ink Bold. Innovative. Growth. B.I.G. B.I.G. Appendix C: Priority Transportation Projects

Upload: others

Post on 06-Sep-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

ThinkBold. Innovative. Growth.

B.I.G.B.I.G.

appendix C: Priority Transportation Projects

Page 2: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

Comprehensive Plan 2040 : 65

!!ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SH

OT

WE

LL R

D

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

ENTER

PRISE D

R

US 70 BUS HWY WUS 70 BUS HWY W

SHOTWELL

RD

0 100 20050Feet

Intersection Improvement Needed

Project Extent

PROjECT iD | nAmE inT-1 | us 70 Business west @ shotwell Road

imPROvEmEnT TyPE:

COsT EsTimATE:

EXisTing AnD fuTuRE COnDiTiOns:

Intersection Improvement

< $1 Million

► US 70 Business

■ Existing Conditions: 37,000 Annual Average Daily

Traffic in 2013 (AADT)*

■ Future Conditions: 46,340 AADT in 2040**

■ Comprehensive Transportation Plan (CTP) Class:

Existing Boulevard

► Shotwell Road

■ Existing Conditions: 8,800 AADT on Shotwell Road

(South of US 70) in 2013*

■ Future Conditions: 14,152 AADT and 1.166 Volume

to Capacity Ratio in 2040**

■ CTP Class: Boulevard Needs Improvement

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

US 70 Business is scheduled for widening in the CAMPO 2040 Metropolitan Transportation Plan (MTP) for the 2040 horizon

year. Shotwell Road, south of US 70 Business, is scheduled for widening in 2040 in the CAMPO 2040 MTP. Shotwell Road,

north of US 70 is identified in the CAMPO 2040 MTP as a need, but is unfunded.

The intersection is located adjacent to a growing Commercial Center identified on the Clayton Future Land Use Plan. Shotwell

Road serves a vital linkage from Wake County and Downtown Clayton to dense residential areas south of US 70. There are

significant safety concerns with this intersection. There were 8 vehicular accidents in 2013-2014. Safety concerns and

problems due to lack of pedestrian facilities will be exacerbated in the future.

This intersection is being evaluated as part of the CAMPO Southeast Area Study. Recommended improvements will need to address

current and future levels-of-service as well as vehicular and pedestrian safety concerns.

*Based on NCDOT 2013 Annual Average Daily Traffic Counts**Based on CAMPO Triangle Regional Model results (Max PM V/C Ratio in 2040, No Build Scenario)

APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS

Page 3: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

66 : Town of Clayton

ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SHO

TW

ELL

RD

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

ST42

ST42

AMELIA CHURCHRD

PARK DR

COU

NTRY

LN

W FIRSTST

US70 HWY

W

WILLOW

DR

CHARLES S

T

BI LTMOREDR

S FAYETTEVILLE

ST

S LOMBARD ST

WIGEONLN

GR

OV EWOO DD

R

S BARBOUR

ST

NC42 HWY W

HO

BB

S ST

GUY RD

HARDEE ST

VOG

UE S

T

STO

NEBR

OOK D R

WEXFORD DR

HORSEMANS

RIDGE

DR

BENNINGTON DR

STONELN

CRES

CENT DR

DOV ELN

US 70 BUS HWY W

GLENGARIFF LN

WAS HIN

GTON

ST

AVON DAL

EDR

KER

SH AWLN

WA

LNU

TCR

EE K

DR

KERRIANN LN

CAMELST

NORWICH DRKILLINGTON DR

HU

NTER

WAY

US 70HWY W

KENDALLDR N

MIA

L ST

ROWAN DR

VALLEY DR

WESTMINSTER

DR

FORT DR

BUTTONWOOD

LN

RAN D

OLPH

D R

SES

DR

GRANT ST

US70 BUS

HWY

W

MC

KEN

Z IE

CIR

AMELIA CHURCH RD

WINDINGWOODDR

OHARA ST

JOHNSONESTATE RD

DAIRY

RD

PL

Y MOUTH D R

GREE

NWOOD

DR

BAR

BER

MIL

L R

D

S ROBERTSON S

T

NC 42 HWY E

G

RA

CIE

LN

PECAN LNDURH AM ST

E FRONT ST

REGEN CY DR

BRIGADOON DR

SHOTW

ELLRD

DEER

TRL

CO

X W OODS RD

AVE

R

AS BORO DR

SHORT JO HNSON RD

RIDGE DR

WIN

STON RD

HOR

SE

MA N S RID

GE

DR

LAU RE

LR

IDGE

DR

KELL

ERDR

WA

LDEN

WAY

W

TIFFANY

CIR

LITT

LEC

REEK

CH

URC

HR

D

SAN

DY

RID

GE

DR

E

PAM

LIC

ODR

HARDEE LN

ST

ATEAV E

WIL

DW

OO

D D

R

CO

RB

ETT

RD

CLAYTONHIGH

WESTCLAYTON

ELEMCLAYTON MIDDLE

ClaytonCommunity

Park

AllStarPark

FutureLionsgate

Park

East ClaytonCommunity

ParkEast

ClaytonDog Park

HorneSquare

0 1,000 2,000500Feet

Roadway Classification

Freeway, Existing

Freeway, Widening and HOT Lane

Freeway, New Location

Boulevard, Existing

Boulevard, Widening

Boulevard, New Location

Major Thoroughfare, Existing

Minor Thoroughfare, Existing

Minor Thoroughfare, Streetscape

Minor Thoroughfare, New Location

Project Extent

PROjECT iD | nAmE nl-1 | southern Connector (R-3618)

imPROvEmEnT TyPE:

lEngTh

COsT EsTimATE:

EXisTing AnD fuTuRE COnDiTiOns:

New Location Roadway

2.67 Miles

$30.5 Million*

► Right-of-way

■ 100 ft of right-of-way existing through the

Cobblestone Subdivision

■ 100 ft of right-of-way needed on remainder of

corridor

► Road Class and Cross Section

■ Comprehensive Transportation Plan (CTP) Class:

Future Boulevard

■ Cross Section: 2-lane divided, intermittent turn

lane, planted median, bike lanes, and sidewalks

(both sides) or greenway (one side)**

■ Potential to widen to 4 lane facility in future phase

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

Guy Road, west of NC 42 is scheduled for widening in the CAMPO 2040 Metropolitan Transportation Plan (MTP) for the 2040 horizon

year. The Southern Connector is included in the Johnston County Comprehensive Transportation Plan (CTP) and in the CAMPO MTP

as an unfunded project. The project scored well in the previous NCDOT prioritization process, and is programmed for planning and

environmental study in the Statewide Transportation Improvement Program (STIP), but has not received construction funding.

A new location roadway would provide additional connectivity on the southside of US 70 Business, potentially relieving

congestion on NC 42 and US 70 Business. Additionally, a connection from the Cobblestone Subdivision to Little Creek Church

Road would improve fire response and relieve congestion on US 70 Business.

Coordinate with transportation planning agencies to determine appropriate segmentation and improve project scoring in NCDOT

prioritization process. Coordinate with NCDOT to prioritize project and include design and construction funding in STIP.

*Cost estimate provided is from NCDOT for R-3618 in the 2016-2025 STIP**Exact Cross Section to be determined with further study

APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS

Page 4: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

Comprehensive Plan 2040 : 67APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS

ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SHO

TW

ELL

RD

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP**

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

##

##

##

##

##

##

####

##

##

##

##

##

##

####

##

ST42

JOHNST

ON

WAK

E

BOB

BITR

D

EAS

ON

DR

NE USE RIDGE DR

M

OUNTAINTO SEA TRL

N

HOBBS ST

EC

OTT

ON

GIN

DR

CHAR

LES

ST

S FA

YETT

EVIL

LE S

T

MAYFLOWER WAY

S BA

RBO

URST

GERAN

IUM

WAY

N FA

YETT

EVIL

LEST

MIS

SY LN

SIOUXLN

WILLIA

M LN

GREEN

WILLOWS DR

WILLOW DR

PARK DR

HAR

DEE

ST

TANN

ERSW

AY

W MAIN STW HORNE ST

OLE ANDER

DR

ENT

ERPRI SE

D

R

COVERED BRIDGE RD

VIN

S ON

RID

GE

LN

HIBISCU

S

DR

LAFOY DR

DAFF

ODI

LLN

PO

WE LL

DR

CR

ESC

ENT

DR

GEO

RGETOWNEDR

SNE

ADDR

POPE

CT

LAKESID

ED

R

CAMEL ST

RIV

ERH

ILLS

DR

RID

GECR

ESTD

R

WASHINGTO

NST

KE

R

SHAWLN

PEBBLE DR

OAKDALE AVE

HAR

MO

NY

CT

VINSON RD

ROSEMARY ST

W FIRST ST

SHO

TWE

LL RD

RIV

ERW

OO

DDR

NM

IAL

ST

ATKINS

ON

ST

OH

AR

A S

T

FOX HOLLOW DR

CEDARDALE CT

NC42 HWY E

SARATOGA

LN

ED

GEW

ATERDR

AMELIA CHURCH RD

PINELAND AVE

GUY RD

JASMIN

E

DR

GREE

NWO

OD

DR

PER CY

DR

S R

OBE

RTSO

N S

T

MAYLO NLN

MULBERRY RD

OLD US 70 HWY W

US 70 BUS HWY W

PECAN LNLOPEZ LN

HU

N TSBRIDGE

DR

TOWN CENTRE BLVD

DOGWOOD

AVE

LIGH

TF

OOT DR

BIRK DALEDR

E FRONT ST

CH

RIS

TENBURY

LN

REGEN CY DR

T R DR

GLEN LAUREL RD

SMITH

DR

DEER

FIELD DR

SM

OKEYS

WAY

RANG

ER

STR

L

FOREST DR

LIBERTY

LN

DEERTRL

CR

ES

TDAL

E

DR

US 70 BUS HWY W

MOUNTAIN TO SEA TRL S

RIDGE DR

BRO

OK

HILL

DR

CA

STL

EBE

RR

YRD

LY

NSHI RE

AVE

DOV

E L N

AVE

RY

FAR

MLN

QU

EEN

ANN

DR

MEDICALPARKPL

WA

LD

ENWAY

LAK

EPO

INTDR

QUEENS

FERRYLN

MU

IRFI

ELD

LN

CITY R

D

PALM

ER

DR

FER

NW

OO

D D

R

RID

GE

CT

NE

US

ER

IVE

RPK

WY

H

OGA N

CIR

GATE

WAY

DR

ROCK CIR

TRANTHAM

TRLALAN

LN

PINE

TRL

EASTCLAYTONELEM

CLAYTONHIGH

COOPERELEMENTARY

ClaytonMunicipal

Park

Legend Park

ClaytonCommunity Park

All StarPark

East ClaytonCommunity Park

East ClaytonDog Park

North ClaytonCommunity Park

(Planned)

