs

Purchase of 12- Printers for District Units (@2.5 lakh per unit)

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin) &

Sharad Kumar (PM-IT)

PP 40

National

Shopping

Post October 1, 2016

10/16/2016

10/24/2016

11/1/2016

11/2/2016

11/7/2016

11/14/2016

11/21/2016

R

22BH/BPSP/G-022

Procurement of Consumables and Stationery Items

Stationery Item, Housekeeping Items and computer peripherals

items for SPMU office Patna

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin)

PP 10

National

Shopping

Post October 1, 2016

10/16/2016

10/24/2016

11/1/2016

11/2/2016

11/7/2016

11/14/2016

11/21/2016

R

23BH/BPSP/G-023

Housekeeping services (Non-Consultancy

Services)

Housekeeping services (Non-Consultancy Services) for SPMU

office Patna

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin)

PP 300 NCB PriorDecemb

er 15, 2016

1/4/2017

1/24/2017

2/23/2017

3/10/2017

3/20/2017

4/9/2017

4/16/2017

R 24

BH/BPSP/G-024

MS Office Licence for the Desktops / Laptops/Mini-

laptop/Tablet at SPMU, DPMUs, BPMUs &

CRPs (Gram Panchayat Project Coordinators)

Purchase of 1500 -MS Office for State, District & Block Units (@ 20

Thousand per systems)

Component-4

A

Component-

4

Mrinal Sisodia

(SPM -HR & Admin) &

Sharad Kumar (PM-IT)

Component -4 (Goods) Proposed Expenditure per the Procurement Plan 1767

Page 23: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

23

23

Table -3

PROCUREMENT PLAN FOR Non Consultancy(DAVP Rate)[BIHAR PANCHAYAT STRENGTHENING PROJECT]

WB LOAN No. 5160/IN

SL N

o.

Pack

age

No.

Des

crip

tion

of G

oods

Des

crip

tion

of G

oods

Com

pone

nt

PP/A

/R1/

R2/

R3

Estim

ated

C

ontr

act

Valu

e (IN

R

in la

khs)

Met

hod

of

Proc

urem

ent

Prio

r R

evie

w/

Post

R

evie

w

Prep

arat

ion

of B

id

D

ocum

ent

(Dat

e)

Com

men

ts

Com

men

ts

1 2 3 4 5 6 7 8 9 10 23 24

PP 500Direct

Contracting (DAVP)

Post December 15, 2016

R 1 BPSP/N

C-001

Broadcast of Radio Jingles on Radio at Directorate of Audio-Visual Publicity Rates

determined by the Ministry of Broadcasting, Govt. of India

Broadcast of Radio Jingles on Radio at Directorate of Audio-Visual Publicity Rates determined by the Ministry of Broadcasting,

Govt. of India (for a year)

Component-2

A

Component-2

Vishal Singh (SPM- Communication)

PP 150Direct

Contracting (DAVP)

Post December 15, 2016

R 2 BPSP/N

C-002

Broadcast of Fictional Radio Serial on Radio at Directorate of Audio-Visual

Publicity Rates determined by the Ministry of Broadcasting, Govt. of India

Broadcast of Fictional Radio Serial on Radio at Directorate of Audio-Visual Publicity Rates determined by the Ministry of Broadcasting,

Govt. of India (for a year)

Component-2

A

Component-2

Vishal Singh (SPM- Communication)

PP 250Direct

Contracting (DAVP)

Post December 15, 2016

R 3 BPSP/N

C-003

Phase-1,Broadcast of short films interviews, discussions on local TV

channels

Phase-1,Broadcast of short films interviews, discussions on local TV channels (for a year)

Component-2

A

Component-2

Vishal Singh (SPM- Communication)

Component -2 (Non-Consultancy) Proposed Expenditure as per the Procurement Plan 900

PROCUREMENT SCHEDULE FOR WORKS FOR 18 MONTHS

Page 24: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

24

24

COUNTRY : INDIABORROWER : GOVERNMENT OF INDIA PROJECT : BIHAR PANCHAYAT STRENGTHENING PROJECTDATED : September 20, 2016.Note:- 330 Panchayat Sarkar Bhawans are to be treated as separate packages

TABLE – 4

PROCUREMENT PLAN FOR WORKS[BIHAR PANCHAYAT STRENGTHENING PROJECT]

WB LOAN No. 5160/IN Bids

SL N

o.

Pack

age

No.

Des

crip

tion

of W

orks

/ G

oods

PP/A

/R1/

R2/

R3

Est

imat

ed C

ontr

act

Val

ue (R

s. L

akhs

)

Met

hod

of

Proc

urem

ent

ICB

/NC

B

Rev

iew

Prep

arat

ion

of B

id

D

ocum

ent (

Star

t Dat

e)

Ban

k's N

o. O

bjec

tion

to B

iddi

ng D

ocum

ent

(Dat

e)**

Bid

doc

umen

t sen

t to

IPR

D fo

r pu

blic

atio

n

Invi

tatio

n (L

ast

Dat

e fo

r su

bmis

sion

)

Ope

ned

on (D

ate)

Bid

Eva

luat

ion

Con

trac

t Aw

ard

deci

ded

(Dat

e)

Ban

k's N

o. O

bjec

tion

to C

ontr

act A

war

d (D

ate)

**

Con

trac

t Sig

ned

(Dat

e)

Con

trac

t Val

ue

(incl

usiv

e of

all

appl

icab

le ta

xes)

Nam

e of

C

ontr

acto

r/N

atio

nalit

y &

ZIP

Cod

e**

WB

R N

o. (o

nly

in

case

of p

rior

rev

iew

)D

ate

of c

ompl

etio

n of

C

ontr

act/E

OT

ap

prov

ed

Com

men

ts

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

PP 100 each total 7500 NCB Post

November 1, 2016

N/A December 1, 2016

December 31, 2016

January 1, 2017

January 16, 2017

January 26,

2017N/A February 2,

2017 ______ ______ N/A

February

2, 2018

R

1BPSP/W-001 -075

Construction of Panchayat Sarkar Bhawan- 1 to 75 (in ______ Gram Panchayat _________ in Block of _______District ) There shall be 75 Packages for Each of the Panchayat Sarkar Bhawans

