BHUTAN POWER CORPORATION LIMITED

THIMPHU: BHUTAN

TENDER DOCUMENT

(TENDER NO. BPC/TS/TCD/2017/T-3A & 3B)

FOR

TURNKEY PACKAGE FOR DESIGN, ENGINEERING, SUPPLY,

CONSTRUCTION, TESTING & COMMISSIONING OF 66/33 kV GIS

SUBSTATION AT CHANGIDAPHU, THIMPHU AND DAMJI,GASA.

VOLUME III

JUNE 2017

Page 2: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates
Page 3: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

CONTENTS

VOLUME I & II INSTRUCTION TO BIDDERS, CONDITIONS OF

CONTRACT, TECHNICAL SPECIFICATIONS & SAMPLE

FORMS

NOTICE INVITING BID

SECTION 1 INSTRUCTION TO BIDDERS

SECTION 2 CONDITIONS OF CONTRACT

PART I - GENERAL CONDITIONS OF CONTRACT

SECTION 3 CONDITIONS OF CONTRACT

PART II - CONDITIONS OF PARTICULAR APPLICATION

SECTION 4 TECHNICAL SPECIFICATIONS

SECTION 5 FORM OF BID, APPENDIX TO BID, FORM FOR BID

SECURITY, INTEGRITY PACT, MANUFACTURER’S

AUTHORISATION / UNDERTAKING

SECTION 6 SAMPLE FORM OF AGREEMENT

SECTION 7 SAMPLE FORMS OF SECURITIES

SECTION 8 SCHEDULES OF SUPPLEMTARY INFORMATION

(ALL THE ABOVE SECTIONS ARE IN VOLUME I EXCEPT SECTION 4, WHICH IS IN

VOLUME II)

VOLUME III PRICE SCHEDULE INCLUDING BILL OF QUANTITIES

PREAMBLE TO PRICE SCHEDULE

PRICE SCHEDULES

Page 4: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates
Page 5: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Volume III / Preamble / Page 1 of 3

SCHEDULE OF PRICES

Preamble

1. The Contract is of turnkey nature and includes the definitive engineering

and design that shall ultimately define actual quantities of work.

2. The provisional quantities of various items of work like excavation/ filling,

foundations, supply and erection of steelwork, construction of control

building structure, supply, erection, testing and commissioning of the

electrical equipment and miscellaneous work items such as fire protection

system for transformers, air conditioning etc. for the proposed substation

are given in the price-schedule. However, the quantities may vary

consequent to actual execution of the work. The payment shall be made for

the actual quantities used for various items. Items with quantity ‘LOT’ will

not be eligible for any variation in payment irrespective of the quantities of

the constituent sub-items.

3. The Contract Price shall be adjusted for the actual and correct quantities as

executed and duly approved by the Employer on the basis of the proposed

all inclusive unit rates to arrive at the final Contract Price.

4. Wherever no quantity is given against any item in the Schedule of prices, a

rate shall nevertheless be entered against that item. This rate shall be used,

in case the item is required to be used during actual execution of the

contract.

5. It shall be a condition of this contract that the all-inclusive rates quoted in

Schedule of Rates / Prices shall not be varied for reasons of change in

respective quantities.

6. Further, it shall also be an important condition of this contract that there

shall not be any change in Unit Rates of items consequent to revision of

labour rates by the Royal Government of Bhutan.

7. The supply rate against each item shall be an all-inclusive rate, and be

inclusive of engineering, manufacture, supply, freight, transport,

insurance, etc. The Bidder shall indicate the all-inclusive rate separately

for each item. Further, the all-inclusive unit rates shall be on FAS basis

inclusive of ex-works price, packing and forwarding charges, railway

freight, transport charges to actual work site, storage where necessary,

charges for transit insurance, insurance of material/ goods at site. Bidder

shall quote prices inclusive of BST and Customs Duties, as applicable and

applicable percentage BST and Customs Duty shall be brought out

separately.

8. All labour, supervision, inspection, testing and commissioning costs

should be covered in Schedules for erection of substation equipment. The

charges/ expenses to be incurred on testing and commissioning of the

Page 6: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Volume III / Preamble / Page 2 of 3

entire system as a whole shall be included in the prices for individual

activities.

9. The total price for each activity should cover all costs and expenses

required for supply, delivery, storage, erection, testing, commissioning and

maintenance of works together with all risks, liabilities, contigencies,

insurances and obligations imposed and implied by the Contractor.

10. Bidder shall enter prices in Schedule 4 for the supply of specified spares to

site. These prices will be considered during bid evaluation.

11. Separate price schedules for unit prices of major items and civil works

have been included for the purpose of estimation of Contract variations, if

any, due to additions and deletions to the scope of works during execution.

It shall be noted that such unit rates of constituent sub-items of “LOT”

items in the price schedule are not meant for changing the “LOT” prices

during actual execution and “LOT” price quoted by the bidder shall govern

irrespective of quantity variation for the intended works. The rates of such

sub-items can, however, be adopted for on-account payment purposes.

12. All items of work specified in the specifications have not been included in

the price-schedule. The items of work not specifically called for in the

Schedules are deemed to have been covered under the items called for, to

leave the works complete, as per the specifications. The rate quoted by the

Contractor shall be deemed to be all inclusive, to cover the smaller items

specified / required but not included in the Price-Schedule.

13. In addition to the points stipulated / highlighted in these clauses, all the

conditions mentioned in the specifications, pertaining to measurement of

quantities and unit rates of scheduled items shall apply.

14. It is deemed that the Bidder has understood the site conditions,

environment, transport facilities, soil data etc. while preparing the price

schedule and has adequately provided for them in his quoted prices. No

claims of extra compensation will be payable for items and situations not

foreseen and not incorporated by him in the schedules.

15. The wording under "Description" in the schedules is for subject matter

guidance only. The Bidder's price shall include all works as specified in

the specifications and drawings and all contractual obligations whether

specifically mentioned or not.

16. The Bidder shall, if so desired by the Employer/Engineer, furnish at any

stage of the bidding or Contract execution, break-up of prices considered

for any or all items covered in various activities.

Page 7: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Volume III / Preamble / Page 3 of 3

17. The measurement of quantities shall be on the following basis:

a) Structural Steel

The per M.T. rate shall cover, supply and erection of galvanized

structural steel including all connections and connecting material as

specified to constitute complete equipment support structure in the

final form contemplated in the specifications. Connecting materials

like nuts, bolts, washers, cover-plates etc. shall neither be measured

nor be paid separately, but shall be deemed to be included in the

weight of above steel members. The rectification to damage to

protective zinc surface by approved paint as specified shall be

covered under the quoted rates.

b) Foundations and Miscellaneous RCC and Other Works: -

Designs of Foundations and other RC items of work to suit actual

soil characteristics shall be submitted by the Contractor for the

approval of the Engineer, and shall be paid as per the Unit Rates of

individual items like ordinary concrete, steel reinforcement bars,

excavation etc, based on the actual quantities.

The rates for excavation shall be deemed to include execution of all

items mentioned in the specifications like earth work for casting of

foundations, benching and back filling, compacting, leveling, de-

watering etc., It also includes cost of shoring and shuttering

wherever used. The rates for concreting shall together cover cost of

all materials for shuttering, casting concrete, curing and also cost of

all materials related with the item.

Unit rates for reinforcement shall include supply, cutting, bending,

tying, properly placing, providing lap and every other work needed

for casting of the concrete, as specified. Similarly the Rates for

other items like stone masonry revetment shall be deemed to be all-

inclusive.

c) Control Building and Other Buildings: -

Rates for control room building and other buildings shall be item

rate. The quoted rates shall cover, supply, transportation, storage

and insurance of all materials at site, all labour and plant for

erection, finishing, etc as per specifications and drawings included

therein.

Page 8: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 Supply and delivery of Equipment

2 Erection works

3Testing and commissioning including design of

Aux.systems.

4 Supply and delivery of Spares and special tools

6 Earth works

7 Supply of structural steel and reinforcement steel works

8 Supply and erection

TOTAL

0. SUMMARY SHEET

PACKAGE-3A

66/33KV INDOOR GIS SUBSTATION, CHANGIDAPHU, THIMPHU

SN DESCRIPTION Total Price(Nu)

Summary

Page 9: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu

Ex-Work CIF (Site)

1 2 3 4 = 1 x 3 5 6 7 = 1 x 2 x 5 8 = 1 x 2 x 6 9 = 4 + 7 + 8

1.0 POWER TRANSFORMER

1.1 20MVA, 66/33kV, Power transformer including

RTCCSet 2

2.0 GIS EQUIPMENT

2.1 66kV GIS transformer feeder bay (1250A, 20kA) Bay 2

2.3 66kV GIS line feeder (1250A, 20kA) Bay 2

2.4 66kV GIS Voltage Transformer (3phase, 1250A,

40kA)Bay 2

2.5 66kV GIS Bus Sectionaliser breaker (1250A, 20kA)Bay 1

3.0 CONTROL AND RELAY PANEL

3.1 66kV line feeder No 2

3.2 66kV transformer feeder No 2

3.3 Bus Section No 1

4.0 LIGHTNING ARRESTER

Unit RateBST

Total Including

Taxes

66/33KV INDOOR GIS SUBSTATION, CHANGIDAPHU,THIMPHU

1. SCHEDULE OF SUPPLY & DELIVERY

Item Description UnitProv.

Quantity

CD/

Taxes

Total Excluding

CD and BST

CD/Tax

AmountBST Amount

4.0 LIGHTNING ARRESTER

4.1 60kV Set 2

5.0 SUBSTATION AUTOMATION

SYSTEMS/SCADA

5.1Complete Substation Automation

Systems(SAS)/SCADA) and Accessories. All the

required data should report to NLDC, Thimphu.

Lot 1

6.0 33kV GAS INSULATED SWITCHGEAR

6.1 Incomer Panel, 1250A with all digital meters,

numerical relays, CT , PT & etc.No 2

6.233kV outgoing feeder panels,1250A with all digital

meters, numerical relays, CT , & etc.(refer SLD)No 4

6.3 33kV outgoing Feeders panels, 1250A with all digital

meters, numerical relays, CT, PT & etc. No 2

6.4 33kV Bus Coupler panel, 1250A with all digital

meters, numerical relays, CT, PT & etc.No 1

Schedule 1/Supply of Equipment/Page 1 of 4

Page 10: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu

Ex-Work CIF (Site)

1 2 3 4 = 1 x 3 5 6 7 = 1 x 2 x 5 8 = 1 x 2 x 6 9 = 4 + 7 + 8

Unit RateBST

Total Including

Taxes

66/33KV INDOOR GIS SUBSTATION, CHANGIDAPHU,THIMPHU

1. SCHEDULE OF SUPPLY & DELIVERY

Item Description UnitProv.

Quantity

CD/

Taxes

Total Excluding

CD and BST

CD/Tax

AmountBST Amount

7.0 STATION TRANSFORMER

7.1 250kVA, 33/0.415kV, Station transformer No 2

8.0 POWER AND CONTROL CABLES

8.1 Single Phase 66kV, 630sq.mm cable including end

terminations and sealing

8.1(a) from 66 kV Gantry (outdoor)to 66kV GIS equipment

(indoor)1

8.1(b) from 66kV GIS equipment (indoor)to primary of

2x20MVA, 66/33kV Transformer (outdoor)1

8.2Single Phase 33kV, 630 sq.mm cables including end

terminations from secondary of 2x20MVA, 66/33kV

power transformers to 33kV GIS panels

Lot 1

8.3 3cx 70 sq.mm, XLPE Al. Cable from 33kV GIS panel

to two station transformers.Lot 1

8.4 1.1kV Power and Control Cables for the entire

Lot

8.4 1.1kV Power and Control Cables for the entire

substation including 20% for spareLot 1

8.5 33kV, 3Cx300 sq. mm., XLPE, Aluminium, earthed

grade Cable alongwith associated termination &

accessories from 33kV Switchgear to Lattice

Structure

Lot 1

9.0 CABLING EQUIPMENT

9.1 All accessories for switchyard such as cable trays,

racks, conduits, bends, tees, junction boxes, etc. for

the entire cabling system including all accessoriesLot 1

Schedule 1/Supply of Equipment/Page 2 of 4

Page 11: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu

Ex-Work CIF (Site)

1 2 3 4 = 1 x 3 5 6 7 = 1 x 2 x 5 8 = 1 x 2 x 6 9 = 4 + 7 + 8

Unit RateBST

Total Including

Taxes

66/33KV INDOOR GIS SUBSTATION, CHANGIDAPHU,THIMPHU

1. SCHEDULE OF SUPPLY & DELIVERY

Item Description UnitProv.

Quantity

CD/

Taxes

Total Excluding

CD and BST

CD/Tax

AmountBST Amount

10.0 OUTDOOR LIGHTING

10.1 Complete outdoor lighting system with LED for

substation area including access road with complete

accessories, lighting panels etc.

Lot 1

11.0 INDOOR LIGHTING

11.1 Complete indoor lighting system with LED including

all lighting panels & complete accessories. Lot 1

12.0 EARTHING & LIGHTNING PROTECTION

12.1 Earthing and lightning protection systems for

switchyard complete with earth grid and mat, earth

leads, electrodes, shield wire, clamps and connectors

and all other hardware & accessories

Lot 1

13.0 BATTERY& BATTERY CHARGER

13.1 110V DC Battery and Battery charger( Maintenance

free)Set 2

14.0 DISTRIBUTION BOARDS

14.1 AC Distribution board Set 2

14.2 DC Distribution board Set 2

15.0 FIRE FIGHTING SYSTEMS

15.1 Fire Fighting Equipment and Fire Fighting System

including Emulsifier System for Power Transformers

(2Nos. power transformers)

Lot 1

Schedule 1/Supply of Equipment/Page 3 of 4

Page 12: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu

Ex-Work CIF (Site)

1 2 3 4 = 1 x 3 5 6 7 = 1 x 2 x 5 8 = 1 x 2 x 6 9 = 4 + 7 + 8

Unit RateBST

Total Including

Taxes

66/33KV INDOOR GIS SUBSTATION, CHANGIDAPHU,THIMPHU

1. SCHEDULE OF SUPPLY & DELIVERY

Item Description UnitProv.

Quantity

CD/

Taxes

Total Excluding

CD and BST

CD/Tax

AmountBST Amount

16.0 FIRE ALARM & DETECTION SYSTEM

16.1 Complete fire alarm and detection system as per

technical specificationsLot 1

17.0 SURVILANCE AND SECURITY SYSTEMS

17.1 Complete CCTV systems along with complete

accessoriesLot 1

18.0 EPABX SYSTEM

18.1Complete EPABX system suitable for optic fibre

communication along with all accessories.Lot 1

19.0 FIBRE OPTIC CABLE

19.1

1310 nm, Monomode Underground Armoured Fibre

Optic approach cable, Joint Boxes,Pigtails, clamps &

any other required accessories

Lot 1

20.0 DIESEL GENERATOR(DG) SET

21.1Diesel generator set, 50 kVA, 415V along with

control panel and required accessoriesNo. 1

21.0 33kV LATTICE STRUCTURE

33 kV out going feeders Lattice structure

inclusive of all items like Lightning Arresters,

Isolators with earth blade, insulators, hardware

accessories complete

Set 4

22.0 EOT CRANE

1.0

EOT crane of 5T capacity suitable to operate as

and when required, complete with all accessories

and slings as detailed in the specifications.

