Industrial Training Project
on Turbo Generators
Presented By-
1
![Page 2: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/2.jpg)
Overview of B.H.E.L.
Bharat Heavy Electricals Limited (B.H.E.L.) is the largest engineering and manufacturing enterprise in India.
BHEL caters to core sectors of the Indian Economy viz., Power Generation's & Transmission, Industry, Transportation, Telecommunication, Renewable Energy, Defense and many more.
2
BHEL has its setup spread all over India namely New Delhi,Gurgaon,Hardwar, Rudrapur, Jhansi, Bhopal, Hyderabad, Jagdishpur, Tiruchirapalli, Banglore and many more.
![Page 3: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/3.jpg)
B.H.E.L., Hardwar
Bharat Heavy Electricals Limited (B.H.E.L.), Hardwar has two manufacturing plants:-
Heavy Electrical Equipment Plant(HEEP) Central Foundry Forge Plant(CFFP)
3
![Page 4: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/4.jpg)
H.E.E.P.
Heavy Electrical Equipment Plant (HEEP) located in Hardwar is one of the major manufacturing plants of BHEL. The core business of HEEP includes design and manufacturing of large steam and gas turbines, turbo generators, hydro turbines and generators, large AC/DC motors and so on.
4
![Page 5: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/5.jpg)
The various blocks in HEEP are as follows:
Block-1: Turbo generator Shop Block-2: Fabrication Shop Block-3: Turbine Shop Block-4: Insulation Block Block-5: Forging Shop Block-6: Stamping Shop Block-7: Packing and Wood Working Shop Block-8: Condenser and Piping Shop New Blade Shop
5
![Page 6: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/6.jpg)
PROJECTTURBO GENERATORS
6
![Page 7: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/7.jpg)
BLOCK -1
Machine section Assembly section Hydro generator Stator winding
Machine section Iron assembly Heavy rotor assembly section Stator winding section Turbo generator Armature/Rotor section General assembly section Test stands
7
![Page 8: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/8.jpg)
8
STUDY OF TURBO GENERATOR
![Page 9: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/9.jpg)
TECHNICAL DATA
Rated data & output
Turbo generator
Main exciter Pilot exciter
Apparent power
588 MVA - 65kVA
Active power 500 MW 3780 KW -
Current 16.2 KA 5300 A 195 A
Voltage 21 KV 600 V 220 V
Frequency 50 Hz - 400 Hz
Power factor 0.85 - -
Hydrogen pressure
3.5 Bar - -
Rated field current
4040 A - -
Rated field voltage
340 V - -9
![Page 10: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/10.jpg)
RECTIFIER WHEEL
Number of fuses per rectifier wheel
30(800V ,800A)
Fuse resistance Approx 150 μ ohm
Number of diode per rectifier wheel
60
10
![Page 11: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/11.jpg)
The two pole uses hydrogen cooling for rotor
winding and direct water cooling stator winding.
Turbo generator consists of following parts:
o STATORo ROTORo BEARINGSo SHAFT BEARINGS
Other additional auxiliaries:o Excitation systemo Gas system
11
Constructional Features Of Turbo Generator
![Page 12: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/12.jpg)
STATOR
Stator consists of following parts:o Stator frameo Stator coreo Stator windingo Locating barso End shieldso Terminal bushingso Phase connectorso Hydrogen coolero End winding vibrationo Supervision of generator
12
![Page 13: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/13.jpg)
STATOR FRAME
13
![Page 14: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/14.jpg)
14
STATOR CORE
![Page 15: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/15.jpg)
ROTOR
Rotor consists of following parts:o Rotor shafto Rotor windingo Retaining ringo Field connectiono Fanso Rotor cooling system o Bearingso Shaft seals
15
![Page 16: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/16.jpg)
16
ROTOR SHAFT
![Page 17: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/17.jpg)
17
ROTOR WINDING
![Page 18: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/18.jpg)
RETAINING RING
18
![Page 19: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/19.jpg)
19
FAN
![Page 20: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/20.jpg)
AUXILLARY SYSTEMS
20
o GAS SYSTEM
o BRUSHLESS EXCITATION SYSTEM
oPERMANENT MAGNETIC PILOT EXCITER
oTHREE PHASE MAIN EXCITER
oAUTOMATIC VOLTAGE REGULATOR
oRECTIFIER WHEELS
oCOOLING SYSTEM
![Page 21: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/21.jpg)
21
RECTIFIER WHEEL
![Page 22: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/22.jpg)
22
The exciter is air cooled. The cooling air is
circulated in a closed circuit and recooled in two
cooling sections arranged along side the exciter.
The complete exciter is housed in an enclosure
draw the cool air in at both ends and expels the
warmed air to the compartment beneath the base
plate.The main exciter enclosure receives the cool
air from the fan after it passes over the pilot
exciter.
COOLING SYSTEM
![Page 23: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/23.jpg)
23
BRUSHLESS EXCITER
![Page 24: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/24.jpg)
24
PERMANENT MAGNET EXCITER
![Page 25: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/25.jpg)
25
Advantage Of Turbo Generator Over Hydro Generator
![Page 26: bhel haridwar](https://reader035.vdocuments.mx/reader035/viewer/2022081413/5468e3a3b4af9f6e0d8b46aa/html5/thumbnails/26.jpg)
26
CONCLUSION
o Turbo Generators are used where high frequency supply is required.
o As steam is used so no site problem.