bi 136 prepare data integration layer model
TRANSCRIPT
BI 136 Prepare Data Integration Layer Model
BI 136Prepare Data Integration Layer ModelBusiness Intelligence Method (BIM)
BIM Phase: Business Intelligence Planning and Strategy
Version: 1.0
Released: Content Owner:
Dept Name:
Note: Only the online version of the BIM will be maintained as the controlled document. Any paper copy is considered an uncontrolled copy.
Prepare Data Integration Layer Model
PurposeThis task provides the next planning and strategy layer down from the BI Architectural Blueprint on what data integration architecture and high-level processes will be needed to populate with the right granularity, frequency, and source data quality the data repository structures needed to meet the analytics and reporting solution requirements.
Estimated Level of EffortLow Complexity Environment, 8 Hours
Medium Complexity Environment, 16 Hours
High Complexity Environment, 24 Hours
InputHigh-Level Business Requirements Available Business Intelligence Assets InventoryHigh-Level BI Architectural BlueprintHigh-Level Data Repositories Layer Model
Procedures
1. Leverage High-Level BI Architectural Blueprint2. High-level sourcing strategy
3. Determine High-Level Data Integration Architecture and Best Practices for Data Integration Tool use (e.g. functionality and performance)4. Develop Data Integration Environment Staffing Model
5. Review/Prepare Development Approach Best Practices
6. Review/Prepare High-Level Data Integration Operation Processes Best Practices7. Develop Data Integration Strategy Plan
Process Diagram
OutputsHigh-Level Data Integration Layer Model
StandardsNone.
ToolsNone.
Templates and ExamplesExamples: None
Job AidsNone.
TrainingA link to training materials (if available online).
Examples: MS PowerPoint files and user manuals.
Roles & Responsibilities< Prepare Data Integration Layer Model > RASIC Chart
Key: R-Responsible, A-Approves, S-Supports, I- Informs, C-Consults
Enterprise Data Warehouse ArchitectData Integration Architect
RS
Confidential22/19/2007