No. 1

2.02x13 m Runway rails of suitable size complete in

all respect including fixing at site.Set 1

3.0Complete trolley runway with conductors,

fixtures, insulations etc. as per Clauses.Set 1

4.0 All consumables for site assembly & erection etc. Lot 1

G-TOTAL

Schedule 1/Supply of Equipment/Page 4 of 4

Page 13: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 = 1 x 2

1.0 POWER TRANSFORMER

1.1 20MVA, 66/33kV, Power transformer including RTCC Set 2

2.0 GIS EQUIPMENT

2.1 66kV GIS transformer feeder bay (1250A, 20kA) Bay 2

2.2 66kV GIS line feeder (1250A, 20kA) Bay 2

2.3 66kV GIS Voltage Transformer (3phase, 1250A, 20kA) Bay 1

2.4 66kV GIS Bus Coupler breaker (1250A, 20kA) Bay 1

3.0 CONTROL AND RELAY PANEL

3.1 66kV line feeder No 2

3.2 66kV transformer feeder No 2

3.3 Bus Section No 1

4.0 LIGHTNING ARRESTER

4.1 60kV Set 2

66/33KV INDOOR GIS SUBSTATION, CHANGIDAPHU,THIMPHU

2. SCHEDULE OF ERECTION

ItemDescription

Unit Prov. Quantity Unit Price Total

5.0 SUBSTATION AUTOMATION SYSTEMS/SCADA

5.1 Complete Substation Automation Systems(SAS)/SCADA) and Accessories. All the

required data should report to NLDC, Thimphu.Lot 1

6.0 33kV GIS Panel

6.1 Incomer Panel, 1250A with all digital meters, numerical relays, CT , PT & etc. No 2

6.2 33kV outgoing feeder panels,1250A with all digital meters, numerical relays, CT ,

& etc.(refer SLD)No 4

6.3 33kV outgoing Feeders panels, 1250A with all digital meters, numerical relays, CT,

PT & etc. No 2

6.4 33kV Bus Coupler panel, 1250A with all digital meters, numerical relays, CT, PT &

etc.1

7.0 STATION SERVICE TRANSFORMER

7.1 250kVA, 33/0.415kV, Station transformer No 2

Schedule 2/Erection/Page 1 of 3

Page 14: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 = 1 x 2

ItemDescription

Unit Prov. Quantity Unit Price Total

8.0 POWER AND CONTROL CABLES

8.1 Single Phase 66kV, 630sq.mm cable including end terminations and sealing

8.1(a) from 66 kV Gantry (outdoor)to 66kV GIS equipment (indoor)

8.1(b) from 66kV GIS equipment (indoor)to primary of 2x20MVA, 66/33kV Transformer

(outdoor)

8.2Single Phase 33kV, 630 sq.mm cables including end terminations from secondary of

2x20MVA, 66/33kV power transformers to 33kV GIS panelsLot 1

8.3

3cx 70 sq.mm, XLPE Al. Cable from 33kV GIS panel to two station transformers. Lot 1

8.4 1.1kV Power and Control Cables for the entire substation Lot 1

8.5 33kV, 3Cx300 sq. mm., XLPE, Aluminium, earthed grade Cable alongwith

associated termination & accessories from 33kV Switchgear to Lattice Structure Lot 1

9.0 CABLING EQUIPMENT

9.1 All accessories for switchyard such as cable trays, racks, conduits, bends, tees, Lot 1

Lot 1

9.1 All accessories for switchyard such as cable trays, racks, conduits, bends, tees,

junction boxes, etc. for the entire cabling system including all accessoriesLot 1

10.0 OUTDOOR LIGHTING

10.1 Complete outdoor lighting system for switchyard including access road with

complete accessories, lighting panels etc.

Lot1

11.0 INDOOR LIGHTING

11.1 Complete indoor lighting system including all lighting panels & complete

accessoriesLot 1

12.0 EARTHING & LIGHTNING PROTECTION

12.1 Earthing and lightning protection systems for switchyard complete with earth grid

and mat, earth leads, electrodes, shield wire,clamps and connectors and all other

hardware & accessories

Lot 1

13.0 BATTERY& BATTERY CHARGER

13.1 110V DC Battery and Battery charger No 2

14.0 DISTRIBUTION BOARDS

14.1 AC Distribution board Set 2

Schedule 2/Erection/Page 2 of 3

Page 15: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 = 1 x 2

ItemDescription

Unit Prov. Quantity Unit Price Total

14.2 DC Distribution board Set 2

15.0 FIRE FIGHTING SYSTEMS

15.1 Fire Fighting Equipment and Fire Fighting System including Emulsifier System for

Power Transformers (2 Nos. power transformers)Lot 1

16.0 FIRE ALARM & DETECTION SYSTEM

16.1 Complete fire alarm and detection system as per technical specifications Lot 1

17.0 SURVILANCE AND SECURITY SYSTEMS

17.1 Complete CCTV systems along with complete accessories Lot 1

18.0 EPABX SYSTEM

18.1Complete EPABX system suitable for optic fibre communication along with all

accessories.LOT 1

19.0 FIBRE OPTIC CABLE

19.11310 nm, Monomode Underground Armoured Fibre Optic approach cable, Joint

Boxes,Pigtails, clamps & any other required accessoriesLOT 1

20.0 DIESEL GENERATOR(DG) SET

20.1Diesel generator set, 50 kVA, 415V along with control panel and required

accessoriesNo. 1

21 33kV LATTICE STRUCTURE

21.133 kV out going feeders Lattice structure inclusive of all items like Lightning

Arresters, Isolators with earth blade, insulators, hardware accessories completeSet 4

22.0 EOT Crane Lot 1

TOTAL

Schedule 2/Erection/Page 3 of 3

Page 16: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu.

Item Description UnitProv.

QuantityUnit Price Total Amount Remarks

1 Complete testing and commissioning of substation including

design and engineering of Aux. Systems.Lot 1

TOTAL

66/33KV INDOOR GIS SUBSTATION, CHANGIDAPHU, THIMPHU

3. TESTING AND COMISSIONING

Schedule 3/Testing Commissioning/Page 1 of 1

Page 17: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 4 = 1 x 3 5 6 7=1x2x5 8=1x2x6 9=4+7+8

1.0 66kV GIS SPARE PARTS

1.1 Set of Gasket/'O'Rings for one complete bay No 1

1.2 Rupture Disc for gas compartment Set 2

1.3 Gas Insulating Barrier for gas compartment Set 2

1.4 Circuit Breaker Trip Coils Set 5

1.5 Circuit Breaker Closing Coils Set 5

1.6 Gas Density Monitor with Pressure Swicth Set 2

1.7 Manual Operation Handle for Circuit Breaker No 2

1.8 Manual Operation Handle for DS and ES No 2

1.9 Moisture absorbent No 2

1.10 Additional SF6 Gas (5% from the total quantity) No 1

1.11 Current Transformer( ring type) Set 1

1.12 Potential Transformer No 1

1.13 Disconnector Set 1

1.14 High speed earth switch Set 1

2.0 LIGHTNING ARRESTORS

2.1 60kV Lighting Arrestor

2.1.1Single phase surge arrestor complete in all respect

including base and surge monitorNo. 1

2.1.2 Terminal connectors No. 2

2.2 33kV Lightning Arrestor

2.1.1 30kV surge arrestor including surge monitor Set 2

2.1.2 Terminal connectors Set 2

3.0 SPECIAL TOOLS FOR GIS EQUIPMENT

3.1Set of SF6 Gas Filling Adapter/Device Including

Hoses Valves, etc.Set 1

3.2 Set of SF6 Gas Filling and Evacuating Equipment Set 1

3.3 Set of Dew Point Meter Set 1

3.4 Precision Pressure Gauge Set 2

3.5 SF6 Gas Leakage Detection Device Set 1

3.6 Set of Torque Wrench Set 1

3.7 Tong tester meter(0mA to 2A) No 1

3.8 Digital Multi meter No 1

3.9 Megger (5KV) No 1

3.10 Earth resistance clamp on meter No 1

3.1 SF6 GAS Analysing equiment No 1

CD/Tax Amount BST Amount Total Including

CD/taxes & BST Remarks

66/33KV INDOOR GIS SUBSTATION, CHANGIDAPHU,THIMPHU

4. SUPPLY & DELIVERY OF ESSENTIAL SPARES AND SPECIAL TOOLS

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

Site

Schedule 4/Spares Special Tools/Page 1 of 5

Page 18: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

CD/Tax Amount BST Amount Total Including

CD/taxes & BST Remarks

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

Site

4 TRANSFORMER SPARE PARTS

4.1 66/33kV TR

4.1.1 Breather -(Silica gel(12.5kg)) No 1

4.1.2 Gasket Set 1

4.1.3 Packing Box Set 2

4.1.4 Touch up Paint Set 1

4.1.5 HV Bushing Set 1

4.1.6 LV Bushing Set 1

4.1.7 OTI No 1

4.1.8 WTI No 1

4.2 33/0.415 kV TRANSFORMER

4.2.1 33 kV bushing mounted inside cable box No. 1

4.2.2 0.415kV bushing with metal parts with gaskets

mounted inside cable boxNo.

1

4.2.3 Set of gaskets Set 1

Set of Valve complete Set 1

5 SPECIAL TOOLS FOR POWER TRANSFORMER

5.1 Adjustable angle wrenchs(10") Set 1

5.2 Adjustable angle wrenchs(6") Set 1

5.3 Adjustable angle wrenchs(8") Set 1

5.4 Adjustable angle wrenchs(12") Set 1

5.5 C-Clamp Set 1

5.6 Manila Rope_18DIA X 10M Set 4

5.7 Pipe Wrench (10INCH) Set 1

5.8 Pipe Wrench (6INCH) Set 1

5.9 Pipe Wrench (8INCH) Set 1

5.10 Pipe Wrench (12INCH) Set 1

5.11 Torque Wrench Set 1

5.12 Paint Spray Gun Set 1

6 33kV GIS PANEL SPARE PARTS

6.1 Closing coil of each type No. 6

6.2 Trip coil of each type No. 6

6.3 Potential transformer Set 1

6.4 Current transformer Incomer Set 1

6.5 Current transformer outgoing feeder Set 2

Schedule 4/Spares Special Tools/Page 2 of 5

Page 19: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

CD/Tax Amount BST Amount Total Including

CD/taxes & BST Remarks

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

Site

7.0 POWER CABLE

7.1 Single Phase 66kV, 630sq.mm cable Mtr. 300

7.2

33kV, 1Cx630 sq. mm., XLPE, Aluminium, earthed

grade Cable alongwith associated termination &

accessories from 20MVA transformer to 33kV GIS

Switchgear

Mtr. 100

7.3

33kV, 3Cx300 sq. mm., XLPE, Aluminium, earthed

grade Cable alongwith associated termination &

accessories from 33kV GIS Switchgear to Lattice

Structure

Mtr. 400

7.4

33kV, 3Cx70 sq. mm., XLPE, Aluminium, earthed

grade Cable alongwith associated termination &

accessories from 33kV GIS Switchgear to

2X250kVA LT Transformer

Mtr. 50

7.5 66kV Cable termination kits at gantry end Set 2

7.6 66kV cable sealing end at GIS bus Set 4

7.7 66kV cable termination kit at 2x20MVA transformer Set 2

7.8Indoor cable termination kit for 33kV incommer at

GIS Switchgear end.Set 2

7.9Indoor cable termination kit for 33kV outgoing

feeders at GIS Switchgear end.Set 4

7.10Indoor cable termination kit for station transformer

feeders at GIS Switchgear end.Set 2

7.11Out door cable terminationkit for all types of 33kV

power cable each.Set 4

8.0 CONTROL AND RELAY PANEL SPARE PARTS

66kV

8.1 Control Switches No. 1

8.2 Relays one number of each type No. 1

8.3 Meters one number of each type No. 1

Schedule 4/Spares Special Tools/Page 3 of 5

Page 20: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

CD/Tax Amount BST Amount Total Including

CD/taxes & BST Remarks

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

Site

9.0 Spares for 110V Battery Charger

9.1 SCR for Recifier bridge No. 1

9.2 Blocking diode for rectifier bridge No. 1

9.3 Electronic control card for AVR No. 1

9.4 Electronic conrol card for AVR / ACR No. 1

9.5 Electronic control card for OCR No. 1

9.6 HRC fuse link for output ckt. Set 1

9.7 Fuse link for various control ckt. Set 1

9.8 Indicating Lamps Set 1

10.0 MCC and Control panel each

10.1 Indicating lamps (Set consists of 1 no. of each type) Set 1

10.2 Lamp holder and globes (Set consists of 1 no. of

each type)Set 1

10.3 Control fuse (Set consists of 1 no. of each type) Set 1

10.4 Push buttons (Set consists of 1 no. of each type) Set 1

10.5 Auxiliary relay (Set consists of 1 no. of each type) Set 1

10.6 Annunciation cards No 1

10.7 Sound card No 1

12.0 LIGHTING EQUIPMENT Lot 1

12.1 Outdoor lighting (LED) with complete fittings. No 5

12.2 Indoor lighting (LED) for each type including

complete fittingsNo

10

13.0 SAS/SCADA SYSTEM

13.1 SCADA Computer spares

13.1.1 Hard Disk Drive No. 1

13.2 SAS Spares

13.2.1 Bay IED No. 1

13.2.2 Longest length of fibre optic cable No. 1

13.2.3 Ethernet Switch No. 1

14.0 EPABX Lot 1

15.0 FIRE ALARM SYSTEM

15.1 Manual Call Point No. 1

15.2 Detector of each type Set 1

Schedule 4/Spares Special Tools/Page 4 of 5

Page 21: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

CD/Tax Amount BST Amount Total Including

CD/taxes & BST Remarks

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

Site

16.0 CCTV

16.1 PC based Digital Video Recorder System Lot 1

17 EOT CRANE FOR GIS HALL

17.1

Pair of brake shoe with lining for each size of brake

used viz. D.C. operated E.M, or Hydraulic thruster

operated.

Sets 2

17.2Pair of brake linings with rivets for each size of

brake used.Sets 2

17.3 Main springs for each size of brake used. Nos. 2

17.4 Brake coils for each size of brake used. Sets 2

17.5 Thruster of each size used. No. 1

17.6 Pair of oil seals for each gear box used on crane. Sets 2

17.7 Contactors of each size used. Sets 2

17.8Fixed & moving contacts of each size of contactor

used.Set 1

17.9 3 Nos. Coils for each size of contactor used. Set 1

17.10 Overload relay for each motor. No. 1

17.11 Timers Nos. 3

17.12 3 No. fuse links of each sizes used on crane Sets 2

17.13 1 Printed circuit breaker of each size and type Set 1

17.14 Complete set of lamps for lightning and signals Set 1

17.15 Carbon brushes & holdings for each slip ring motor Sets 2

17.16 Fuse links of each size used Sets 2

17.17 Resistance element of each size and type Set 1

17.18 Communication Cards/cables

17.19 I/O Cards

17.20 Processors

17.21 Indicating lamps

Total Amount (Nu.)

TOTAL

1

Set

(for

one

compl

Schedule 4/Spares Special Tools/Page 5 of 5

Page 22: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 4 (3x2)

1.0 Earth Works

1.1

Earthwork in excavation including clearing away vegetation, if any in foundations, and pits trenches, drains, road formation and

earthing etc. in all types of soils (ordinary/ hard soil) in both dry and wet conditions including shoring, strutting, dewatering, dressing

of sides and ramming of bottom & backfilling with selected earth from excavation in layers of 200 mm, watering, ramming,

consolidation & transporting excavated material (at all leads and lifts) to temporary stockpiles within the PURCHASER’s premises,

spreading, levelling etc. all complete as specified and as directed.

(a)     Depth upto 3.00 m from G.L. Cu.M. 2,135

(b)     Depth exceeding 3.00 m and upto 6.00 m Cu.M. 712

(c)      All Depths exceeding 6.00 m. Cu.M. 178

1.2 Same as the item No.3.1 but for excavation in soft rock at all depths. Cu.M. 178

1.3 Same as the item No.3.1 but for excavation in hard rock at all depths. Cu.M. 385

1.4 Extra over items 3.1 to 3.3 for lead outside PURCHASER’s premises upto 2.00 km. Cu.M. 50

1.5

Earthwork in embankment for roads/ ramps with excavated earth obtained from items 3.1 to 3.3 above or any other excavation,

including handling and transporting excavated earth from PURCHASER’s premises at all leads, depositing in layers 200 mm deep,

watering and compacting the same to 95% Modified Proctor density, finishing and dressing, etc. complete all as specified.

Cu.M. 500

Earthwork in filling in plinth under floors, ramps, etc. including watering, ramming, compacting to 95% Modified Proctor density

and dressing to the required profiles, etc. complete, as directed by the Engineer.

(a) With excavated earth from stockpiles in the PURCHASER’s premises at all leads Cu.M. 1,423

(b) With excavated earth from approved borrow areas from outside PURCHASER’s premises upto a lead of 2.0 km Cu.M. 569

1.7 Extra over items 3.5 & 3.6 for lead from

i) 2 km - 5 km. Cu.M. 75

ii) 5 km -10 km. Cu.M. 75

1.8

Supplying approved granular / coarse granular material with maximum particle size of 20mm, brought from borrow pits outside

PURCHASER’s boundary and filling at places wherever specified including clearing away vegetation, depositing in layers not

exceeding 150 mm, watering and compaction with mechanical compaction machines to 70% of relative density including finishing to

specified slopes, etc. all as specified.

