beyond - outpatient health care facility for autism
TRANSCRIPT
2Introduction
BEYOND
Harmony between nature and art.Art therapy is known as one of the effective treatments for people with autism. Its creative process of art creation improves and enhances a patient's physical, mental, and emotion well-being. Artistic self-expression helps people to resolve conflicts within themselves and problems in their lives. More-over, it helps to manage behavior, reduce stress, and develop interpersonal skills. With the help of power and beauty in the nature surrounding the site, the introduction of various kinds of artistic pro-grams will promote treatment and improve autism.
Proposal
Program 3
Room Number Quantity Area (sq.ft) Total (sq.ft) Room Number Quantity Area (sq.ft) Total (sq.ft)
R101 1 500 500 P101 2 500 1000R201 1 200 200 P201 1 800 800R301 1 200 200 P301 2 1500 3000
R401 - R402 2 100 200 P401 - P404 4 60 240R501 1 60 60 P501 1 120 120
1160 5160
AT 1 3000 3000 T101 - T102 2 250 5003000 T103 - T105 3 130 390
T201 - T203 3 300 900T301 1 1300 1300
T302 - T304 3 40 120D101 - D110 10 100 1000 T306 1 70 70D201 - D210 10 150 1500 T401 1 1000 1000D301 - D310 10 150 1500 T501 1 800 800
D401 1 300 300 T601 1 250 250D501 - D502 2 200 400 T701 1 150 150
D601 1 150 150 T801 - T806 6 60 360D701 1 700 700 T901 1 70 70
D801 - D802 2 200 400 T1001 1 60 60D901 1 60 60 1560
D1001 - D1004 4 60 240D1101 10 150 1500
6750A101 1 200 200A201 1 300 300A301 1 200 200
S101 1 400 400 A401 1 300 300S201 - S202 2 200 400 A501 1 200 200
S301 1 200 200 A601 5 150 750S401 1 300 300 A701 1 300 300S501 1 200 200 A801 1 300 300
S601 - S605 5 150 750 A901 - A902 2 100 200S701 1 300 300 A1001 1 60 60S801 1 100 100 2550
S901 - 902 2 60 120S1001 1 100 100S1101 1 100 100
2970Total 20150
Reception Desk
Bathroom
Exective Office
StorageMail Room
Locker Room
Staff Kitchen/Lounge AreaConference Room
Public Area
Bathroom
Restaurant / BarExhibition space
Lecture Room
General Stuff Work Station
Janitorial Room
Staff Kitchen/Lounge Area
Stuff Area
Doctor's OfficeDoctor's Lounge
Stuff Nap Room
Stuff Conference RoomStuff Lockerrooms
Stuff Bathrooms
Stuff Entrance
Ceramic Studio
Evaluation RoomNurse Station
Observation Room
Janitorial Closet
ATRIUMAtrium
Examination Room
Storage
Dignostic Area
Laboratory
Waiting Area
Physical TherapyPainting Room
Waiting Area
Janitorial Room
Diagnosis Office
Storage
Entry / ReceptionEntry LobbyReception
Waiting AreaBathroom
Storage
Storage
Storage
MUsic Studio
EscapeFurnace
Janitorial Closet
Therapy Area
Bathroom
Sterile Area
Administrative Area
Music Studio L
Bathroom
Nurse station
Wash Room
PC Studio
Room Number Quantity Area (sq.ft) Total (sq.ft) Room Number Quantity Area (sq.ft) Total (sq.ft)
