bid publication date: 2 / 4 / 2021
TRANSCRIPT
SHEET NUMBER
1
BidPublicationDate:2 / 4 / 2021
EXTG ASU-1 EXTG ASU-2
EXTG ASU-3 EXTG ASU-4
EXTG AHU-1
EXTG AHU-2
EXTG AHU-3
EXTG AHU-4
M
EXTG GAS METER
EXTG 3" GAS
EXTG 2" GAS
EXTGCU-1
EXTGCU-2
EXTGCU-3
EXTGCU-4
MD-1 MD-1
MD-1MD-1
MD-3
MD-4
MD-3
MD-3
MD-3
MD-4
MD-4
MD-4
SPECIAL NOTICE TO CONTRACTORS
1. IT IS RECOMMENDED THAT ALL CONTRACTORS BIDDING THIS PROJECT VISIT THE JOB SITEAND VERIFY THE EXISTING CONDITIONS PRIOR TO SUBMITTING THEIR BID. CONTRACTORSARE TO CAREFULLY REVIEW ALL CONSTRUCTION DOCUMENTS AND NOTE ANYDISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND THE CONDITIONSOBSERVED AT THE JOB SITE PRIOR TO SUBMISSION OF ANY BID. THE BUILDING OWNERREPRESENTATIVE MAY BE CONTACTED FOR ACCESS TO THE JOB SITE.
2. PRIOR TO CONSTRUCTION, CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THELOCATION AND CONDITION OF THE FOLLOWING:
A. ALL POINTS OF CONNECTION TO BUILDING UTILITIES AND/OR SYSTEMS INCLUDING, BUTNOT LIMITED TO, GAS, WATER, SEWER, VENT, ELECTRICAL, MECHANICAL SYSTEMS,DUCTWORK, EXHAUST/OUTSIDE AIR, SECURITY, FIRE/LIFE SAFETY, DATA, AND PHONE.
B. ALL REQUIRED CONNECTIONS TO THE BUILDING STRUCTURE.
C. ALL REQUIRED BUILDING PENETRATIONS.
3. ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND THE CONDITIONSOBSERVED SHALL BE BROUGHT TO THE ATTENTION, IN WRITING, TO THE ARCHITECT AND/ORENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION.
4. REFER TO THE CONSTRUCTION DOCUMENTS FOR ALL CONTACT INFORMATION.
MECHANICAL DEMOLITION NOTES
1. EQUIPMENT, PIPING, DUCTWORK, ETC., TAGGED WITH A PRECEDING "EXTG", "EX." OR "x" AREEXISTING.
2. BEFORE COMMENCING WORK ENSURE GAS IS OFF, AND ELECTRICAL POWER IS TURNED OFFTO THE EXISTING EQUIPMENT.
3. THE MECHANICAL CONTRACTOR SHALL REMOVE ALL ITEMS INDICATED AND SHALL BERESPONSIBLE FOR THEIR DISPOSAL PER LOCAL, STATE AND FEDERAL REGULATIONS ANDPAY FOR ALL ASSOCIATED COSTS OF DISPOSAL.
4. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVETO DETERMINE IF ANY PARTS OR EQUIPMENT ARE DESIRED TO BE KEPT BY THE OWNER. THEOWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL. ANY ITEM NOT WISHED TO BE RETAINED,SHALL BE DISPOSED OF AT THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR.
5. ITEMS HATCHED SHALL BE PERMANENTLY REMOVED.
6. ITEMS CLOUDED SHALL BE TEMPORARILY REMOVED AND REUSED.
REMOVE EXISTING AIR SUPPLY UNITS (ASU'S), OUTDOOR AIR, SUPPLY AIR, RETURN AIRDUCTWORK AND FRAME. PREPARE TO TIE IN NEW ROOF TOP UNIT (RTU) AND COORDINATENEW TAPERED RTU CURBS AND CONCENTRIC DIFFUSER WITH EXISTING ASUPENETRATIONS.
REMOVE EXISTING GAS LINES LEADING TO EXISTING AHU'S AND PREPARE TO REUSE GASPIPING. INSTALL NEW GAS PIPING WHERE NEEDED FOR NEW RTU'S.
REMOVE EXISTING AIR HANDLING UNITS (AHU'S).
REMOVE EXISTING CONDENSING UNITS (CU'S).
MD-1
MD-2
DEMOLITION KEYED NOTES
ALTERNATE #1
1. EXISTING EQUIPMENT AIR HANDLING UNITS (AHU'S): EXISTING AHU'S TO REMAIN IN PLACE.COORDINATE WITH OWNER.
2. EXISTING EQUIPMENT CONDENSING UNITS (CU'S): EXISTING CU'S TO REMAIN IN PLACE.COORDINATE WITH OWNER.
MD-X
MD-3
MD-4
NOTE:LOCATE FOUR (4) NEW RTU'SDIRECTLY ABOVE EXTG UNITSTHAT ARE GOING TO BE REMOVED.
ENGR. PROJ.#
MD1
ET
20071
MEC
HAN
ICAL
DEM
OLI
TIO
NFL
OO
R P
LAN
DRAWN BY:
CHECKED BY:GLN
DATE:
SHEE
T TI
TLE:
PRO
JEC
T TI
TLE:
12-18-2020PLAN REVIEW
------------------------------------------
SHEET NUMBER
MU
LTI-P
UR
POSE
FAC
ILIT
Y
Cad
illac,
MI
Wex
ford
Cou
nty
SCALE:MECHANICAL DEMOLITION FLOOR PLAN
1/8" = 1'-0"
SCALE:KEY PLAN
NO SCALE
M
EXTG GAS METER
EXTG 3" GAS
EXTG 2" GAS
ROOFOPENING
76-1
/2"
81"
ROOFOPENING
76-1
/2"
81"
ROOFOPENING
76-1
/2"
81"
ROOFOPENING
76-1
/2"
81"
T
RTU-1
RTU-2
RTU-3
RTU-4
T-STATRTU-1
TT-STATRTU-3
TT-STATRTU-4
T
T-STATRTU-2
AB
C D
55"
35"
AB
C D
AB
C D
AB
C D
3.
1-1/4" GAS
1-1/4" GAS1-1/4" GAS
EXTEND 3/4" GASUP TO NEW RTU
1-1/4" GAS
4.
4.
4.
4.EXTG TRUSS (TYP.)
EXTG TRUSS (TYP.)
6'-8"
6'-8"
TRU
SS P
ANEL
PO
INT
AT T
OP
CH
OR
D(T
YP. O
F 4)
30'-8" ± (TYP. OF 4)
TRU
SS P
ANEL
PO
INT
AT T
OP
CH
OR
D(T
YP. O
F 4)
30'-8" ± (TYP. OF 4)
EXTEND 3/4" GASUP TO NEW RTU
EXTEND 3/4" GASUP TO NEW RTU
EXTEND 3/4" GASUP TO NEW RTU
ALTERNATE #2
3. ELIMINATE RTU-4 AND CAP EXISTING ROOF PENETRATION.
ALTERNATE #3
4. ADD NEEDLEPOINT IONIZATION IN EACH ROOF TOP UNIT.
OPERATING WEIGHT
2626.0 LBS
A
635.0 LB
B
515.0 LB 374.0 LB 454.0 LB
C D
CORNER WEIGHTSRTU WEIGHT*
CONCENTRICDIFFUSER WEIGHT*
388 LBS
RTU, CONCENTRICDIFFUSER, & CURB WEIGHT*
3249 LBS
ROOF CURB*
235 LBS
*ALL WEIGHTS ARE APPROXIMATE. THE ACTUALWEIGHTS ARE LISTED ON THE UNIT NAMEPLATE.