Cu.M. 80

1.9Supplying and spreading 150mm thick layer of 40mm nominal size (ungraded) of uncrushed/crushed/broken stone including

clearing vegetation and compacting the same to correct lines and levels, etc. complete. Cu.M. 750

SCHEDULE - 6: EARTH WORKS FOR 66/33 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Total Price DescriptionItem

1.6

UnitProvisional

Quantity Unit Price

Page 1 of 2

Page 23: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 4 (3x2)

SCHEDULE - 6: EARTH WORKS FOR 66/33 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Total Price DescriptionItem UnitProvisional

Quantity Unit Price

1.10

Earthwork in excavation including clearing away vegetation if any, for general site grading in all types of soils (ordinary/ hard soil)

in both dry and wet conditions & transporting excavated material (at all leads and lifts) to temporary stockpiles within the

EMPLOYER’s premises, spreading, levelling etc. all complete as specified and as directed.

a) Depth upto 3.00 m from G.L. Cu.M. 2,835

b) Depth exceeding 3.00 m and upto 6.00 m Cu.M. 945

c) All Depths exceeding 6.00 m. Cu.M. 236

1.11 Same as the item No.3.10 but for excavation in soft rock at all depths. Cu.M. 236

1.12 Same as the item No.3.10 but for excavation in hard rock at all depths Cu.M. 236

1.13 Extra over items No.3.10 to 3.12 for lead outside EMPLOYER’s premises upto

a) 2.00 km. Cu.M. 70.0

b) 5.00 km Cu.M. 70.0

1.14Filling for general site grading with selected excavated surplus material including transporting within the owner's premises, and

levelling but excluding excavation, as directed by the Engineer.

a) With excavated earth from stockpiles in the EMPLOYER’s premises at all leads. Cu.M. 1600.0

b) With excavated earth from approved borrow areas from outside EMPLOYER’s premises upto

i) 2.00 km. Cu.M. 100.0

ii) 5.00 km Cu.M. 100.0

iii) 10 km Cu.M. 20.0

1.15Same as item No.3.14, but including depositing the approved excavated material in layers in line and level and compacting the same

to the finished grade level to 95% Modified Procter Density including watering, ramming,finishing, dressing etc complete.

a) With excavated earth from stockpiles in the EMPLOYER’s premises at all leads. Cu.M. 100.0

b) With excavated earth from approved borrow areas from outside EMPLOYER’s premises upto a lead of 2.0 km. Cu.M. 100.0

1.16 Extra over items 3.15 for lead of

a) 2 km to 5 km Cu.M. 100.0

b) 5 km to 10 km Cu.M. 100.0

c) 10 km to 15 km Cu.M. 100.0

Total Amount (Nu.)

Page 2 of 2

Page 24: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Ex-Works

FAS

excluding

BST/CD

FAS

including

BST/CD

BST% CD%

Value(BST+CD)

1 2 3 4 5=1 x 3 6 7 8=(6+7)x1 x 2 9=1 x 4

1.0 Structural Steel

1.1

Supplying, Transporting, fabricating, loading,

unloading, etc of Hot dip galvanized structural steel

work fabricated from rolled sections, Compound

Sections built from Rolled Steel Sections and plates.

(The rate shall include bolts, nuts, flat washers,

foundation bolts,pack washers & plates.)

All works strictly shall be carried out as per approved

drawings after detailed Engineering.

M.T. 8

1.2

Same as item no.1.1 above but for chequered plates

including fixing/ welding opening notches etc. all as

per specifications and drawings.(a) Non galvanised

M.T. 0.5

1.3

Supply, fabricate, transport, delivery to site, loading

and unloading, etc. for insert plates, angles for cable

trenches, precast cover slab &floor grating of approved

make and pattern, fabricated to required shapes and

sizes including making opening in same of required

shape and size fixing clamps, clips or welding as per

specifications and drawings

M.T. 0.4

2.0 Concrete and Allied Works

2.1

Supply including handling and transport complete,

tested grade steel reinforcement for all reinforced

concrete works. all as per approved drawings

a)Using high yield strength deformed bars conforming to

IS:1786 (All diameters)

i 8 mm to 12 mm MT 11

ii 16 mm dia. and above MT 5

Total Amount (Nu.)

SCHEDULE - 7: SUPPLY OF STRUCTURAL STEEL AND REINFORCEMENT STEEL WORKS FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU, THIMPHU

UnitProvisional

Quantity

Provision for BST/CD Unit Price

Total FAS

including BST/CD Item Description

Total FAS excluding

BST/CD

Page 1 of 1

Page 25: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

1.00 Structural Steel

1.10

Erection of Main and Auxiliary structures including all works above ground level Rolled sections, Compound Sections

built from Rolled Steel Sections and plates, Miscellaneous steel work such as stairs, ladders, etc., Plates only, For water

tanks, covers, ducts, etc.

(The rate shall include bolts, nuts, washers, welding, all butt weld splices for making up member length as required and

shall also include one shop coat of red oxide zinc chrome primer after erection)

All works strictly shall be carried out as per approved drawings.

M.T. 8

1.20Same as item no.1.1 above but for chequered plates including fixing/ welding opening notches etc. all as per specifications

and drawings.(a) Non galvanisedM.T. 0.5

1.30

Fixing in position of M.S.non-galvanised floor grating of approved make and pattern, fabricated to required shapes and

sizes including making opening in same of required shape and size fixing clamps, clips or welding as per specifications

and drawings.

M.T. 0.4

2.00 Concrete and Allied Works

2.10

Providing and Laying plain or Sulphate resistant cement concrete with or without water proofing compound in blinding

layer, thickness as shown in drawings, including antiweed treatment, etc. with 1:5:10 concrete with aggregates of size

20mm downgraded including curing, etc. complete. (Rate to be inclusive of supply of all necessary material like formworks

& nails, laying in position as per specifications and as directed by Engineer for the substation area below the gravel.)

Cu.M. 9

2.20

Providing and Laying plain or Sulphate resistant cement concrete with or without water proofing compound in blinding

layer, thickness as shown in drawings, under reinforced concrete, masonry walls in foundations, grade slabs, bottom of pits,

sumps, etc. with 1:3:6 concrete with aggregates of size 20mm downgraded including curing, etc. complete. (Rate to be

inclusive of supply of all necessary material like formwork & nails, laying in position as per specifications and as directed

by Engineer.)

Cu.M. 209

(a) Providing and Laying Reinforced concrete of grade M20 with or without water proofing compound excluding

reinforcement but including formwork, with coarse aggregate of sizes 20 mm downgraded as directed by Engineer in

foundations (all types), walls, grade slabs, road pavement and any other structures including vibrating, curing, etc.

complete. (Rate to be inclusive of supply of all necessary material like formwork & nails, laying in position as per

specifications and shall include mixing of water-proofing compound where-ever directed by Engineer.)

Cu.M. 353

(b) Same as in item 2.5(a) but for concrete of grade M25. Cu.M. 15

2.40

Supplying & fixing in position all items required for Box type waterproofing treatment to basement walls & slabs as

specified by India Waterproofing Company or equivalent (Contractor to furnish 10 years Guarantee in format acceptable to

EMPLOYER.)

Sq.M. 40

Item Description Erection Price

2.30

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

Page 1 of 13

Page 26: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

2.50

Placing in postion including cleaning, cutting, bending, lapping, binding with 16 SWG annealed soft iron wire/welding,

irrespective of locations & levels, all as per drawings including handling and transport complete, tested grade steel

reinforcement for all reinforced concrete works.

(a) Using high yield strength deformed bars confirming to IS:1786 (All diameters).

i. 8 mm to 12 mm M.T. 11

ii. 16 mm dia. and above M.T. 5

2.60 Providing and laying approved water proofing compound in concrete / plastering for works, where specified. Kg. 5

2.70

Supplying & fixing precast slabs including suitable formwork to provide smooth finish, casting, curing, storing, protecting

under appropiate conditions, erecting them in position , etc. complete using M20 concrete with 20mm downgraded coarse

aggregate for trench covers including lifting hooks as required and as per specification & drawings.

Sq.M. 22

2.80

Supplying, fabricating and fixing in position in concrete or in masonry at any level, of length between 150 to 600 mm MS

flanged puddle pipes conforming to IS 1239 with puddle including one coat of primer on exposed surfaces all as per

specifications and as directed. (Flanges shall be flat face and shall be as per ANSI B 16.5 150 rating.)

(a)     25 mm dia. No. 50

(b)     50 mm dia. No. 25

(c)     75 mm dia. No. 15

(d)     100 mm dia. No. 10

2.90

Grouting pockets, holes, pipe sleeves of any shape or size for column bases, Machine foundations, etc. with cement mortar

1:2 with water cement ratio not more than 0.5 including roughening surface, cleaning with compressed air/ water jets,

ramming, curing, etc. complete.

Cu.M. 5

2.10Supplying & laying integral floor finish with 15 mm thk. layer of “Ironite” or equivalent on concrete floor. (using not less

than 2 kg of “Ironite” per sq.m).Sq.M. 25

2.11Supply & fixing of approved PVC water stops as indicated in drgs. Including all necessary splices etc. as per

manufacturer’s instructions, etc. complete.

(a) 150 mm ribbed type-min 10thk R.M. 28

(b) 225 mm ribbed type-min 10thk. R.M. 28

2.12

Supplying & Laying uncoursed random rubble mansonry wherever specified, with approved quality locally available hard

stone in cement mortar (1:5) including scaffolding, curing, raking of joints and flush/raised pointing in (1:3) cement mortar

etc. complete.

Cu.M. 480

Page 2 of 13

Page 27: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

3.00 Road Works and Drains

3.10Supplying & Laying sand filter layer 225 mm thick including spreading and compacting to lines and levels as specified

using sand of classification D 85 < 4 D15, D2 > 2.5mm (D2 refers to sieve size permitting 2% by weight, etc.).Sq.M. 1500

3.20Supplying & laying soling course of finished thickness of 230 mm, packing with 80 mm metall, dry rolling, sprinkling

gravel, watering and rolling, etc. all complete as specified.Sq.M. 1500

3.30Supplying & Laying waterbound macadam course of compacted finished thickness of 100mm including dry rolling,

spreading and consolidation of screening and binding material all complete as specified.Sq.M. 300

3.40Supplying & laying Hammer dressed stone edging 150 x 250 mm with stones including excavation, refilling and disposal

of surplus earth within 30 m lead.R.M. 150

3.50 Supplying & Laying 50mm thk. Asphalt concrete macadam course as per specifications. Sq.M. 650

3.60 Supplying & Laying 25mm thick premix asphalt macadam including tack coat as per specifications. Sq.M. 650

3.70Supplying & Laying a seal coat of asphalt of grade 80/100 at 1.5 kg/sq.m. and spreading grit, brushing, rolling, etc.

complete as specified and as directed.Sq.M. 650

3.80

Supplying & Laying reinforced concrete road with thickness as specified in the specification with or without water

proofing compound excluding reinforcement but including formwork, with coarse aggregate of sizes 20 mm downgraded

as directed by Engineer including vibrating, curing, etc. complete. (Rate to be inclusive of supply of all necessary material,

laying in position as per specifications and shall include mixing of water-proofing compound where-ever directed by

Engineer.)

Cu.M. 25

3.90Supplying, & Laying, jointing, hydraulically testing NP2 class cement concrete pipes conforming to IS:458 for cable

crossing etc. (Pipe shall have collar joint sealed in C.M. 1:2).

(a)     150 mm dia. R.M. 15

(b)     300 mm dia. R.M. 15

(c)     450 mm dia. R.M. 15

(d)     600 mm dia. R.M. 15

(e)     900 mm dia. R.M. 15

3.10Supplying, & Laying, jointing, hydraulically testing NP3 class cement concrete pipes conforming to IS:458 for cable

crossing etc. (pipe shall have collar joint sealed in C.M. 1:2).

(a)     150 mm dia. R.M. 15

(b)     300 mm dia. R.M. 15

(c)     450 mm dia. R.M. 15

(d)     600 mm dia. R.M. 15

(e)     900 mm dia. R.M. 15

Page 3 of 13

Page 28: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

3.11

Supplying, laying & fixing G.I. pipes of Class ‘C’ ( unit price to be inclusive of necessary heavy class GI fitting such as

tees, bends, unions, elbows, reducers, sockets, flanges, check nuts, plug ends, etc. ) in vertical or horizontal position at all

heights, including cutting, threading, bending and jointing, cutting holes in the walls or floors and making good the same

with cement mortar 1:4, trenching, refilling , sand bedding, providing necessary G.I. malleable clamps and supports and

testing the line as specified complete.

(a)     100 mm dia. R.M. 800

(b)     50 mm dia. R.M. 40

(c)     32 mm dia. R.M. 20

(d)     25 mm dia. R.M. 20

4.00 Building and Miscellaneous Works

Supplying & laying of Brick masonry in super structure in cement mortar 1:6 (1 cement : 6 coarse sand ) using approved

quality country bricks including scaffolding, curing, raking of joints, etc. as specified for walls, etc. at all levels.

i. 115 mm thick including placing chicken mesh at every 4th layer. Sq.M. 25

ii. same as item No.4.1(i) above but in C.M. 1:4. Sq.M. 5

iii. 230 mm thick and above. Cu.M. 10

4.20 Same as in item No.4.1 but for brick masonry in cement mortar 1:6 in foundations and in plinth.

(a) 230 mm thick and above. Cu.M. 8

4.30

Supply, Providing & laying hammer dressed RRM with approved quality locally available hard stone in cement mortar

(1:5) including scaffolding, curing, raking of joints and flush/raised pointing in (1:3) cement mortar etc. complete.for

boundary wall as per specification, drawings and as directed by Engineer. ( including supply & fixing in position 11nos of

barbed wire and concertina coil of 700mm dia., 80 nos of circles per running meter. Clips hot dip galvanised. The wire

shall be of 12SWG Tensile wire, covering 10RM with one coil, each RM will have 8 nos. of circles etc.).

R.M. 320

Providing & Laying Interior plain faced cement plaster in C.M. 1:6 with neeroo finish on all types of surfaces specified in

drawings at all levels. The rates shall also include moulding wherever specified, scaffolding, curing, etc.

(a) 12 mm thick on brick walls and concrete surfaces. Sq.M. 50

(b) 6 mm thick on underside of slabs. Sq.M. 50

Providing & Laying 20 mm thick exterior cement plaster in C.M. 1:3 in two layers, with first layer of 14mm thickness, and

second layer of 6mm thickness, using sand of approved quality, size and shape and including providing bands, grooves,

drip moulds, and including scaffolding, curing, etc. complete at all levels.

(a) Sand faced plaster including grooves in plaster. Sq.M. 50

(b) Plain sand faced plaster. Sq.M. 50

4.60Supply of 230 mm thick rubble packing under floor with approved hard stone, set in regular lines, hand packed, filling the

interstices with small stone chips and sand with approved hard stone obtained from borrow pits outside owner’s boundary.Sq.M. 30

4.40

4.50

4.10

Page 4 of 13

Page 29: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

Supplying and fixing approved quality premoulded bituminous joint filter as per IS:1838 wherever specified.

a) 12 mm thick Sq.M. 20

b) 25 mm thick Sq.M. 20

4.80Supplying and filling in place bituminous sealing compound conforming to IS:1834 in grooves 25 mm x 25 mm over joints.

R.M. 20

4.90

Supplying and fixing the chain link fencing of 2.0m high above finished grade level, 50 x 50 mm mesh with 3.15 mm dia.

GI Wire. The chain link shall be clamped to angle posts ISA 65 x 65 x 6 at spacing not exceeding 2.5m by MS flat 50x6

with 16mm diameter bolt with flat washers.The foundation shall be anchored in 1:3:6 PCC block of size 350mm x 350mm

x 600mm deep, including providing of braced bays at corners and every tenth bay with angle ISA 75x75x6 diagonal

bracing one 4mm diameter galvanised MS line wires at top and bottom including erection, painting over approved primer

cost, etc. complete as per details indicated in the drawings.

Sq.M. 200

4.10

Providing & Fixing in place 1000 litres capacity SINTEX or equivalent high density polyethylene cylindrical vertical water

tank on roof, with closed top including all GI fixtures and fittings for 25 mm Inlet, 25mm outlet, 25mm overflow, 50mm

scour connection and PVC float valve complete.

No. 2

4.11

Supply, Design, fabricate, transport to site and erect in position electrically operated sliding gate made out of hollow

rectangular MS pipes complete with drive unit having 3 phase motor and gear arrangement, electric control panel, limit

switches and arrangement for manual operation, as per standard supply including all necessary fixtures, etc. complete. Rate

shall include all inserts and embedments essential for smooth operation of the gate. The rate shall also include for 3 coats

of enamel painting of approved brand and shade after erection over 2 coats of red oxide zinc chromate primer.

Sq.M. 30

4.12Supply & Fixing of 140 mm dia. HDPE pipes PE 63 grade with pressure rating of PN 2.5 conforming to IS:4984 for cables

at road/pavement crossings as per drawing.R.M. 25

4.13Supply & Fixing of 110 mm dia. HDPE pipes PE 63 grade with pressure rating of PN 2.5 conforming to IS:4984 for

weeps holes in the walls. as per drawing.R.M. 50

4.14

Supplying, Fabricating and erecting M.S. gates consisting of M.S. angle framework (Internal) and 25 mm dia. G.I. pipe

external frame work using ISA 50x50x6 with 6mm thick MS joining plates including chain link stretched and tack welded

over the framework with necessary hinges, locking arrangement including applying one coat of red oxide paint to all

exposed surfaces of steel. Contractor shall arrange for all the materials, tools, labour, etc. required to complete the job.

Sq.M. 50

4.70

Page 5 of 13

Page 30: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

5.0 Building Works

A. EARTH WORKS

1.00Excavation in foundation trenches or drains, for all width<1.5m & area 10sqm in plan, incl. dressing & ramming, disposal

of surplus soil for all lead & lift -All kinds of Soil for footings and wall footings etc.

1.10 All kinds of soil. Cu.M 404

1.20 Ordinary rock with or without blasting. Cu.M 106

2.00

Hand excavation and refilling in layers < 200 mm, of trenches for pipes incl. dressing of sides/ ramming of bottom, depth

up to 1.5m, disposal of surplus materials within lead of 50 m. ( For external water supply pipes & waste pipes) - All kinds

of soil for pipes(80 mm< dia < 300 mm).