R101 1 500 500 P101 2 500 1000R201 1 200 200 P201 1 800 800R301 1 200 200 P301 2 1500 3000
R401 - R402 2 100 200 P401 - P404 4 60 240R501 1 60 60 P501 1 120 120
1160 5160
AT 1 3000 3000 T101 - T102 2 250 5003000 T103 - T105 3 130 390
T201 - T203 3 300 900T301 1 1300 1300
T302 - T304 3 40 120D101 - D110 10 100 1000 T306 1 70 70D201 - D210 10 150 1500 T401 1 1000 1000D301 - D310 10 150 1500 T501 1 800 800
D401 1 300 300 T601 1 250 250D501 - D502 2 200 400 T701 1 150 150
D601 1 150 150 T801 - T806 6 60 360D701 1 700 700 T901 1 70 70
D801 - D802 2 200 400 T1001 1 60 60D901 1 60 60 1560
D1001 - D1004 4 60 240D1101 10 150 1500
6750A101 1 200 200A201 1 300 300A301 1 200 200
S101 1 400 400 A401 1 300 300S201 - S202 2 200 400 A501 1 200 200
S301 1 200 200 A601 5 150 750S401 1 300 300 A701 1 300 300S501 1 200 200 A801 1 300 300
S601 - S605 5 150 750 A901 - A902 2 100 200S701 1 300 300 A1001 1 60 60S801 1 100 100 2550
S901 - 902 2 60 120S1001 1 100 100S1101 1 100 100
2970Total 20150
Reception Desk
Bathroom
Exective Office
StorageMail Room
Locker Room
Staff Kitchen/Lounge AreaConference Room
Public Area
Bathroom
Restaurant / BarExhibition space
Lecture Room
General Stuff Work Station
Janitorial Room
Staff Kitchen/Lounge Area
Stuff Area
Doctor's OfficeDoctor's Lounge
Stuff Nap Room
Stuff Conference RoomStuff Lockerrooms
Stuff Bathrooms
Stuff Entrance
Ceramic Studio
Evaluation RoomNurse Station
Observation Room
Janitorial Closet
ATRIUMAtrium
Examination Room
Storage
Dignostic Area
Laboratory
Waiting Area
Physical TherapyPainting Room
Waiting Area
Janitorial Room
Diagnosis Office
Storage
Entry / ReceptionEntry LobbyReception
Waiting AreaBathroom
Storage
Storage
Storage
MUsic Studio
EscapeFurnace
Janitorial Closet
Therapy Area
Bathroom
Sterile Area
Administrative Area
Music Studio L
Bathroom
Nurse station
Wash Room
PC Studio
Concept 5
Circulation
Sustainability
Art
Soft
Geometry
coexistence
Division
Blend
Expanse
Close
Wood
Glass
Sun Light1.618
Beyond
creativity
Acoustic
OrganicPath
Radial
Nature
Separation
mineral
Branch
Open
Green
Neutral
Connection
Section
Design Criteria
Project Diagram 7
Bubble Diagram
Main Level Lower Level
Atrium
Reception
PublicArea
AdministrativeArea
DiagnosisArea
Therapy Area
StuffArea
DiagnosisArea
Atrium
AdministrativeArea
Project Diagram 8
Entry Lobby
Waiting Area
Bathroom
Lecture Room
RestaurantBar
Bathroom
Museum
Evaluation Room
Examination Room
Waiting Area
Bathroom
Nurse Station
Observation Room
Sterile Area
Reception Desk
Atrium
Reception
1
Storage
Laboratory
Janitorial Closet
Bathroom
Waiting Area
Waiting Area
Reception
2
Storage
StuffEntrance
StuffBathroom
StuffLounge
