bidadi industries association special purpose group...
TRANSCRIPT
Bidadi Industries Association Special Purpose Group (SPG) Progress
1 2 3 4
SAFE
TY &
EN
VIR
ON
MEN
T
5
5
Byramangala cross~ coca cola road relaying 3 KM
Byramangala PWD road
2
TKM
Project Area
No ACTIVITY CURRENT STATUSPHOTO
NEXT ACTIVITY
2 PWD road –Relaying
Mr.
Lakshminarayan, IASACS, PWD
Mr. Ravi KumarEE, Ramanagaram
File is with ACS for approval
ACS has forwarded proposal to MD ,KRDCL for consideration
Planning to meetMr.Krishana reddy ,MD ,KRDCL for approval by Oct end
Pot Holes & Undulations on road
Byramangala cross~ coca cola road relaying 3 KM
Road Up gradation : Phase II Road relying
4
Project Area
Project Cost : Rs 40 Million Target date for completion : Nov17 Activity is Started in April 17
Sub base preparation work is completedAsphalt is work delayed to continuous rain KIADB will take this Asphalting work after rainy season
Drain Connection work near RP metal
New Steet light erection by KIADB
5
LED STREET LIGHTS : 60 Number of 150W LED street light erection is completed in Phase # 2 Shifting of LT line poles from road to road shoulder activity is in progress in Phase # 2
Bangalore City
BIA
Stage 2 to Stage 4 Connection for BIA
Activity will be completed by end of Oct ‘17
Stage 2 to Stage 4 connection :
Work Order is released by BWSSB
Digital data logger has been installed
Connection will be completed by Oct 17 end
Bidadi Industries Association Special Purpose Group (SPG) Progress
21 3 4
SAFE
TY &
EN
VIR
ON
MEN
T
5
5
Pot Hole Repair Work
After Before
cold Asphalt activity will be carried out after rainy season
Pot hole repair work carried out by Using concrete due continuous rain
Old Coca cola road : Concreting for the road & walkway gap
Trial concreting completed for one side 100 M length from coca cola junction to coca cola Gate # 1 Target Date : 20th Nov
Project Area
Cover Slab Work Byramangala cross
Cover Slab work for byramangala cross drain completed
Project Area
Before After
Water Transmission Loss reduction
Next target to reduce
losses up to 8%
Bidadi Industries Association Special Purpose Group (SPG) Progress
31 2 4
SAFE
TY &
EN
VIR
ON
MEN
T
5
5
Ashoka Tree Plantation SA
FETY
& E
NV
IRO
NM
ENT
GAIL sponsored 150 Nos Ashoka Tress Plantation work carried out along GAIL compound wall
Sponsorship Activity
Project Area
Convex Mirror : To eliminate Blind spot SA
FETY
& E
NV
IRO
NM
ENT
PO released for the 6 Number as pilot project Target date for completion : 30th Oct 17
13
2
4 6
7
89
10
11
12
13
Phase # 1 6 No’s Phase # 2 7 No’sTotal 13 Numbers
Road STUDS for Hump – Night Visibility SA
FETY
& E
NV
IRO
NM
ENT
Total Hump : 7 No’s Stud Required : 56 No’s
PO releasedTarget date for completion : 30th Oct 17
Pylon Boards & pedestal SA
FETY
& E
NV
IRO
NM
ENT
12
PO released .Pedestal casting completed Target date for completion : 30th Oct 17
CCTV : 8 cameras SA
FETY
& E
NV
IRO
NM
ENT
1
Total Number of camera’s : 8
2
34
7
6
8
Work order released for additional 8 Number of wire less cameras activity will completed by 20th Nov 2017
7
Completed
FY 2018~2019
FY 2017 ~ 2018
PHASE # 1 230 Lamps Replaced with LED Lamp in July 17 As PHASE # 1 for Kadu mane road & BOSCH Road & TKM Gate # 6 Road
PHASE # 2 100 Lamp replacement by Oct ‘ 17 end
Energy conservation Street Light Changing to LED SA
FETY
& E
NV
IRO
NM
ENT
Road Safety : Road sign board Sponsorship By TLISA
FETY
& E
NV
IRO
NM
ENT
Sponsorship Activity
Target Date : Nov 17 End
Bidadi Industries Association Special Purpose Group (SPG) Progress
1 2 3
SAFE
TY &
EN
VIR
ON
MEN
T
5
5
4
51 55 61 65 67 73 75 77 78 84 89 91 93102
114 115 116 117 123125 127 128 130 131 134 136 137 138142
0
20
40
60
80
100
120
140
160
Oct
'14
De
c'1
4
Feb
'15
Ap
r'1
5
Jun
'15
Au
g'1
5
Oct
'15
De
c'1
5
july
,16
Sep
t,1
6
No
v, 1
6
Jan
, 17
May
,17
July
, 17
Sep
, 17
91 New Members
enrolled from Oct-2014
Target Industries for the year2
MEMBERSHIP ENROLMENT STATUS
150
Solid Waste Management : BASELINE STUDY COMPLETED
BOSCH ROAD TKM Gate 5 road BIA has enlisted Saahas Waste Management Pvt Ltd. as its exclusive partner in driving the waste management initiatives for Base line study.
Final design report submitted.
Summary of dry waste streams across detailed categories
Saahas – Solid waste management study
Disaster management program -7th and 8th Oct 2017
BOSCH ROAD TKM Gate 5 road Disaster management program is organized by District Administration Ramanagara – Total 32 members participated from all the member industries.
Sl No Name of the company No of
Participants
1Grupo Antolin India Pvt
Ltd.,1
2 Chemozol Additives pvt ltd 1
3Toyota Logistics Kishor
india pvt Ltd2
4Nxtgen Datacentre & Cloud
Technologies Pvt Ltd.1
5Bharatiyam Foods &
Beverages Pvt Ltd2
6 Minda Kyoraku Ltd 1
7Owari Precision Products
(India Pvt. Ltd.)1
8 Cauvery Motors Pvt Ltd 1
9 KAVERI PLASTO
CONTAINERS PVT LTD2
10 GAIL 2
11Jayalakshmi Poly Packs
Pvt.Ltd2
12 Transystem Logistics Intl. 2
13 TGSIN 2
14 Toyotetsu India 1
15TT Steel Service India Pvt
Ltd2
16 TTPI 3
17 Jtekt Sona Automotive
India Ltd1
18 TGSIN 3
19 TKAP 2
Total 32
Disaster management program
Bidadi Industries Association Special Purpose Group (SPG) Progress
1 2 3
SAFE
TY &
EN
VIR
ON
MEN
T
4
5
5
Water Drop Point Inauguration : Sponsored by TLI
Water Drop Point Inaugurated near TLI TLI initiative to provide potable water to industries
Honorable MLA Mr .Balakrishna visit to BIA Office
Honorable MLA ,Mr.Balakrishana visited BIA Office to understand the BIA activities & CSR
He assured to support in releasing the fund for road up gradation of Medanhalliroad 3 KM
Vision Mission
GoK organized vision2025 exercise to understand the industry requirement for creating better infrastructure
Mr .Hegde presented views of Industries on 16th
Oct to PS Mrs .RenukachoudharyPS well accepted the suggestions & views