M 715

3.00Filling of trenches, sides of foundations etc. in layers < 200 mm using selected excavated earth, ramming etc. within lead

50 m & lift 1.5 m.Cu.M 415

B. STEEL WORKS

4.00Providing & fixing cold twisted deformed bar (Fe500) for R.C.C work incl. cutting, bending, binding & placing in position

complete, in footings, columns, beams, slabs, lintels, cornices and props etc.Kg 60812

5.00 Providing and fixing stainless steel staircase handrails, balustrades, horzontal pipes etc, complete as per the drawings. Set 1

C. P.C.C & R.C.C WORKS

6.00Providing & laying Cement concrete 1:4:8, 40 mm agg., excluding the cost of centering & shuttering-in foundation and

plinth- All works uptp plinth levels.Cu.M 37

7.00Providing & laying R.C.C 1:1.5:3, 20 mm agg. excluding the cost of formwork & reinforcement cost in- foundation pads,

bases of columns below plinth, plinth beams, etc, complete. Cu.M 150

8.00Providing & laying R.C.C 1:1.5:3, 20 mm agg. excluding the cost of formwork & reinforcement cost for- Columns above

plinth beams, props, etc complete.Cu.M 50

9.00Providing & laying R.C.C 1:1.5:3, 20 mm agg. excluding p&f the cost of formwork & excluding reinforcement cost for -

First floor slab, roof slab, prorch, landings of staircase, etc complete.Cu.M 68

10.00Providing & laying R.C.C 1:1.5:3, 20 mm agg. excluding the cost of formwork & reinforcement cost for - floor beams,

lintels, staircases, etc. Cu.M 105

Page 6 of 13

Page 31: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

11.00

Providing & laying traditional R.C.C Cornices in 1:1.5:3, 20 mm agg. including cost of formwork including finishing with

6mm thick plaster on the exposed surface with cement mortar 1:3, excluding reinforcement & decorative painting cost as

per standard design/drawings furnished (Meas. to be along the cornice and wall junction).

11.10 Multi-storied building at floor 2 level including the cost of lhanglag and at other floors where lhanglag is provided. M 27

11.20 Phana at roof level cornice. M 83

11.30 Lintel cornice (only cornice portion at external face). M 229

12.00

Providing & laying water tank for fire fighting system including RCC, 1:1:2, 20 mm agg. with water proofing compound,

the cost of formwork, reinforcement, pipes, water stoppers, valves, water level indicators etc, complete as per specification

and drawings in accordance to IS:3370.

Each 1

D. FORM WORKS

13.00 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork.

13.10 Foundations and plinths. Sq.M 630

13.20 Beams and lintels. Sq.M 740

13.30 Columns above plinth upto props. Sq.M 460

13.40 Staircase excluding landing. Sq.M 13

13.50 Slabs including landings of staircase. Sq.M 302

E. STONE/BRICKWORK

14.00 Providing & laying Hand packed stone filling/soling (under flooring footings and retaining walls). Cu.M 118

15.00 Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In CM 1:5 under plinth beams. Cu.M 60

16.00 Providing & laying 250 mm Cement Concrete Block in superstructure (upto floor 2 level ) as external infill- In CM 1:4. Cu.M 187

17.00 Providing & laying 125 mm Cement Concrete Block in superstructure (upto floor 2 level ) as internal infill- In CM 1:4. Sq.M 28

F. PLASTERING

19.00 Providing & laying 6 mm cement plaster (in ceilings) in cement mortar 1:4. Sq.M 193

20.00Providing & laying 12 mm cement plaster on rough side of single or half -brick wall - C.M 1:4 (Internal walls above plinth

including exposed portion of beams and columns).Sq.M 115

21.00 Providing & laying 20 mm cement plaster - C.M 1:4 (External walls Above plinth). Sq.M 664

22.00 Providing & laying cement plaster, finished with floating coat of neat cement - 20 mm plaster in C.M 1:4 in plinth walls. Sq.M 102

23.00Providing & applying plaster of paris putty 12 mm thickness over plastered surface to prepare the surface even and smooth

complete.Sq.M 133

Page 7 of 13

Page 32: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

G. FLOORING

24.00 Providing and laying sand bedding, including watering, ramming, dressing , etc in ground floor. Cu.M 25

25.00 Providing and laying 2.5 mm thk. Bitumen sheet in floors of ground floor and under walls. Sq.M 454

26.00Providing and laying in position plain cement concrete 1:3:6, 20 mm aggregate excluding the cost of centering and

shuttering in floors of ground floor - 100 mm thk.(All work up to plinth level).Cu.M 45

27.00 Providing and laying cement concrete flooring 1:2:4 finished with floating coat of neat cement. Sq.M 260

28.00Providing & laying Epoxy Flooring in ground floor vertified and polished - in white cement as per the drawings and

specifications (FF1)- Shades to be choose by Client.Sq.M 245

29.00Providing & laying 150 mm Epoxy skirting in ground floor vertified and polished - in white cement as per the drawings

and specifications (FF1).M 49

30.00Providing & laying anti-acid floor tiles in Battery Room, 25 mm thick, vetrified and polished- in white cement as specified

in architectural drawings (FF2).Sq.M 31

31.00Providing & laying 150 mm anti-acid skirting tiles in Battery Room, 25 mm thick, vetrified and polished- in white ceemnt

as specified in architectural drawings (FF2).M 23

32.00Providing & laying anti-acid wall tiles in Battery Room, 25 mm thick, vetrified and polished up to 2.1 m height from

finished floor levels - in white ceemnt as specified in architectural drawings (WT3).Sq.M 48

33.00Providing & laying terrazo floor tiles, 25 mm thick, vetrified and polished- in grey cement as specified in architectural

drawings (FF3).Sq.M 94

34.00Providing & laying 150 mm terrazo skirting tiles, 25 mm thick, vetrified and polished- in grey cement as specified in

architectural drawings (FF3).M 88

35.00Providing & laying granite floor tiles, 25 mm thick, vetrified and polished in landings and tread risers of staircase in grey

cement as specified in architectural drawings (FF4).Sq.M 14

36.00Providing & laying 150mm granite skirting tiles, 25 mm thick, vetrified and polished in staircase in grey ceemnt as

specified in architectural drawings (FF4).M 10

37.00Providing & laying anti-skid terrazo floor tiles, 25 mm thick, vetrified and polished in washrooms in grey cement as

specified in architectural drawings (FF5).Sq.M 16

38.00Providing & laying 150mm anti-skid terrazo skirting tiles, 25 mm thick, vetrified and polished in washrooms in grey

cement as specified in architectural drawings (FF5).M 38

39.00Providing & laying ceramic wall tiles, 25 mm thick, vetrified and polished in washrooms walls up to 2.1 m height from

finished floor levels in white cement as specified in architectural drawings (WT1).Sq.M 79

Page 8 of 13

Page 33: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

40.00Providing & laying ceramic wall tiles, 25 mm thick, vetrified and polished in pantry walls up to 2.1 m height from finished

floor levels in white cement as specified in architectural drawings (WT2).Sq.M 15

41.00Providing & laying granite -counter top in tiles, 25 mm thick, vetrified and polished in washrooms basins and pantry

counter in white cement as specified in architectural drawings (FF7).Sq.M 3

42.00

Providing and laying False Flooring, 600x600x40mm thick square modualr panel with 38 mm High Density E1 chipboard

core strengthened with high performance thermosetting resins. Including substructure- heavy duty pedastal assembly &

stringers, anti static, anti-vibrational, all steel components epoxy caoted, fire rating confirming to BS 476 Part 6 & &,

Electrical resistivity as ASTM F150/NFPA 99/ANSI S7.1/CEI 61340, etc, complete. Substructure installed to support

panel shall b e suitable to achieve a minimum finished floor height of 600mm from existing floor level. The Engineer In-

charge shall choose suitable brands or equivalent to UNITILE UCBLA 38 SERIES, etc.

Sq.M 99

H. WINDOWS AND DOOR WOOKS Sq.M

43.00Providing & fixing pelmet 100 mm x 12 mm, with 25 mm dia. wooden curtain rod & brackets including M.S.flats

25x3x100 mm & plugs etc. complete - Mixed Conifer.Sq.M 81

44.00Providing & fixing anodised Aluminium doors, including all accessories such as U-rubber gasket for fixing glass panes,

weather strips or weather seals, roller, springs, glass panes, etc complete as per the drawings.M

44.10 Control room building

44.1.1 D0 Each 1

44.1.2 D1 Each 1

44.1.3 D2 Each 1

44.1.4 D3 Each 3

44.1.5 SD1 Each 1

44.1.6 SD2 Each 2

44.1.7 RS Each 1

44.20 Pump house

44.2.1 D1 Each 1

44.2.2 RS Each 1

44.30 Store shed

44.3.1 D1 Each 2

44.3.2 RS Each 1

44.40 Security Guard room

44.4.1 D1 Each 1

44.4.2 D2 Each 2

Page 9 of 13

Page 34: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

45.00

Providing, making and fixing in position of timber Doors Components including frames, security bars (if any),brass tower

bolt 150 mm,brass handle 150 mm,brass hinges 250 mm,brass sliding bolts 250 mm and applying wood preservative on

unexposed surface and painting, all necessary hardwares (holdfast complete, bolts, screws etc.) as applicable and as per the

design drawing and specification.

45.10 D4 Each 5

45.20 D5 Each 3

46.00

Providing & fixing anodised Aluminium windows including all accessories such as U-rubber gasket for fixing glass panes,

weather strips or weather seals, roller, springs,glass panes, steel frames, hold fast, etc complete as per

the drawings / technical specification.

46.10 Control room building Each

46.1.1 W1 Each 21

46.1.2 W2 Each 5

46.1.3 WK Each 1

46.1.4 V1 Each 4

46.20 Pump house

46.2.1 W1 Each 4

46.30 Store shed

46.3.1 W1 Each 11

46.40 Security Guard room

46.4.1 W1 Each 1

46.4.2 W2 Each 2

46.4.3 V1 Each 2

I. PARTITION AND FALSE FLOORING

47.00Providing & fixing anodised Aluminium partitions framing of specified sections including all accessories such as U-rubber

gasket for fixing glass panes, weather strips or weather seals, roller, springs, 8mm thick prelaminated boards, etc complete.Sq.M 23

48.00 Providing & fixing TRAC-84C false ceiling as per the techincal specifications, complete. Sq.M 99

J. ROOFING

49.00Providing and fixing PPGI tropical deep green roof sheeting, including bolts,hooks,and nuts 8 mm dia. With bitumen and

G.I limpet washers filled with white lead for connection, etc, excluding the cost of purlins,struts, rafters and trusses.-24G.Sq.M 934

50.00Providing and fixing 600 mm ridges or hips in PPGI roof sheeting including bolts, hooks, and nuts 8mm dia. With bitumen

and G.I limpet washers filled with white lead for connection. M 140

51.00Steel work welded, in built up sections, trusses, frameworks including cutting, hoisting, fixing and appl. Priming coat of

red lead paint. in tubular sections.Kg 15560

52.00 Providing and fixing MS round hold-down bolts with nuts and washer plates, complete in all areas. Kg 625

Page 10 of 13

Page 35: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

53.00 Providing & fixing bolts and expansion bolts (wherever necessary) of various sizes including nuts & washers. Kg 680

54.00 Providing, making and fixing, M.S plates all thickness complete in roof truss work. Kg 813

55.00Providing and fixing 450 mm over all semi-circular PVC gutter, including brackets, bolts, nuts, washers and rain water

pipes connections, exlcluding the cost of pipes - 24g sheets.Kg 202

56.00Providing and fixing on wall face single socketed rigid PVC (working pressure 4kgf per sq.cm) rain water pipes including

jointing with seal ring leaving 10 mm gap for thermal expansion - complete - 110 mmM 55

57.00Providing and fixing on the wall face PVC coupler for rigid rain water pipes including jointing with seal ring leaving

10 mm gap for thermal expansion - complete - 110 mm.M 50

58.00Providing and fixing on the wall face PVC bend for rigid rain waer pipes including jointing with seal ring leaving 10 mm

gap for thermal expansion - complete - 110 mm.M 19

59.00 Providing, making and fixing M.S. straps, flats, sole plates etc in eaves board of 225x2 mm M.S flats in roof. M 37

K. PLUMBING WORKS

60.00 Providing & fixing PVC pipes incl. PVC fittings & clamps & repair walls - 20 mm internal piping. M 35

61.00 Providing & fixing PVC pipes incl. PVC fittings & clamps & repair walls - 25 mm external piping. M 20

62.00 Providing & fixing PVC pipes incl. PVC fittings & clamps & repair walls - 40 mm external piping (excluding trenching). M 425

63.00 Providing & fixing 600 x 450 mm bevelled edge mirror (superior glass) incl.4mm A.C sheet base fixed to wooden cleats. M 5

64.00 Providing & fixing c.p. towel rail 600 x 20 mm with c.p brass brackets fixed to wooden cleats. Each 4

65.00 Providing & fixing soap dish including brackets, wooden cleats, c.p. brass screws. Each 5

66.00 Providing & fixing soap dispenser including brackets, wooden cleats, c.p. brass screws. Each 5

67.00 Providing & fixing c.p brass bibcock - 15 mm standard vertical, c.p knob. Each 5

68.00 Providing & fixing pedestals for basins, white vit.china, recessed back for pipes & necessary fittings. Each 5

69.00

Providing and fixing flat back 550 x 400 mm wash basin with single 15 mm c.p brass pillar, including C.I brackets, 15 mm

C.P brass pillar taps, C.P chain and rubber plug 32 mm pvc waste, 32 mm dia trap & union, repair walls. (Note: Approval

for the brand have to be sought from the employer before the purchase of the items.)

Each 5

70.00Providing and fixing kitchen sink including all connections, fittings and repairs to walls, etc, stainless steel 580 x 480 x 175

mm single bowl.Each 1

71.00 Providing & fixing C.P Brass shower fittings with revolving joint, 15 mm. Each 2

Page 11 of 13

Page 36: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

72.00Providing & fixing European‐type vitreous china w.c pedestal including seat and lid with c.p brass hinges, 15 lit white

vitreous china low level cistern, fittings, brackets, repair walls.Each 5

73.00 Providing & fixing toilet paper holder - Recessed ceramic, roll-type, 150 x 150 mm. Each 5

74.00 Providing & fixing plastic tank including all accessories complete - 2000 litre capacity. Each 2

75.00 Providing & fixing plastic tank including all accessories complete - 3000 litre capacity. Each 2

76.00 P & f P.V.C Nahani Trap - 110 mm inlet & 75 mm outlet. Each 10

77.00 Providing & fixing brass stop cock - 25 mm ( At junction-External). Each 5

78.00Providing & fixing P.V.C soil and vent pipes, single or double socketed, including pipe clip complete (excluding the cost of

PVC fittings)-110 mm dia.M 26

79.00 Providing & fixing P.V.C Coupler -110 mm dia. Each 13

80.00 Providing & fixing P.V.C Coupler -75 mm dia. Each 13

81.00 Providing & fixing P.V.C door bend - 75 mm dia. Each 9

82.00Providing & laying H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &

thrust block), 75 mm.Each 16

83.00Providing & laying H.D.P.E pipes including H.D.P.E fittings pressure class 6kg/sq.cm(excluding trenching, refilling &

thrust block) -- 110 mm dia.Each 41

84.00 Constructing Soak Pit filled with brick bats including 100 mm S.W drain-pipe - As per the drawing. Each 2

85.00

Constructing Septic Tanks, in 2nd class brick masonry in cement mortar 1:4, including fittings, C.I cover with frame, 40

mm thick concrete flooring (40 mm aggregates) cement plaster concrete base in C.M 1:4:8 etc. complete as per standard

design - 50 users.

Each 1

86.00

Constructing Septic Tanks, in 2nd class brick masonry in cement mortar 1:4, including fittings, C.I cover with frame, 40

mm thick concrete flooring (40 mm aggregates) cement plaster concrete base in C.M 1:4:8 etc. complete as per standard

design - 15 users.

Each 1

L. DRAINAGE WORKS

87.00Providing and laying plinth protection 50 mm thk. complete including finishing the top surface smooth - with cement

concrete 1:3:6, 20 mm aggregate, laid over 100 mm thick layer of compacted gravel (40 mm).Sq.M 286

88.00

Construction of second class brick masonry open surface drain in cement mortar 1:4 including earth work in excavation

100mm thick concrete bed 1:5:10, 40 mm aggregate and 25 mm thick cement concrete 1:2:4, 12mm aggregate for filling

haunches including 12 mm cement plastering 1:4 with a floating coat of neat cement and disposal of surplus earth etc.

complete- 250 x 200 mm depth.

M 255

89.00

Const. Brick masonry manhole in CM 1:5, R.C.C top slab with 1:2:4 20 mm agg., fdn. PCC 1:4:8 40 mm agg.12mm

CP 1:3 finished with floating coat & making channels in PCC 1:2:4., 20 mm agg. neatly finished complete - as per the

drawing.

