A SEMINAR PRESENTATIONON

2013ELECTRONICS AND COMMUNICATION ENGINEERING

PACIFIC INSTITUTE OF TECHNOOGY

Deepak Singh 10EPFEC024

Mr. Ashok Kherodia(H.O.D of ECE DEPT.)

Guided By :-

Presented By :-

BSL - Thermal power station

REASON FOR CHOOSING BHILWARA FOR THERMAL

POWER PLANT SETUP Availability of large amount of clean water from Kothari River required for the station.

Location of station on broad gauge main Hamirgarh Railway line.

Requirement of load in Bhilwara.

Constant power supply.

Proximity to M.P. Coal fields.

Transmission and Grid substation are quite nearer to the

site.

INTRODUCTION

B.S.L-T.P.S is coal based power plant in Bhilwara.

It is located ideally on the left bank of Kothari River

near Bhilwara.

Its has 2 units of capacity 10 MW and 6 MW, which

were synchronized in 1999.

It is one of the highest power generating plant in

Bhilwara with installed capacity of 16 MW.

CONTENTS OF THE PRESENTATION

• GENERAL LAYOUT

• COAL HANDLING PLANT

• PROCESS OF STEAM GENERATION

• TURBINE

• GENERATOR

• SWITCHYARD

PLANT OVERVIEW

COAL HANDLING PLANT

• Is called the HEART of thermal power plant because it provided the fuel for combustion in boiler.

• The coal is brought to the BSL-TPS from BHARAT COAL LTD.

• There are 3 tracks for transportation.

• Everyday multiple trains of coal are unloaded.

• Coal is unloaded from wagons by means of WAGON TRIPPLER

Bunkers Crusher house Conveyor

Row coal feeders

Coal mills(pulverization

)

BOILER FURNACETANGENTIAL FIRING OF PULVERISED COAL

OVERVIEW OF COAL HANDLING PLANT

Row coal from Bharat coal ltd. Dhanbad &

bilaspur(MP)

To B.S.L-T.P.S from gurla via a single railway track

Wagon trippler

CONVEYING SYSTEM

Coal size reduced by 20 mm

PROCESS OF STEAM GENERATION

B.S.L- T.P.S

TURBINE

• Turbine is a machine in which a shaft is rotated steadily by impact of steam it converts heat energy into mechanical energy.

BOILER & SUPERHEATER

M P TURBINE

H P TURBINE

L P TURBINE

REHEATER

STEAM AT 545 C

STEAM AT 545 C

STEAM AT 535 C

STEAM AT 535 C

STEAM TURBINE

TURBO GENERATOR

Designed for continuous operation at the rated output.

Directly coupled with steam turbine, rotated at high speed

of 3000 RPM.

Two major parts:-

STATOR AND ROTOR

Major parts of stator are Major parts of rotor areStator frame Rotor frameStator core Rotor WindingsStator barsStator windings

SWITCHYARD

The 220 KV Switch yard is the main part of the KTPS it has two buses arrangement with a bus coupled breaker.

There are 11 feeders connected at 220 KV switchyard

Main parts of Switchyard

• CIRCUIT BREAKER

• ISOLATOR

• CURRENT TRANSFORMER

• POTENTIAL TRANSFORMER

• LIGHTNING ARRESTOR

CIRCUIT BREAKER

Circuit breaker is basically a mechanical device used to make or break an electrical circuit under normal & abnormal condition.

A circuit breaker is switched on or off under load conditions an arc is produced in between the breaker contacts.

This arc produced between the breaker contacts is quenching by some suitable medium.

ISOLATORS & ARRESTORS

• Isolators are device which disconnect the instruments from power supply, the isolators provided at 220 KV switchyard are motor operated.

• Lightening Arresters are used in switchyard for preventing from Lightening phenomena and are installed at entrance of switchyard.

CURRENT TRANSFORMER

• Current transformers are provided for measuring and protection. All Current Transformers at 220 KV switchyard are BHEL manufactured .

• Designed to provide a current in its secondary coil proportional to current flowing in its primary coil.

• Primary winding consists of very few turns.

• Secondary winding consists of large no. of turns

• Current to be measured is passes through primary winding.

.

POTENTIAL TRANSFORMER

• Used for the measurement of high voltages.

• Primary winding is connected to voltage to be measured.

• Voltmeter is connected across the secondary winding.

SWITCHYARD LAYOUT

CONTROL PANEL

CONTROL ROOM

Turbine desk

Fan control desk

Fuel control desk

Generator control desk

Steam pressure & control desk