A

PP 100 each total 7500 NCB Post January

1, 2017 N/A January 31, 2017

March 2, 2017

March 3, 2017

March 18,

2017

March 28,

2017N/A April 4, 2017 ______ ______ N/A

April 4,

2018

R 2

BPSP/W-

076-150

Construction of Panchayat Sarkar Bhawan- 76 to150 (in ______ Panchayat _________Block in _______District ) There shall be 75 Packages for Each of the Panchayat Sarkar Bhawans

A

PP 100 each total 7500 NCB Post March

1, 2017 N/A March 31, 2017

April 30, 2017

May 1, 2017

May 16,

2017

May 26,

2017N/A June 2, 2017 ______ ______ N/A

June 2,

2018

R 3

BPSP/W-

151-226

Construction of Panchayat Sarkar Bhawan- 151 to 225 (in ______ Panchayat _________Block in _______District ) There shall be 75 Packages for Each of the Panchayat Sarkar Bhawans

A

PP100 each

total 10500

NCB Post April 1, 2017 N/A May 1,

2017May 31,

2017June 1, 2017

June 16,

2017

June 26,

2017N/A July 3, 2017 ______ ______ N/A

July 3,

2018

R 4

BPSP/W-

226-330

Construction of Panchayat Sarkar Bhawan- 226 to 330 (in ______ Panchayat _________Block in _______District ) There shall be 105 Packages for Each of the Panchayat Sarkar Bhawans

A

PP 30 Shopping Post

November 1, 2016

N/A NANovemb

er 11, 2016

November 12, 2016

November 15,

2016

November 18, 2016

N/A November 21, 2016 ______ ______ N/A

December

6, 2016

Component-4

R 5 BPSP/

W-331 Refurbishment of SPMU

A

PP 25 Shopping Post

October 15,

2016N/A NA October

25, 2016

October 26,

2016

October 29, 2016

November 1, 2016

N/A November 4, 2016 ______ ______ N/A

November 11,

2016

Component-4

R 6 BPSP/

W-332 Electrical works of SPMU

A

Page 25: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

25

25

Page 26: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 1

PROCUREMENTPLAN India : India - Bihar Panchayat Strengthening ProjectGeneral InformationCountry: India Bank�s Approval Date of the Original Procurement Plan: 2017-03-08

Revised Plan Date(s): (comma delineated, leave blank if none) 2017-12-20Project ID: P102627 GPN Date: Project Name: India - Bihar Panchayat Strengthening ProjectLoan / Credit No: IDA / 51600Executing Agency(ies): Bihar Gram Swaraj Yojna Society, Panchayati Raj, Local Area Engineering Organization

WORKSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BH/BPSP/W-332 / RenovationElectrical works of SPMU

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 37,878.78 0.00 Pending

Implementation 2017-04-24 2017-06-19 2017-12-16

BH/BPSP/WB-006 /Construction of PanchayatSarkar Bhawan in(i) Bargaon Panchayat in BlockSilao &(ii) Shabait Panchayat in BlockSilao.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-17 2018-01-30 2018-02-19 2019-02-19

BH/BPSP/WB-003 /Construction of PanchayatSarkar Bhawan in(ii) Doiya Panchayat in BlockNoorsarai &(ii) Meyar Panchayat in BlockNoorsarai.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-22 2018-01-12 2018-02-07 2019-02-21

BH/BPSP/WB-005 /Construction of PanchayatSarkar Bhawan in(i) Gajipur Panchayat in BlockGiriyak &(ii) Jiyar Panchayat in BlockAsthawan.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-004 /Construction of PanchayatSarkar Bhawan in(i) Ajaipur Panchayat in BlockNoorsarai &(ii) Amba Panchayat in BlockRahui.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-002 /Construction of PanchayatSarkar Bhawan in(i) Devra Panchayat in BlockNaubatpur &(ii) Habaspur Goona Panchayatin Block Bikram.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-001 /Construction of PanchayatSarkar Bhawan in(i) Kosut Panchayat in BlockDhanarua &(ii) Vijaypura Panchayat in BlockDhanarua.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-07 2017-11-29 2018-01-20 2018-02-24 2018-08-23

BH/BPSP/WB-007 /Construction of PanchayatSarkar Bhawan in(i) Ghostama Panchayat in BlockSilao &(ii) Gorma Panchayat in BlockSilao.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-008 /Construction of PanchayatSarkar Bhawan in (i)    MeghiNagwan Panchayat in BlockBiharsharif & (ii) Bara Panchayatin Block Ben.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-009 /Construction of PanchayatSarkar Bhawan in(i) Aant Panchayat in Block Ben&(ii) Ben Panchayat in Block Ben.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-010 /Construction of PanchayatSarkar Bhawan in(i) Lodipur Panchayat in BlockRajgir &(ii) Akauna Panchayat in BlockBen.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-011 /Construction of PanchayatSarkar Bhawan in(i) Damodarpur BaldhaPanchayat in Block Nagarnausa& (ii) Kachhiyava Panchayat inBlock Nagarnausa.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-012 /Construction of PanchayatSarkar Bhawan in(i) Shivnagar Panchayat in BlockParvalpur &(ii) Chousanda Panchayat inBlock Parvalpur.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

Page 27: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 2

BH/BPSP/WB-013 /Construction of PanchayatSarkar Bhawan in(i) Pillich Panchayat in BlockParvalpur &(ii) Asta Panchayat in BlockTharthari.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-014 /Construction of PanchayatSarkar Bhawan in(i) Juniyar Panchayat in BlockHilsa &(ii) Daniyava Pendapur-Panchayat in BlockEakangarsarai.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-016 /Construction of PanchayatSarkar Bhawan in(i) Rupauli Panchayat in BlockHanuman Nagar &(ii) SanahpurPanchayat in Block Singhwara.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-017 /Construction of PanchayatSarkar Bhawan in(i) Murho Panchayat in BlockMadhepura &(ii) Sakarpura BetaunaPanchayat in Block Madhepura.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-018 /Construction of PanchayatSarkar Bhawan in(i) Aourahi Eakpraha Panchayatin Block Gamahriya & (ii)Bhatarandha ParmanandapurPanchayat in Block Ghailadh.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-019 /Construction of PanchayatSarkar Bhawan in(i) Paina Panchayat in BlockChousa &(ii) Ghosai ParmanandapurPanchayat in Block Chousa.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-020 /Construction of PanchayatSarkar Bhawan in (i) Araipanchyat in Block Daudnagar &(ii) Karsaon Panchyat in BlockObra