Naproom
Work Station
Janitorial Closet
Executive Office
Painting Studio
MusicStudio
Physical Therapy
Bathroom
CeramicStudio
PCStudio
Nurse Station
Bathroom
Conference Room
Mail Room
DiagnosisOffice
Staff Lounge
Storage
StuffLocker
Doctors Office
Conference Room
Doctors Lounge
Atrium
Bubble Diagram
Project Diagram 9
Stuff Entrance
Locker Room
DiagnosisOffice
Diagnosis Area
Stuff Lounge
Locker Room
TherapyArea
Stuff Lounge
Locker Room
StaffSequence
Stuff Entrance
Office
Administration
Staff Lounge
AdministrationSequence
Reception
Therapy Area
Atrium
Administration
Exhibition Space
Restaurant /Bar
Lecture Room
Administration
Diagnosis Area
Waiting Area / Bathroom
Exam Area
Waiting Area / Bathroom
Evaluation Area
Administration
Family / PatientSequence
Sequence Diagram
Plan Section Perspective 11
677 SF
PHYSICAL THERAPYT501
1302 SF
CERAMIC ROOMT301
136 SF
OFFICED401
234 SF
STUFF KITCHEN / LOUNGEA701
118 SF
STORAGES1101
144 SF
MAIL ROOMA301
79 SF
BATHROOMA901
76 SF
BATHROOMA902
142 SF
OFFICED403142 SF
OFFICED402
142 SF
OFFICED404
142 SF
OFFICED405
142 SF
OFFICED406
152 SF
OFFICED408
152 SF
OFFICED409
136 SF
OFFICED410
152 SF
OFFICED407
52 SF
BATHROOMS902
51 SF
BATHROOMS901
176 SF
LOCKER ROOMS201
141 SF
DOCTORS OFFICES602
140 SF
DOCTORS OFFICES601
141 SF
DOCTORS OFFICES603
141 SF
DOCTORS OFFICES604
166 SF
LOCKER ROOMS202
190 SF
CONFERENCE ROOMA801
150 SF
EXECTIVE OFFICEA601
150 SF
EXECTIVE OFFICEA602
151 SF
EXECTIVE OFFICEA603
136 SF
EXECTIVE OFFICEA604
142 SF
EXECTIVE OFFICEA605
253 SF
DOCTORS LOUNGES701
56 SF
BATHROOMT801
50 SF
BATHROOMT802
139 SF
STORAGET702
283 SF
MUSIC STUDIO LT102
135 SF
MUSIC STUDIOT103
58 SF
BATHROOMT805
226 SF
MUSIC STUDIO LT101
135 SF
MUSIC STUDIOT104
334 SF
PC STUDIOT201
898 SF
PAINTING ROOMT401
28 SF
ESCAPET302
28 SF
ESCAPET303
28 SF
ESCAPET304
80 SF
JANITORIALT901
65 SF
JANITORIALS1001
53 SF
JANITORIALD604
213 SF
STAFF KITCHEN / LOUNGES401
123 SF
STAFF CONFERENCES301
160 SF
STAFF NAP ROOMS501
108 SF
WORKSTATIONS801
141 SF
DOCTORS OFFICES605
56 SF
BATHROOMT803
81 SF
FURNACET305
3326 SF
ATRIUMAT
73 SF
STORAGED1101
257 SF
NURSE STATIONT601
59 SF
BATHROOMT806
145 SF
STORAGEA1101
140 SF
PC STUDIOT202
334 SF
PC STUDIOT203
183 SF
LOCKER ROOMA501
50 SF
RoomD311
1/16" = 1'-0"1 Level 1
Plan Section Perspective 12
103 SF
OBSERVATIOND101
143 SF
WAITING AREAA101
103 SF
OBSERVATIOND102
103 SF
OBSERVATIOND103
103 SF
OBSERVATIOND104
103 SF
OBSERVATIOND105
103 SF
OBSERVATIOND106
103 SF
OBSERVATIOND107
108 SF
OBSERVATIOND108
108 SF
OBSERVATIOND109
108 SF
OBSERVATIOND110
150 SF
EX ROOMD201
143 SF
EVALUATIOND307
134 SF
STORAGED802
146 SF
NURSE STATIOND401
145 SF
EX ROOMD202 137 SF
EX ROOMD203
137 SF
EX ROOMD204
133 SF
EX ROOMD205