HorneSquare

Trail HeadSams Branch

Greenway

ClemmonsStateForest

0 1,300 2,600650Feet

Roadway Classification

Freeway, Existing

Freeway, Widening and HOT Lane

Freeway, New Location

Boulevard, Existing

Boulevard, Widening

Boulevard, New Location

Major Thoroughfare, Existing

Minor Thoroughfare, Existing

Minor Thoroughfare, Streetscape

Minor Thoroughfare, New Location

Project Extent

PROjECT iD | nAmE nl-2 | northern Connector

imPROvEmEnT TyPE:

lEngTh

COsT EsTimATE:

EXisTing AnD fuTuRE COnDiTiOns:

New Location Roadway

2.36 Miles

$14 Million*

► Right-of-way ■ Up to 110 ft of right-of-way needed

► Road Class and Cross Section ■ Comprehensive Transportation Plan (CTP)

Class: Future Boulevard ■ Cross Section: 2-lane undivided, intermittent

turn lane, bike lanes, planting strip, and sidewalks (both sides) or greenway (one side)**

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

The Clayton Northern Connector is included as a new location boulevard in the adopted Johnson County Comprehensive Transpor-

tation Plan (CTP). It is not included as a funded or unfunded project in the CAMPO 2040 Metropolitan Transportation Plan (MTP).

The northside of the Town of Clayton is growing. Additional connectivity is needed to reduce travel times between Covered

Bridge Road and NC 42 East. This new location facility would reduce traffic on Covered Bridge Road, NC 42, and US 70

Business, as well as decrease fire response time to new residential areas north of Downtown Clayton. Submit project for inclusion in the next update of the CAMPO MTP.

*Cost estimates provided are for planning purposes only and include construction cost only (does not include right-of-way or utilities)**Exact route and cross sction to be determined with further study

Page 5: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

68 : Town of Clayton

ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SHO

TW

ELL

RD

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

ST42

GLENN ST

SES DR PLYM

OU

THDR

CH

AR

LES

ST

BI LTM

ORE

DR

S FA

YET

TEVI

LLE

ST

SLO

MBA

RD

ST

W STALLINGS ST

S B

AR

BO

UR

ST

N F

AYE

TTEV

ILLE

ST

SIOUXLN

HOBBS ST

WILLOW DRPARK DR

HA

RD

EE S

T

W MAIN ST

W HORNE ST

ENT

ERPRISE

D

R

VOGUE ST

GRACIE LN

POW

ELL

DR

CR

ESC

E NT

DR

GEORGETOWNEDR

POPE CT

US 70 BUS HWY W

CA

RD

I NAL

DR

LAKESIDEDR

CAMEL ST

RIDGECREST

DR

WASHING

TON

ST

AVON

DALE D

R

KE

R S HAW

LN

RA

NC

H R

D

PEBBLE DR

OAKDALE AVE

NORW

ICH D

R

KILL

ING

TON

DR

HARMONYCT

ROSEMARY ST

EC

HAM

PION

ST

W FIRST ST

SHOTWELL RD

GRANT ST

WALDENWAY

ATKI

NSONS

T

RAMBLEWOODDR

WES

TMIN

STER

DR

DOGWOOD

FOREST LN

EDGEWATERDR

RANDOLPH

DR

AMELIA

CHURCHR

D

OH

AR

A ST

PINELAND AVE

WO

ODM

ERE DR

GR

EE

NW

OO

D

D R

US 70 HWY W

S R

OB

ERTS

ON

ST

MULBERRY RD

OLD US 70 HWY W

US 70 BUS HWY W

PE

CAN LN

BRIG

ADOO

N DR

DURHAM

ST

TOWN CENTRE BLVD

DOGWOOD

AVE

LIGHT

FOOT

DR

EFRONT ST

REG

EN CY

DR

T R D

R

COVE

RED B

RIDG

E RD

RIDGE DR

WILDW

OOD DR

SMOKEYSW

AY

RAN

GE

RS

TRL

NO

'NEI

L ST

FOREST DR

CREST

DALE

DR

LIBERTY

LN

DEERTRL

CITY RD

US 70 BUS HWY WLITTLE CREEK CHURCH RD

NC42

HWY

E

DOV

E L N

MAYLON

LN

RIVER OAKS

RD

NM

IAL

ST

ROW

ANDR

W

TIFFANY CIR

NC

HUR

CHST

MEADOW

RU

N

PAMLICODR

HA

RD

EE L

N

RIDG

E CT

GAT

EW

AYDR

ROCK CIR

OUT OFCOUNTY

CLAYTONHIGH

WEST CLAYTONELEM

COOPERELEMENTARY

ClaytonMunicipal

Park

LegendPark

ClaytonCommunity

Park

AllStarPark

FutureLionsgate

Park

East ClaytonCommunity

Park EastClayton

Dog Park

HorneSquare

ClemmonsStateForest

0 1,000 2,000500Feet

Roadway Classification

Freeway, Existing

Freeway, Widening and HOT Lane

Freeway, New Location

Boulevard, Existing

Boulevard, Widening

Boulevard, New Location

Major Thoroughfare, Existing

Minor Thoroughfare, Existing

Minor Thoroughfare, Streetscape

Minor Thoroughfare, New Location

Project Extent

PROjECT iD | nAmE ss-1 | main street streetscape improvements

imPROvEmEnT TyPE:

lEngTh

COsT EsTimATE:

EXisTing AnD fuTuRE COnDiTiOns:

Streetscape Improvements

1.17 Miles

$60,000-80,000 for Streetscape Master Plan, cost of

improvements will vary based on recommendations.