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-07 2017-10-30 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09

BH/BPSP/WB-021 /Construction of PanchayatSarkar Bhawan in (i) OraPanchyat in Block Aurangabad &(ii) Ibrahimpur Panchyat in BlockAurangabad

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-022 /Construction of PanchayatSarkar Bhawan in (i) KerkaPanchyat in Block Navinagar &(ii) Tengra Panchyat in BlockBaroon

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-023 /Construction of PanchayatSarkar Bhawan in (i) SalaiyaPanchyat in Block Madanpur &(ii) Nima Ajan Panchyat in BlockMadanpur

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-025 /Construction of PanchayatSarkar Bhawan in (i) HathiyaraPanchyat in Block Goh & (ii)Purhara Panchyat in BlockHaspura

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-026 /Construction of PanchayatSarkar Bhawan in (i)Udavantnagar Panchyat in BlockUdvantnagar & (ii)KasapPanchyat in Block Udvantnagar

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-027 /Construction of PanchayatSarkar Bhawan in (i) AsniPanchyat in Block Udvantnagar& (ii) Sonpura Panchyat in BlockUdvantnagar

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-028 /Construction of PanchayatSarkar Bhawan in (i) Korthu westPanchyat in Block Ghansyampur& (ii) Harinagar Panchyat inBlock Kusheshwar Asthan

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-029 /Construction of PanchayatSarkar Bhawan in (i) HarhachchaPanchyat in Block Baheri & (ii)Pokharbhinda Panchyat in BlockTardih

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

Page 28: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 3

BH/BPSP/WB-030 /Construction of PanchayatSarkar Bhawan in (i) ChiloneePanchyat in Block Pratapganj &(ii) Koriapatti west Panchyat inBlock Triveniganj

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-031 /Construction of PanchayatSarkar Bhawan in (i) MaheshuaPanchyat in Block Triveniganj &(ii) Lotuana south Panchyat inBlock Triveniganj

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-032 /Construction of PanchayatSarkar Bhawan in (i) DinapattiPanchyat in Block Pipara & (ii)Tulaptti south Panchyat in BlockPipara.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-033 /Construction of PanchayatSarkar Bhawan in (i) ThuthiPanchyat in Block Chhatapur &(ii) Laxmipur Khunti Panchyat inBlock Chhatapur

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-034 /Construction of PanchayatSarkar Bhawan in (i) KatharaPanchyat in Block Chhatapur &(ii) Bhimpur Panchyat in BlockChhatapur

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-035 /Construction of PanchayatSarkar Bhawan in (i)Champanagar Panchyat in BlockRaghopur & (ii) Chithi Hanumannnagar Panchyat in Blocksaragadh Bhaptiyahi

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-036 /Construction of PanchayatSarkar Bhawan in (i) MauraJharkha Panchyat in BlockSankarpur & (ii) Tamot persaPanchyat in Block Murliganj

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-037 /Construction of PanchayatSarkar Bhawan in (i) JeetapurPanchyat in Block Murliganj &(ii) Haripurkala Panchyat inBlock Murliganj

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-038 /Construction of PanchayatSarkar Bhawan in (i) BelariPanchyat in Block kumarkhand& (ii) Bishanpur KoilahiPanchyat in Block kumarkhand

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-039 /Construction of PanchayatSarkar Bhawan in (i) Madhukarchak Panchyat in BlockBihariganj & (ii) BarahiAanandpura Panchyat in BlockUdakishunganj

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-040 /Construction of PanchayatSarkar Bhawan in (i) PipraJagdish Panchyat in BlockBihiya & (ii) Goudadh RudranagarPanchyat in Block Bihiya

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-041 /Construction of PanchayatSarkar Bhawan in (i) ShivpurPanchyat in Block Bihiya & (ii)Tiyar Panchyat in Block Bihiya

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-042 /Construction of PanchayatSarkar Bhawan in (i) PanwariPanchyat in Block Tarari & (ii)Imadpur Panchyat in BlockTarari

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10

BH/BPSP/WB-015 /"Construction of PanchayatSarkar Bhawan in(i) Sonki Panchayat in BlockDarbhanga Sadar &(ii) Chhotaipatti Panchayat inBlock Darbhanga Sadar.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Pending

Implementation 2017-11-09 2017-11-14 2017-12-26 2018-03-10 2018-04-14 2018-10-11

BH/BPSP/WB-024 /Construction of PanchayatSarkar Bhawan in (i) KerapPanchyat in Block rafiganj & (ii)Dadhpi Panchyat in Block Goh

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-09 2017-10-30 2017-11-14 2017-12-26 2018-03-10 2018-04-14 2018-10-11

BH/BPSP/WB-043 /Construction of PanchayatSarkar Bhawan in (i) LadaniyaPanchyat in Block Laukahi & (ii)Majhuara Panchyat in BlockKhutauna

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

Page 29: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 4

BH/BPSP/WB-044 /Construction of PanchayatSarkar Bhawan in (i) SatgharaPanchyat in Block Rajnagar & (ii)Koilakh Panchyat in BlockRajnagar

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

BH/BPSP/WB-045 /Construction of PanchayatSarkar Bhawan in (i) BagarPanchyat in Block Tarari & (ii)Andhari Panchyat in BlockSahar

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

BH/BPSP/WB-046 /Construction of PanchayatSarkar Bhawan in (i) KajarPanchyat in Block Shahpur & (ii)Basauna Panchyat in BlockJagdishpur

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

BH/BPSP/WB-047 /Construction of PanchayatSarkar Bhawan in (i) BampaliPanchyat in Block Udavantnagar& (ii) Nawadaben Panchyat inBlock Udavantnagar

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

BH/BPSP/WB-048 /Construction of PanchayatSarkar Bhawan in (i) PurviBabura Panchyat in BlockBarhara & (ii) DaulatpurPanchyat in Block Koilwar