141 SF
EX ROOMD206 165 SF
EX ROOMD207
141 SF
EX ROOMD208
162 SF
EX ROOMD209
137 SF
EVALUATIOND305
128 SF
EVALUATIOND301
128 SF
EVALUATIOND302
137 SF
EVALUATIOND306 166 SF
STERILE ROOMD601
140 SF
EVALUATIOND308
140 SF
EVALUATIOND309
140 SF
EVALUATIOND310
158 SF
RECEPTION DESKA201
52 SF
BATHROOMD1002
51 SF
BATHROOMD1001
1506 SF
RESTAURANT / BARP201
57 SF
BATHROOMR401
58 SF
JANITORIALA901
84 SF
BATHROOMD1004
79 SF
BATHROOMD1003
2443 SF
EXHIBITION SPACEP301
689 SF
LABORATORYD701
47 SF
STORAGED801
60 SF
BATHROOMR402
56 SF
BATHROOMP403
50 SF
BATHROOMP404 56 SF
BATHROOMP401
50 SF
BATHROOMP402
145 SF
EX ROOMD210
131 SF
EVALUATIOND303
390 SF
RECEPTIONR201
47 SF
JANITORIALR501
342 SF
LECTURE ROOM1102
344 SF
LECTURE ROOM1103
206 SF
WAITING AREAD502
137 SF
EVALUATIOND304
227 SF
WAITING AREAD501
108 SF
STORAGEP501
247 SF
WAITING AREAR301
1/16" = 1'-0"1 Level 2
Plan Section Perspective 15
Level 10"
Level 214' - 0"
Level 214' - 0"
ROOF28' - 0"
Level 10"
Level 214' - 0"
ROOF28' - 0"
1/8" = 1'-0"1 Drawing
1/8" = 1'-0"2 lobby
1/16" = 1'-0"3 garden
1/8" = 1'-0"1 Level 1 - Drawing
1/16" = 1'-0"2 Level 1 - Garden
1/8" = 1'-0"3 Level 2 - Lobby
Level 10"
3'-0"
3'-0"
1'-6"
2'-6"
10'-0
"
1/4" Plywood
1/4" Clear Float Glass
1/4" Tempered Etched Glass
1/4" Tempered Etched Glass
4" Diameter Steel Epoxy zinc primer with PU paint
1 1/2" = 1'-0"1 LIGHTING DETAIL
1/4" = 1'-0"2 Drawing Detail
3 GLASS DOME DETAIL
4" WOOD RADIAL CUSTOM SYSTEMS
INPLANA C07 CDP19 1000-830 ET 01
Plan Section Perspective 16
Level 10"
Level 214' - 0"
Level 214' - 0"
ROOF28' - 0"
Level 10"
Level 214' - 0"
ROOF28' - 0"
1/8" = 1'-0"1 Drawing
1/8" = 1'-0"2 lobby
1/16" = 1'-0"3 garden
1/8" = 1'-0"1 Level 1 - Drawing
1/16" = 1'-0"2 Level 1 - Garden
1/8" = 1'-0"3 Level 2 - LobbyLevel 1
0"
3'-0"
3'-0"
1'-6"
2'-6"
10'-0
"
1/4" Plywood
1/4" Clear Float Glass
1/4" Tempered Etched Glass
1/4" Tempered Etched Glass
4" Diameter Steel Epoxy zinc primer with PU paint
1 1/2" = 1'-0"1 LIGHTING DETAIL
1/4" = 1'-0"2 Drawing Detail
3 GLASS DOME DETAIL
4" WOOD RADIAL CUSTOM SYSTEMS
INPLANA C07 CDP19 1000-830 ET 01
Plan Section Perspective 17
Level 10"
Level 214' - 0"
Level 214' - 0"
ROOF28' - 0"
Level 10"
Level 214' - 0"
ROOF28' - 0"
1/8" = 1'-0"1 Drawing
1/8" = 1'-0"2 lobby
1/16" = 1'-0"3 garden
1/8" = 1'-0"1 Level 1 - Drawing
1/16" = 1'-0"2 Level 1 - Garden
1/8" = 1'-0"3 Level 2 - Lobby
Level 10"
3'-0"
3'-0"
1'-6"
2'-6"
10'-0
"
1/4" Plywood
1/4" Clear Float Glass
1/4" Tempered Etched Glass
1/4" Tempered Etched Glass
4" Diameter Steel Epoxy zinc primer with PU paint
1 1/2" = 1'-0"1 LIGHTING DETAIL
1/4" = 1'-0"2 Drawing Detail
3 GLASS DOME DETAIL
4" WOOD RADIAL CUSTOM SYSTEMS
INPLANA C07 CDP19 1000-830 ET 01