NOTE:LOCATE FOUR (4) NEW RTU'SDIRECTLY ABOVE EXTG UNITSTHAT ARE GOING TO BE REMOVED.
ENGR. PROJ.#
M1
ET
20071
MEC
HAN
ICAL
FLO
OR
PLA
N
DRAWN BY:
CHECKED BY:GLN
DATE:
SHEE
T TI
TLE:
PRO
JEC
T TI
TLE:
------------------------------------------
SHEET NUMBER
MU
LTI-P
UR
POSE
FAC
ILIT
Y
Cad
illac,
MI
Wex
ford
Cou
nty
SCALE:MECHANICAL FLOOR PLAN
1/8" = 1'-0"SCALE:KEY PLAN
NO SCALE
12-18-2020PLAN REVIEW
1. THE MECHANICAL CONTRACTOR SHALL SUBCONTRACT A TEST AND BALANCE CONTRACTOR TO BALANCE THE SYSTEMS DESCRIBED BELOW.2. THE BALANCING SHALL BE COMPLETED BY AN INDEPENDENT TEST AND BALANCE CONTRACTOR WHO IS NOT AN EMPLOYEE OF THE MECHANICAL
CONTRACTOR.3. PER COMPLIANCE WITH ASHRAE 90.1-2013, THE BALANCER SHALL SUBMIT AN AIR BALANCE REPORT TO THE ENGINEER AND STATE OR COUNTY
INSPECTOR.4. THE BALANCE REPORT SHALL SHOW PROOF THAT THE SYSTEM HAS BEEN BALANCED TO +/- 10% OF THE DESIGNED FLOW RATE. IT IS THE
MECHANICAL CONTRACTOR AND TEST AND BALANCER'S DUTY TO PROVIDE ACCURATE DATA, SO AREAS OF INCORRECT FLOW MAY BEDISCLOSED TO THE ENGINEER, INSPECTOR, AND OWNER.
5. ALL AIRSIDE SYSTEMS, COMPONENTS, ETC. INCLUDING SUPPLY, RETURN, OUTDOOR, AND EXHAUST AIR SYSTEMS SHALL BE BALANCED. THEBALANCER SHALL PROVIDE SHEAVES AND BELTS AS NEEDED TO PROPERLY BALANCE EQUIPMENT TO +/- 10% OF THE DESIGNED AIRFLOWS. ALLDIFFUSERS, REGISTERS, GRILLES, AND LOUVERS SHALL BE INDIVIDUALLY BALANCED AND LISTED IN THE BALANCE REPORT. ALL AIRSIDEEQUIPMENT, SUPPLY, RETURN, AND OUTDOOR AIR FLOWRATES SHALL BE LISTED IN THE BALANCE REPORT.
6. ALL HVAC MOTOR DATA INCLUDING FREQUENCY (RPM), AMP DRAW, HORSEPOWER, EXTERNAL STATIC PRESSURE, HEAD PRESSURE, ETC., SHALLBE INCLUDED IN THE BALANCE REPORT.
23 05 93
TESTING,ADJUSTING,ANDBALANCING
23 11 00
FACILITY FUELPIPING
1. GAS PIPING SHALL COMPLY WITH THE CURRENTLY ENFORCED VERSION OF THE INTERNATIONAL FUEL GAS CODE (I.F.G.C.).2. ABOVE GROUND GAS PIPING SHALL BE SCHEDULE 40, BLACK IRON WITH MALLEABLE IRON THREADED FITTINGS, SUPPORT PIPING WITH
ADJUSTABLE BAND TYPE PIPE HANGERS, EQUAL TO ITT-GRINNEL FIG. 97. INSTALL DRIP LEG WITH UNION AND VALVE AT CONNECTION TO EACHPIECE OF EQUIPMENT. GAS SHUT-OFF VALVES SHALL BE 150 PSI, NON-SHOCK WOG, BRONZE BODY, STRAIGHT CONFIGURATION, AND/OR SHALLCOMPLY WITH I.F.G.C TABLE 409.1.1 AND SHALL MEET ANSI Z21.15, CSA REQUIREMENT 3-88, ASME B16.44, ASME B16.33.
3. INSTALL AND TEST GAS PIPING IN COMPLIANCE WITH UTILITY COMPANY REGULATIONS AND THE LATEST VERSION OF THE INTERNATIONAL FUELGAS CODE, NFPA NO. 54.
23 74 00
ROOF-TOPUNITS
23 00 00
BASICMECHANICALREQUIREMENTS
1. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL PACKAGED ROOF-TOP UNIT(S) AS SHOWN AND SCHEDULED. THE UNIT(S) SHALL BEINSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS, AND SHALL PERFORM AT THE CONDITIONS SCHEDULED.
2. THE ROOF TOP UNIT PACKAGE(S) SHALL INCLUDE:2.1. R-410A CONDENSER SECTION. SEE SCHEDULE FOR REQUIREMENTS INCLUDING
2.1.1. STAGING REQUIREMENTS2.1.2. ANTI-SHORT CYCLING TIMER (ADJ. TIMED ON AND TIMED OFF)2.1.3. LOW AMBIENT CRANK-CASE HEATER
2.2. TWO STAGE NATURAL GAS BURNER.2.3. BELT-DRIVE EVAPORATOR BLOWER2.4. 100% FULL ECONOMIZER WITH REFERENCE ENTHALPY CONTROLLER.2.5. DEMAND CONTROL VENTILATION (DCV) CONTROLLER.2.6. BAROMETRIC RELIEF DAMPER OR POWERED EXHAUST AS SCHEDULED.2.7. DIGITAL CONTROL BOARD.2.8. HINGED ACCESS DOORS.2.9. ELECTRICAL DISCONNECT (SEE ROOF TOP UNIT SCHEDULE FOR CORRECT VOLTAGE.)2.10. 115V CONVENIENCE OUTLET WITH ALL-WEATHER COVER (MAY NOT BE REQUIRED ON ALL UNITS --- SEE SCHEDULE AND DRAWINGS FOR
REQUIRED LOCATIONS.)2.11. (2) SETS OF THROW-AWAY FILTERS FOR EACH ROOF TOP UNIT.
3. THE MECHANICAL CONTRACTOR SHALL PROVIDE TWO (2) SETS OF FILTERS FOR EACH UNIT AND SHALL BE RESPONSIBLE FOR CHANGING FILTERSWITHIN TWO (2) WEEKS OF START-UP.
4. THE MECHANICAL CONTRACTOR SHALL PROVIDE A SINGLE POWER SOURCE CONNECTION DISCONNECT, AND A 15 AMP DUPLEX, WEATHERPROOFCONVENIENCE OUTLET BOX FOR EACH ROOF TOP UNIT INSTALLED.
6. MANUFACTURERS: TRANE, CARRIER, MCQUAY, YORK, AAON (NOTE THAT THESE MANUFACTURERS ARE APPROVED CONTINGENT ON MEETING THEREQUIREMENTS OF THE TOTAL RTU AND ZONE DAMPER PACKAGE INCLUDING CONTROL ACCESSORIES).