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

BH/BPSP/WB-049 /Construction of PanchayatSarkar Bhawan in (i) FarnaPanchyat in Block Barhara & (ii)Gundi Panchyat in BlockBarhara

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

BH/BPSP/WB-050 /Construction of PanchayatSarkar Bhawan in (i)BasantpurPanchyat in Block Ara sadar &(ii) Balua Panchyat in BlockBarhara

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

BH/BPSP/WB-051 /Construction of PanchayatSarkar Bhawan in (i)BarunaPanchyat in Block Agiawan & (ii)Nonaur Panchyat in BlockAgiawan

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

BH/BPSP/WB-052 /Construction of PanchayatSarkar Bhawan in (i)GarhaniPanchyat in Block Garhani & (ii)Echari Panchyat in BlockGarhani

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16

BH/BPSP/WB-053 /Construction of PanchayatSarkar Bhawan in (i)LagmaPanchyat in Block Sonversa &(ii) Mahua Panchyat in BlockSonversa

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25

BH/BPSP/WB-054 /Construction of PanchayatSarkar Bhawan in (i)BaithPanchyat in Block Sonversa &(ii) Mora Kopa Panchyat inBlock Sonversa

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25

BH/BPSP/WB-055 /Construction of PanchayatSarkar Bhawan in (i)MubarakpurPanchyat in Block Salkhua & (ii)Kabira Panchyat in BlockSalkhua

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25

BH/BPSP/WB-056 /Construction of PanchayatSarkar Bhawan in (i)HarebaPanchyat in Block Salkhua & (ii)Chanan Panchyat in BlockSalkhua

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25

BH/BPSP/WB-057 /Construction of PanchayatSarkar Bhawan in (i)KapPachami Panchyat in BlockSaur Bazar & (ii) GamhariaPanchyat in Block Saur Bazar

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25

BH/BPSP/WB-058 /Construction of PanchayatSarkar Bhawan in (i)SahuriaPachami Panchyat in BlockSaur Bazar & (ii) Chandaur PurbiPanchyat in Block Saur Bazar

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25

BH/BPSP/WB-059 /Construction of PanchayatSarkar Bhawan in (i)NeemaPanchayat in Block Dobhi & (ii)Kurmawa Panchayat in BlockDobhi

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-01 2017-11-20 2017-12-06 2018-01-17 2018-04-01 2018-05-06 2018-11-02

Page 30: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 5

BH/BPSP/WB-060 /Construction of PanchayatSarkar Bhawan in (i)GhoraghatPanchayat in Block Dobhi & (ii)Bhalua Panchayat in BlockBarachatti

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-01 2017-11-20 2017-12-06 2018-01-17 2018-04-01 2018-05-06 2018-11-02

BH/BPSP/WB-061 /Construction of PanchayatSarkar Bhawan in (i)KorapPanchayat in Block Konch & (ii)Kawar Panchayat in BlockKonch

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-01 2017-11-20 2017-12-06 2018-01-17 2018-04-01 2018-05-06 2018-11-02

BH/BPSP/WB-062 /Construction of PanchayatSarkar Bhawan in (i)NarawatPanchayat in Block Atari &(ii)Panari Panchayat in BlockBelaganj

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-01 2017-11-20 2017-12-06 2018-01-17 2018-04-01 2018-05-06 2018-11-02

BH/BPSP/WB-063 /Construction of PanchayatSarkar Bhawan in (i)Alam NagarUtari Panchayat in Block AlamNagar & (ii)ParmanandpurPanchayat in Block Murliganj

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-064 /Construction of PanchayatSarkar Bhawan in (i)TengarahaPariyahi Panchayat in BlockKumarkhand & (ii)JeevachhpurPanchayat in Block Gamhariya

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-065 /Construction of PanchayatSarkar Bhawan in (i)Pipra KarautiPanchayat in BlockUdakisunganj & (ii)GopalpurPanchayat in BlockUdakisunganj

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-066 /Construction of PanchayatSarkar Bhawan in (i)ChirauriPanchayat in Block Chausa &(ii)Laualagan East Panchayat inBlock Chausa

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-067 /Construction of PanchayatSarkar Bhawan in (i)NardahPanchayat in Block Purainee &(ii)Durgapur Panchayat in BlockPurainee

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-068 /Construction of PanchayatSarkar Bhawan in (i)JeeravaMadhailee Panchayat in BlockShankarpur & (ii)SonvarshaPanchayat in Block Shankarpur

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-23 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-069 /Construction of PanchayatSarkar Bhawan in (i)TetrahPanchayat in Block Akodhi Gola& (ii)Bagha Khoh Panchayat inBlock Akodhi Gola

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-070 /Construction of PanchayatSarkar Bhawan in (i)ChitouliPanchayat in Block Tilauthu &(ii)Sewahi Panchayat in BlockTilauthu

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-071 /Construction of PanchayatSarkar Bhawan in (i)AkasheePanchayat in Block Sasaram &(ii)Rohtas Garh Panchayat inBlock Rohtas

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-072 /Construction of PanchayatSarkar Bhawan in (i)ReriyaPanchayat in Block Kochas &(ii)Karup Panchayat in BlockShivsagar

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-073 /Construction of PanchayatSarkar Bhawan in (i)KarharaPanchayat in Block Benipatti &(ii)Tyonth Panchayat in BlockBenipatti

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-074 /Construction of PanchayatSarkar Bhawan in (i)TaraiyaPanchayat in Block Madhawapur& (ii)Pirokhar Panchayat inBlock Madhawapur

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-075 /Construction of PanchayatSarkar Bhawan in (i)SidhapaPanchayat in Block Ladaniya &(ii)Chatra Gobrarua NorthPanchayat in Block Khajauli

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-05 2017-11-29 2017-12-10 2018-01-21 2018-04-05 2018-05-10 2018-11-06

Page 31: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 6

BH/BPSP/WB-076 /Construction of PanchayatSarkar Bhawan in (i)ChatraGobraura South Panchayat inBlock Khajauli & (ii)ChandradihMaharajpur Panchayat in BlockKhajauli

