bidder b page 1 of 26 -...

26
Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra). Tender No. : 44LK-5100: EPCC-3 FORM-N BIDDER’S PRE-BID QUERIES FOR DISCUSSION Bidder B Page 1 of 26 DISCIPLINE – MECHANICAL/ROTATING REFERENCE OF BIDDING DOCUMENT SL. NO. Part / Vol. Page No. Clause No Subject BIDDER'S QUERY CONSULTANT'S REPLY 1 Tech Amd #4 ARU / SWS Equipment List As per Equipment list of ARU and SWS unit for pump item 703-P-1002 A/B, 703-P-1004 A/B, 702- P-1002 A/B Insulation is to be provided. Bidder understands the following: 1) Due to pump maintenance considerations, insulation is usually not provided. It is also observed that pump warm up line (By pass line of pump discharge NRV) is already provided hence ensuring that the pump will always be in the heated condition. Please confirm this understanding Confirmed. 2 Tech Amd #4 ARU / SWS Equipment List As per Equipment list of ARU and SWS unit pump item 703-P-1006 B, 702-P-1004 B, 702-P-1005 B are warehouse spare. All these pumps have been specified with dual mechanical seals. Bidder understands the following in this regard: i) Vertical Pumps: Warehouse spare pump will be with Mechanical seal(Not Installed) without coupling, Electric Motor or Seal Flushing system. ii) Horizontal Pump: Warehouse spare pump will be with Mechanical Seal(Not Installed) without coupling, electric i) Refer replies to pre-bid queries for warehouse spare for vertical pumps. ii) For horizontal pumps, installed spares with all accessories is envisaged.

Upload: ngobao

Post on 11-May-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 1 of 26

DISCIPLINE – MECHANICAL/ROTATING

REFERENCE OF BIDDING DOCUMENT SL.

NO. Part /

Vol. Page No. Clause No Subject

BIDDER'S QUERY CONSULTANT'S REPLY

1 Tech Amd #4

ARU / SWS Equipment List

As per Equipment list of ARU and SWS unit for pump item 703-P-1002 A/B, 703-P-1004 A/B, 702-P-1002 A/B Insulation is to be provided. Bidder understands the following:

1) Due to pump maintenance considerations, insulation is usually not provided. It is also observed that pump warm up line (By pass line of pump discharge NRV) is already provided hence ensuring that the pump will always be in the heated condition.

Please confirm this understanding

Confirmed.

2 Tech Amd #4

ARU / SWS Equipment List

As per Equipment list of ARU and SWS unit pump item 703-P-1006 B, 702-P-1004 B, 702-P-1005 B are warehouse spare. All these pumps have been specified with dual mechanical seals. Bidder understands the following in this regard:

i) Vertical Pumps: Warehouse spare pump will be with Mechanical seal(Not Installed) without coupling, Electric Motor or Seal Flushing system.

ii) Horizontal Pump: Warehouse spare pump will be with Mechanical Seal(Not Installed) without coupling, electric

i) Refer replies to pre-bid queries for warehouse spare for vertical pumps. ii) For horizontal pumps, installed spares with all accessories is envisaged.

Page 2: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 2 of 26

REFERENCE OF BIDDING DOCUMENT SL.

NO. Part /

Vol. Page No. Clause No Subject

BIDDER'S QUERY CONSULTANT'S REPLY

motor, seal flushing system and baseplate.

Please confirm this understanding

3 Tech Amd #4

ARU / SWS P&ID’s

As per P&ID of ARU and SWS unit for pump item 703-P-1002 A/B, 703-P-1004 A/B, 702-P-1002 A/B pump warm up line (By pass line of pump discharge NRV) is already provided. Bidder understands that no warm up flow over and above the rated flow as indicated in the datasheet needs to be considered while pump selection. Please confirm this understanding.

Confirmed.

4 Tech Amd #4

ARU / SWS Process datasheets

As per pump process datasheet NPSH Safety margin above 0.6m is already considered. In view of this Bidder understands that even if the Pump NPSHR is equal to NPSHA as given in the pump process datasheet, pump model is acceptable. Please confirm this understanding.

Not acceptable.

5

Part I\Section VIII - Mandatory Spares List

17 of 38 10.0 Tools and Tackles

Bidder understands that only special tools as recommended by various suppliers for their equipment need to be supplied. All the tools as given under 10.2, 10.3 and 10.4 since are normally available in the plant need not be supplied. Please confirm this understanding.