Each 5

90.00

Const. Brick masonry inspection chamber in CM 1:5, R.C.C top slab with 1:2:4 20mm agg., fdn. PCC 1:4:8 40mm

agg.12mm CP 1:3 finished with floating coat & making channels in PCC 1:2:4., 20mm agg. neatly finished complete - as

per the drawing.

Each 3

Page 12 of 13

Page 37: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Item Description Erection Price Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT CHANGIDAPHU,THIMPHU

Unit

M. PAINTING

91.00Providing and applying one coat of primers of approved color and texture by the client on the eave board and eave ceiling -

pink primer.Sq.M 399

92.00Providing and applying two coats of synthetic enamel paint of approved color and texture by the client on eave board and

ceiling.Sq.M 399

93.00 Providing & applying one coat of primers ( on external wall surface) -Cement primer. Sq.M 385

94.00 Finishing wall with Water- Proof Cement Paint - New work, three coats ( on external wall surface). Sq.M 385

95.00Providing & applying finishing coats - Acrylic washable distemper, two coats on new work, including cement primer coat -

internal walls.Sq.M 318

96.00Providing, preparing and applying Sumdang Traditional Bhutanese painting (Washable) - Ding quality. (Rate quoted

should be able to cover the cost of applying paints to all the cornices, external window portions, etc.)Sq.M 773

N. FURNITURES

97.00 Control room

97.10 Arch Table for control room Each 3

97.20 Rotating chair Each 4

98.00 General office/record room

98.10 File rack Each 2

98.20 Medium Office working table consisting of : 1 office working table, 1 drawer cabinet, 1 side extension table Each 1

98.30 Executive rotating chair Each 1

98.40 Chair with arm rest with fabric Each 3

98.50 Writiing table Each 3

98.60 Rotating chair Each 2

99.00 Guest room

99.10 Medium size beds with Mattress, pillows, quilts, etc Each 2

99.20 Wooden cupborads Each 2

99.30 TV set - 32 inch LED (Sony, Samsung) Set 1

99.40 Easy sofa double seater set consisting of one number double seater and two numbers single seater Set 1

99.50 Center table Each 1

99.60 TV cabinet simple with one drawer Each 1

99.70 Fridge (single deck), equivalent to 190 litres. Make to be approved by BPC Each 1

99.80 Rice cooker, Curry cooker and Water boiler. Make to be approved by BPC Set 1

99.90 Micro wave oven. Make to be approved by BPC. Each 1

99.10 Plate and cups set each 1

99.11 Dining table 4 Seater No. 1

99.12 Chair for dining table No. 4

Total Amount (Nu.)

Page 13 of 13

Page 38: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 Supply and delivery of Equipment

2 Erection works

3 Testing and commissioning including design of Aux.systems.

4 Supply and delivery of Spares and special tools

6 Earth works

7 Supply of structural steel and reinforcement steel works

8 Supply and erection

2 X 5 MVA, 66/33 KV INDOOR GIS SUBSTATION INCLUDING ALL OTHER ASSOCIATED WORKS AT DAMJI IN GASA

DZONGKHAG AS PACKAGE 'B'

SN DESCRIPTION Total Price(Nu)

TOTAL

0. SUMMARY SHEET

Summary

Page 39: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu

Ex-Work CIF (Site)

1 2 3 4 = 1 x 3 5 6 7 = 1 x 2 x 5 8 = 1 x 2 x 6 9 = 4 + 7 + 8

1.0 POWER TRANSFORMER

1.1 5MVA, 66/33kV, Power transformer including

RTCCSet 2

2.0 GIS EQUIPMENT

2.1 66kV GIS transformer feeder bay (1250A, 20kA) Bay 2

2.3 66kV GIS line feeder (1250A, 20kA) Bay 2

2.4 66kV GIS Voltage Transformer (3phase, 1250A,

40kA)Bay 2

2.5 66kV GIS Bus Sectionaliser breaker (1250A, 20kA)Bay 1

3.0 CONTROL AND RELAY PANEL

3.1 66kV line feeder No 2

3.2 66kV transformer feeder No 2

3.3 Bus Section No 1

4.0 LIGHTNING ARRESTER

4.1 60kV Set 2

5.0 SUBSTATION AUTOMATION

SYSTEMS/SCADA

Unit RateBST

Total Including

Taxes

TURNKEY PACKAGE FOR DESIGN, SUPPLY, CONSTRUCTION, ERECTION, TESTING & COMMISSIONING OF 2 X 5 MVA, 66/33 KV INDOOR GIS SUBSTATION INCLUDING ALL

OTHER ASSOCIATED WORKS AT DAMJI IN GASA DZONGKHAG

1. SCHEDULE OF SUPPLY & DELIVERY

Item Description UnitProv.

Quantity

CD/

Taxes

Total Excluding

CD and BST

CD/Tax

AmountBST Amount

SYSTEMS/SCADA

5.1Complete Substation Automation

Systems(SAS)/SCADA) and Accessories. All the

required data should report to NLDC, Thimphu.

Lot 1

6.0 33kV Gas Insulated Switchgear

6.1 Incomer Panel, 1250A with all digital meters,

numerical relays, CT , PT & etc.No 2

6.233kV outgoing feeder panels,1250A with all digital

meters, numerical relays, CT , & etc.(refer SLD)No 4

6.3 33kV outgoing Feeders panels, 1250A with all

digital meters, numerical relays, CT, PT & etc. No 2

6.4 33kV Bus Coupler panel, 1250A with all digital

meters, numerical relays, CT, PT & etc.No 1

Schedule 1/Supply of Equipment/Page 1 of 4

Page 40: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu

Ex-Work CIF (Site)

1 2 3 4 = 1 x 3 5 6 7 = 1 x 2 x 5 8 = 1 x 2 x 6 9 = 4 + 7 + 8

Unit RateBST

Total Including

Taxes

TURNKEY PACKAGE FOR DESIGN, SUPPLY, CONSTRUCTION, ERECTION, TESTING & COMMISSIONING OF 2 X 5 MVA, 66/33 KV INDOOR GIS SUBSTATION INCLUDING ALL

OTHER ASSOCIATED WORKS AT DAMJI IN GASA DZONGKHAG

1. SCHEDULE OF SUPPLY & DELIVERY

Item Description UnitProv.

Quantity

CD/

Taxes

Total Excluding

CD and BST

CD/Tax

AmountBST Amount

7.0 STATION TRANSFORMER

7.1 250kVA, 33/0.415kV, Station transformer No 2

8.0 POWER AND CONTROL CABLES

8.1 Single Phase 66kV, 630sq.mm cable including end

terminations and sealing.

8.1(a) from 66 kV Gantry (outdoor)to 66kV GIS

equipment (indoor)1

8.1(b) from 66kV GIS equipment (indoor)to primary of

2x5MVA, 66/33kV Transformer (outdoor)1

8.2Single Phase 33kV, 630 sq.mm cables including end

terminations from secondary of 2x5MVA, 66/33kV

power transformers to 33kV GIS panels

Lot 1

8.3 33kV, 3Cx300 sq. mm., XLPE, Aluminium, earthed

grade Cable alongwith associated termination &

accessories from 33kV Switchgear to Lattice

Structure

Lot 1

8.4 3cx 70 sq.mm, XLPE Al. Cable from 33kV GIS

Lot

8.4 3cx 70 sq.mm, XLPE Al. Cable from 33kV GIS

panel to two station transformers including end

termination.

Lot 1

8.5 1.1kV Power and Control Cables for the entire

substation including 20% for spareLot 1

9.0 CABLING EQUIPMENT

9.1 All accessories for switchyard such as cable trays,

racks, conduits, bends, tees, junction boxes, etc. for

the entire cabling system including all accessoriesLot 1

10.0 OUTDOOR LIGHTING

10.1 Complete outdoor lighting system with LED for

substation area including access road with complete

accessories, lighting panels etc.

Lot 1

Schedule 1/Supply of Equipment/Page 2 of 4

Page 41: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu

Ex-Work CIF (Site)

1 2 3 4 = 1 x 3 5 6 7 = 1 x 2 x 5 8 = 1 x 2 x 6 9 = 4 + 7 + 8

Unit RateBST

Total Including

Taxes

TURNKEY PACKAGE FOR DESIGN, SUPPLY, CONSTRUCTION, ERECTION, TESTING & COMMISSIONING OF 2 X 5 MVA, 66/33 KV INDOOR GIS SUBSTATION INCLUDING ALL

OTHER ASSOCIATED WORKS AT DAMJI IN GASA DZONGKHAG

1. SCHEDULE OF SUPPLY & DELIVERY

Item Description UnitProv.

Quantity

CD/

Taxes

Total Excluding

CD and BST

CD/Tax

AmountBST Amount

11.0 INDOOR LIGHTING

11.1 Complete indoor lighting system with LED

including all lighting panels & complete accessories. Lot 1

12.0 EARTHING & LIGHTNING PROTECTION

12.1 Earthing and lightning protection systems for

switchyard complete with earth grid and mat, earth

leads, electrodes, shield wire, clamps and connectors

and all other hardware & accessories

Lot 1

13.0 BATTERY& BATTERY CHARGER

13.1 110V DC Battery and Battery charger Set 2

14.0 DISTRIBUTION BOARDS

14.1 AC Distribution board Set 2

14.2 DC Distribution board Set 2

15.0 FIRE FIGHTING SYSTEMS

15.1 Fire Fighting Equipment and Fire Fighting System

including Emulsifier System for Power

Transformers (2Nos. power transformers)

Lot 1

16.0 FIRE ALARM & DETECTION SYSTEM

16.1 Complete fire alarm and detection system as per

technical specificationsLot 1

17.0 SURVILANCE AND SECURITY SYSTEMS

17.1 Complete CCTV systems along with complete

accessoriesLot 1

Schedule 1/Supply of Equipment/Page 3 of 4

Page 42: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu

Ex-Work CIF (Site)

1 2 3 4 = 1 x 3 5 6 7 = 1 x 2 x 5 8 = 1 x 2 x 6 9 = 4 + 7 + 8

Unit RateBST

Total Including

Taxes

TURNKEY PACKAGE FOR DESIGN, SUPPLY, CONSTRUCTION, ERECTION, TESTING & COMMISSIONING OF 2 X 5 MVA, 66/33 KV INDOOR GIS SUBSTATION INCLUDING ALL

OTHER ASSOCIATED WORKS AT DAMJI IN GASA DZONGKHAG

1. SCHEDULE OF SUPPLY & DELIVERY

Item Description UnitProv.

Quantity

CD/

Taxes

Total Excluding

CD and BST

CD/Tax

AmountBST Amount

18.0 EPABX SYSTEM

18.1Complete EPABX system suitable for optic fibre

communication along with all accessories.LOT 1

19.0 FIBRE OPTIC CABLE

19.1

1310 nm, Monomode Underground Armoured Fibre

Optic approach cable, Joint Boxes,Pigtails, clamps

& any other required accessories

LOT 1

20.0 DIESEL GENERATOR(DG) SET

20.1Diesel generator set, 50 kVA, 415V along with

control panel and required accessoriesNo. 1

21.0 33kV LATTICE STRUCTURE

33 kV out going feeders Lattice structure inclusive

of all items like Lightning Arresters, Isolators with

earth blade, insulators, hardware accessories

complete

Set 4

22.0 EOT CRANE

EOT crane of 5T capacity suitable to operate as

22.1

EOT crane of 5T capacity suitable to operate as

and when required, complete with all

accessories and slings as detailed in the

specifications.

22.22x13 m Runway rails of suitable size complete

in all respect including fixing at site.

22.3Complete trolley runway with conductors,

fixtures, insulations etc. as per Clauses.

22.4All consumables for site assembly & erection

etc.

G-TOTAL

Schedule 1/Supply of Equipment/Page 4 of 4

Page 43: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 = 1 x 2

1.0 POWER TRANSFORMER

1.1 5MVA, 66/33kV, Power transformer including RTCC Set 2

2.0 GIS EQUIPMENT

2.1 66kV GIS transformer feeder bay (1250A, 20kA) Bay 2

2.2 66kV GIS line feeder (1250A, 20kA) Bay 2

2.3 66kV GIS Voltage Transformer (3phase, 1250A, 20kA) Bay 1

2.4 66kV GIS Bus Coupler breaker (1250A, 20kA) Bay 1

3.0 CONTROL AND RELAY PANEL

3.1 66kV line feeder No 2

3.2 66kV transformer feeder No 2

3.3 Bus Section No 1

2. SCHEDULE OF ERECTION

ItemDescription

Unit Prov. Quantity Unit Price Total

TURNKEY PACKAGE FOR DESIGN, SUPPLY, CONSTRUCTION, ERECTION, TESTING & COMMISSIONING OF 2 X 5 MVA, 66/33 KV INDOOR GIS SUBSTATION

INCLUDING ALL OTHER ASSOCIATED WORKS AT DAMJI IN GASA DZONGKHAG

3.3 Bus Section No 1

4.0 LIGHTNING ARRESTER

4.1 60kV Set 2

5.0 SUBSTATION AUTOMATION SYSTEMS/SCADA

5.1 Complete Substation Automation Systems(SAS)/SCADA) and Accessories. All the required

data should report to NLDC, Thimphu.Lot 1

6.0 33kV GIS Panel

6.1 Incomer Panel, 1250A with all digital meters, numerical relays, CT , PT & etc. No 2

6.2 33kV outgoing feeder panels,1250A with all digital meters, numerical relays, CT , &

etc.(refer SLD)No 4

6.3 33kV outgoing Feeders panels, 1250A with all digital meters, numerical relays, CT, PT &

etc. No 2

6.433kV Bus Coupler panel, 1250A with all digital meters, numerical relays, CT, PT & etc. No 1

Schedule 2/Erection/Page 1 of 3

Page 44: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 = 1 x 2

ItemDescription

Unit Prov. Quantity Unit Price Total

7.0 STATION SERVICE TRANSFORMER

7.1 250kVA, 33/0.415kV, Station transformer No 2

8.0 POWER AND CONTROL CABLES

8.1 Single Phase 66kV, 630sq.mm cable including end terminations

8.1(a) from 66 kV Gantry (outdoor)to 66kV GIS equipment (indoor)

8.1(b) from 66kV GIS equipment (indoor)to primary of 2x5MVA, 66/33kV Transformer

(outdoor)

8.2 Single Phase 33kV, 630 sq.mm cables including end terminations from secondary of

2x5MVA, 66/33kV power transformers to 33kV GIS panelsLot 1

8.3 33kV, 3Cx300 sq. mm., XLPE, Aluminium, earthed grade Cable alongwith associated

termination & accessories from 33kV Switchgear to Lattice Structure

8.4 3cx 70 sq.mm, XLPE Al. Cable from 33kV GIS panel to two station transformers

including end termination.Lot 1

8.5 1.1kV Power and Control Cables for the entire substation Lot 1

9.0 CABLING EQUIPMENT

9.1 All accessories for switchyard such as cable trays, racks, conduits, bends, tees,

junction boxes, etc. for the entire cabling system including all accessoriesLot 1

Lot 1

junction boxes, etc. for the entire cabling system including all accessories

10.0 OUTDOOR LIGHTING

10.1 Complete outdoor lighting system for switchyard including access road with

complete accessories, lighting panels etc.

Lot1

11.0 INDOOR LIGHTING

11.1 Complete indoor lighting system including all lighting panels & complete

accessoriesLot 1

12.0 EARTHING & LIGHTNING PROTECTION

12.1 Earthing and lightning protection systems for switchyard complete with earth grid

and mat, earth leads, electrodes, shield wire,clamps and connectors and all other

hardware & accessories

Lot 1

13.0 BATTERY& BATTERY CHARGER

13.1 110V DC Battery and Battery charger No 2

14.0 DISTRIBUTION BOARDS

14.1 AC Distribution board Set 2

14.2 DC Distribution board Set 2

Schedule 2/Erection/Page 2 of 3

Page 45: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 = 1 x 2

ItemDescription

Unit Prov. Quantity Unit Price Total

15.0 FIRE FIGHTING SYSTEMS

15.1 Fire Fighting Equipment and Fire Fighting System including Emulsifier System for

Power Transformers (2 Nos. power transformers)Lot 1

16.0 FIRE ALARM & DETECTION SYSTEM

16.1 Complete fire alarm and detection system as per technical specifications Lot 1

17.0 SURVILANCE AND SECURITY SYSTEMS

17.1 Complete CCTV systems along with complete accessories Lot 1

18.0 EPABX SYSTEM

18.1 Complete EPABX system suitable for optic fibre communication along with all accessories. LOT 1

19.0 FIBRE OPTIC CABLE

19.11310 nm, Monomode Underground Armoured Fibre Optic approach cable, Joint

Boxes,Pigtails, clamps & any other required accessoriesLOT 1

20.0 DIESEL GENERATOR(DG) SET20.0 DIESEL GENERATOR(DG) SET

20.1 Diesel generator set, 50 kVA, 415V along with control panel and required accessories No. 1

21.1 33kV LATTICE STRUCTURE

21.133 kV out going feeders Lattice structure inclusive of all items like Lightning Arresters,

Isolators with earth blade, insulators, hardware accessories completeSet 4

22.0 EOT Crane Lot 1

TOTAL

Schedule 2/Erection/Page 3 of 3

Page 46: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Amount in Nu.