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-077 /Construction of PanchayatSarkar Bhawan in (i)Shri KhindaPanchayat in Block Nokha &(ii)Chandi English Panchayat inBlock Sanjhouli

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-078 /Construction of PanchayatSarkar Bhawan in(i)NonharPanchayat in BlockBikramganj & (ii)ManpurPanchayat in Block Bikramganj

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-079 /Construction of PanchayatSarkar Bhawan in (i)lilwachhPanchayat in Block Dinara &(ii)Dawath MaharajpurPanchayat in Block Dawath

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05

BH/BPSP/WB-080 /Construction of PanchayatSarkar Bhawan in (i)DhamniPanchayat in Block Barun &(ii)Dhangai Panchayat in BlockBarun

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Request for Bids Open - National

Single Stage - TwoEnvelope 443,077.00 0.00 Under

Implementation 2017-12-05 2017-11-29 2017-12-10 2018-01-21 2018-04-05 2018-05-10 2018-11-06

GOODSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BH/BPSP/G-015 / Power Back-Up System for SPMU

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 22,727.27 0.00 Under

Implementation 2017-04-24 2017-06-19 2017-12-16

BH/BPSP/G-026 / Printing ofDiary & Calender -2017

IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process

Post Request forQuotations Open - National

Single Stage - OneEnvelope 22,727.27 0.00 Under

Implementation 2017-04-24 2017-06-19 2017-12-16

BH/BPSP/G-025 / MS OfficeLicence for the Desktops atSPMU, DPMUs, BPMUs

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 30,303.03 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

BH/BPSP/G-023 / Procurementof Consumables and StationeryItems For DPMU and BPMU

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 75,757.58 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

BH/BPSP/G-027 / Printing ofDiary & Calender -2018

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request forQuotations Open - National

Single Stage - OneEnvelope 22,727.27 0.00 Pending

Implementation 2017-10-08 2017-12-03 2018-06-01

BH/BPSP/G-021 / ColourPrinters for DPMUs

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 45,454.55 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

BH/BPSP/G-020 / Printers forDPMUs & BPMUs

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 75,757.58 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

BH/BPSP/G-018 / Desktops forSPMUs, DPMUs & BPMUs

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 45,454.55 0.00 Pending

Implementation 2017-12-20 2018-02-14 2018-08-13

BH/BPSP/G-016 / Power Back-Up System for DPMU

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 27,272.73 0.00 Pending

Implementation 2017-07-05 2017-08-30 2018-02-26

BH/BPSP/G-013 / OfficeFurniture for DPMUs

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 90,909.09 0.00 Pending

Implementation 2017-07-05 2017-08-30 2018-02-26

BH/BPSP/G-017 / Power Back-Up System for BPMU

IDA / 51600 Project Management andCoordination Post Request for Bids Open - National

Single Stage - OneEnvelope 154,545.45 0.00 Pending

Implementation 2017-10-16 2017-10-21 2017-12-02 2018-02-14 2018-03-21 2018-09-17

BH/BPSP/G-007 / WallPaintings on the Aims & Objectsof the Project

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request for Bids Open - National

Single Stage - OneEnvelope 227,272.73 0.00 Pending

Implementation 2017-10-02 2017-10-07 2017-11-18 2018-01-31 2018-03-07 2018-09-03

BH/BPSP/G-008 / Printing andInstallation of Hoardings, Kiosk,Wall-wrap, Banner, poster etc.in 12 Project Districts

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request for Bids Open - National

Single Stage - TwoEnvelope 303,000.00 0.00 Pending

Implementation 2017-12-15 2017-12-20 2018-01-31 2018-04-15 2018-05-20 2018-11-16

BH/BPSP/G-001 / Purchase of100 information machines to bedeployed at 100 GPs @estimated cost of INR 3 Lakhseach.

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request for Bids Open - National

Single Stage - TwoEnvelope 450,000.00 0.00 Pending

Implementation 2017-11-15 2017-11-20 2018-01-01 2018-01-28 2018-02-14 2018-05-15

Page 32: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 7

BH/BPSP/G-003 / Printing oftraining modules for Schemesunder BPSP and Department ofPanchayati Raj, Govt. of Bihare.g. Functional GramPanchayats, MukhyamantriGramin Peyjal Nischaye Yojna,Mukhyamantri Gramin Gali-NaliPakkikaran Nischaye Yojna, etc.

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request for Bids Open - National

Single Stage - TwoEnvelope 454,600.00 0.00 Pending

Implementation 2018-01-15 2018-01-20 2018-03-03 2018-05-16 2018-06-20 2018-12-17

BH/BPSP/G-004 / Printing oftraining modules for GramPanchayat Development Plan(GPDP)

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request for Bids Open - National

Single Stage - TwoEnvelope 454,600.00 0.00 Pending

Implementation 2018-03-15 2018-03-20 2018-05-01 2018-07-14 2018-08-18 2019-02-14

BH/BPSP/G-010 / Printing ofTraining modules on PanchayatFinancial Management forMukhiya, Up-Mukhiya, GPSecretary, Accountants Hired onOutsourced Arrangement and anAdditional 2 Functionaries in theGPs

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request for Bids Open - National

Single Stage - TwoEnvelope 113,700.00 0.00 Pending

Implementation 2017-11-15 2017-11-20 2018-01-01 2018-03-16 2018-04-20 2018-10-17

BH/BPSP/G-002 / Printing oftraining modules for RefresherCourse on Acts and Rules forPRI members and functionaries.

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request for Bids Open - National

Single Stage - TwoEnvelope 606,000.00 0.00 Pending

Implementation 2017-12-20 2017-12-25 2018-02-05 2018-04-20 2018-05-25 2018-11-21

BH/BPSP/G-009 / Printing ofIEC material for MobileAwareness Campaigns in the 2Pilot Project Districts andDistribution in the Gram Sabhasin rest of the 10 Project Districts.