► Right-of-way

■ Existing right-of-way varies from 40-60 ft

► Road Class and Cross Section

■ Comprehensive Transportation Plan (CTP) Class:

Minor Thoroughfare Needs Improvement

■ Future cross section: aesthetic and operational

improvements need to be determined with a

detailed streetscape master plan.

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

Main Street is designated as a minor thoroughfare that needs improvement in the adopted Johnson County Comprehensive

Transportation Plan (CTP). It is not included as a funded or unfunded project in the CAMPO 2040 Metropolitan Transportation

Plan (MTP). Minor aesthetic improvements have been made in the Downtown area in previous years.

Aesthetic and operational improvements are needed between Shotwell Road and US 70 Business through Downtown Clayton.

Additional street, pedestrian and bicycle accommodations, and intersection improvements should be studied and included as

components of a streetscape master plan.

Coordinate with transportation planning agencies and request NCDOT Division funds, Local Area Administered Projects

Program (LAPP) funds and/or identify local funds for a detailed streetscape master plan. This master plan could be conducted

as a stand-alone project or in conjunction with an update of the Downtown Master Plan. The streetscape master plan would

identify key operational, safety and aesthetic improvements between South Moore Street and Central Street.

APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS

Page 6: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

Comprehensive Plan 2040 : 69

ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SHO

TW

ELL

RD

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

ST42

GUY RD

RIVER

HILLS

DR

CIT

Y R

D

CAST

LEBE

RRY

RD

CARD

INAL

DR

CHARLES S

T

BI LTMOREDR

S FAYETTEVILLE

ST

S LOMBARD ST

W STALLINGS ST

TEW CT

S BARBOUR

ST

N FAYETTEVILL

E

ST

HO

BB

S ST

WILLOW

DR

PARK DR

HARDEE ST

W MAIN STW HORNE ST

ENT

ERPR

ISE

DR

VOG

UE ST

WEXFORD DR

BENNINGTON

DR

OLD US70H

WY

W

NEU

SERID

GE DR

CR

ESCENT DR

DOV ELN

GEO

RG

ETOWNE

DR

GLENGARIFF LN

WAS HIN

G

TON

ST

KER

SH AWLN

CAMELST

OAKDALE AVE

NC 42 HWY W

DAIRY RD

ROSEMARY ST

W FIRST ST

NM

IAL STATKIN

SON

ST

FOX HOLLOWDR

NC 42 HWY E

BUTTONWOOD

LN

RAN D

O

LPH

D R

SES

DR

MC

KENZ

IE CIR

AMELIA CHURCH RD

WINDINGWOODDR

OHARA ST

PINELAND AVE

JASMIN

ED

R

GREE

NWOOD

DR

MUI

RFIEL

DLN

S ROBERTSON S

T

MULBERRY RD

G

RA

CIE

LN

US70 BUS

HWY

W

PECAN LN

FERN

WOO

DDR

MOUNTAIN TOSEA TRL

S

DURH AM ST

LIG

HT

FOOT DR

E FRONT ST

REGEN CY DR

DEER

TRL

RIDGE DR SHOTW

ELLRD

GLEN

LAUREL

RD

RIVE

RWOO

D

DR

VIN

SON

RID

GE

LN

LAUR

EL

RIDG

ED

R

MEDICAL

PARKPL

WA

LDEN

WAY

W

TIFFANY

CIR

DOGWOODAVE

ST

ATE AV E

DEE

R

FIELD DR

TRANTHAMTRL

EASTCLAYTONELEM

CLAYTONHIGH

WESTCLAYTON

ELEM

COOPERELEMENTARY

CLAYTONMIDDLE

ClaytonMunicipal

Park

Legend Park

ClaytonCommunity

Park

AllStarPark

East ClaytonCommunity

Park

HorneSquare

Trail HeadSams Branch

Greenway

0 1,000 2,000500Feet

Bike/Ped Features

Existing Greenway

Proposed Greenway

Project Extent

PROjECT iD | nAmE BP-1 | Downtown - sam’s Branch greenway Connection

imPROvEmEnT TyPE:

lEngTh

COsT EsTimATE:

fACiliTy DEsCRiPTiOn

Greenway

1.2-1.5 Miles (Depending on Alignment)

$900,000-$1,125,000 (Depending on Alignment)*

► Cross Section

■ Paved 10-12 ft greenway**

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

The Downtown to Sam’s Branch Greenway Connection is shown on the adopted Johnston County Comprehensive Transportation

Plan (CTP). The planned alignment has since been refined. Two connection options exist toward the southern end of the

alignment.

A safe pedestrian and bicycle connection is needed between Downtown Clayton and Sam’s Branch Greenway. This connection

would provide a direct route for users of the Neuse River Greenway section of the Mountains to Sea Trail and East Coast

Greenway to access downtown and would offer downtown residents improved access to the greenway and river.

