bight exploration q1 2017 update - regional development … · 2017-03-06 · © 2017 chevron...
TRANSCRIPT
© 2017 Chevron Australia Pty Ltd
Bight Exploration Q1 2017 Update
David Moffat General Manager Exploration
&
Dee Bourbon External Affairs
2 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Bight exploration - Q1 2017 update Chevron’s operations in Australia
EXMOUTH PLATEAU
GREATER GORGON
NORTH WEST SHELF
WHEATSTONE
Karratha
Onslow
Barrow Island
Thevenard Island 200kms
North West Operations
Bight Basin
500kms
North Carnarvon Basin
3 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Chevron Australia Largest natural gas resource holder in Australia
Exploration • One of Chevron’s
global focus areas.
• 25+ Discoveries
2009 -2015.
• Success rate 90%.
4 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Chevron’s commitment to Australia Australian industry participation
Gorgon
• $34 billion* Spent on Australian goods and
services
• 700 contracts Awarded to Australian companies
• 10,000 jobs Workers directly employed
Wheatstone
• $11 billion* Spent on Australian goods and
services
• 300 contracts Awarded to Australian companies
• 7,000 jobs Workers directly employed
*To end of quarter one 2015
Source: ACIL Allen economic modelling
5 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Chevron’s Bight Exploration EPP44 & EPP45 permit locations and distances to main ports
Ceduna
Port Lincoln
Adelaide
Great Australian Bight
EPP44
EPP45
620 km
Chevron acreage
Nerites 3D seismic survey
100 km
6 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Chevron Australia Supporting local South Australian communities
• Committed to full, fair and reasonable opportunity for local industry.
• ~$125 million committed to Australian local content to date.
• 196 Australian workers employed offshore in two-stage seismic survey.
• Chase boats contracted from local businesses.
• Working with Industry Capability Network of South Australia (ICN SA).
• Identifying capacity and capability in marine, aviation & logistics services in Ceduna, Port Lincoln
& Adelaide.
CASE STUDY: Osmoflo
“The contract Osmoflo was awarded [five desalination projects] required a high level
of design engineering and documentation to achieve Gorgon’s operability
requirements and environmental standards.”
“This enabled Osmoflo to provide opportunities to our employees to increase their
skillset, which helped expand our business capabilities. Osmoflo has secured projects
not only in Australia but globally using the expertise obtained on the Gorgon Project.”
Marc Fabig, Director, Osmoflo South Australia
7 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Chevron’s deepwater exploration record
Drilling expertise • Highly experienced in difficult deepwater
environments: Gulf of Mexico, North Sea, Brazil,
West Africa, Australia, Canada.
• 301 wells in water depths (WD) greater than 1,000m.
• 80 wells deeper than 1,500m WD.
• 2,363m WD 400 km off Newfoundland.
• Deepest WD 2,934m Tobago#1 in the GOM.
• Drilled 70 wells in offshore WA since 1987 without a
single well-related loss of containment.
• Continuous improvement in safe practice and
regulatory oversight since Macondo and Montara.
• Led the industry in gaining regulatory approval to
resume operations in Gulf of Mexico.
• Industry leading WellSafe process.
Exploration areas Production
8 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Offshore exploration in Australia
Offshore SA exploration • Australian petroleum industry that has safely
produced in NW WA and Bass Strait for 50 years.
• Offshore exploration safely undertaken in SA
waters for 50 years.
• First SA seismic survey conducted in 1966 with
130 programs completed.
• Since 2011, four seismic surveys undertaken in
the Bight without environmental incident or
identified harm.
• First well drilled offshore SA in 1972.
• 24 wells drilled to date with 13 wells in the Bight.
• Last Bight well drilled by Woodside was
Gnarlyknots 1A in 2003, drilled safely to 4,736m.
Source: SA Government
9 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Offshore exploration in Australia Southern Australia Margin Analogue - Gippsland Basin
Development analogue
• Multiple >1 BBOE fields.
• Halibut Field has already produced >900MMBO.
• Several giant fields are present with oil fields in the
outer trend.
• Generating approximately $300 billion* in federal
government revenues in real terms (2.1 per cent of
all Government revenues collected in the period.)
• Flow on effects have contributed over $200 billion
to Australia's Gross Domestic Product (GDP).
• $2.2 billion per annum in nominal terms.
• Approximately 50,000 permanent additional jobs
have been created in Victoria (14,000 in regional
Gippsland alone).
*ExxonMobil study, 2006 and Figures over time are calculated in 2004
present value terms
10 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
• Exploration and development is a decade-long
process
• The Bight represents one of Australia’s most
prospective frontier hydrocarbon exploration
regions and remains largely unexplored.
• Chevron has extensive experience:
− Safely drilling comparable wells globally
− Developing and implementing Environment Plans
for our exploration programs
Bight exploration - Q1 2017 update Chevron’s operations in South Australia
11 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Overview of NOPSEMA environment plan process
Prepare
Draft EP
Public
consultation
Update and
submit EP
NOPSEMA
assessment
Ongoing
consultation
12 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Progress update: what we’ve been working on
• Preparation of draft Environment Plan
• Analysis of seismic data to plan the drilling campaign
• Emergency response planning
• Completed stage 1 of the CSIRO Great Australian Bight deepwater marine program
• Preliminary stakeholder consultation
– New APPEA methodology
– Community events: Tunarama, Mortlock Shield, Cleve Field Day, Oysterfest
13 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Information for public consultation
• Introduction to activities in the Great Australian
Bight
• Description of the activity
• Description of the environment
• Stakeholder engagement and feedback
• Implementation strategy
• Introduction to emergency response
• Environmental risk and impact assessment
methodology
• Environmental risk assessment and management
– Planned activities
– Unplanned events (non-emergency)
– Emergency events
– Emergency response
• Supplementary information
14 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
Current environment plan schedule
Conduct seismic Analyse
seismic
2014-15 2015-2018
Plan & prepare
draft EP
Stakeholder
consultation
Update and
submit EP
Q3/Q4 2017 Q1 2016-Q3 2017 Q2-Q3 2017
• Baseline studies
• CSIRO study
• Oil spill modelling
• Preliminary
stakeholder
consultation
• Emergency
response planning
• Management and
monitoring plans
• Six week formal
consultation
• Website for
information and
submissions
• Stakeholder input
assessed and EP
updated
• NOPSEMA
assessment
15 © 2017 Chevron Australia Pty Ltd. All Rights Reserved.
the RGB values to select color.
• Information on website
• Local community visits
• Stakeholder meetings
• Industry engagement
Q2-Q3 2017
Current stakeholder engagement schedule
Notify
stakeholders
Formal
consultation
Late Q2 2017
Assess
submissions
Q3 2017
Close
feedback
Q3 2017
Update &
submit EP
Q3/Q4 2017
Incorporate relevant stakeholder
feedback into draft EP
Q2-Q3 2017 Ongoing consultation as per
commitments in EP
stakeholder engagement plan
Preliminary consultation
Q2 2016-Q2 2017
© 2016 Chevron Corporation
Thank you, any questions?