Follow tender document

Page 3: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 3 of 26

6

Part I\Section VIII - Mandatory Spares List

17 of 38 10.0 Tools and Tackles

Incase Special Tools, General Purpose maintenance tools and Diagnostic tools need to be supplied by Bidder please clarify the following:

1) Special tools as listed under 10.2.1 (Sub Sl No: 1, 2, 3, 4) shall be supplied only if applicable.

2) Quantity for Special tools (10.2) and General Purpose maintenance tools (10.3) shall be for the whole LSTK bid and not each unit.

3) Quantity of Diagnostic tools (Sl No: 10.4) shall be one number for the whole LSTK bid and not each unit.

4) Make and model of the Diagnostic tools to be provided.

1) Follow tender document 2) Noted 3) Noted. 4) This shall be discussed

with successful bidder during detail engineering stage.

Page 4: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 4 of 26

7

Part I\Section XI - Vendors List

Vendor list does not contain approved Vendors for Vertical Process and Vertical Barrel Pumps. Bidder understands that approved vendor list for Horizontal Special Purpose Pumps shall be followed. Please confirm this understanding.

Issues on Vendor List shall be discussed with successful bidder on case-to-case basis during execution stage.

8

Part I\Section XI - Vendors List

Vendor list does not contain approved Vendor for Special Purpose Couplings. Please provide.

Issues on Vendor List shall be discussed with successful bidder on case-to-case basis during execution stage.

9

Part I\Section XI - Vendors List

Vendor list does not contain approved Vendor for Sulfur Pumps. Please provide.

Issues on Vendor List shall be discussed with successful bidder on case-to-case basis during execution stage.

10

Part I\Section XI - Vendors List

Vendor list does not contain approved Vendor for Sulfur Pelletizer. Please provide.

Issues on Vendor List shall be discussed with successful bidder on case-to-case basis during execution stage.

11

Part III\Section A\A.3 Rotating Eqpt

7 of 33 2.23 Vibration Monitoring

As per referred clause of Engineering Design Basis Rotating Equipment (Doc No 44LK-5100-00-M-02-0001-A4, Rev 1) Fan and Pumps above 160Kw shall be provided with Vibration Monitoring system. Bidder understands that Vibration Monitoring

Refer reply to pre-bid queries

Page 5: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 5 of 26

system shall be provided for Pumps and Fans having hydro dynamic bearings. Vibration Monitoring system is not required for Pumps and Fans with antifriction bearings irrespective of Motor rating. Please confirm this understanding

12

Part III\Section A\A.3 Rotating Eqpt

7 of 33 2.25 MOC

As per referred clause of Engineering Design Basis Rotating Equipment (Doc No 44LK-5100-00-M-02-0001-A4, Rev 1) MOC for the Oil cooler and cooling water console cooler shall be Super Duplex SS. Bidder understands that this clause is applicable for Reciprocating Compressors only. Since Reciprocating compressors are not expected in SRU / SWS / ARU units, hence considered not applicable. Please confirm this understanding.

Exchangers using sea cooling water as cooling medium shall have MOC as specified in BEDB (doc. no. 44LK-5100-00/P.02/0001/A4)

13

Part III\Section A\A.3 Rotating Eqpt

8 of 33 2.38 Mechanical Seals

As per referred clause of Engineering Design Basis Rotating Equipment (Doc No 44LK-5100-00-M-02-0001-A4, Rev 1) Mechanical seals shall be removed after performance testing and replaced by secondary packing. Bidder understands that this is applicable only for Horizontal Single Stage Pumps. Please confirm this understanding.

Follow tender document

14

Part III\Section A\A.3 Rotating

10 of 33 2.47.3 Mandatory Spares

As per referred clause of Engineering Design Basis Rotating Equipment (Doc No 44LK-5100-00-M-02-0001-A4, Rev 1) mandatory spares shall be recommended by Vendors. Bidder understands

Follow mandatory spare list document No. 44LK-5100-704/N.02/0048/A4. Spare parts for two years normal

Page 6: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 6 of 26

Eqpt that only the first sentence is applicable for this LSTK bid. Mandatory spares shall be as per list attached with the Bid documents. Please confirm this understanding.

operation only shall be recommended by vendor.