Item Description UnitProv.

QuantityUnit Price Total Amount Remarks

1 Complete testing and commissioning of substation including

design and engineering of Aux. Systems.Lot 1

TOTAL

3. TESTING AND COMISSIONING

TURNKEY PACKAGE FOR DESIGN, SUPPLY, CONSTRUCTION, ERECTION, TESTING & COMMISSIONING OF 2 X 5 MVA, 66/33

KV INDOOR GIS SUBSTATION INCLUDING ALL OTHER ASSOCIATED WORKS AT DAMJI IN GASA DZONGKHAG

Schedule 3/Testing Commissioning/Page 1 of 1

Page 47: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 4 = 1 x 3 5 6 7=1x2x5 8=1x2x6 9=4+7+8

1.0 66kV GIS SPARE PARTS

1.1 Set of Gasket/'O'Rings for one complete bay No 1

1.2 Rupture Disc for gas compartment Set 2

1.3 Gas Insulating Barrier for gas compartment Set 2

1.4 Circuit Breaker Trip Coils Set 5

1.5 Circuit Breaker Closing Coils Set 5

1.6 Gas Density Monitor with Pressure Swicth Set 2

1.7 Manual Operation Handle for Circuit Breaker No 2

1.8 Manual Operation Handle for DS and ES No 2

1.9 Moisture absorbent No 2

1.10 Additional SF6 Gas (5% from the total quantity) No 1

1.11 Curent Transformer Set 1

1.12 PT No 1

1.13 LA Set 1

1.14 Discnector Set 1

1.15 High Speed Earth switch Set 1

2.0 LIGHTNING ARRESTORS

2.1 60kV Lightning Arrestor

2.1.1Single phase surge arrestor complete in all respect

including base and surge monitorSet

1

2.1.2 Terminal connectors Set 1

2.2 33kV Lightning Arrestor

2.1.1 30kV surge arrestor including surge monitor Set 2

2.1.2 Terminal connectors Set 2

4. SUPPLY & DELIVERY OF ESSENTIAL SPARES AND SPECIAL TOOLS

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

Site

TURNKEY PACKAGE FOR DESIGN, SUPPLY, CONSTRUCTION, ERECTION, TESTING & COMMISSIONING OF 2 X 5 MVA, 66/33 KV INDOOR GIS SUBSTATION INCLUDING

ALL OTHER ASSOCIATED WORKS AT DAMJI IN GASA DZONGKHAG

CD/Tax Amount BST Amount Total Including

CD/taxes & BST

Schedule 4/Spares Special Tools/Page 1 of 5

Page 48: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

SiteCD/Tax Amount BST Amount

Total Including

CD/taxes & BST

3.0 SPECIAL TOOLS FOR GIS EQUIPMENT

3.1Set of SF6 Gas Filling Adapter/Device Including

Hoses Valves, etc.Set 1

3.2 Set of SF6 Gas Filling and Evacuating Equipment Set 1

3.3 Set of Dew Point Meter Set 1

3.4 Precision Pressure Gauge Set 2

3.5 SF6 Gas Leakage Detection Device Set 1

3.6 Set of Torque Wrench Set 1

3.7 Tong tester meter(0mA to 2A) No 1

3.8 Digital Multi meter No 1

3.9 Megger (5KV) No 1

3.10 Earth resistance clamp on meter No 1

3.11 BDV test kit No 1

4 TRANSFORMER SPARE PARTS

4.1 66/33kV TR

4.1.1 Breather -(Silica gel(12.5kg)) No 1

4.1.2 Gasket Set 1

4.1.5 HV Bushing mounted inside the cable box Set 1

4.1.6 LV Bushing mounted inside the cable box Set 1

4.1.7 OTI No 1

4.1.8 WTI No 1

4.2 33/0.415 kV TRANSFORMER

4.2.1 33 kV bushing mounted inside cable box No. 1

4.2.2 0.415kV bushing with metal parts with gaskets

mounted inside cable boxNo.

1

4.2.3 Set of gaskets Set 1

Set of Valve complete Set 1

5 SPECIAL TOOLS FOR POWER TRANSFORMER

5.1 Adjustable angle wrenchs(10") Set 1

5.2 Adjustable angle wrenchs(6") Set 1

5.3 Adjustable angle wrenchs(8") Set 1

5.4 Adjustable angle wrenchs(12") Set 1

5.5 C-Clamp Set 1

5.6 Manila Rope_18DIA X 10M Set 4

5.7 Pipe Wrench (10INCH) Set 1

5.8 Pipe Wrench (6INCH) Set 1

5.9 Pipe Wrench (8INCH) Set 1

5.10 Pipe Wrench (12INCH) Set 1

5.11 Torque Wrench Set 1

5.12 Paint Spray Gun Set 1

Schedule 4/Spares Special Tools/Page 2 of 5

Page 49: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

SiteCD/Tax Amount BST Amount

Total Including

CD/taxes & BST

6 33kV GIS PANEL SPARE PARTS

6.2 Closing coil of each type No. 6

6.3 Trip coil of each type No. 6

6.4 Potential transformer Set 1

6.5 Current transformer for Incomer Set 1

6.6 Current transformer for Outgoing feeder Set 1

7 CONTROL AND RELAY PANEL SPARE PARTS

7.1 66kV

7.1.1 Control Switches No. 1

7.1.2 Relays one number of each type No. 1

7.1.3 Meters one number of each type No. 1

8 POWER CABLE & CABLE TERMINATIN.

8.1 Single Phase 66kV, 630sq.mm cable Mtr. 300

8.2

33kV, 1Cx630 sq. mm., XLPE, Aluminium, earthed

grade Cable alongwith associated termination &

accessories from 5MVA transformer to 33kV GIS

Switchgear

Mtr. 100

8.3

33kV, 3Cx300 sq. mm., XLPE, Aluminium, earthed

grade Cable alongwith associated termination &

accessories from 33kV GIS Switchgear to Lattice

Structure

Mtr. 400

8.4

33kV, 3Cx70 sq. mm., XLPE, Aluminium, earthed

grade Cable alongwith associated termination &

accessories from 33kV GIS Switchgear to

2X250kVA LT Transformer

Mtr. 50

8.5 66kV Cable termination kits at gantry end Set 2

8.6 66kV cable sealing end at GIS bus Set 4

66kV cable termination kit at 2x5MVA transformer Set 2

8.7Indoor cable termination kit for 33kV incommer at

GIS Switchgear end.Set 2

8.8Indoor cable termination kit for 33kV outgoing

feeders at GIS Switchgear end.Set 4

8.9Indoor cable termination kit for station transformer

feeders at GIS Switchgear end.Set 2

8.10Out door cable terminationkit for all types of 33kV

power cable each.Set 4

Schedule 4/Spares Special Tools/Page 3 of 5

Page 50: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

SiteCD/Tax Amount BST Amount

Total Including

CD/taxes & BST

10.0 BATTERY CHARGER

10.1 Spares for 110V Battery Charger

10.2 SCR for Recifier bridge No. 1

10.3 Blocking diode for rectifier bridge No. 1

10.4 Electronic control card for AVR No. 1

10.5 Electronic conrol card for AVR / ACR No. 1

10.6 Electronic control card for OCR No. 1

10.7 HRC fuse link for output ckt. Set 1

10.8 Fuse link for various control ckt. Set 1

10.9 Indicating Lamps Set 1

11.0 MCC and Control panel each

11.1 Indicating lamps (Set consists of 1 no. of each type) Set 1

11.2 Lamp holder and globes (Set consists of 1 no. of each

type)Set

1

11.3 Control fuse (Set consists of 1 no. of each type) Set 1

11.4 Push buttons (Set consists of 1 no. of each type) Set 1

11.5 Auxiliary relay (Set consists of 1 no. of each type) Set 1

11.6 Annunciation cards No 1

11.7 Sound card No 1

12.0 LIGHTING EQUIPMENT

12.1 Outdoor lighting (LED) with complete fittings. No 5

12.2 Indoor lighting (LED) for each type including

complete fittingsNo

10

13.1 SCADA Computer spares

13.2 Hard Disk Drive No. 1

14 SAS Spares

14.1 Bay IED No. 1

14.2 Longest length of fibre optic cable No. 1

14.3 Ethernet Switch No. 1

15.0 EPABX Lot 1

16.0 FIRE ALARM SYSTEM

16.1 Manual Call Point No. 1

16.2 Detector of each type Set 1

17.0 CCTV

17.1 PC based Digital Video Recorder System Lot 1

Schedule 4/Spares Special Tools/Page 4 of 5

Page 51: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price

EX-work

Total

Excluding CD

& BST

CD /

Taxes BST SN Description Unit QTY'

Unit Price CIF

SiteCD/Tax Amount BST Amount

Total Including

CD/taxes & BST

18 EOT CRANE FOR GIS HALL

18.1

Pair of brake shoe with lining for each size of brake

used viz. D.C. operated E.M, or Hydraulic thruster

operated.

Sets 2

18.2Pair of brake linings with rivets for each size of

brake used.Sets 2

18.3 Main springs for each size of brake used. Nos. 2

18.4 Brake coils for each size of brake used. Sets 2

18.5 Thruster of each size used. No. 1

18.6 Pair of oil seals for each gear box used on crane. Sets 2

18.7 Contactors of each size used. Sets 2

18.8Fixed & moving contacts of each size of contactor

used.Set 1

18.9 3 Nos. Coils for each size of contactor used. Set 1

18.10 Overload relay for each motor. No. 1

18.11 Timers Nos. 3

18.12 3 No. fuse links of each sizes used on crane Sets 2

18.13 1 Printed circuit breaker of each size and type Set 1

18.14 Complete set of lamps for lightning and signals Set 1

18.15 Carbon brushes & holdings for each slip ring motor Sets 2

18.16 Fuse links of each size used Sets 2

18.17 Resistance element of each size and type Set 1

18.18 Communication Cards/cables

18.19 I/O Cards

18.20 Processors

18.21 Indicating lamps

TOTAL

Set (for one

complete crane)1

Schedule 4/Spares Special Tools/Page 5 of 5

Page 52: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 4 (3x2)

1.0 Earth Works

1.1

Earthwork in excavation including clearing away vegetation, if any in foundations, and pits trenches, drains, road formation and

earthing etc. in all types of soils (ordinary/ hard soil) in both dry and wet conditions including shoring, strutting, dewatering,

dressing of sides and ramming of bottom & backfilling with selected earth from excavation in layers of 200 mm, watering,

ramming, consolidation & transporting excavated material (at all leads and lifts) to temporary stockpiles within the

PURCHASER’s premises, spreading, levelling etc. all complete as specified and as directed.

(a)     Depth upto 3.00 m from G.L. Cu.M. 3433

(b)     Depth exceeding 3.00 m and upto 6.00 m Cu.M. 892

(c)      All Depths exceeding 6.00 m. Cu.M. 541

1.2 Same as the item No.3.1 but for excavation in soft rock at all depths. Cu.M. 270

1.3 Same as the item No.3.1 but for excavation in hard rock at all depths. Cu.M. 135

1.4 Extra over items 3.1 to 3.3 for lead outside PURCHASER’s premises upto 2.00 km. Cu.M. 135

1.5

Earthwork in embankment for roads/ ramps with excavated earth obtained from items 3.1 to 3.3 above or any other excavation,

including handling and transporting excavated earth from PURCHASER’s premises at all leads, depositing in layers 200 mm

deep, watering and compacting the same to 95% Modified Proctor density, finishing and dressing, etc. complete all as specified.

Cu.M. 120

Earthwork in filling in plinth under floors, ramps, etc. including watering, ramming, compacting to 95% Modified Proctor density

and dressing to the required profiles, etc. complete, as directed by the Engineer.

(a) With excavated earth from stockpiles in the PURCHASER’s premises at all leads Cu.M. 3,784

(b) With excavated earth from approved borrow areas from outside PURCHASER’s premises upto a lead of 2.0 km Cu.M. 1,622

1.7 Extra over items 3.5 & 3.6 for lead from

i) 2 km - 5 km. Cu.M. 75

ii) 5 km -10 km. Cu.M. 45

1.8

Supplying approved granular / coarse granular material with maximum particle size of 20mm, brought from borrow pits outside

PURCHASER’s boundary and filling at places wherever specified including clearing away vegetation, depositing in layers not

exceeding 150 mm, watering and compaction with mechanical compaction machines to 70% of relative density including

finishing to specified slopes, etc. all as specified

Cu.M. 80

1.9Supplying and spreading 150mm thick layer of 40mm nominal size (ungraded) of uncrushed/crushed/broken stone including

clearing vegetation and compacting the same to correct lines and levels, etc. complete.Cu.M. 320

1.10

Earthwork in excavation including clearing away vegetation if any, for general site grading in all types of soils (ordinary/ hard

soil) in both dry and wet conditions & transporting excavated material (at all leads and lifts) to temporary stockpiles within the

EMPLOYER’s premises, spreading, levelling etc. all complete as specified and as directed.

SCHEDULE - 6: EARTH WORKS FOR 66/33 kV GIS SUBSTATION AT DAMJI, GASA

Total Price DescriptionItem

1.6

UnitProvisional

Quantity Unit Price

Page 1 of 2

Page 53: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

1 2 3 4 (3x2)

SCHEDULE - 6: EARTH WORKS FOR 66/33 kV GIS SUBSTATION AT DAMJI, GASA

Total Price DescriptionItem UnitProvisional

Quantity Unit Price

a) Depth upto 3.00 m from G.L. Cu.M. 2,575

b) Depth exceeding 3.00 m and upto 6.00 m Cu.M. 945

c) All Depths exceeding 6.00 m. Cu.M. 319

1.11 Same as the item No.3.10 but for excavation in soft rock at all depths. Cu.M. 239

1.12 Same as the item No.3.10 but for excavation in hard rock at all depths Cu.M. 80

1.13 Extra over items No.3.10 to 3.12 for lead outside EMPLOYER’s premises upto

a) 2.00 km. Cu.M. 239

b) 5.00 km Cu.M. 160

1.14Filling for general site grading with selected excavated surplus material including transporting within the owner's premises, and

levelling but excluding excavation, as directed by the Engineer.

a) With excavated earth from stockpiles in the EMPLOYER’s premises at all leads. Cu.M. 1425.0

b) With excavated earth from approved borrow areas from outside EMPLOYER’s premises upto

i) 2.00 km. Cu.M. 120

ii) 5.00 km Cu.M. 100

iii) 10 km Cu.M. 50

1.15Same as item No.3.14, but including depositing the approved excavated material in layers in line and level and compacting the

same to the finished grade level to 95% Modified Procter Density including watering, ramming,finishing, dressing etc complete.

a) With excavated earth from stockpiles in the EMPLOYER’s premises at all leads. Cu.M. 160

b) With excavated earth from approved borrow areas from outside EMPLOYER’s premises upto a lead of 2.0 km. Cu.M. 100.0

1.16 Extra over items 3.15 for lead of

a) 2 km to 5 km Cu.M. 120

b) 5 km to 10 km Cu.M. 100

c) 10 km to 15 km Cu.M. 80

Total Amount (Nu.)

Page 2 of 2

Page 54: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Ex-

Works

FAS

excluding

BST/CD

FAS

including

BST/CD

BST% CD%

Value(BST+CD)

1 2 3 4 5=1 x 3 6 7 8=(6+7)x1 x 2 9=1 x 4

1.0 Structural Steel

1.1

Supplying, Transporting, fabricating, loading,

unloading, etc of Hot dip galvanized structural steel

work fabricated from rolled sections, Compound

Sections built from Rolled Steel Sections and plates,

(The rate shall include bolts, nuts, flat washers,

foundation bolts,pack washers,plates)

All works strictly shall be carried out as per approved

drawings after detailed Engineering)

M.T. 8

1.2

Same as item no.1.1 above but for chequered plates

including fixing/ welding opening notches etc. all as per

specifications and drawings.(a) Non galvanised

M.T. 0.50

1.3

Supply, fabricate, transport, delivery to site, loading

and unloading, etc. for insert plates, angles for cable

trenches, precast cover slab &floor grating of approved

make and pattern, fabricated to required shapes and

sizes including making opening in same of required

shape and size fixing clamps, clips or welding as per

specifications and drawings

M.T. 0.40

2.0 Concrete and Allied Works

2.1

Supply including handling and transport complete,

tested grade steel reinforcement for all reinforced

concrete works. all as per approved drawings

a)Using high yield strength deformed bars conforming to

IS:1786 (All diameters)

i 8 mm to 12 mm MT 11

ii 16 mm dia. and above MT 5

Total Amount (Nu.)