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request for Bids Open - National

Single Stage - TwoEnvelope 757,600.00 0.00 Pending

Implementation 2017-12-15 2017-12-20 2018-01-31 2018-04-15 2018-05-20 2018-11-16

BH/BPSP/G-014 / OfficeFurniture for BPMUs

IDA / 51600 Project Management andCoordination Post Request for Bids Open - National

Single Stage - OneEnvelope 927,272.73 0.00 Pending

Implementation 2017-12-20 2017-12-25 2018-02-05 2018-04-20 2018-05-25 2018-11-21

NON CONSULTING SERVICESActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BH/BPSP/G-028 / Designing,fabrication and presentation oftableau on 26th January, 2017

IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process

Post Request forQuotations Open - National

Single Stage - OneEnvelope 12,121.21 0.00 Under

Implementation 2017-04-24 2017-06-19 2017-12-16

BH/BPSP/G-005 / Hiring of Non-Consultancy Services for EventManagement

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request forQuotations Open - National

Single Stage - OneEnvelope 90,909.09 0.00 Pending

Implementation 2017-07-05 2017-08-30 2018-02-26

BH/BPSP/G-024 /Housekeeping services (Non-Consultancy Services)

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 15,151.52 0.00 Pending

Implementation 2017-06-10 2017-08-05 2018-02-01

BH/BPSP/G-019 / Hiring of Non-Consultancy Services for RentalVehicles for the Project

IDA / 51600 Project Management andCoordination Post Request for

Quotations Open - National

Single Stage - OneEnvelope 75,757.58 0.00 Pending

Implementation 2018-01-04 2018-03-01 2018-08-28

BH/BPSP/G-029 / Designing,fabrication and presentation oftableau on 15th August, 2017

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request forQuotations Open - National

Single Stage - OneEnvelope 15,151.52 0.00 Pending

Implementation 2017-08-21 2017-10-16 2018-04-14

BH/BPSP/G-031 / Development& Operationalization of a MobileApp for Infrastructure AssetMapping

IDA / 51600 Project Management andCoordination Post Request for Bids Open - National

Single Stage - OneEnvelope 189,393.94 0.00 Pending

Implementation 2017-10-23 2018-04-21

BH/BPSP/G-030 / Hiring of Non-Consultancy Services for StateEvent (in 2018)

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Request forQuotations Open - National

Single Stage - OneEnvelope 15,151.52 0.00 Pending

Implementation 2018-01-22 2018-03-19 2018-09-15

BH/BPSP/G-011 / Hiring of theNon-Consulting Firm for ProvidingServices of 800 Accountants(Hired on an OutsourcedArrangement) to Support GPsunder 12 Project Districts

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Prior Request for Bids Open - National

Single Stage - TwoEnvelope 4,546,000.00 0.00 Pending

Implementation 2017-11-20 2017-11-25 2018-01-06 2018-03-21 2018-04-25 2018-10-22

BH/BPSP/G-012 / Hiring of anon-consulting firm for providingservices of 1300 Accountants(Hired on an OutsourcedArrangement) to Support GPsunder 26 Non-Project Districts inBihar (For 6 Months). In thiscase the detailed proposal maybe referred to comment section

IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process

Prior Request for Bids Open - National

Single Stage - TwoEnvelope 1,819,000.00 0.00 Pending

Implementation 2017-11-20 2017-11-25 2018-01-06 2018-03-21 2018-04-25 2018-10-22

Page 33: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 8

BH/BPSP/G-032 / Hiring of ManPower Supply Agency for theSupply of 660 Human Resources(330 Data Entry Operator And330 Accountant) for 330Functional Gram Panchayats inPhase Wise Manner

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Prior Request for Bids Open - National

Single Stage - TwoEnvelope 3,800,000.00 0.00 Pending

Implementation 2017-12-05 2017-12-10 2018-01-21 2018-04-05 2018-05-10 2018-11-06

CONSULTING FIRMSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)

Actual Amount(US$) Process Status Terms of Reference Expression of Interest

NoticeShort List and Draft

Request for ProposalsRequest for Proposals

as IssuedOpening of TechnicalProposals / Minutes

Evaluation of TechnicalProposal

Combined EvaluationReport and Draft

Negotiated ContractSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BH/BPSP/C-024 / Hiring ofHuman Resource agency for staffrecruitment

IDA / 51600 Project Management andCoordination Prior Quality And Cost-

Based Selection Open - National

265,151.51 0.00 UnderImplementation 2017-03-07 2017-03-08 2017-03-28 2017-03-09 2017-05-11 2017-03-23 2017-06-08 2017-04-25 2017-07-08 2017-06-05 2017-08-12 2017-07-31 2017-09-16 2018-09-16

BH/BPSP/C-015 / PMU forState Wide PFM Roll Out

IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process

Prior Quality And Cost-Based Selection Open - National

606,061.00 0.00 Under

Implementation 2017-04-10 2017-04-24 2017-05-01 2017-05-30 2017-06-14 2017-06-07 2017-07-12 2017-07-07 2017-08-11 2017-07-13 2017-09-15 2017-08-07 2017-10-20 2018-10-20

BH/BPSP/C-021 / Base Line &End Line Surveys for MeasuringProgress

IDA / 51600 Project Management andCoordination Post

ConsultantQualificationSelection

Open - National

189,394.00 0.00 UnderImplementation 2017-04-10 2017-04-21 2017-05-01 2017-06-14 2017-05-24 2017-07-14 2017-08-18 2018-02-14

BH/BPSP/C-028 / Hiring of HRSupport Agency

IDA / 51600 Project Management andCoordination Prior Quality And Cost-

Based Selection Open - National

196,970.00 0.00 UnderImplementation 2017-04-10 2017-06-01 2017-05-01 2017-06-05 2017-06-14 2017-07-24 2017-07-12 2017-08-11 2017-09-15 2017-10-20 2018-10-20

BH/BPSP/C-027 / IntegratedWeb Portal for BGSYS-Development and Management ofIntegrated Web Portal thatincludes HR - MIS, Training -MIS, Online BiometricAttendance, etc. for the Society

IDA / 51600 Project Management andCoordination Post

ConsultantQualificationSelection

Open - National

189,393.94 0.00 UnderImplementation 2017-04-19 2017-04-21 2017-05-10 2017-06-23 2017-07-23 2017-08-27 2018-02-23

BH/BPSP/C-007 / Hiring ofagency for Training NeedAssessment

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

PostConsultantQualificationSelection

Open - National

75,757.58 0.00 PendingImplementation 2017-08-31 2017-09-21 2017-11-04 2017-12-04 2018-01-08 2018-07-07