15

Part III\Section A\A.3 Rotating Eqpt

20 of 33 3.6.1 EQC

As per referred clause of Engineering Design Basis Rotating Equipment (Doc No 44LK-5100-00-M-02-0001-A4, Rev 1) all pumps shall be established manufacturer. Bidder understands that for the purpose of EQC references of API 610, 8

th

Edition would be acceptable. Please confirm this understanding.

API 610, 10th edition pumps shall be provided. PTR with API 610, 8th edition may be accepted on case to case basis. Min. one reference of API 610, 10th edition shall be provided in the PTR.

16

Part III\Section A\A.3 Rotating Eqpt

21 of 33 3.6.16.3 Plan 53

As per referred clause of Engineering Design Basis Rotating Equipment (Doc No 44LK-5100-00-M-02-0001-A4, Rev 1) plan 53 shall be as per Annexure-2. Bidder understands that the sketch attached as Annexure-2 shall not be applicable as it is for Plan 53 and not for plan 53A/B/C as per API 682. Seal flushing plan 53 A/B/C shall be as per API 682 3

rd Edition.

Noted. However all other general requirements of sketch shall be followed.

17

Part III\Section A\A.3 Rotating Eqpt

22 of 33 3.6.16.5 Mechanical Seal Type

As per referred clause of Engineering Design Basis Rotating Equipment (Doc No 44LK-5100-00-M-02-0001-A4, Rev 1) Tank / pit mounted vertical pump of volute design shall be provided with double seal. Incase handling hazardous or toxic fluids vapour seal shall be provided and shall be nitrogen buffered. As per the Process datasheet all Vertical pumps should have double mechanical seals. Please clarify.

Follow Engineering Design Basis – Rotary Equipment no. 44LK-5100-00-M-02-0001-A4

Page 7: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 7 of 26

18

III\Section A\A.3 Rotating Eqpt

3.6.26 Monorail Requirement

As per clause 3.6.26 of Engineering Design Basis

Rotating Equipment (Doc No 44LK-5100-00-M-02-

0001-A4, Rev 1) Monorail are required for pumps

with motor rating above 55Kw.

As per clause 3.1.8 of Engineering Design Basis-

Piping (Doc No 44LK-5100-0/L.02/003/A4, Rev 0)

pumps open to sky with motor rating 75kw and

above shall be provided with monorails.

Bidder understands that requirement of Piping

design basis shall govern.

Please confirm this understanding.

Monorail to be provided as per clause 3.1.8 of Engineering Design Basis-Piping (Doc No 44LK-5100-0/L.02/003/A4, Rev 0).

19

Part III\Section B\B.4 MEG

4 of 9 1.11.19 ARC Valves

As per referred clause of Scope of Work Mechanical / Rotating Equipment / Heaters (Doc No: 44LK-5100-704/M.02/0003/A4, Rev 0) all multistage and column bottom pumps shall have ARC valves. There is only column bottom pump (702-P-1002 A/B) for which Control Valve is already provided for minimum flow protection. Bidder understands that ARC valve is not required. Please confirm this understanding.

Confirmed.

20 Part III\Section B\B.4

6 of 9 1.11.19 Monsoon Protection

As per referred clause of Scope of Work Mechanical / Rotating Equipment / Heaters (Doc No: 44LK-5100-704/M.02/0003/A4, Rev 0) all

Motors for all pumps shall be provided with weather canopies.

Page 8: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 8 of 26

MEG Critical pumps like Sundyne shall be provided with monsoon protection. Please furnish the list of Critical Pumps and what is expected from Bidder for Monsoon protection since motors are already provided with Canopy.

21

Part III\Section B\B.4 MEG

8 of 9 3.3 Thermal design

As per referred clause of Scope of Work Mechanical / Rotating Equipment / Heaters (Doc No: 44LK-5100-704/M.02/0003/A4, Rev 0) Mechanical and Thermal design shall be by Contractor based on process datasheet and standard specifications of the UOP (licensor). These process datasheet and specifications are not available with the bid documents.

The following clause “Mechanical and thermal design shall be by contractor based on process data sheets and standard specifications of the UOP (licensor)” shall be read as follows: “Mechanical and thermal design shall be by contractor based on process data sheets and standard specifications.”