MECHANICAL SPECIFICATIONSSECTION SECTION 1. BUILDING AUTOMATION SYSTEM (BAS) SHALL BE AS INDICATED ON THE DRAWINGS AND DESCRIBED IN THESE SPECIFICATIONS. SYSTEM MUST BE
FULLY INTEGRATED AND COORDINATED WITH MECHANICAL EQUIPMENT DDC CONTROLLERS FURNISHED AND INSTALLED IN THE EQUIPMENTMANUFACTURER'S FACTORY AS SPECIFIED IN THOSE SECTIONS.
1.1. THE INTENT OF THE BAS IS TO INTEGRATE THE MECHANICAL EQUIPMENT ASSOCIATED WITH THIS PROJECT INTO ONE SYSTEM FOR GLOBALMONITORING, CONTROL, AND ALARMING.
1.2. ALL MECHANICAL EQUIPMENT THAT IS INTENDED TO BE INTEGRATED INTO THE BAS SHALL BE CONTROLLED BY CUSTOM APPLICATION ORAPPLICATION SPECIFIC CONTROLLERS THAT MEET THE INTERFACE REQUIREMENTS AS DETAILED IN THE COMMUNICATIONS SECTION OF THISSPECIFICATION.
1.3. ACCEPTABLE INSTALLERS1.3.1. TRANE1.3.2. SIEMENS
2. PROVIDE TOUCH SCREEN DISPLAY WITH MOBILE APP AND WEB UI ACCESS.3. SYSTEM COMMUNICATIONS SHALL WORK SEAMLESSLY WITH CONTROLLERS AND ROOF TOP UNITS.4. SYSTEM CONTROLLER CONFIGURATION
4.1. SYSTEM SHALL BE CAPABLE OF SETUP FROM TOUCHSCREEN INTERFACE.4.2. UNIT CONTROLLERS SHALL BE ABLE TO BE ADDRESSED BY METHODS OTHER THAN SOFTWARE IN CASES WHERE TOUCHSCREEN INTERFACE
ISSUES ARISE.
1. ALL WORK TO BE DONE AND MATERIALS FURNISHED COMPLYING WITH APPLICABLE LAWS AND REGULATIONS, INCLUDING THE 2015 MICHIGANMECHANICAL CODE (M.M.C.), ASHRAE 90.1-2013 "ENERGY STANDARDS FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS", ASHRAE62.1-2013 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY", 2015 INTERNATIONAL PLUMBING CODE (M.P.C.), CURRENTLY ENFORCED MICHIGANBUILDING CODE (M.B.C.), AND LOCAL, STATE, AND FEDERAL FIRE SAFETY CODES (NFPA).
2. ALL MATERIALS USED SHALL BE NEW AND UNDAMAGED.3. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH CURRENT CONSTRUCTION INDUSTRY STANDARDS AND WORKMANSHIP.4. LABEL PIPING AND EQUIPMENT USING PROFESSIONAL MARKERS PER ASME A13.1-1996:
4.1. PROVIDE PROFESSIONAL ENGRAVED PLASTIC EQUIPMENT NAMEPLATES FOR ALL HVAC EQUIPMENT IDENTIFYING EQUIPMENT TAG ANDNUMBER. SEE PLANS FOR EQUIPMENT TAG NUMBERS (FOR EXAMPLE, B-1, P-1, AHU-1, ... ETC.)
5. FURNISH ALL ACCESS DOORS (RATED OR NON-RATED AS REQUIRED) WHERE VALVES OR EQUIPMENT ARE CONCEALED BEHIND A NON-ACCESSIBLECEILING OR WALL. FURNISH ACCESS DOORS TO GENERAL CONTRACTOR FOR INSTALLATION.
6. THE CONTRACTOR SHALL ARRANGE TO MEET AND INSTRUCT THE OWNER IN THE USE AND MAINTENANCE OF SYSTEMS AND EQUIPMENT. THISINSTRUCTION SHALL BE FOR A MINIMUM OF (4) HOURS. AN ADDITIONAL (2) HOURS OF INSTRUCTION FOR THE OWNER WILL BE GIVEN IN THEOPERATION OF THE TEMPERATURE CONTROLS BY THE INSTALLER OF THE TEMPERATURE CONTROLS.
7. ALL MANUFACTURED EQUIPMENT, ACCESSORIES AND MATERIALS SHALL BE USED AS INTENDED BY THE MANUFACTURER, IN STRICT ACCORDANCEWITH THE MANUFACTURER'S WRITTEN INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS.
8. THE CONTRACTOR SHALL PROVIDE, IN ADDITION TO ANY OTHER WARRANTIES SPECIFIED, A ONE (1) YEAR FULL LABOR AND MATERIAL WARRANTYON ALL WORKMANSHIP, MATERIAL AND EQUIPMENT FURNISHED FOR THIS PROJECT.
9. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL OPENINGS AND REQUIRED LINTELS NEEDED FOR THE GENERALCONTRACTOR FOR THE INSTALLATION OF MECHANICAL EQUIPMENT.
10.SAWCUTS, LINTELS, HEADERS, AND STRUCTURAL MODIFICATIONS TO THE BUILDING STRUCTURE NEEDED FOR THE INSTALLATION OF MECHANICALEQUIPMENT SHALL BE APPROVED BY THE GENERAL CONTRACTOR, BEFORE INSTALLATION.
11.IN GENERAL, OPENINGS AND REQUIRED LINTELS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR ISRESPONSIBLE FOR PROVIDING DETAILS AND TEMPLATES OF ALL OPENINGS NECESSARY FOR MECHANICAL EQUIPMENT INSTALLATION INCLUDING:HOUSING, ACCESS DOORS, INSPECTION DOORS, AND PASSAGEWAYS FOR MECHANICAL EQUIPMENT. THE MECHANICAL CONTRACTOR ISRESPONSIBLE FOR SEALING CRACKS AND FINISHING ROUGH EDGES LEFT FOLLOWING MECHANICAL INSTALLATION.
12.THE USE OF THE MECHANICAL EQUIPMENT FOR HEATING, COOLING, OR DRYING DURING CONSTRUCTION IS PROHIBITED, UNLESS APPROVED BYWRITTEN DOCUMENTATION BY THE OWNER.
13. APPROVED EQUALS: MECHANICAL EQUIPMENT MANUFACTURED BY A COMPANY OTHER THAN THAT WHICH WAS SPECIFIED IN THE SCHEDULE MAYBE SUBSTITUTED BY APPROVED SHOP DRAWINGS CONTINENT UPON MEETING THE DESIGN, APPEARANCE, AND FUNCTIONAL STANDARDSESTABLISHED BY THE ORIGINALLY SPECIFIED ITEM(S). THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING DIMENSIONS,CLEARANCES, ASSEMBLY, FIT, ETC. OF THE APPROVED EQUAL(S) AND THEIR AFFECT ON OTHER EQUIPMENT FIT AND OPERATION. THE MECH.CONTRACTOR IS LIABLE FOR ANY ADDED COSTS TO HIMSELF OR OTHERS CAUSED BY THE APPROVED EQUALS.