BH/BPSP/C-008 / Hiring ofagency for Research and Studieson thematic issues related toPRIs

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

PostConsultantQualificationSelection

Open - National

75,757.58 0.00 PendingImplementation 2017-07-17 2017-08-07 2017-09-20 2017-10-20 2017-11-24 2018-05-23

BH/BPSP/C-030 / IntegratedMobile Van AwarenessCampaign for the Piloted basison two Project PanchayatsDistricts - Integrated InformationDelivery System

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Prior Quality And Cost-Based Selection Open - National

1,363,636.36 0.00 Under

Implementation 2017-05-30 2017-10-17 2017-06-20 2017-10-17 2017-08-03 2017-08-31 2017-09-30 2017-11-04 2017-12-09 2018-12-09

BH/BPSP/C-033 / Hiring of aCreative Agency on a short termconsultancy basis forDevelopment of Print Designs

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

PostConsultantQualificationSelection

Open - National

22,727.27 0.00 PendingImplementation 2017-05-25 2017-06-15 2017-07-29 2017-08-28 2017-10-02 2018-03-31

BH/BPSP/C-014 / Preparationof training Module and materialsfor Water & Sanitation Programs

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

PostConsultantQualificationSelection

Open - National

75,757.58 0.00 PendingImplementation 2017-06-30 2017-07-21 2017-09-03 2017-10-03 2017-11-07 2018-05-06

BH/BPSP/C-020 / PMU for e-Panchayat Implementation

IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process

Prior Quality And Cost-Based Selection Open - National

757,575.76 0.00 Pending

Implementation 2017-07-31 2017-08-21 2017-10-04 2017-11-01 2017-12-01 2018-01-05 2018-02-09 2019-02-09

BH/BPSP/C-022 / Internal Auditfor the BGSYS ProjectManagement Units

IDA / 51600 Project Management andCoordination Post

ConsultantQualificationSelection

Open - National

12,121.21 0.00 PendingImplementation 2017-07-17 2017-08-07 2017-09-20 2017-10-20 2017-11-24 2018-05-23

BH/BPSP/C-023 / StatutoryAudit to BGSYS ProjectImplementation Units

IDA / 51600 Project Management andCoordination Post Least Cost Selection Open - National

7,575.76 0.00 Pending

Implementation 2017-05-31 2017-06-21 2017-08-04 2017-09-01 2017-10-01 2017-11-05 2017-12-10 2018-06-08

BH/BPSP/C-003 / Hiring of aconsultancy firm to assist theproject in implementation ofEnvironment ManagementFramework and Monitoring for330 PSBs

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Quality And Cost-Based Selection Open - National

151,500.00 0.00 Pending

Implementation 2018-01-10 2018-01-31 2018-03-16 2018-04-13 2018-05-13 2018-06-17 2018-07-22 2019-07-22

BH/BPSP/C-10 / Hiring ofagency for Development ofContent with Design for TrainingModules for fulfilment of BPSPObjectives vis-a-vis FunctionalGPs, Gram Panchayat FinancialManagement, GPDP and StateSchemes Implemented throughPanchayati Raj Deptt, GoB.

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Quality And Cost-Based Selection Open - National

160,000.00 0.00 Pending

Implementation 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-06-26

Page 34: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 9

BH/BPSP/C-011 / Hiring of aConsultancy firm for Developmentof Community EngagementPlatform for MeaningfullyRecording the Citizens'Reactions on the Performance ofthe PRIs and Subsequent Issueof Advisory to the RespectivePRIs

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Quality And Cost-Based Selection Open - National

151,600.00 0.00 Pending

Implementation 2017-12-25 2018-01-15 2018-02-28 2018-03-28 2018-04-27 2018-06-01 2018-07-06 2019-07-06

BH/BPSP/C-028/N / Hiring ofHR Support Agency Pay Roll &Performance Management of theBGSYS Staff at all levels (1575employee for 18 Month- @Rs.450 Per person per month)

IDA / 51600 Project Management andCoordination Post Quality And Cost-

Based Selection Open - National

200,000.00 0.00 PendingImplementation 2017-09-26 2017-10-17 2017-11-30 2017-12-28 2018-01-27 2018-03-03 2018-04-07 2019-04-07

BH/BPSP/C-001 / Third PartyQuality Audit of the Constructionof 330 PSBs under the Project

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Quality And Cost-Based Selection Open - National

227,272.73 0.00 Pending

Implementation 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-06-26

BH/BPSP/C-002 / Consultancyto monitor and enable process ofmaking 330 gram panchayatsFunctional

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Quality And Cost-Based Selection Open - National

454,545.45 0.00 Pending

Implementation 2018-02-15 2018-03-08 2018-04-21 2018-05-19 2018-06-18 2018-07-23 2018-08-27 2019-08-27

BH/BPSP/C-012 / Production ofTwo Short Films

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Quality And Cost-Based Selection Open - National

454,545.45 0.00 Under

Implementation 2017-10-17 2017-10-12 2017-11-07 2017-10-17 2017-12-21 2018-01-18 2018-02-17 2018-03-24 2018-04-28 2019-04-28

BH/BPSP/C-031 / Hiring of Firmfor designing of all IEC materialfor the Project with Ready toPrint Designs

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

PostConsultantQualificationSelection

Open - National

200,000.00 0.00 UnderImplementation 2017-10-16 2017-10-12 2017-11-06 2017-10-17 2017-12-20 2018-01-19 2018-02-23 2019-10-16

BH/BPSP/C-032 / Hiring ofconsultancy firm for Production ofAudio Jingles & Fictional RadioSerials

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Quality And Cost-Based Selection Open - National

380,000.00 0.00 Under

Implementation 2017-10-16 2017-10-12 2017-11-06 2017-10-17 2017-12-20 2018-01-17 2018-02-16 2018-03-23 2018-04-27 2019-04-27

BH/BPSP/C-018 / Identificationof Trainers & ToT for State WidePFM Training

IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process

Post Quality And Cost-Based Selection Open - National

303,030.30 0.00 Pending

Implementation 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-06-26

BH/BPSP/C-037 / Hiring of theconsultancy firm for DLIVerification of 330 functionalPanchayats in 12 ProjectDistricts.