22

Part III\Section B\B.4 MEG

5 of 8 3.1.11 Weather canopies

As per the referred clause of Job Specification for Centrifugal Pumps Weather canopies are to be provided for all pumps. Bidder understands that canopies only for the motors are to be provided. Please confirm this understanding.

Noted

23

Part III\Section B\B.4 MEG

8 of 8 4.0 and 5.0

Coupling and Mechanical Seal make

As per the referred clause of Job Specification for Centrifugal Pumps Coupling shall be Flexibox and Mechanical Seal shall be from one make only. Bidder understands that this is only a preference and not a rejection criteria during detail

Noted

Page 9: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 9 of 26

engineering. Please confirm this understanding.

24 Bid documents

Bidder understands that Experience Record Proforma, datasheet formats shall be made available in editable format during detail engineering. Please confirm this understanding.

No editable copies for Experience Record Performa, datasheets shall be furnished to contractor.

25 Amendment #3

4 of 17 5.1.10 NPSH(A-R)

As per the referred clause of Standard Specification for Centrifugal Pumps (Doc No: 44-LK-5100-704/M.02/0001/A4, Rev 1) pumps with NPSH (A-R) less than 0.6m from MCSF to maximum expected flow are not acceptable. As per clause 3.6.8 of Engineering Design Basis Rotating Equipment (Doc No 44LK-5100-00-M-02-0001-A4, Rev 1) range of NPSH(A-R) is defined from MCSF to rated flow. Bidder understands that NPSH(A-R)>=0.6m has to be ensured from pump MCSF to rated flow. Please confirm this understanding.

Follow document “Standard Specification for Centrifugal Pumps (Doc No: 44-LK-5100-704/M.02/0001/A4, Rev 1)”

26 Amendment #3

4 of 17 5.1.19 Cooling

As per the referred clause of Standard Specification for Centrifugal Pumps (Doc No: 44-LK-5100-704/M.02/0001/A4, Rev 1) Bearing cooling is required for pumps above 65 deg C and pedestal cooling for pumps above 125 deg C. Bidder understands that this shall be as per Pump manufacturer’s recommendation. Please confirm this understanding.

Follow tender document.

27 Amendment #3

8 of 17 6.5.2.10 Mechanical Seal API

As per the referred clause of Standard Specification for Centrifugal Pumps (Doc No: 44-

Follow latest edition of API 682.

Page 10: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 10 of 26

Edition LK-5100-704/M.02/0001/A4, Rev 1) all instrumentation on mechanical seal flushing system has to be as per API 682, 2

nd Edition.

Bidder understands that 3rd

Edition is applicable for Mechanical Seals. Please confirm this understanding.

28 Amendment #4

Lifting arrangement for Vertical Pumps

As per Notes on P&ID arrangement for lifting arrangement for Vessel Mounted Vertical Pumps is to be provided. Normally most of these vertical pumps are in the open. In order to provide a permanent lifting arrangement a complete structure with Monorail and CPB block will have to be provided. Also the height of this structure would be twice the height of the pump. Please advice.

Lifting arrangement not required.

Page 11: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 11 of 26

29 Amendment #4

5 of 7 2.12.1 Switches

As per referred clause of Standard Specification for Oil Mist Lubrication system (Doc No: 44LK-5100-704/M.02/0024/A4, Rev 0) Switches are required for alarms. Please confirm that Switches are acceptable for Oil Mist lubrication.

Switches shall not be provided. Only transmitters shall be provided.

Page 12: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 12 of 26

DISCIPLINE – CIVIL/ STRUCTURAL

1.0

Minimum depth of foundation from NGL / FGL not mentioned. Please clarify the same.

Refer Geo-technical Investigation report for depth of foundation & Civil scope of work dwg no-44LK-5100-704/C.01/0401/A0 for FFL.

2.0

Please provide tentative size of sulfur pit and sulfur pelletising unit. Also confirm the sulfur pit to be covered with concrete slab or it will remain open but shall be covered with shade structure.

Refer Equipment layout .drg,no: 44LK5100-704/L.01/0001/A0 for sulphur pit size.

3.0 Please mention the type of lining and its specification required for sulfur pit and pelletising unit.

As per SRU licensers requirement.

4.0

Wheather sulfur resistant cement to be used in sulfur pit concrete ? Please confirm. Also mention other structures where this must be used.