Coordinate with transportation planning agencies and request NCDOT Statewide funds, NCDOT Division funds, CAMPO Local

Area Administered Projects Program (LAPP) funds and/or identify local funds for design and construction.

10-12 ft

*Cost estimates provided are for planning purposes only and include construction cost only (does not include right-of-way or utilities)**Exact alignment and cross section to be determined with further study

APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS

Page 7: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

70 : Town of Clayton

ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SHO

TW

ELL

RD

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

ATKINSON

ST

DOVELN

CIT

YR

D

AMELIA CHURCH RD

CHARLES S

T

E MAIN ST

N FAYETTEVILL

E ST

ESTALLINGS

ST

WILLOW

DRPARK DR

W MAIN ST

W HORNE ST

E FRONT ST

OAKDALE AVE

CAMEL ST

DE

ERT

RL

US 70 BUS HWY W

ROSEMARY ST

W FIRST ST

NM

IAL

ST

PINELAND AVE

NCHURCH ST

S ROBERTSON S

T

WAS

HIN

GTO

NST

RANDOLPH DR

DOGWOOD AVE

CLAYTONHIGH

COOPERELEMENTARY

ClaytonMunicipal

Park

All StarPark

HorneSquare

0 360 720180Feet

Existing Sidewalks

Proposed Sidewalks

Project Extent

PROjECT iD | nAmE BP-2 | Cooper Elementary Pedestrian Connections

imPROvEmEnT TyPE:

lEngTh

COsT EsTimATE:

fACiliTy DEsCRiPTiOn

Sidewalks

0.4 Miles

$185,000*

► Cross Section

■ 5-6 ft sidewalk on one side of roadway

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

This missing link in the sidewalk network was identified as part of the development of the Comprehensive Plan Update (2014-2015).

A safe pedestrian connection is needed between residential areas along O’Neil Street and near Downtown Clayton and Cooper

Elementary School. Currently, there are missing sections of sidewalk along Wilson Street, North Mial Street, East Stallings

Street, Camel Street, and Lombard Street.

Coordinate with transportation planning agencies and request Local Area Administered Projects Program (LAPP) funds and/or

identify local funds for design and construction.

*Cost estimates provided are for planning purposes only and include construction cost only (does not include right-of-way or utilities)

APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS

Page 8: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

Comprehensive Plan 2040 : 71

ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SHO

TW

ELL

RD

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

ST42 ST42

ST42

ST42

£¤70AustinPond

E MAIN ST

LEE STNC 42 HWY W

ILLIN

OIS D

R

WIN

STO

NPO

INTE

DRPECAN LN

US 70 HWYW

DAVID LN

WINSTON

RD

BARB

ERM

I LL

RD

S FAYETT

EVILLE ST

BI LTMORE DR

S LOMBARD ST

BUTTERNUT LN

BRIGH

TLE

AFD

R

GROVEWOOD DR

GUY RD

S BARBOUR ST

WMOSS

CREEKDR

GRANT LN

NC42 HWY W

HOBBS

ST

GUY RD

HARDEE ST

STONEBROOK

DR

BRAN

DON

DR

WEXFORD DR

AMELIACHURCH

RD

COUNTRYLN

MEDSPRING DR

BENNINGTON DR

CRESCEN

TDR

UM

STEAD

DR

US 70 BUS HWY W

CAR

DINA

LDR

GLENGARIFF LN

S CONNECTOR BLVD

AVO

N DAL

EDR

W ALEX DR

CAB

ERNET

CT

AMELIA CHURCHRD

KERRIANN LN

JASPER DR

NORWICH DR

KILLINGTON DR

HUNTE RW

A Y

E MOSS CREEK DR

GLENN ST

ECH

AMPI

ONST

STEPHANIE LN

ROWAN DR

US 70 BUS HWY W

WESTMINSTER DR

FORT DR

SES

DR

GRANT ST

WINDING WOOD DR

OHARA

ST

CANYON RD

JOHNSON ESTATE RD

DA IR

YR

D

PLYMOUTH DR

NC 42 HWY W

CH

ARD

ONN

EYDR

BARB

ER M

ILL

RD

DEER TRL

RAN

CH R

D

NC 42 HWY E

OLD NC 42 HWY E

GRA

CIE

LN

PECAN LN

IOWA

DR

DURHAM ST

E FRONT ST

REGENCY DR

DORY LN SHADYM

EA DO

WS

L N

BRADY DR

BRIGADOON DR

LEEWAY CT

COXWOODS RD

AVERASBORO DR

SHORT JOHNSON RD

LITTLECREEK

CHURCHRD

US 70 HWY W

CARLTON ST

E

TIFFANY CIR

HOR

S EM

ANS RIDGE

DR

CAR

DIN

AL A

CRES

VOG

UE ST

CR I

CKE

TH

OLL

OW

RUN

STONE LN

GO

VER N

MENT

RD

LAUREL

RIDG

ED

R

HAPPY TRAILS RD

WALDEN

WAY

GREEN WO ODDR

WTIFFANY

C IR

BUTTONWOOD LN

MCK

ENZI

ECI

R

SAND

YR

IDG

ED

RE

MEA

D OW

RUN

PAM

LIC

OD

R

HARDEE LN

HEREFORDDR

STATEAVE

WIL

DWO

OD

DR

PONDEROSA DR

CROOKEDCREEK

RD

CO

RBE

T TRD

BENTBRANCH

LOOP

WESTCLAYTONELEM

CLAYTONMIDDLE

ClaytonCommunity

Park

FutureLionsgate

Park

NC Department ofTransportationMitigation Land

0 1,000 2,000500Feet

Existing Greenway

Proposed Greenway

Existing Sidewalks

Proposed Pedestrian Facility

Project Extent

PROjECT iD | nAmE BP-3 | nC 42 west Pedestrian Connector

imPROvEmEnT TyPE:

lEngTh

COsT EsTimATE:

fACiliTy DEsCRiPTiOn

Sidewalks or Multi-use path

3.02 Miles

$55,939,000 (R-3410A), $35,019,000 (R-3410B),

$2,400,000 (Estimated Cost of Pedestrian Facilities)*

► Cross Section

■ 5-6 ft sidewalks or Multi-use path**

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

This missing link in the sidewalk network was identified as part of the development of the Comprehensive Plan Update (2014-2015).

A safe pedestrian connection along NC 42 West would serve as a critical link in the pedestrian system by connecting current

and future residential and commercial/mixed-use areas. Downtown Clayton, Guy Road/NC 42, and NC 42/US 70 Bypass

are designated as mixed use centers on the Future Land Use Map. In addition, NC 42 West is planned for medium and high

density residential. Connecting these uses with a pedestrian facility has the potential to reduce the number of short trips that

require driving on NC 42 West.

Coordinate with transportation planning agencies to ensure that NC 42 is constructed as a “Complete Street” with adequate

pedestrian facilities due to the fact that the segment will serve as a primary connection for non-motorized travel between

higher density residential areas and mixed use centers. Request inclusion of pedestrian facilities in the widening project

designated as R-3410A and B in the Statewide Transportation Improvement Program (STIP).

Multi-use Trail

*Cost estimates provided are for planning purposes only and include construction cost only (does not include right-of-way or utilities)**Exact Cross Section to be determined with further study

APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS

Page 9: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

72 : Town of Clayton

ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SHO

TW

ELL

RD

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

ST42

GUY RD

RIVER

HILLS

DR

CIT

Y R

D

CAST

LEBE

RRY

RD

CARD

INAL

DR

CHARLES S

T

BI LTMOREDR

S FAYETTEVILLE

ST

S LOMBARD ST

W STALLINGS ST

TEW CT

S BARBOUR

ST

N FAYETTEVILL

E

ST

HO

BB

S ST

WILLOW

DR

PARK DR

HARDEE ST

W MAIN STW HORNE ST

ENT

ERPR

ISE

DR

VOG

UE ST

WEXFORD DR

BENNINGTON

DR

OLD US70H

WY

W

NEU

SERID

GE DR

CR

ESCENT DR

DOV ELN

GEO

RG

ETOWNE

DR

GLENGARIFF LN

WAS HIN

G

TON

ST

KER

SH AWLN

CAMELST

OAKDALE AVE

NC 42 HWY W

DAIRY RD

ROSEMARY ST

W FIRST ST

NM

IAL STATKIN

SON

ST

FOX HOLLOWDR

NC 42 HWY E

BUTTONWOOD

LN

RAN D

O

LPH

D R

SES

DR

MC

KENZ

IE CIR

AMELIA CHURCH RD

WINDINGWOODDR

OHARA ST

PINELAND AVE

JASMIN

ED

R

GREE

NWOOD

DR

MUI

RFIEL

DLN

S ROBERTSON S

T

MULBERRY RD

G

RA

CIE

LN

US70 BUS

HWY

W

PECAN LN

FERN

WOO

DDR

MOUNTAIN TOSEA TRL

S

DURH AM ST

LIG

HT

FOOT DR

E FRONT ST

REGEN CY DR

GLEN LAUREL RD

DEER

TRL

RIDGE DR SHOTW

ELLRD

RIVE

RWOO

D

DR

VIN

SON

RID

GE

LN

LAUR

EL

RIDG

ED

R

MEDICAL

PARKPL

WA

LDEN

WAY

W

TIFFANY

CIR

DOGWOODAVE

ST

ATE AV E

DEE

R

FIELD DR

TRANTHAMTRL

EASTCLAYTONELEM

CLAYTONHIGH

WESTCLAYTON

ELEM

COOPERELEMENTARY

CLAYTONMIDDLE

ClaytonMunicipal

Park

Legend Park

ClaytonCommunity

Park

AllStarPark

FutureLionsgate

Park

East ClaytonCommunity

ParkEastClayton Dog

Park

HorneSquare

Trail HeadSams Branch

Greenway

0 1,000 2,000500Feet

Bike/Ped Features

Existing Greenway

Proposed Greenway

Project Extent

PROjECT iD | nAmE BP-4 | mountains to sea Trail (middle segment)

imPROvEmEnT TyPE:

lEngTh

COsT EsTimATE:

fACiliTy DEsCRiPTiOn

Greenway

2.2 Miles

$2,500,000*

► Cross Section

■ Paved 10 ft greenway

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

This section of the Mountains to Sea Trail (MST) and the East Coast Greenway (ECG), from Sam’s Branch Greenway to NC 42 East

and along NC 42 to the Neuse River, is shown on the adopted Johnston County Comprehensive Transportation Plan (CTP). The

planned alignment has since been refined and is shown in the map below.