SCHEDULE - 7: SUPPLY OF STRUCTURAL STEEL AND REINFORCEMENT STEEL WORKS FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

Unit Provisional

Quantity

Provision for BST/CD Unit Price

Total FAS

including BST/CD Item Description

Total FAS excluding

BST/CD

Pg. 1 of 1

Page 55: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

1.0 Structural Steel

1.1

Erection of Main and Auxiliary structures including all works above ground level Rolled sections, Compound Sections

built from Rolled Steel Sections and plates, Miscellaneous steel work such as stairs, ladders, etc., Plates only, For water

tanks, covers, ducts, etc.

(The rate shall include bolts, nuts, washers, welding, all butt weld splices for making up member length as required and

shall also include one shop coat of red oxide zinc chrome primer after erection)

All works strictly shall be carried out as per approved drawings.

M.T. 8

1.2Same as item no.1.1 above but for chequered plates including fixing/ welding opening notches etc. all as per specifications

and drawings.(a) Non galvanisedM.T. 0.5

1.3

Fixing in position of M.S.non-galvanised floor grating of approved make and pattern, fabricated to required shapes and

sizes including making opening in same of required shape and size fixing clamps, clips or welding as per specifications

and drawings.

M.T. 1.5

2.0 Concrete and Allied Works

2.1

Providing and Laying plain or Sulphate resistant cement concrete with or without water proofing compound in blinding

layer, thickness as shown in drawings, including antiweed treatment, etc. with 1:5:10 concrete with aggregates of size

20mm downgraded including curing, etc. complete. (Rate to be inclusive of supply of all necessary material like

formworks & nails, laying in position as per specifications and as directed by Engineer for the substation area below the

gravel.)

Cu.M. 9

2.2

Providing and Laying plain or Sulphate resistant cement concrete with or without water proofing compound in blinding

layer, thickness as shown in drawings, under reinforced concrete, masonry walls in foundations, grade slabs, bottom of

pits, sumps, etc. with 1:3:6 concrete with aggregates of size 20mm downgraded including curing, etc. complete. (Rate to be

inclusive of supply of all necessary material like formwork & nails, laying in position as per specifications and as directed

by Engineer.)

Cu.M. 209

(a) Providing and Laying Reinforced concrete of grade M20 with or without water proofing compound excluding

reinforcement but including formwork, with coarse aggregate of sizes 20 mm downgraded as directed by Engineer in

foundations (all types), walls, grade slabs, road pavement and any other structures including vibrating, curing, etc.

complete. (Rate to be inclusive of supply of all necessary material like formwork & nails, laying in position as per

specifications and shall include mixing of water-proofing compound where-ever directed by Engineer.)

Cu.M. 353

(b) Same as in item 2.5(a) but for concrete of grade M25. Cu.M. 15

2.4

Supplying & fixing in position all items required for Box type waterproofing treatment to basement walls & slabs as

specified by India Waterproofing Company or equivalent (Contractor to furnish 10 years Guarantee in format acceptable to

EMPLOYER.)

Sq.M. 50

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

2.3

Page 1 of 13

Page 56: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

2.5

Placing in postion including cleaning, cutting, bending, lapping, binding with 16 SWG annealed soft iron wire/welding,

irrespective of locations & levels, all as per drawings including handling and transport complete, tested grade steel

reinforcement for all reinforced concrete works.

(a) Using high yield strength deformed bars confirming to IS:1786 (All diameters).

i. 8 mm to 12 mm M.T. 11

ii. 16 mm dia. and above M.T. 5

2.6 Providing and laying approved water proofing compound in concrete / plastering for works, where specified. Kg. 5

2.7

Supplying & fixing precast slabs including suitable formwork to provide smooth finish, casting, curing, storing, protecting

under appropiate conditions, erecting them in position , etc. complete using M20 concrete with 20mm downgraded coarse

aggregate for trench covers including lifting hooks as required and as per specification & drawings.

Sq.M. 22

2.8

Supplying, fabricating and fixing in position in concrete or in masonry at any level, of length between 150 to 600 mm MS

flanged puddle pipes conforming to IS 1239 with puddle including one coat of primer on exposed surfaces all as per

specifications and as directed. (Flanges shall be flat face and shall be as per ANSI B 16.5 150 rating.)

(a)     25 mm dia. No. 50

(b)     50 mm dia. No. 25

(c)     75 mm dia. No. 15

(d)     100 mm dia. No. 10

2.9

Grouting pockets, holes, pipe sleeves of any shape or size for column bases, Machine foundations, etc. with cement mortar

1:2 with water cement ratio not more than 0.5 including roughening surface, cleaning with compressed air/ water jets,

ramming, curing, etc. complete.

Cu.M. 5

2.10Supplying & laying integral floor finish with 15 mm thk. layer of “Ironite” or equivalent on concrete floor. (using not less

than 2 kg of “Ironite” per sq.m).Sq.M. 25

2.11Supply & fixing of approved PVC water stops as indicated in drgs. Including all necessary splices etc. as per

manufacturer’s instructions, etc. complete.

(a) 150 mm ribbed type-min 10thk R.M. 28

(b) 225 mm ribbed type-min 10thk. R.M. 28

2.12

Supplying & Laying uncoursed random rubble mansonry wherever specified, with approved quality locally available hard

stone in cement mortar (1:5) including scaffolding, curing, raking of joints and flush/raised pointing in (1:3) cement mortar

etc. complete.

Cu.M. 480

Page 2 of 13

Page 57: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

3.0 Road Works and Drains

3.1Supplying & Laying sand filter layer 225 mm thick including spreading and compacting to lines and levels as specified

using sand of classification D 85 < 4 D15, D2 > 2.5mm (D2 refers to sieve size permitting 2% by weight, etc.). Sq.M. 1500

3.2Supplying & laying soling course of finished thickness of 230 mm, packing with 80 mm metall, dry rolling, sprinkling

gravel, watering and rolling, etc. all complete as specified. Sq.M. 1500

3.3Supplying & Laying waterbound macadam course of compacted finished thickness of 100mm including dry rolling,

spreading and consolidation of screening and binding material all complete as specified.Sq.M. 1500

3.4Supplying & laying Hammer dressed stone edging 150 x 250 mm with stones including excavation, refilling and disposal

of surplus earth within 30 m lead.R.M. 300

3.5 Supplying & Laying 50mm thk. Asphalt concrete macadam course as per specifications. Sq.M. 1500

3.6 Supplying & Laying 25mm thick premix asphalt macadam including tack coat as per specifications. Sq.M. 1500

3.7Supplying & Laying a seal coat of asphalt of grade 80/100 at 1.5 kg/sq.m. and spreading grit, brushing, rolling, etc.

complete as specified and as directed.Sq.M. 1500

3.8

Supplying & Laying reinforced concrete road with thickness as specified in the specification with or without water

proofing compound excluding reinforcement but including formwork, with coarse aggregate of sizes 20 mm downgraded

as directed by Engineer including vibrating, curing, etc. complete. (Rate to be inclusive of supply of all necessary material,

laying in position as per specifications and shall include mixing of water-proofing compound where-ever directed by

Engineer.)

Cu.M. 56

3.9Supplying, & Laying, jointing, hydraulically testing NP2 class cement concrete pipes conforming to IS:458 for cable

crossing etc. (Pipe shall have collar joint sealed in C.M. 1:2).

(a)     150 mm dia. R.M. 10

(b)     300 mm dia. R.M. 10

(c)     450 mm dia. R.M. 10

(d)     600 mm dia. R.M. 15

(e)     900 mm dia. R.M. 15

3.10Supplying, & Laying, jointing, hydraulically testing NP3 class cement concrete pipes conforming to IS:458 for cable

crossing etc. (pipe shall have collar joint sealed in C.M. 1:2).

(a)     150 mm dia. R.M. 10

(b)     300 mm dia. R.M. 10

(c)     450 mm dia. R.M. 10

(d)     600 mm dia. R.M. 15

(e)     900 mm dia. R.M. 15

Page 3 of 13

Page 58: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

3.11

Supplying, laying & fixing G.I. pipes of Class ‘C’ ( unit price to be inclusive of necessary heavy class GI fitting such as

tees, bends, unions, elbows, reducers, sockets, flanges, check nuts, plug ends, etc. ) in vertical or horizontal position at all

heights, including cutting, threading, bending and jointing, cutting holes in the walls or floors and making good the same

with cement mortar 1:4, trenching, refilling , sand bedding, providing necessary G.I. malleable clamps and supports and

testing the line as specified complete.

(a)     100 mm dia. R.M. 1318

(b)     50 mm dia. R.M. 155

(c)     32 mm dia. R.M. 78

(d)     25 mm dia. R.M. 65

4.0 Building and Miscellaneous Works

Supplying & laying of Brick masonry in super structure in cement mortar 1:6 (1 cement : 6 coarse sand ) using approved

quality country bricks including scaffolding, curing, raking of joints, etc. as specified for walls, etc. at all levels.

i. 115 mm thick including placing chicken mesh at every 4th layer. Sq.M. 25

ii. same as item No.4.1(i) above but in C.M. 1:4. Sq.M. 5

iii. 230 mm thick and above. Cu.M. 10

4.2 Same as in item No.4.1 but for brick masonry in cement mortar 1:6 in foundations and in plinth.

(a) 230 mm thick and above. Cu.M. 8

4.3

Supply, Providing & laying hammer dressed RRM with approved quality locally available hard stone in cement mortar

(1:5) including scaffolding, curing, raking of joints and flush/raised pointing in (1:3) cement mortar etc. complete.for

boundary wall as per specification, drawings and as directed by Engineer. ( including supply & fixing in position 11nos of

barbed wire and concertina coil of 700mm dia., 80 nos of circles per running meter. Clips hot dip galvanised. The wire

shall be of 12SWG Tensile wire, covering 10RM with one coil, each RM will have 8 nos. of circles etc.).

R.M. 763

Providing & Laying Interior plain faced cement plaster in C.M. 1:6 with neeroo finish on all types of surfaces specified in

drawings at all levels. The rates shall also include moulding wherever specified, scaffolding, curing, etc.

(a) 12 mm thick on brick walls and concrete surfaces. Sq.M. 50

(b) 6 mm thick on underside of slabs. Sq.M. 30

Providing & Laying 20 mm thick exterior cement plaster in C.M. 1:3 in two layers, with first layer of 14mm thickness, and

second layer of 6mm thickness, using sand of approved quality, size and shape and including providing bands, grooves,

drip moulds, and including scaffolding, curing, etc. complete at all levels.

(a) Sand faced plaster including grooves in plaster. Sq.M. 50

(b) Plain sand faced plaster. Sq.M. 50

4.6Supply of 230 mm thick rubble packing under floor with approved hard stone, set in regular lines, hand packed, filling the

interstices with small stone chips and sand with approved hard stone obtained from borrow pits outside owner’s boundary.Sq.M. 100

4.5

4.1

4.4

Page 4 of 13

Page 59: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

Supplying and fixing approved quality premoulded bituminous joint filter as per IS:1838 wherever specified.

a) 12 mm thick Sq.M. 20

b) 25 mm thick Sq.M. 20

4.8Supplying and filling in place bituminous sealing compound conforming to IS:1834 in grooves 25 mm x 25 mm over

joints.R.M. 20

4.9

Supplying and fixing the chain link fencing of 2.0m high above finished grade level, 50 x 50 mm mesh with 3.15 mm dia.

GI Wire. The chain link shall be clamped to angle posts ISA 65 x 65 x 6 at spacing not exceeding 2.5m by MS flat 50x6

with 16mm diameter bolt with flat washers.The foundation shall be anchored in 1:3:6 PCC block of size 350mm x 350mm

x 600mm deep, including providing of braced bays at corners and every tenth bay with angle ISA 75x75x6 diagonal

bracing one 4mm diameter galvanised MS line wires at top and bottom including erection, painting over approved primer

cost, etc. complete as per details indicated in the drawings.

Sq.M. 150

4.10

Providing & Fixing in place 1000 litres capacity SINTEX or equivalent high density polyethylene cylindrical vertical water

tank on roof, with closed top including all GI fixtures and fittings for 25 mm Inlet, 25mm outlet, 25mm overflow, 50mm

scour connection and PVC float valve complete.

No. 2

4.11

Supply, Design, fabricate, transport to site and erect in position electrically operated sliding gate made out of hollow

rectangular MS pipes complete with drive unit having 3 phase motor and gear arrangement, electric control panel, limit

switches and arrangement for manual operation, as per standard supply including all necessary fixtures, etc. complete.

Rate shall include all inserts and embedments essential for smooth operation of the gate. The rate shall also include for 3

coats of enamel painting of approved brand and shade after erection over 2 coats of red oxide zinc chromate primer.

Sq.M. 30

4.12Supply & Fixing of 140 mm dia. HDPE pipes PE 63 grade with pressure rating of PN 2.5 conforming to IS:4984 for

cables at road/pavement crossings as per drawing.R.M. 25

4.13Supply & Fixing of 110 mm dia. HDPE pipes PE 63 grade with pressure rating of PN 2.5 conforming to IS:4984 for

weeps holes in the walls. as per drawing.R.M. 80

4.14

Supplying, Fabricating and erecting M.S. gates consisting of M.S. angle framework (Internal) and 25 mm dia. G.I. pipe

external frame work using ISA 50x50x6 with 6mm thick MS joining plates including chain link stretched and tack welded

over the framework with necessary hinges, locking arrangement including applying one coat of red oxide paint to all

exposed surfaces of steel. Contractor shall arrange for all the materials, tools, labour, etc. required to complete the job.

Sq.M. 50

4.7

Page 5 of 13

Page 60: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

5.0 Building Works

A. EARTH WORKS

1.00Excavation in foundation trenches or drains, for all width<1.5m & area 10sqm in plan, incl. dressing & ramming, disposal

of surplus soil for all lead & lift -All kinds of Soil for footings and wall footings etc.

1.10 All kinds of soil. Cu.M 404

1.20 Ordinary rock with or without blasting. Cu.M 106

2.00

Hand excavation and refilling in layers < 200 mm, of trenches for pipes incl. dressing of sides/ ramming of bottom, depth

up to 1.5m, disposal of surplus materials within lead of 50 m. ( For external water supply pipes & waste pipes) - All kinds

of soil for pipes(80 mm< dia < 300 mm).

M 715

3.00Filling of trenches, sides of foundations etc. in layers < 200 mm using selected excavated earth, ramming etc. within lead

50 m & lift 1.5 m.Cu.M 415

B. STEEL WORKS

4.00Providing & fixing cold twisted deformed bar (Fe500) for R.C.C work incl. cutting, bending, binding & placing in position

complete, in footings, columns, beams, slabs, lintels, cornices and props etc.Kg 60812

5.00 Providing and fixing stainless steel staircase handrails, balustrades, horzontal pipes etc, complete as per the drawings. Set 1

C. P.C.C & R.C.C WORKS

6.00Providing & laying Cement concrete 1:4:8, 40 mm agg., excluding the cost of centering & shuttering-in foundation and

plinth- All works uptp plinth levels.Cu.M 37

7.00Providing & laying R.C.C 1:1.5:3, 20 mm agg. excluding the cost of formwork & reinforcement cost in- foundation pads,

bases of columns below plinth, plinth beams, etc, complete. Cu.M 150

8.00Providing & laying R.C.C 1:1.5:3, 20 mm agg. excluding the cost of formwork & reinforcement cost for- Columns above

plinth beams, props, etc complete.Cu.M 50

9.00Providing & laying R.C.C 1:1.5:3, 20 mm agg. excluding p&f the cost of formwork & excluding reinforcement cost for -

First floor slab, roof slab, prorch, landings of staircase, etc complete.Cu.M 68

10.00Providing & laying R.C.C 1:1.5:3, 20 mm agg. excluding the cost of formwork & reinforcement cost for - floor beams,

lintels, staircases, etc. Cu.M 105

Page 6 of 13

Page 61: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

11.00

Providing & laying traditional R.C.C Cornices in 1:1.5:3, 20 mm agg. including cost of formwork including finishing with

6mm thick plaster on the exposed surface with cement mortar 1:3, excluding reinforcement & decorative painting cost as

per standard design/drawings furnished (Meas. to be along the cornice and wall junction).

11.10 Multi-storied building at floor 2 level including the cost of lhanglag and at other floors where lhanglag is provided. M 27

11.20 Phana at roof level cornice. M 83

11.30 Lintel cornice (only cornice portion at external face). M 229

12.00

Providing & laying water tank for fire fighting system including RCC, 1:1:2, 20 mm agg. with water proofing compound,

the cost of formwork, reinforcement, pipes, water stoppers, valves, water level indicators etc, complete as per specification

and drawings in accordance to IS:3370.

Each 1

D. FORM WORKS

13.00 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork.