As per SRU licensers requirement.

5.0 Please provide the minimum dia of reinforcement to be considered for wall, slab and footing.

Kindly refer SP-34 & IS 456-2000

6.0

All cable trench shall be sand filled and cover shall be of PCC. Top of cover shall flush with finished floor. Please confirm.

Kindly refer doc. No 44 LK-5100-704/C.02/0007/A4, clause 2.6.1 of pages 10 of 11.

7.0 We presume all floors of technological structures shall be of grating.

Kindly refer doc. No 44 LK-5100-704/C.02/0009/A4, clause 2.3.1 of pages 8 of 21

8.0 Can we use Jindal sections or wide flange beam and columns in steel structure design ? Please clarify.

Kindly refer doc. No 44 LK-5100-704/S.02/0001/A4, clause 5.3 of pages 25 of 31

Page 13: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 13 of 26

9.0 In steel structure, we assume fire proofing upto 10m height from finished floor level. Please confirm.

Kindly refer doc. No 44 LK-5100-704/S.02/0008/A4, clause 4.3.1 of pages 18 of 31

10.0 Please provide layout and dimentional elevation of all Technological structures.

11.0

Please provide layout and dimentional elevation of Piperack.

Refer Equipment layout-plan .Drg.no: 44LK5100-704/L.01/0001/A0 & Equipment layout-section dwg. no. 44LK5100-704/L.01/0001/A0 for dimensional elevation.

12.0 Part III, Section –A.

Page - 6 2.2.2.1 Architecture

Can we use acrilic sheets (Glazed) for compressor shed roof ? Pls confirm.

Kindly refer doc. No 44 LK-5100-704/S.02/0009/A4, clause 2.3.2 of pages 8 of 21

Page 14: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 14 of 26

DISCIPLINE - PROCESS

1

Process Datasheet (702-D-1001)

All lines from DHT/HGU/LOUP units joining at B/L is at 5.3 kg/cm2(g) pressure. But this pressure is not consistent with the process dataheet, where the pressure is specified as 4.75kg/cm2(g). Please clarify. PMC to clarify which one is correct.

Pressure 5.3 kg / cm2 g at battery limit is including line pressure loses, pressure drop across 702-FT-1701.

2) Process Datasheet (702-T-1002)

DEC assumes tray internals: SS316L, CA: 0.5 mm on both sides for tray MOC. Also, DEC understands that there is a mismatch between the absorber top and bottom pressure in the datasheet. As per DEC, the top pressure is 4.501kg/cm2(g) and bottom pressure is 4.68kg/cm2(g). Pl clarify the understanding. Also there is a mismatch of this value in the HMB and PFD, according to which the top pressure specified is 4.8 kg/cm2(g). Please clarify.

To be clarified later in consultation with HPCL. Bidder’s understanding is correct. Data sheet to be updated by bidder during detail engineering. In PFD, 4.8 kg / cm2 g pressure is indicated for lean amine. This pressure includes pressure drop across lean amine

Page 15: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 15 of 26

inlet distributor device. Pressure of offgas leaving absorber is 4.5 kg / cm2 g.

3)

Process Datasheet (702-P-1007)

702-P-1007 amine drain pump specifies a mismatch in the capacities in the PFD and Datasheet as 10m3/hr and 5m3/hr respectively. DEC understands that datasheet is the basic document and hence assumes 5m3/hr as the correct capacity. Please clarify. Also please provide the B/L pressure for the pump to verify the head.

Bidder’s understanding is correct. PFD to be updated by bidder during detail engineering. Battery limit pressure is as specified in pump data sheet i.e. 5 kg / cm2 g.

4)

Process Datasheet (702-D-1001)

There is mismatch in the dimensions of the amine flash drum between the datasheet and the PFD. DEC is considering the datasheet as correct and assumes the following values for the drum:

Bidder’s understanding is correct. PFD to be updated by bidder during detail engineering.

Page 16: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 16 of 26

ID: 4250 mm, TL-TL: 11900 mm PMC to Confirm

5) (702)Basic Engineering Design Basis

For acid flare gas, total back up pressure is 1.7 kg/cm2(g). DEC understands that low pressure system control valve cannot operate on that higher side. Please give confirmation on the flare header.