The Neuse River Greenway is a local amenity and statewide tourist destination which currently terminates at the Sam’s Branch

Greenway spur. This section would add to the overall MST and eventually continue all the way to the North Carolina Coast as well

as provide a key link in the ECG that will eventually stretch from Florida to Maine. In addition to providing a key connection in the

statewide trail network this segment will also connect residential areas to a planned commercial area located at Glen Laurel Road

and NC 42, and to Downtown.

Coordinate with transportation planning agencies, and/or parks and tourism agencies, and request NCDOT Statewide, NCDOT

Division funds, CAMPO Local Area Administered Projects Program (LAPP) funds and/or Parks and Recreation Trust Fund (PARTF)

grants for design and construction. These funding sources may require a local match.

10 ft

*Cost estimates provided are for planning purposes only and include construction cost only (does not include right-of-way or utilities)

APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS

Page 10: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

Comprehensive Plan 2040 : 73

ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SHO

TW

ELL

RD

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

ST42

MOTORCYCLE RD

RU

DY

LN

WILLOWDR

US 70 BUS HWY W

N O'NEIL ST

PARK DR

NC 42 HWY E

EC

OTT

ON

GIN

DR

E WALKER

WOODSLN

WCOV ENTRYC T

W STALLINGS ST

MAYFLOWER WAY

WW

AL

KER

WOO

DSLN

S BARBOUR

ST

GE

RANI U

MW

AY

N FAYETTEVILL

E

ST

HEIN

D R

KEN SING

TON

CT

HO

BB

S ST

GREENWILLOWS DR

HARDEE ST

W MAIN STW

HORNE ST

NEUSE COLON

YD

R

OLE

ANDERD R

VOG

UE S

T

HI B

I SC

USD

R

DAF

FODIL

LN

CR

ESCENTDR

DOV ELN

GE

OR

GETOW

NE

DR

RIV

ERGL

ADEDR

RIVER

HILLS

DR

WAS

HIN

GTON

ST

CHERRY

LAUREL DR

QUE

ENANN

DR

CAMELST

OA KDALE AVE

ROSEMARY ST

AVENELLN

W FIRST ST

NM

IAL ST

FOX HOLLOWDR

NC 42 HWY E

WESTMINSTER

DR

EDG

EW

ATER

DR

RAN D

O

LPH

D R

PRES TWIC

KDR

OHARA ST

PINELAND AVE

JASMIN

ED

R

NEUSE RIDGE DR

MUI

RFIEL

DLN

LAFOY DR

TEAS

EL

CT

PECAN LN

GLEN LAUREL RD

DURH AM ST

BIRK

DALEDR

E FRONT ST

CHRIS

TENBURYLN

REGEN CY DR

NEUS

ERI

VER

PKWY

DEER

TRL

CIT

YR

D

CAST

LEBE

RRY

RDMOUNTAIN TO SEA

TRLS

LYNSHIR E

AV E

VIN

SON

RID

GE

LN

WA

LDEN

WAY

WAV

ER

LY DR

PARKR

IDG

ED

R

TRIL

LIUM

WAY

DOGWOODAVE

DEE

R

FIELD DR

RIV

ERW

OO

DDR

TOWNSE

ND

DR

EASTCLAYTONELEM

CLAYTONHIGH

COOPERELEMENTARY

ClaytonMunicipal

Park

LegendPark

AllStarPark

East ClaytonCommunity

ParkEastClayton Dog

Park

HorneSquare

Trail HeadSams Branch

Greenway

0 1,000 2,000500Feet

Bike/Ped Features

Existing Greenway

Proposed Greenway

Project Extent

PROjECT iD | nAmE BP-5 | mountains to sea Trail (East segment)

imPROvEmEnT TyPE:

lEngTh

COsT EsTimATE:

fACiliTy DEsCRiPTiOn

Greenway

1.9 Miles

$2,025,000*

► Cross Section

■ Paved 10-12 ft greenway

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

The Mountains to Sea Trail (MST) and the East Coast Greenway (ECG) from NC 42 East to the Clayton Town limits is shown on

the adopted Johnston County Comprehensive Transportation Plan (CTP).

The Neuse River Greenway is a local amenity and statewide tourist destination which currently terminates at the Sam’s Branch

Greenway spur. This section would add to the overall MST and eventually continue all the way to the North Carolina Coast as

well as provide a key link in the ECG that will eventually stretch from Florida to Maine.

Coordinate with transportation planning agencies, and/or parks and tourism agencies, and request NCDOT Statewide, NCDOT

Division funds, CAMPO Local Area Administered Projects Program (LAPP) funds and/or Parks and Recreation Trust Fund

(PARTF) grants for design and construction. These funding sources may require a local match.