14.SUBMITTALS14.1. FURNISH SHOP DRAWINGS TO ENGINEER FOR APPROVAL PRIOR TO PLACING DELIVERY ORDERS. PROVIDE SHOP DRAWINGS OF ALL
MANUFACTURED EQUIPMENT AND MATERIALS EXCEPT PIPE, PIPE FITTINGS, AND GALVANIZED DUCTWORK.14.2. AT SUBSTANTIAL COMPLETION OF CONSTRUCTION, FURNISH AS-BUILT PLANS TO ENGINEER FOR APPROVAL. WITHIN 90 DAYS AFTER THE
DATE OF SYSTEM ACCEPTANCE, APPROVED AS-BUILT PLANS SHALL BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALLINCLUDE, AS A MINIMUM, THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCTAND PIPE DISTRIBUTION SYSTEM INCLUDING SIZES, AND THE TERMINAL AIR OR WATER DESIGN FLOW RATES.
14.3. AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER WITHIN 90 DAYS OF SYSTEMACCEPTANCE. THESE MANUALS SHALL BE IN ACCORDANCE WITH INDUSTRY-ACCEPTED STANDARDS AND SHALL INCLUDE, AT THE MINIMUM:
14.3.1. SUBMITTAL DATA STATING EQUIPMENT SIZE AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE.14.3.2. OPERATION AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE
MAINTENANCE ACTIONS SHALL BE CLEARLY IDENTIFIED.14.3.3. NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY.14.3.4. HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING DIAGRAMS, SCHEMATICS, AND CONTROL
SEQUENCE DESCRIPTIONS. DESIRED OR FIELD-DETERMINED SET POINTS SHALL BE PERMANENTLY RECORDED ON CONTROL DRAWINGSAT CONTROL DEVICES OR IN PROGRAMMING COMMENTS.
23 09 00
INSTRUMENTA-TION ANDCONTROL FORHVAC
NOTES:
1. DO NOT INSTALL FACTORY SUPPLIED DUCT SUPPORTS,UNLESS NOTED IN ASSEMBLY INSTRUCTIONS.
2. INSTALL CONCENTRIC DUCTWORK BEFORE SETTING A/CUNIT IN PLACE.
3. PLACE GASKET ON ALL SURFACES OF DUCT FLANGE ANDCURB.
4. ALIGN TRANE UNIT SUPPLY OPENING TO MATCH SUPPLYOPENING OF CONCENTRIC DUCT KIT.
5. FIELD BAFFLES MAY BE REQUIRED FOR BALANCING.6. FOR INSTALLATION SEE ASSEMBLY INSTRUCTIONS.
Scale: None
CONCENTRIC DIFFUSER DETAIL
DUCT SUPPORTSUPPLIED WITH CURB
INSULATED PANELSSUPPLIED WITH CURB
DO NOT INSTALL
ACCESSORY ROOF CURB
TRANSITION CURBMAKE TRANSITION PRIOR TOPENETRATION THROUGH ROOF
DROP TYPECONCENTRIC DIFFUSER
ENGR. PROJ.#
M2
ET
20071
MEC
HAN
ICAL
SC
HED
ULE
SD
ETAI
LS &
SPE
CIF
ICAT
ION
S
DRAWN BY:
CHECKED BY:GLN
DATE:
SHEE
T TI
TLE:
PRO
JEC
T TI
TLE:
------------------------------------------
SHEET NUMBER
MU
LTI-P
UR
POSE
FAC
ILIT
Y
Cad
illac,
MI
Wex
ford
Cou
nty
12-18-2020PLAN REVIEW
ENGR. PROJ.#20071
STR
UC
TUR
AL D
ETAI
LS
DRAWN BY:
CHECKED BY:
DATE:
SHEE
T TI
TLE:
PRO
JEC
T TI
TLE:
------------------------------------------
SHEET NUMBER
MU
LTI-P
UR
POSE
FAC
ILIT
Y
Cad
illac,
MI
Wex
ford
Cou
nty
12-18-2020PLAN REVIEW
12/18/20
ENGR. PROJ.#
E0
BSR
20071
ELEC
TRIC
ALSC
HED
ULE
S &
DET
AILS
DRAWN BY:
CHECKED BY:JAV
DATE:
SHEE
T TI
TLE:
PRO
JEC
T TI
TLE:
12-18-2020PLAN REVIEW
------------------------------------------
SHEET NUMBER
MU
LTI-P
UR
POSE
FAC
ILIT
Y
Cad
illac,
MI
Wex
ford
Cou
nty
ABBREVIATIONS
C/B, CB
C
EC
EF
A
DWG
EWC
GFI
GEC
AMPERES
CIRCUIT BREAKER
CONDUIT
ELECTRICAL CONTRACTOR
EXHAUST FAN
DRAWING
COOLERELECTRIC WATER
CIRCUIT INTERRUPTERGROUND FAULT
CONDUCTORGROUNDING ELECTRODE
EGC CONDUCTOREQUIPMENT GROUNDING
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AC ABOVE COUNTER
KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT-AMPERES
KW KILOWATTS
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION PANEL
MLO MAIN LUG ONLY
NTS NOT TO SCALE
RGS RIGID GALVANIZED STEEL
TVSS SUPPRESSIONTRANSIENT VOLTAGE SURGE
UON UNLESS OTHERWISE NOTED
V VOLT
VFD VARIABLE FREQUENCY DRIVE
W WIRE
WP WEATHERPROOF
XFMR TRANSFORMER
WG WIREGUARD
NL NIGHT LIGHT
P PUMP
PNL PANEL
PS PRIMARY SWITCH
PT PRIMARY TRANSFORMER
ERV VENTILATORENERGY RECOVERY
EWH HEATERELECTRIC WATER
G GROUND
EMT ELECTRICAL METALLIC TUBING
PVC POLYVINYL CHLORIDE
1-21 PANEL 1, CIRCUIT 21
ETR EXISTING TO REMAIN
E-R EXISTING TO BE RELOCATED
E EXISTING TO REMAIN
TR TAMPER RESISTANT
BC BELOW COUNTER
UGRD or U/G UNDERGROUND
DF DEAD FRONT
DEVICE ON REAR SIDE OF COVER
OTHER THAN POWER ORLIGHTING CKT.'S LABELCOVERS INDICATINGSYSTEM TYPE AND ZONES.
JUNCTION BOXES (EXPOSEDOR CONCEALED ABOVE
FOR J.B.'S CONTAINING
ACCESSIBLE CEILING)
PLATE. USE PERMANANT MARKER PEN, BRADY MARKING SYSTEM OR OTHERMETHOD APPROVED BY THE ENGINEER
CKT.SLP4-13,15,17
"P.A. ZONES 4,5,&6""DATA CIRCUITS A&B""EXIT SIGNS-EMI&2""EMERG. CKTS. BPEM1-3,4"
"FIRE ALARM-ZONES 2&3"
LABEL EXAMPLES:
LABEL COVERS WITH CKT.'S
-----------
OTHER APPROVED METHOD.
SWITCH PLATESTANDARD TOGGLE
REAR SIDE
LABEL CKT. NO. OF EACH
DUPLEX RECEPTACLE
ELECTRICAL IDENTIFICATION
N-2
FRONT
OF PLATE
FRONT
PLATE
N-5
OF PLATEREAR SIDE
PERMANANT MARKER PEN ORCONTAINED WITHIN. USE
WIRE SIZE REQUIREMENTS
WIRES FOR RUNS OVER 100'-0" SHALL BE DETERMINED ON THIS
LENGTH OF RUN - FROM PANEL TO FIRST CONNECTION - FEET
NOTE:BASED ON A MAXIMUM OF 3.6-VOLT DROP (3%) ON 120V CIRCUITS.