Minimum design pressure of any equipment having safety valve connected to flare is 3.5 kg / cm2 g. bidder to design and provide appropriate safety valves.

5) General

Is any LP nitrogen available at refinery ? If so, what are the conditions?

Nitrogen is available at conditions specified in BEDB part-B.

6) Process Datasheet (702-T-1001)

Please provide the specifications for feed tray for 702-T-1001 Amine Regeneration Column.

Refer page 4 of the data sheet.

7) Process Datasheet (703-T-1001)

Please provide the specifications for the chimney tray for sour water stripper column 703-T-1001. DEC understands that since the feed tray location is at tray no 32 and the chimney tray is placed above it, hence the chimney tray should be at tray

Chimney tray is not numbered. It is located in between tray no. 32 and 33. Design of chimney

Page 17: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 17 of 26

no 33. Please clarify the arrangement of pump around system.

tray shall be in the scope of column internal vendor.

8) Process Datasheet (702-T-1001)

TL-TL length of amine regeneration column 702-T-1001 specified in the datasheet is 22380 mm. But it shows a mismatch in the value between the datasheet and the P&ID. DEC understands Datasheet is correct. Please clarify.

Bidder’s understanding is correct. P&ID to be updated by bidder during detail engineering.

9) Process datasheet (702-P-1007)

702-P-1007 amine drain pump capacity is mismatched between the datasheet and PFD as 5 m3/hr and 10 m3/hr respectively. DEC understands datasheet is correct.PMC to clarify.

Bidder’s understanding is correct. PFD to be updated by bidder during detail engineering.

10) Piping Material specifcation

Tender document indcated two different basic material such as 1.2%Cr.-1/2% Mo & Carbon steel for the same fluid service (steam). PMC to confirm which material to be used for the steam service.

Both alloy Steel material (1.25% Cr. – ½% Mo : as mentioned below) and Carbon Steel in Piping Material Specification shall be used for MP & HP steam services based on pressure and respective

Page 18: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 18 of 26

temperature combinations.

11)

Flow rate (Existing ARU & SWS unit)

PMC to provide the design flow rate of ARU & SWS Acid gas from the existing ARU & SWS unit.

Shall be furnished to the successful bidder.

12)

Process Datasheet (702-AFC-1002)

Data sheet indicated the operating pressure at the inlet of the Air cooler as 16.7 Kg/cm2(g), whereas in the mass balance stream no 14 indicated as 19.3Kg/cm2(g). PMC to confirm the operating pressure.

Stream no. 14 is at outlet of lean / rich amine cross exchanger which is at grade level. 16.7 kg / cm2 g pressure in air cooler 702-AFC-1002 inlet is after considering static difference and line loses. So operating pressure of 702-AFC-1002 in process data sheet is correct.

13) Process datasheet (703-E-1002)

Operating pressure in stream 8(Sour water to 703-E-1002 SWS Feed/Sour Water Stripper Bottom Exchangers, ref HMB) mentioned in PFD is 7.1 kg/cm2(g). Whereas, in HMB it is specified as 7.3 kg/cm2(g).

7.1 kg / cm2 g is correct. Pump PDS shows the same. Bidder to update relevant document.

Page 19: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 19 of 26

PMC to specify the correct value.

14) 702/703 units

General Flare Load Summary

Flare load summary is not available for ARU and

SWS units.

To be developed by bidder.

15) Process datasheet (702-E-1007)

As per mass balance the clean condensate

required for the preparation of 40% MDEA

solution at the inlet of Amine regeneration column

is 2708 kg/hr only. DEC understands for

preparation of 40% MDEA DM water can be

used as an option instead of clean condensate.

The above understaning leads to elimination of

clean condensate cooler & also reduces the sea

cooling water consumption.

PMC to review & advise

Also please confirm the clean condensate flow

rate. Cooler data sheet indicated as 10000 kg/hr

DM water shall not be used for preparation of 40 wt % MDEA solution. DM water shall not be used for water make-up to MDEA solution. Deletion of clean condensate cooler is not acceptable. Cooler data sheet is sized for flowrate required during startup

Page 20: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 20 of 26

for preparation of 40 wt % MDEA solution.

Page 21: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 21 of 26

DISCIPLINE - PIPING

01

II

Miissing p& id.

Process and utilities p & ids are not available in the bid documents. PMC to provide the same.