10-12 ft

*Cost estimates provided are for planning purposes only and include construction cost only (does not include right-of-way or utilities)

APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS

Page 11: B.I.G. · 2015. 11. 6. · Comprehensive Plan 2040 : 65! ST42 ST42 70 £¤ 70 ¨§¦ 40 St e p Hi l B r a n c h M a r k s C r e e k B i g B r a n c h Arms Cr e k R e e d y B r a n

74 : Town of Clayton

ST42

ST42

£¤70

£¤70

§̈¦40

Steep Hill Branch

Mar

ksC

reekBig

Bra nch

Arms Creek

ReedyBranch

Li t tl e

Po p

l ar

Creek

Co

o per

Bra

nch

Li tt l eCreek

Whiteoak

Cr e

ek

Neuse

River

Middle Creek

White

Oak

Cre

ek

Swift Cree k

Swift Creek

WILSON'SMILLS

ARCHERLODGE

RALEIGH

GARNER

JOHNSTON

WAKE

RANCH RD

S LOMBARD ST

CO

RBE

TTR

D

VINSONRD

GUY RD

COVEREDBRID

GER

D

WIN STON

RD

POW

HATAN RD

AMELIA

CHURCH RD

LITTLE

CREEK CHURCH

RD

CIT

YR

D

EFR

O

NT

ST G

LEN

LAUREL RD

GORDON RD

N O' N

EIL

ST

LOOPRD

SHO

TW

ELL

RD

BARBERMILL

RD

PR

ITC

HA

RD

RD

CA

STL

EBE

RRYRD

MIA

LP

LAN

TATI

ON

RD

E GARNER RD

WH

ITE OAK R

D

OLD BAUCOM RD

NE

WB

ET

HEL

CH

UR

CH

RD

0 21Miles

Triangle Expressway Alternatives

PROJECT LOCATION

PROJECT MAP

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

##

##

##

##

##

##

##

##

##

##

##

##

##

##

##

####

ST42NC 42 HWY E

S LOMBARD ST

TAN

NE

RS

WAYROWAN

DR RU

DY

LN

EC

OTT

ON

GIN

DR

S FAYETTEVILLE

ST

W STALLINGS ST

MAYFLOWER WAY

S BARBOUR

ST

GE R

ANI UM

WAY

N FAYETTEVILL

E

ST

HEIN

D R

KEN SING

TON

CT

HO

BB

S ST

GREENWILLOWS DR

WILLOW

DR

PARK DR

HARDEE ST

W MAIN STW HORNE ST

NEUSE COLON

YD

R

OLE

ANDERD R

VOG

UEST

HIB

I SC

USD

R

DAF

FODIL

LN

CR

ESCENT DR

DOV ELN

GE

OR

GETOW

NE

DR

US 70 BUS HWY W

RIV

ERGL

ADEDR

RIVER

HILLS

DR

WAS

HIN

G

TON

ST

CHERRY

LAUREL DR

QUE

ENANN

DR

CAMELST

OAKDALE AVE

ROSEMARY ST

AVENELLN

W FIRST ST

NM

IAL ST

FOX HOLLOWDR

NC 42 HWY E

WESTMINSTER

DR

ED

GEW

ATER

DR

RAN D

O

LPH

D R

PRES TWIC

KDR

OHARA ST

PINELAND AVE

JASMIN

ED

R

NEUSE RIDGE DR

MUI

RFIEL

DLN

LAFOY DR

TEAS

EL

CT

PECAN LNDURH AM ST

BIRK

DALED R

E FRONT ST

CHRIS

TENBURY

LN

REGEN CY DR

CIT

YR

D

GLEN LAUREL RD

NEUSE

RIVE

RPK

WY

BRIGADOON DR

DEER

TRL

MO

TORCYCLE RD

CAS

TLEB

ERRY

RD

N O'NEIL STMOUNTAIN

TOSEA

TRL

S

LYNSHI R E

AV E

VIN

SON

RID

GE

LN

DAIRY

RD

WA

LDEN

WAY

W

TIFFANY

CIR

WAVE

R

LY DR

LITTLE CR

EEK

CH

UR

CH

RD

PARKR

IDG

ED

R

TRI L

LIUM

WAY

RIV

ERW

OO

DD

R

DOGWOODAVE

DEE

R

FIELD DR

TOWNSE

ND

DR

EASTCLAYTONELEM

CLAYTONHIGH

COOPERELEMENTARY

ClaytonMunicipal

Park

AllStarPark

East ClaytonCommunity

ParkEastClayton Dog

Park

HorneSquare

Trail Head SamsBranch Greenway

0 1,000 2,000500Feet

Bike/Ped Features

Existing Greenway

Proposed Greenway

Project Extent

PROjECT iD | nAmE BP-6 | front street to northside Connector multi-use Trail

imPROvEmEnT TyPE:

lEngTh

COsT EsTimATE:

fACiliTy DEsCRiPTiOn

Multi-Use Path

1.02 Miles

$1,000,000*

► Cross Section

■ Paved 10 ft multi-use trail in road right-of-way

PREviOus PlAnning:

COnTEXT AnD nEED:

RECOmmEnDATiOn:

The Front Street to Northside Connector Multi-use Trail is shown on the adopted Johnston County Comprehensive

Transportation Plan (CTP). The Front Street portion of the multi-use trail has been completed.

The Mountains to Sea Trail (MST) is a local amenity and regional tourist destination which will eventually continue to NC

42 East and all the way to the North Carolina Coast. This connection between Downtown Clayton and the MST via NC 42

would allow for multiple running and biking excursions from the north side of Clayton. This facility will also connect a planned

commercial/mixed-use center with Downtown and the MST.

Coordinate with transportation planning agencies and request inclusion of pedestrian facilities in the widening project

(designated as R-3410 in the Statewide Transportation Improvement Program (STIP), or request CAMPO Local Area

Administered Projects Program (LAPP) funds and/or Parks and Recreation Trust Fund (PARTF) grants for design and

construction.

*Cost estimates provided are for planning purposes only and include construction cost only (does not include right-of-way or utilities)

APPENDIx C: TRANSPORTATION PRIORITY PROJECT SHEETS