13.10 Foundations and plinths. Sq.M 630

13.20 Beams and lintels. Sq.M 740

13.30 Columns above plinth upto props. Sq.M 460

13.40 Staircase excluding landing. Sq.M 13

13.50 Slabs including landings of staircase. Sq.M 302

E. STONE/BRICKWORK

14.00 Providing & laying Hand packed stone filling/soling (under flooring footings and retaining walls). Cu.M 118

15.00 Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In CM 1:5 under plinth beams. Cu.M 60

16.00 Providing & laying 250 mm Cement Concrete Block in superstructure (upto floor 2 level ) as external infill- In CM 1:4. Cu.M 187

17.00 Providing & laying 125 mm Cement Concrete Block in superstructure (upto floor 2 level ) as internal infill- In CM 1:4. Sq.M 28

F. PLASTERING

19.00 Providing & laying 6 mm cement plaster (in ceilings) in cement mortar 1:4. Sq.M 193

20.00Providing & laying 12 mm cement plaster on rough side of single or half -brick wall - C.M 1:4 (Internal walls above plinth

including exposed portion of beams and columns).Sq.M 115

21.00 Providing & laying 20 mm cement plaster - C.M 1:4 (External walls Above plinth). Sq.M 664

22.00 Providing & laying cement plaster, finished with floating coat of neat cement - 20 mm plaster in C.M 1:4 in plinth walls. Sq.M 102

23.00Providing & applying plaster of paris putty 12 mm thickness over plastered surface to prepare the surface even and smooth

complete.Sq.M 133

Page 7 of 13

Page 62: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

G. FLOORING

24.00 Providing and laying sand bedding, including watering, ramming, dressing , etc in ground floor. Cu.M 25

25.00 Providing and laying 2.5 mm thk. Bitumen sheet in floors of ground floor and under walls. Sq.M 454

26.00Providing and laying in position plain cement concrete 1:3:6, 20 mm aggregate excluding the cost of centering and

shuttering in floors of ground floor - 100 mm thk.(All work up to plinth level).Cu.M 45

27.00 Providing and laying cement concrete flooring 1:2:4 finished with floating coat of neat cement. Sq.M 260

28.00Providing & laying Epoxy Flooring in ground floor vertified and polished - in white cement as per the drawings and

specifications (FF1)- Shades to be choose by Client.Sq.M 245

29.00Providing & laying 150 mm Epoxy skirting in ground floor vertified and polished - in white cement as per the drawings

and specifications (FF1).M 49

30.00Providing & laying anti-acid floor tiles in Battery Room, 25 mm thick, vetrified and polished- in white cement as specified

in architectural drawings (FF2).Sq.M 31

31.00Providing & laying 150 mm anti-acid skirting tiles in Battery Room, 25 mm thick, vetrified and polished- in white ceemnt

as specified in architectural drawings (FF2).M 23

32.00Providing & laying anti-acid wall tiles in Battery Room, 25 mm thick, vetrified and polished up to 2.1 m height from

finished floor levels - in white ceemnt as specified in architectural drawings (WT3).Sq.M 48

33.00Providing & laying terrazo floor tiles, 25 mm thick, vetrified and polished- in grey cement as specified in architectural

drawings (FF3).Sq.M 94

34.00Providing & laying 150 mm terrazo skirting tiles, 25 mm thick, vetrified and polished- in grey cement as specified in

architectural drawings (FF3).M 88

35.00Providing & laying granite floor tiles, 25 mm thick, vetrified and polished in landings and tread risers of staircase in grey

cement as specified in architectural drawings (FF4).Sq.M 14

36.00Providing & laying 150mm granite skirting tiles, 25 mm thick, vetrified and polished in staircase in grey ceemnt as

specified in architectural drawings (FF4).M 10

37.00Providing & laying anti-skid terrazo floor tiles, 25 mm thick, vetrified and polished in washrooms in grey cement as

specified in architectural drawings (FF5).Sq.M 16

38.00Providing & laying 150mm anti-skid terrazo skirting tiles, 25 mm thick, vetrified and polished in washrooms in grey

cement as specified in architectural drawings (FF5).M 38

39.00Providing & laying ceramic wall tiles, 25 mm thick, vetrified and polished in washrooms walls up to 2.1 m height from

finished floor levels in white cement as specified in architectural drawings (WT1).Sq.M 79

Page 8 of 13

Page 63: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

40.00Providing & laying ceramic wall tiles, 25 mm thick, vetrified and polished in pantry walls up to 2.1 m height from finished

floor levels in white cement as specified in architectural drawings (WT2).Sq.M 15

41.00Providing & laying granite -counter top in tiles, 25 mm thick, vetrified and polished in washrooms basins and pantry

counter in white cement as specified in architectural drawings (FF7).Sq.M 3

42.00

Providing and laying False Flooring, 600x600x40mm thick square modualr panel with 38mm High Density E1 chipboard

core strengthened with high performance thermosetting resins. Including substructure- heavy duty pedastal assembly &

stringers, anti static, anti-vibrational, all steel components epoxy caoted, fire rating confirming to BS 476 Part 6 & &,

Electrical resistivity as ASTM F150/NFPA 99/ANSI S7.1/CEI 61340, etc, complete. Substructure installed to support

panel shall b e suitable to achieve a minimum finished floor height of 600mm from existing floor level. The Engineer In-

charge shall choose suitable brands or equivalent to UNITILE UCBLA 38 SERIES, etc.

Sq.M 99

H. WINDOWS AND DOOR WOOKS Sq.M

43.00Providing & fixing pelmet 100 mm x 12 mm, with 25 mm dia. wooden curtain rod & brackets including M.S.flats

25x3x100 mm & plugs etc. complete - Mixed Conifer.Sq.M 81

44.00Providing & fixing anodised Aluminium doors, including all accessories such as U-rubber gasket for fixing glass panes,

weather strips or weather seals, roller, springs, glass panes, etc complete as per the drawings.M

44.10 Control room building

44.1.1 D0 Each 1

44.1.2 D1 Each 1

44.1.3 D2 Each 1

44.1.4 D3 Each 3

44.1.5 SD1 Each 1

44.1.6 SD2 Each 2

44.1.7 RS Each 1

44.20 Pump house

44.2.1 D1 Each 1

44.2.2 RS Each 1

44.30 Store shed

44.3.1 D1 Each 2

44.3.2 RS Each 1

44.40 Security Guard room

44.4.1 D1 Each 1

44.4.2 D2 Each 2

Page 9 of 13

Page 64: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

45.00

Providing, making and fixing in position of timber Doors Components including frames, security bars (if any),brass tower

bolt 150 mm,brass handle 150 mm,brass hinges 250 mm,brass sliding bolts 250 mm and applying wood preservative on

unexposed surface and painting, all necessary hardwares (holdfast complete, bolts, screws etc.) as applicable and as per the

design drawing and specification.

45.10 D4 Each 5

45.20 D5 Each 3

46.00

Providing & fixing anodised Aluminium windows including all accessories such as U-rubber gasket for fixing glass

panes, weather strips or weather seals, roller, springs,glass panes, steel frames, hold fast, etc complete

as per the drawings / technical specification.

46.10 Control room building Each

46.1.1 W1 Each 21

46.1.2 W2 Each 5

46.1.3 WK Each 1

46.1.4 V1 Each 4

46.20 Pump house

46.2.1 W1 Each 4

46.30 Store shed

46.3.1 W1 Each 11

46.40 Security Guard room

46.4.1 W1 Each 1

46.4.2 W2 Each 2

46.4.3 V1 Each 2

I. PARTITION AND FALSE FLOORING

47.00

Providing & fixing anodised Aluminium partitions framing of specified sections including all accessories such as U-rubber

gasket for fixing glass panes, weather strips or weather seals, roller, springs, 8 mm thick prelaminated boards, etc

complete.

Sq.M 23

48.00 Providing & fixing TRAC-84C false ceiling as per the techincal specifications, complete. Sq.M 99

J. ROOFING

49.00Providing and fixing PPGI tropical deep green roof sheeting, including bolts,hooks,and nuts 8 mm dia. With bitumen and

G.I limpet washers filled with white lead for connection, etc, excluding the cost of purlins,struts, rafters and trusses.-24G.Sq.M 934

50.00Providing and fixing 600 mm ridges or hips in PPGI roof sheeting including bolts, hooks, and nuts 8mm dia. With bitumen

and G.I limpet washers filled with white lead for connection. M 140

51.00Steel work welded, in built up sections, trusses, frameworks including cutting, hoisting, fixing and appl. Priming coat of

red lead paint. in tubular sections.Kg 15560

52.00 Providing and fixing MS round hold-down bolts with nuts and washer plates, complete in all areas. Kg 625

Page 10 of 13

Page 65: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

53.00 Providing & fixing bolts and expansion bolts (wherever necessary) of various sizes including nuts & washers. Kg 680

54.00 Providing, making and fixing, M.S plates all thickness complete in roof truss work. Kg 813

55.00Providing and fixing 450 mm over all semi-circular PVC gutter, including brackets, bolts, nuts, washers and rain water

pipes connections, exlcluding the cost of pipes - 24g sheets.Kg 202

56.00Providing and fixing on wall face single socketed rigid PVC (working pressure 4kgf per sq.cm) rain water pipes including

jointing with seal ring leaving 10 mm gap for thermal expansion - complete - 110 mmM 55

57.00Providing and fixing on the wall face PVC coupler for rigid rain water pipes including jointing with seal ring leaving

10 mm gap for thermal expansion - complete - 110 mm.M 50

58.00Providing and fixing on the wall face PVC bend for rigid rain waer pipes including jointing with seal ring leaving 10 mm

gap for thermal expansion - complete - 110 mm.M 19

59.00 Providing, making and fixing M.S. straps, flats, sole plates etc in eaves board of 225x2 mm M.S flats in roof. M 37

K. PLUMBING WORKS

60.00 Providing & fixing PVC pipes incl. PVC fittings & clamps & repair walls - 20 mm internal piping. M 35

61.00 Providing & fixing PVC pipes incl. PVC fittings & clamps & repair walls - 25 mm external piping. M 20

62.00 Providing & fixing PVC pipes incl. PVC fittings & clamps & repair walls - 40 mm external piping (excluding trenching). M 425

63.00 Providing & fixing 600 x 450 mm bevelled edge mirror (superior glass) incl.4mm A.C sheet base fixed to wooden cleats. M 5

64.00 Providing & fixing c.p. towel rail 600 x 20 mm with c.p brass brackets fixed to wooden cleats. Each 4

65.00 Providing & fixing soap dish including brackets, wooden cleats, c.p. brass screws. Each 5

66.00 Providing & fixing soap dispenser including brackets, wooden cleats, c.p. brass screws. Each 5

67.00 Providing & fixing c.p brass bibcock - 15 mm standard vertical, c.p knob. Each 5

68.00 Providing & fixing pedestals for basins, white vit.china, recessed back for pipes & necessary fittings. Each 5

69.00

Providing and fixing flat back 550 x 400 mm wash basin with single 15 mm c.p brass pillar, including C.I brackets, 15 mm

C.P brass pillar taps, C.P chain and rubber plug 32 mm pvc waste, 32 mm dia trap & union, repair walls. (Note: Approval

for the brand have to be sought from the employer before the purchase of the items.)

Each 5

70.00Providing and fixing kitchen sink including all connections, fittings and repairs to walls, etc, stainless steel 580 x 480 x

175 mm single bowl.Each 1

71.00 Providing & fixing C.P Brass shower fittings with revolving joint, 15 mm. Each 2

Page 11 of 13

Page 66: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

72.00Providing & fixing European‐type vitreous china w.c pedestal including seat and lid with c.p brass hinges, 15 lit white

vitreous china low level cistern, fittings, brackets, repair walls.Each 5

73.00 Providing & fixing toilet paper holder - Recessed ceramic, roll-type, 150 x 150 mm. Each 5

74.00 Providing & fixing plastic tank including all accessories complete - 2000 litre capacity. Each 2

75.00 Providing & fixing plastic tank including all accessories complete - 3000 litre capacity. Each 2

76.00 P & f P.V.C Nahani Trap - 110 mm inlet & 75 mm outlet. Each 10

77.00 Providing & fixing brass stop cock - 25 mm ( At junction-External). Each 5

78.00Providing & fixing P.V.C soil and vent pipes, single or double socketed, including pipe clip complete (excluding the cost

of PVC fittings)-110 mm dia.M 26

79.00 Providing & fixing P.V.C Coupler -110 mm dia. Each 13

80.00 Providing & fixing P.V.C Coupler -75 mm dia. Each 13

81.00 Providing & fixing P.V.C door bend - 75 mm dia. Each 9

82.00Providing & laying H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &

thrust block), 75 mm.Each 16

83.00Providing & laying H.D.P.E pipes including H.D.P.E fittings pressure class 6kg/sq.cm(excluding trenching, refilling &

thrust block) -- 110 mm dia.Each 41

84.00 Constructing Soak Pit filled with brick bats including 100 mm S.W drain-pipe - As per the drawing. Each 2

85.00

Constructing Septic Tanks, in 2nd class brick masonry in cement mortar 1:4, including fittings, C.I cover with frame, 40

mm thick concrete flooring (40 mm aggregates) cement plaster concrete base in C.M 1:4:8 etc. complete as per standard

design - 50 users.

Each 1

86.00

Constructing Septic Tanks, in 2nd class brick masonry in cement mortar 1:4, including fittings, C.I cover with frame, 40

mm thick concrete flooring (40 mm aggregates) cement plaster concrete base in C.M 1:4:8 etc. complete as per standard

design - 15 users.

Each 1

L. DRAINAGE WORKS

87.00Providing and laying plinth protection 50 mm thk. complete including finishing the top surface smooth - with cement

concrete 1:3:6, 20 mm aggregate, laid over 100 mm thick layer of compacted gravel (40 mm).Sq.M 286

88.00

Construction of second class brick masonry open surface drain in cement mortar 1:4 including earth work in excavation

100mm thick concrete bed 1:5:10, 40 mm aggregate and 25 mm thick cement concrete 1:2:4, 12mm aggregate for filling

haunches including 12 mm cement plastering 1:4 with a floating coat of neat cement and disposal of surplus earth etc.

complete- 250 x 200 mm depth.

M 255

89.00

Const. Brick masonry manhole in CM 1:5, R.C.C top slab with 1:2:4 20 mm agg., fdn. PCC 1:4:8 40 mm agg.12mm

CP 1:3 finished with floating coat & making channels in PCC 1:2:4., 20 mm agg. neatly finished complete - as per the

drawing.

Each 5

90.00

Const. Brick masonry inspection chamber in CM 1:5, R.C.C top slab with 1:2:4 20mm agg., fdn. PCC 1:4:8 40mm

agg.12mm CP 1:3 finished with floating coat & making channels in PCC 1:2:4., 20mm agg. neatly finished complete - as

per the drawing.

Each 3

Page 12 of 13

Page 67: BHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN · PDF fileBHUTAN POWER CORPORATION LIMITED THIMPHU: BHUTAN ... Schedule of Rates / Prices shall not be varied for ... labour rates

Unit Price Total Price

1 2 3 4 (3x2)

Provisional

Quantity

SCHEDULE - 8 : SUPPLY & ERECTION FOR 66 kV GIS SUBSTATION AT DAMJI, GASA

UnitItem Description Erection Price

M. PAINTING

91.00Providing and applying one coat of primers of approved color and texture by the client on the eave board and eave ceiling -

pink primer.Sq.M 399

92.00Providing and applying two coats of synthetic enamel paint of approved color and texture by the client on eave board and

ceiling.Sq.M 399

93.00 Providing & applying one coat of primers ( on external wall surface) -Cement primer. Sq.M 385

94.00 Finishing wall with Water- Proof Cement Paint - New work, three coats ( on external wall surface). Sq.M 385

95.00Providing & applying finishing coats - Acrylic washable distemper, two coats on new work, including cement primer coat -

internal walls.Sq.M 318

96.00Providing, preparing and applying Sumdang Traditional Bhutanese painting (Washable) - Ding quality. (Rate quoted

should be able to cover the cost of applying paints to all the cornices, external window portions, etc.)Sq.M 773

N. FURNITURES

97.00 Control room

97.10 Arch Table for control room Each 3

97.20 Rotating chair Each 4

98.00 General office/record room

98.10 File rack Each 2

98.20 Medium Office working table consisting of : 1 office working table, 1 drawer cabinet, 1 side extension table Each 1

98.30 Executive rotating chair Each 1

98.40 Chair with arm rest with fabric Each 3

98.50 Writing table Each 3

98.60 Rotating chair Each 2

99.00 Guest room

99.10 Medium size beds with Mattress, pillows, quilts, etc Each 2

99.20 Wooden cupborads Each 2

99.30 TV set - 32 inch LED (Sony, Samsung) Set 1

99.40 Easy sofa double seater set consisting of one number double seater and two numbers single seater Set 1

99.50 Center table Each 1

99.60 TV cabinet simple with one drawer Each 1

99.70 Fridge (single deck), equivalent to 190 litres. Make to be approved by BPC Each 1

99.80 Rice cooker, Curry cooker and Water boiler. Make to be approved by BPC Set 1

99.90 Micro wave oven. Make to be approved by BPC. Each 1

99.10 Plate and cups set each 1

99.11 Dining table 4 Seater No. 1

99.12 Chair for dining table No. 4

Total Amount (Nu.)

Page 13 of 13