15
20
30
#12
#12
#10
#12
#10
#10
CIRCUIT AMPS
AMPS
BRANCH
50' 60'
#10
#10
#8
#12
#10
#8
#10
#10
#8
#8
#6
#10 #10
#8
#6
90'
A MAXIMUM OF A 3% DROP ALLOWED.
70' 80' 100' 110'
#10
#8
#6
#8
#8
#6
120' 130'
EGC CONDUCTOREQUIPMENT GROUNDING SM SURFACE MOUNT
CM CEILING MOUNT
NIC NOT IN CONTRACTNEW BRANCH CIRCUIT ELECTRICAL PANEL
REFER TO SHOP DRAWINGS FOR CONNECTION REQUIREMENTS1Ø SPECIAL CONNECTION, AS NOTED
DESCRIPTIONSYMBOL NOTES
REFER TO SPECIFICATIONS AND RISER DIAGRAM ON SHEET E2 FOR DETAILS
ELECTRICAL SYMBOL LEGEND
ELECTRICAL SPECIFICATIONSSECTION
260000
BASICELECTRICALREQUIREMENTS
1. PRIOR TO SUBMITTING A PROPOSAL, BIDDER SHALL HAVE VISITED THECONSTRUCTION SITE. HE/SHE SHALL BE FAMILIAR WITH THE EXISTINGCONDITIONS UNDER WHICH HE/SHE WILL HAVE TO OPERATE AND WHICH WILLIN ANY WAY AFFECT THE WORK UNDER THIS CONTRACT. NO SUBSEQUENTALLOWANCE WILL BE MADE IN THIS CONNECTION ON BEHALF OF THECONTRACTOR FOR ANY ERROR OR NEGLIGENCE ON HIS PART.
2. ELECTRICAL WORK SHALL COMPLY WITH THE LATEST ENFORCEABLE EDITIONOF THE N.E.C., LOCAL AND STATE CODES, ORDINANCES, REGULATIONS,INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA), AND ADAGUIDELINES WITH THE LOCAL CODE AUTHORITIES HAVING JURISDICTION.
3. ELECTRICAL CONTRACTOR SHALL OBTAIN ALL PERMITS, PAY ALL FEES, ANDARRANGE FOR ALL INSPECTIONS FOR HIS/HER WORK. AT THE COMPLETIONOF ELECTRICAL WORK, THE ELECTRICAL CONTRACTOR SHALL FURNISH THEOWNER WITH ALL CERTIFICATES OF FINAL INSPECTION AND APPROVALS.
4. THE CONTRACTOR SHALL EMPLOY QUALIFIED AND EXPERIENCED WORKMENFOR THIS WORK.
5. ELECTRICAL CONTRACTOR SHALL GUARANTEE ALL WORK INSTALLED UNDERHIS/HER CONTRACT TO BE FREE FROM DEFECTIVE WORKMANSHIP ANDMATERIALS FOR A PERIOD OF ONE YEAR AFTER THE ACCEPTANCE OF THEBUILDING BY THE OWNER. SHOULD DEFECTS OCCUR WITHIN THIS PERIOD,REPAIR AND/OR REPLACE DEFECTIVE ITEMS AT NO EXPENSE TO THE OWNER.
6. THE ELECTRICAL CONTRACTOR SHALL PROVIDE A MINIMUM OF ONE (1) HOUROF TRAINING AS NECESSARY TO THE OWNER ON THE ELECTRICAL EQUIPMENTAND/OR DEVICES.
7. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL OPERATING ANDMAINTENANCE INSTRUCTION MANUALS, CERTIFICATES OF INSPECTION, TESTREPORTS, SPARE PARTS, AND RECORD DRAWINGS (AS-BUILTS) TO THEOWNER PRIOR TO CLOSEOUT. FINAL PAYMENT WILL ONLY BE MADE AFTERTHE FINAL PUNCH LIST COMPLETION AND RECEIPT OF THE ABOVE CLOSEOUTDOCUMENTATION.
8. ELECTRICAL CONTRACTOR SHALL COORDINATE LOCATIONS OF HISEQUIPMENT AND WORK WITH OTHER BUILDING TRADES TO AVOID ANYINTERFERENCES BETWEEN HIS WORK AND THE WORK OF OTHER BUILDINGTRADES. IF ANY DISCREPANCIES OCCUR, CONSULT WITH THE ENGINEERAND/OR OWNER BEFORE CONTINUING.
9. THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE PROPERRESTORATION OF ALL EXISTING SURFACES REQUIRING PATCHING,PLASTERING, PAINTING AND/OR REPAIR DUE TO THE INSTALLATION OFELECTRICAL WORK UNDER THE TERMS OF THIS SPECIFICATION. CLOSE ALLOPENINGS, REPAIR ALL SURFACES, ETC. AS REQUIRED.
10. CUTTING AND/OR PATCHING THAT MAY BE REQUIRED FOR THE INSTALLATIONOF THE ELECTRICAL SYSTEM(S) SHALL BE DONE AND/OR REPAIRED BY THEELECTRICAL CONTRACTOR. NO CUTTING OF THE BUILDING STRUCTURALSYSTEM SHALL BE DONE WITHOUT THE WRITTEN CONSENT OF THEOWNER/ENGINEER.
11. CERTAIN REMODELING OF ELECTRICAL FACILITIES WILL BE REQUIRED IN THEEXISTING BUILDING. EXISTING CONDUIT RUNS ARE GENERALLY NOT SHOWNALTHOUGH AN ATTEMPT HAS BEEN MADE TO SHOW SOME EXISTINGCONDITIONS FOR WHICH THE INFORMATION HAS BEEN TAKEN FROM FIELDOBSERVATIONS OF THIS PROJECT. THE DRAWINGS SHOWING LOCATIONS OFEXISTING EQUIPMENT, OUTLETS, FIXTURES, ETC., IN EXISTING AREAS AREAPPROXIMATE ONLY (FIELD VERIFY). VERIFY ALL EXISTING LOADS AND WIRING- NOTIFY THE ARCHITECT/ENGINEER IF EXISTING CONDITIONS ARE FOUNDTHAT VIOLATE INSTALLATION OR SAFETY CODES.
12.BRANCH CIRCUITS SHALL BE REUSED WHERE PRACTICAL AND SHALL, INADDITION, BE REMODELED AS REQUIRED.
13.EXISTING ELECTRICAL WIRING WHICH WILL NOT BE MADE OBSOLETE ANDWHICH WILL BE DISTURBED DUE TO CONSTRUCTION CHANGES REQUIRED BYTHIS CONTRACT SHALL BE RESTORED TO OPERATING CONDITION ASREQUIRED AND/OR DIRECTED. WHERE REQUIRED, SHOWN AND/OR DIRECTED,OUTLETS AND CONDUIT RUNS SHALL BE RELOCATED. IN SOME CASES IT MAYBE NECESSARY TO EXTEND CONDUITS AND PULL IN NEW WIRING, INSTALLJUNCTION BOXES AND SPLICE IN NEW WIRING, OR REPLACE OLD WIRING WITHNEW.