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

PostConsultantQualificationSelection

Open - National

190,000.00 0.00 PendingImplementation 2017-12-20 2018-01-10 2018-02-23 2018-03-25 2018-04-29 2018-10-26

BH/BPSP/C-010/N / Hiring ofagency for Development ofContent with Design for TrainingModules for fulfilment of BPSPObjectives vis-avis FunctionalGPs, Gram Panchayat FinancialManagement, GPDP & StateSchemes Implemented throughPanchayati Raj Department,Govt. of Bihar

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Fixed BudgetSelection Open - National

160,000.00 0.00 Pending

Implementation 2017-12-10 2017-12-31 2018-02-13 2018-03-13 2018-04-12 2018-05-17 2018-06-21 2019-06-21

INDIVIDUAL CONSULTANTSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)

Actual Amount(US$) Process Status Terms of Reference

Invitation toIdentified/Selected

ConsultantDraft Negotiated

Contract Signed Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

BH/BPSP/C-029 / Hiring of theindividual consultant forDesigning and illustrating ofBooks and leaflets for electedrepetitive and functionaries underPRI

IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process

Post Individual ConsultantSelection Open

4,545.45 0.00 Under

Implementation 2017-04-19 2017-04-21 2017-06-07 2017-06-28 2017-08-02 2018-01-29

BH/BPSP/C-006 / Hiring ofIndividual Consultants for theCapacity Building Cell

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Individual ConsultantSelection Open

75,757.58 0.00 Pending

Implementation 2017-07-17 2017-09-04 2017-09-25 2017-10-30 2018-04-28

BH/BPSP/C-013 / IndividualEconomist with expertise inPublic Finance

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Individual ConsultantSelection Open

113,636.36 0.00 Pending

Implementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2018-03-27

BH/BPSP/C-025 / AdminConsultant

IDA / 51600 Project Management andCoordination Post Individual Consultant

Selection Open

30,303.03 0.00 PendingImplementation 2017-06-30 2017-08-18 2017-09-08 2017-10-13 2018-04-11

BH/BPSP/C-026 / IndividualConsultant for Support to theProcurement Unit of BGSYS

IDA / 51600 Project Management andCoordination Post Individual Consultant

Selection Open

30,303.03 0.00 PendingImplementation 2017-05-30 2017-07-18 2017-08-08 2017-09-12 2018-03-11

Page 35: BIHAR PANCHYAT STRENGTHENING PROJECTdocuments.worldbank.org/curated/en/853721513760976732/pdf/Plan...1 1 BIHAR PANCHYAT STRENGTHENING PROJECT PROCUREMENT PLAN FOR 18 MONTHS I. General

Page 10

BH/BPSP/C-034 / Hiring of CAfirm for Statutory Audit ofBGSYS SPMU office

IDA / 51600 Project Management andCoordination Prior Direct Selection Direct

380.00 0.00 Under

Implementation 2017-09-15 2017-09-25 2017-11-29 2018-05-28

BH/BPSP/C-005 / Hiring of anAgency for Training Programunder Core institutional CapacityBuilding Component - through aGovt/semi-Govt agency

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Prior Direct Selection Direct

530,300.00 0.00 PendingImplementation 2017-12-15 2017-12-25 2018-02-28 2018-08-27

BH/BPSP/C-009 / Hiring of anagency for Computer literacyPrograms for the elected PRIrepresentatives through agovernment / semi-governmentagency

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Prior Direct Selection Direct

227,300.00 0.00 UnderImplementation 2017-10-10 2017-09-25 2017-10-20 2017-12-24 2018-06-22

BH/BPSP/C-034/N / Hiring ofCA firm for Statutory Audit ofBGSYS SPMU office

IDA / 51600 Project Management andCoordination Post Direct Selection Direct

380.00 0.00 Pending

Implementation 2017-09-26 2017-10-06 2017-12-10 2018-06-08

BH/BPSP/C-009/N / Hiring of anagency for Computer literacyPrograms for the elected PRIrepresentatives through agovernment / semi-governmentagency

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Direct Selection Direct

340,000.00 0.00 PendingImplementation 2017-10-10 2017-10-20 2017-12-24 2018-06-22

BH/BPSP/C-016 / Procurementof GPMS Software directly fromWest Bengal PRI includingTechnical Services (Hand-holdingServices for State Wide Roll Out,etc.)

IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process

Post Direct Selection Direct

76,000.00 0.00 PendingImplementation 2017-11-15 2017-12-02 2018-01-18 2018-07-17

BH/BPSP/C-017 / OrganizingTraining Programs on usages ofGPMS for the Accountants (Tobe Taken on Board on anOutsourced Arrangement)through an internal arrangementsin collaboration with anygovernment / semi-governmentagency

IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process

Post Direct Selection Direct

230,000.00 0.00 PendingImplementation 2017-11-28 2017-12-08 2018-02-11 2018-08-10

BH/BPSP/C-035 / Hiring of theconsultant firm for preparation ofDPR (330 Panchayat SarkarBhawans)

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Direct Selection Direct

45,000.00 0.00 PendingImplementation 2017-10-17 2017-10-27 2017-12-31 2018-06-29

BH/BPSP/C-036 / Hiring ofconsultancy firm forProgrammatic support to theBihar Gram Swaraj YojnaSociety

IDA / 51600

Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.

Post Direct Selection Direct

160,000.00 0.00 PendingImplementation 2017-12-20 2017-12-30 2018-03-05 2018-09-01

BH/BPSP/C-038 / Hiring ofIndividual Consultant forEnvironmental & SocialSpecialist (Safeguard Specialist)-1

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Individual ConsultantSelection Open

40,000.00 0.00 Pending

Implementation 2017-12-20 2018-02-07 2018-02-28 2018-04-04 2018-10-01

BH/BPSP/C-039 / Hiring ofIndividual Consultant forEnvironmental & SocialSpecialist (Safeguard Specialist)-2

IDA / 51600

Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats

Post Individual ConsultantSelection Open

40,000.00 0.00 Pending

Implementation 2017-12-20 2018-02-07 2018-02-28 2018-04-04 2018-10-01