Refer Amendment no. 1.

02

II

Line designation Table missing.

We have received only sample document For line designation table and not received line designation table. Please provide the same.

Refer Amendment no. 1.

03

.

Process data sheet missing in Doc.

Process data sheets not available in the Bid Documents. PMC to provide the same.

Refer Amendment no. 1.

04

Equipment list

Equipment list shall be required as per Area wise. PMC to provide the same.

Refer Amendment no. 1.

Page 22: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 22 of 26

05

PFDs are missing.

Process flow diagram drawings are not available. PMC to provide the same.

Refer Amendment no. 1.

06

Hook up drawings.

Hook up drawings are required With proper hookup number.PMC to provide the same.

Will be taken up during detail engineering with the successful bidder.

07

Required VMS

PMC is requested to provide valve data sheets.

PMS attached with ITB is tentative. Bidder to develop PMS & VMS based on licensors data & process conditions.

08

Basic engineering package for SWS.

Basic engineering package for SWS. PMC to provide the same.

Refer Amendment no. 1.

Page 23: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 23 of 26

09

Basic engineering package for ARU

Basic engineering package for ARU. PMC to provide the same.

Refer Amendment no. 1.

10

Basic engineering package for SRU

Basic engineering package for SRU. To be provided by Licensor

Refer ITB.

11

44lk-5100-704/p.01/1141/A1 PART II

Battery limit details

In conceptual p & id no. 44lk-5100-704/p.01/1141/A1, battery limit showing tag nos. PT-301 to PT-306,PT 308, PT315 AND PT-318 but there is no any Details of these tags. PMC to provide the same.

Bidder to refer Battery Limit Condition Summary Rev-D; doc. no. 44LK-5100-704/P.03/0004/A4; issued through amendment no. 1

13

Part III SEC.B

Piping material specification details

PMC provided piping material specification, but final checking of PMS will be done after Receiving the process & utilities P&IDs

Successful bidder shall prepare all applicable PMS & VMS including welding charts & NDT specification in line

Page 24: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 24 of 26

with process conditions.

14

Part IV

MDS is missing

PMC provided only Mechanical data sheet formats, there are requirements of Mechanical data sheets.

Bidder may use their own formats covering all necessary details

Page 25: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 25 of 26

DISCIPLINE – MECHANICAL/STATIC

1. IV/ Section 1.4

- - Missing Mechanical Datasheet.

Equipment tag no. 703-D-1002 is listed as one of the auxiliary vessel in the SWS section whereas the mechanical datasheet of the same is not available.

Will be issued as part of Amendment.

Page 26: Bidder B Page 1 of 26 - HPCLtenders.hpcl.co.in/tenders/tender_prog/TenderFiles/1560/Addendums...Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block

Project : Providing Process Licencing (For SRU/TGTU), Residual Process Design, Detailed Engineering, Procurement, Supply, Transportation, Storage, Fabrication, Inspection, Construction, Installation, Testing, Mechanical Completion, Pre-Commissioning, Commissioning And Performance Guarantee Test Runs Of Sulphur Block Consisting of SRU/TGTU (Block-A) & ARU/SWS (Block-B) Of M/S. Hindustan Petroleum Corporation Limited At Mumbai Refinery (Maharashtra).

Tender No. : 44LK-5100: EPCC-3 FORM-N

BIDDER’S PRE-BID QUERIES FOR DISCUSSION

Bidder B Page 26 of 26

DISCIPLINE - ELECTRICAL

Part – III Section B.7.1, Scope of Work – Electrical Doc. No. 44LK-5100-704/E.02/0302/A4

Page 4 of 15 1.15 Scope in Substation & Contol room

We are unclear about Electrical scope of work in substation & new control room. Please elaborate LSTK – 3 contractor scope in substation & control room.

Follow clause 3.0 of Scope of Work, Doc. No. 44LK-5100-704/E.02/0302/A4.

Part – III Section B.7.1, Scope of Work – Electrical Doc. No. 44LK-5100-704/E.02/0302/A4

Page 5 of 15 2.5 System design & calculation

We understand power system studies (load flow, short circuit studies etc.) are not in our scope of work as major electrical items like transformer, switchgear, MCC etc. are free issue to us. Please clarify LSTK – 3 contractor scope of system design & calculations.