14. OUTLETS FROM WHICH FIXTURES, SWITCHES, RECEPTACLES, AND/OR OTHERELECTRICAL DEVICES ARE MOVED AND WHICH ARE NOT REPLACED ORREUSED SHALL BE REMOVED OR, IF IT IS NOT POSSIBLE TO REMOVE, HAVE ABLANK COVER PLACED ON THE OUTLET BOX. WHERE OUTLETS, BOXES, ETC.ARE COMPLETELY REMOVED, THE CONTRACTOR SHALL CUT OFF AND CAPCONDUITS AND REMOVE WIRING.
15. WHERE EXISTING CONDUIT IS TO BE ABANDONED, THE CONDUIT SHALL BEREMOVED IF IT IS EXPOSED, IN A CRAWL SPACE OR IN AN ACCESSIBLECEILING. WHERE IT IS IMPOSSIBLE TO REMOVE THE CONDUIT, IT SHALL BE CUTOFF AND CAPPED OR PLUGGED.
16. WHERE EXISTING WIRE, CONDUIT AND OUTLET BOXES ARE NO LONGER USED,REMOVE WIRE BACK TO THE POWER SOURCE AND PROVIDE BLANK COVER ONOUTLET BOX. EXPOSED CONDUIT NOT REUSED SHALL BE REMOVED.THECONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE PROPERRESTORATION OF ALL EXISTING SURFACES REQUIRING PATCHING,PLASTERING, PAINTING AND/OR REPAIR DUE TO THE INSTALLATION OFELECTRICAL WORK UNDER THE TERMS OF THIS SPECIFICATION. CLOSE ALLOPENINGS, REPAIR ALL SURFACES, ETC. AS REQUIRED.
17. THE ELECTRICAL CONTRACTOR SHALL PERIODICALLY REMOVE FROM THE SITEALL DEBRIS AND RUBBISH ACCUMULATING AS A RESULT OF THE ELECTRICALINSTALLATION. UPON COMPLETION OF THE PROJECT, HE/SHE SHALL DISPOSEOF ALL DEBRIS AND RUBBISH AND SHALL LEAVE ALL AREAS CLEAN. THEINTERIORS OF ALL CABINETS, PULL BOXES, AND EQUIPMENT ENCLOSURESSHALL BE FREE OF ANY DEBRIS.
18. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND SHALLWORK WITH EXISTING SYSTEMS IN AN "AS FOUND" CONDITION.
19.DRAWINGS ARE DIAGRAMMATIC ONLY AND SHOW OBSERVATIONS FROMCASUAL FIELD INVESTIGATIONS AND EXISTING DRAWINGS. FIELD VERIFY ALLEXISTING CONDITIONS, DIMENSIONS AND MOUNTING LOCATIONS. NOTIFYENGINEER IF ANY DISCREPANCIES ARE FOUND THAT AFFECT THE WORK TO BEPERFORMED, PRIOR TO PROCEEDING.
20.ELECTRICAL JOINTS WILL BE PERMITTED ONLY IN JUNCTION AND OUTLETBOXES. ALL JOINTS SHALL BE FIRMLY BONDED TOGETHER AND TAPED ORSHALL BE MADE WITH MECHANICAL CONNECTORS.
21.WITHIN THIRTY (30) DAYS AFTER THE ELECTRICAL CONTRACTOR HAS BEENNOTIFIED TO PROCEED WITH THE WORK, THEY SHALL SUBMIT TO THE OWNEREIGHT (8) PRINTED AND BOUND COPIES -OR- ONE (1) ELECTRONIC COPY IN PDFFORMAT OF EACH OF THE FOLLOWING DRAWINGS AND DATA SHEETS FORREVIEW. ALL EQUIPMENT FOR WHICH SHOP DRAWINGS ARE BEINGSUBMITTED SHALL NOT BE ORDERED UNTIL APPROVED DRAWINGS HAVE BEENRETURNED. SUCH SUBMITTALS SHALL INCLUDE:
* ELECTRICAL DISTRIBUTION EQUIPMENT, INCLUDING PANELBOARDS &CIRCUIT BREAKERS
22.ELECTRICAL MATERIALS SHALL BE NEW, AND BEAR THE "UL" LABEL ORLISTING.
23.BRANCH CIRCUIT WIRE SHALL BE COPPER, RATED 75°C, MINIMUM SIZE #12AWG, AND BE:(1. TYPE 'MC', 'AC' CABLE (10 FT. MAXIMUM UNLESS OTHERWISE NOTED OR
APPROVED BY THE ARCHITECT/ENGINEER/OWNER) WHERE INSTALLED INCONCEALED LOCATIONS, OR
(2. TYPE 'NM', 'NM-B', 'NM-C' OR 'NM-S' WHERE PERMITTED BY CODE ANDINSTALLED IN CONCEALED LOCATIONS ONLY, OR
(3. TYPE "THHN", "THWN" OR "THWN-2" AND INSTALLED IN CONDUIT (EMT, FORINDOOR USE; SCHEDULE 40 PVC OR SCHEDULE 80 PVC, WHERE SUBJECTTO DAMAGE, FOR INDOOR WET LOCATIONS, AND SCHEDULE 40 PVC ORRMC FOR OUTDOOR USE, MINIMUM SIZE 1/2", OR
(4. UNLESS OTHERWISE NOTED OR REQUIRED BY CODE. EXPOSED INTERIORMOTOR CONNECTIONS SHALL BE TYPE "MC" OR "AC" CABLE OR LIQUIDTITE FLEXIBLE CONDUIT (ALL WITH A 6FT. MAXIMUM LENGTH).
(5. ALL WIRE AND CABLE SHALL BE NEW AND SHALL BE DELIVERED TOPROJECT IN UNBROKEN AND UNDAMAGED CARTONS AND/OR REELS. ALLNEW BRANCH WIRING SHALL BE COLOR CODED BY THE FOLLOWINGVOLTAGE SYSTEMS AND LABELED AT THEIR SOURCE PER 2017 NECSECTION #210.5:
(6. 120/240V-1Ø-3W : 120/208V-3Ø-4W: 277/480V-3Ø-4W :ØA - BLACK ØA - BLACK ØA - ORANGEØB - RED ØB - RED ØB - BROWNNEUTRAL - WHITE ØC - BLUE ØC - YELLOWGROUND-GREEN NEUTRAL - WHITE NEUTRAL - WHITE
GROUND-GREEN GROUND-GREEN
24.ALL CONDUIT AND JUNCTION BOXES SHALL BE APPROPRIATELY MARKED WITHTHE CIRCUITS THEY CONTAIN AND A DESIGNATION THAT IT IS CONTAININGELECTRICAL CONDUCTORS.
25.UNDERGROUND CONDUIT TO BE SCHEDULE 40 PVC OR SCHEDULE 80 PVCWHERE SUBJECT TO PHYSICAL DAMAGE.
26.FUSES SHALL BE "UL" LISTED, DUAL-ELEMENT AS MANUFACTURED BY BUSSMANCO., OR APPROVED EQUAL (200,000 AIC).
27.FIRE CAULKING REQUIRED WHERE ANY PENETRATIONS ARE MADE THROUGHFIRE RATED WALLS, BY. E.C.
28.PROVIDE AN UPDATED, AND ACCURATE PANEL SCHEDULE FOR THE EXISTINGELECTRICAL PANEL(S) THAT ARE AFFECTED BY THE WORK IN THIS PROJECT.DOCUMENT ALL CHANGES ON FINAL AS-BUILT DRAWINGS AS REQUIRED. VERIFYALL EXISTING LOADS AND WIRING - NOTIFY THE ARCHITECT/ENGINEER IFEXISTING CONDITIONS ARE FOUND THAT VIOLATE INSTALLATION OR SAFETYCODES.
29. ALL NEW EQUIPMENT (PANELS, DISCONNECTS, COMBINATIONSTARTER/DISCONNECTS, VARIABLE FREQUENCY DRIVES (VFD), ETC.)IDENTIFICATION SHALL BE DONE WITH ENGRAVED 2-PLY LAMACOID PLATESWITH 14" WHITE LETTERING ON A BLACK BACKGROUND. "DYMO" OR TAPEMARKERS MUST BE APPROVED BY OWNER AND/OR ENGINEER PRIOR TO USE.
30.E.C. SHALL COORDINATE WITH THE ELECTRIC UTILITY AND THE OWNER TOCOMPLETE DOCUMENTATION TO OBTAIN ALL AVAILABLE ENERGY INCENTIVECREDITS FOR THE OWNER.
1Ø DISCONNECT (SAFETY SWITCH)
EXISTING BRANCH CIRCUIT ELECTRICAL PANEL
EXISTING MAIN ELECTRICAL DISTRIBUTION PANEL
FIELD VERIFY
FIELD VERIFY
1Ø MOTOR CONNECTION
3Ø SPECIAL CONNECTION, AS NOTED REFER TO SHOP DRAWINGS FOR CONNECTION REQUIREMENTS
3Ø MOTOR CONNECTION
FIELD VERIFY
FIELD VERIFY
3Ø DISCONNECT (SAFETY SWITCH)
FIELD VERIFY
FIELD VERIFY
T
T
EXT'G CONDENSING UNIT NOTE:IT IS BELIEVED THAT EXISTING PANEL #B ISFEEDING THE EXISTING CONDENSING UNITSLOCATED AROUND THE PERIMETER OF THEEXISTING BUILDING. HOWEVER, THIS COULDNOT BE VERIFIED DURING THE DESIGN. E.C. TOCONFIRM THE ELECTRICAL SOURCE FOR THEEXISTING CONDENSING UNITS AND NOTIFYTHE ENGINEER PRIOR TO DEMOLISHING.
ENGR. PROJ.#
E1D
BSR
20071
ELEC
TRIC
AL E
QU
IPM
ENT
FLO
OR
PLA
N
DRAWN BY:
CHECKED BY:JAV
DATE:
SHEE
T TI
TLE:
PRO
JEC
T TI
TLE:
------------------------------------------
SHEET NUMBER
MU
LTI-P
UR
POSE
FAC
ILIT
Y
Cad
illac,
MI
Wex
ford
Cou
nty
SCALE:ELECTRICAL EQUIPMENT FLOOR PLAN
1/8" = 1'-0"SCALE:KEY PLAN
NO SCALE
ELECTRICAL DEMOLITION NOTES
1
FOR THE ELECTRICAL EQUIPMENT TO BE DISCONNECTED AND REMOVED, THE OWNER
DISCONNECT AND REMOVE ELECTRICAL DEVICE(S) WHICH WILL INTERFEREWITH THE DEMOLITION AND REMOVAL OF MECHANICAL EQUIPMENT, CONTROLS,AND PIPING AS DESCRIBED IN THE MECHANICAL DEMOLITION PLANS. REMOVEABANDONED CIRCUITRY (WIRING) AND CONDUIT BACK TO PANEL AND DISCARD.CAUTION!!! MAINTAIN EXISTING BUILDING EQUIPMENT AND SYSTEMS THAT ARETO REMAIN.
DISCONNECT AND REMOVE EXISTING ELECTRICAL CONNECTIONS TO THEEXISTING MECHANICAL AND/OR PLUMBING EQUIPMENT THAT IS TO BEREMOVED, AS INDICATED. ALL DISCONNECTS AND POWER DEVICES ARE TO BEREMOVED AND DISCARDED. REMOVE EXISTING CIRCUITRY (WIRING) ANDCONDUIT BACK TO PANEL OR SOURCE AND DISCARD. ALL UNUSED ABOVEGROUND CIRCUITRY (WIRING) AND CONDUIT ON THE EXTERIOR OF THEBUILDING SHALL BE DISCONNECTED AND REMOVED. EXISTING UNDERGROUNDCONDUIT SHALL BE CUT BELOW GRADE AND ABANDONED. ALL THRU-WALLPENETRATIONS SHALL BE FILLED WITH EXTERIOR RATED SILICONE SEALANT,COLOR TO MATCH EXISTING INTERIOR/EXTERIOR WALLS. PROVIDE BLANKCOVER PLATES FOR EMPTY GANG BOXES. COORDINATE ALL DISCONNECTIONSWITH THE MECHANICAL CONTRACTOR.
DISCONNECT AND REMOVE EXISTING ELECTRICAL PANEL #B1, AND ALLASSOCIATED BRANCH CIRCUITRY (WIRING) AND CONDUITS, AS SHOWN.DISCONNECT AND REMOVE EXISTING FEEDER FROM EXISTING PANEL #B, ANDIDENTIFY THE CIRCUIT BREAKER WHICH PREVIOUSLY FED PANEL #B1 AS ASPARE.
SHALL BE GIVEN THE OPPORTUNITY OF HAVING ANY OF IT TURNED OVER TO THEM.
1 1
1 1
1 1
1
1
1
1
1
1
3
3
2
2 2
2
2
22
2 2
2
2
2
2
12-18-2020PLAN REVIEW
T
NEWPANEL #G
T
RTU-1G-1,3,5
RTU RECEPT.FPB-10
RTU RECEPT.FPB-10
RTU RECEPT.FPB-10
RTU RECEPT.FPB-10
RTU-3G-7,9,11
RTU-4G-8,10,12
RTU-2G-2,4,6
ROOF TOP UNIT NOTE:ALL RTU'S WILL BE SUPPLIED WITH INTEGRALDISCONNECTS AND INTEGRAL CONVENIENCERECEPTACLES. COORDINATE CONNECTIONSREQUIREMENTS AND LOCATIONS WITH SHOPDRAWINGS.
ALTERNATE #2
ENGR. PROJ.#
E1P
BSR
20071
ELEC
TRIC
AL P
OW
ERFL
OO
R P
LAN
DRAWN BY:
CHECKED BY:JAV
DATE:
SHEE
T TI
TLE:
PRO
JEC
T TI
TLE:
------------------------------------------
SHEET NUMBER
MU
LTI-P
UR
POSE
FAC
ILIT
Y
Cad
illac,
MI
Wex
ford
Cou
nty
SCALE:ELECTRICAL POWER FLOOR PLAN
1/8" = 1'-0"SCALE:KEY PLAN
NO SCALE
GENERAL ELECTRICAL NOTES1. CAUTION!!!!!!!! .
E.C. SHALL VERIFY ALL ROUGH-IN ELEVATIONS, LOCATIONS AND/OR HEIGHTSOF ALL MECHANICAL AND POWERED EQUIPMENT WITH ARCHITECT/ENGINEER.FAILURE TO DO SO WILL REQUIRE E.C. TO RELOCATE RESPECTIVE ITEMS ATTHE E.C.'S EXPENSE.
2. THERE SHALL BE NO EXPOSED CONDUITS, EXCEPT IN MECHANICAL ROOMSAND FINISHED SPACES WITH EXPOSED CEILINGS. ALL EXPOSED CONDUITSHALL BE PAINTED TO MATCH ASSOCIATED SURFACE (WALL, CEILING, ETC.) INFINISHED SPACES.
3. THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE OWNER'SREPRESENTATIVE TO DETERMINE IF ANY PARTS OR EQUIPMENT ARE DESIREDTO BE KEPT BY THE OWNER. THE OWNER SHALL HAVE THE RIGHT OF FIRSTREFUSAL. ANY ITEM NOT WISHED TO BE RETAINED, SHALL BE DISPOSED OF ATTHE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR.
4. CIRCUITS SHOWN ON PLANS WITH AN * AFTER IT, INDICATE THE CIRCUITNUMBER FROM OLD DRAWINGS OR A TAKEOFF. E.C. IS TO VERIFY ACTUALCIRCUIT AND USE IT IF DIFFERENT THAN CIRCUIT INDICATED.
ALTERNATE #2 DESCRIPTIONTHE BASE BID SHALL INCLUDE THE INSTALLATION OF ALL FOUR (4) ROOF TOP UNITS,AS SHOWN ON THE FLOOR PLANS. ALTERNATE #2 IS A DEDUCT ALTERNATEWHEREIN ONLY THREE (3) OF THE ROOF TOP UNITS WILL BE INSTALLED. FOR THEDEDUCT PRICING, ELIMINATE ALL LABOR AND EQUIPMENT ASSOCIATED WITH THEINSTALLATION OF RTU-4, INCLUDING THE CIRCUIT BREAKER, CONDUIT ANDCIRCUITRY (WIRING) FROM NEW PANEL #G TO RTU-4.
12-18-2020PLAN REVIEW
ENGR. PROJ.#
E2
BSR
20071
ELEC
TRIC
ALSC
HED
ULE
S &
DET
AILS
DRAWN BY:
CHECKED BY:JAV
DATE:
SHEE
T TI
TLE:
PRO
JEC
T TI
TLE:
------------------------------------------
SHEET NUMBER
MU
LTI-P
UR
POSE
FAC
ILIT
Y
Cad
illac,
MI
Wex
ford
Cou
nty
PANEL #GNEW
400A277/480V-3Ø
NEW 400A/3P
T
DESCRIPTION
1197
AMP/CIR
13
NO.
5
POLES DESCRIPTION LOADLOAD
8
1210
AMP/ CIR
42
POLES NO.
620/1RECEPTS - RTU-1, RTU-2, RTU-3, RTU-4720
KEYNOTE
KEYNOTE
XX
X
XXXN
DESCRIPTION
1197
NEW PANEL #GAMP/CIR
13
NO.
5
POLES DESCRIPTION LOADLOAD
8
1210
AMP/ CIR
42
POLES NO.
6
400 AMPS M.L.O. 277/480V-3Ø-4W SQUARE D NF SURFACE PANEL
70/3
SPACESPACE
RTU-1 - ROOF ------
----
KEYNOTE
KEYNOTE
131517192123252729
141618202224262830
SPACESPACE
----
SPACESPACE
----
SPACESPACE
----
SPACESPACE
SPACESPACE
SPACESPACE
SPACESPACE
----
----
----
----
SPACE-- SPACE --
70/3 RTU-2 - ROOF
RTU-3 - ROOF
RTU-4 - ROOF (ALT#2)
70/3
70/3 A
KEYNOTES: A ELIMINATE CIRCUIT FOR RTU-4 AND REMOVE BREAKER FROM BID FOR ALTERNATE #2 N PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANEL, SIZED AS INDICATED. X DESIGNATES EXISTING CIRCUIT BREAKERS WHICH ARE TO REMAIN. R RE-LABEL EXISTING CIRCUITS AS SPARES AND SWITCH BREAKERS TO THE OFF POSITION
TWO (2) PARALLEL RUNS OF:4#3/0, 1#3 E.G.C, 2-1/2"C
TOTAL CALCULATED LOAD:
(83.1 kVA
342.2 kVA
EXT'G ELECTRICAL SERVICE LOAD CALCULATIONS:AT PRIMARY SWITCH
PRIMARY SWITCH:
142.8 kVA
EXT'G PANEL #B
-- 75.7 AMPS
-- 40.0 AMPS)-- 100.0 AMPS)
EXT'G PANEL #FP: (33.2 kVA
-- 303.1 AMPSEXT'G 3Ø PEAK DEMAND*:+ 25% NEC FACTOR: 63.0 kVA
252.0 kVA
-- 179.2 AMPS
-- 418.2 AMPS
REMOVED LOADS:
* DENOTES PEAK DEMAND DATA OBTAINED OVER A 15-MINUTEPERIOD OF TIME FROM THE ELECTRIC UTILITY (CONSUMERS ENERGY)
0.7 kVA -- 0.8 AMPS
PARTIAL ELECTRICAL RISER DIAGRAMNO SCALE
DESCRIPTION
1197
AMP/CIR
13
NO.
5
POLES DESCRIPTION LOADLOAD
8
1210
AMP/ CIR
42
POLES NO.
6
KEYNOTE
KEYNOTE
131517192123252729
141618202224262830
31 3233 3435 3637 3839 4041 4243 4445 4647 4849 5051 5253 54
SPARE
SPARE
SPARE
SPARE
KEYNOTES: A ELIMINATE CIRCUIT FOR RTU-4 AND REMOVE BREAKER FROM BID FOR ALTERNATE #2 N PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANEL, SIZED AS INDICATED. X DESIGNATES EXISTING CIRCUIT BREAKERS WHICH ARE TO REMAIN. R RE-LABEL EXISTING CIRCUITS AS SPARES AND SWITCH BREAKERS TO THE OFF POSITION
KEYNOTES: A ELIMINATE CIRCUIT FOR RTU-4 AND REMOVE BREAKER FROM BID FOR ALTERNATE #2 N PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANEL, SIZED AS INDICATED. X DESIGNATES EXISTING CIRCUIT BREAKERS WHICH ARE TO REMAIN. R RE-LABEL EXISTING CIRCUITS AS SPARES AND SWITCH BREAKERS TO THE OFF POSITION
XXXXXXXXXXXX
X
X
R
R
XXXXXXXXXX
X
R
R
EXT'G PANEL #FP-BNEW PANEL #G:
ADDED LOADS:
M
NOTE:THE EXSTING #MDP CONTAINS FIVE (5) EXISTING SERVICEDISCONNECTS AND ONE (1) NEW SERVICE DISCONNECTFOR A TOTAL OF SIX (6) SERVICE DISCONNECTS. PER THE2017 NEC, THIS IS THE MAXIMUM ALLOWABLE NUMBER OFSERVICE DISCONNECTS. ALL ADDITIONAL SPACES INEXISTING #MDP SHALL BE LABELED AS "NOT USABLE".
NOTE:INCLUDE NEW PERMENANTIDENTIFICATION PLAQUES ATEACH OF THE ELECTRICALSERVICE DISCONNECTLOCATIONS (2 - TOTAL) PER2017 NEC SECTION #230.2(E)
NOT USABLE
NOT USABLE
12-18-2020PLAN REVIEW