CAPABILITY STATEMENT

POWER SERVICESPowerline & Infrastructure Solutions

Page 2: Betta Power Capability Statement 150219

BETTA POWER SERVICES CAPABILITY

Geoff Williams

Page 3: Betta Power Capability Statement 150219

BETTA POWER SERVICES

BETTA POWER SERVICES CAPABILITY

Our company also focuses on asset maintenance; annual statutory testing; street

Betta Power Services have secured 6000 m2 of hard stand area in the Airport Precinct

projects with bulk materials and a hard stand

Betta Power Services have been accredited to

Our Principle Activities are:• Construction of Underground and Overhead

• Asset Maintenance of HV & LV Poles

protection

• Maintenance of Street Lights and Sport Field

replacement; light patrols & all corrective and preventative maintenance)

• Hire of all Overhead & Underground

03

about usIn 2012 Betta Group of Companies (QLD) P/L trading as Betta Power Services was formed. The focus for this company is predominantly on the High Voltage Overhead and Underground Infrastructure for Ergon Energy, Queensland Rail, PowerLink, Q-Build, Australian Defence Force and the Bowen Basin Mining Industry.

GEOGRAPHICAL COVERAGE

Coverage to the Central Queensland area including Rockhampton, Yeppoon, Emu Park, Mount Larcom, Gladstone, Biloela, Moura, Blackwater, Emerald and

to accommodate work in other areas by

Page 4: Betta Power Capability Statement 150219

BETTA POWER SERVICES CAPABILITY

04

our valuesSAFETY Securing our Success

We believe in providing a safe and secure working environment, free of incidents, accidents, and unsafe acts. We will live by our standards, the highest standards.

ETHICS AND INTEGRITY Ensuring our Success We believe in operating with the upmost integrity, where the law is not only upheld but respected, and promises made are promises kept.

RESPECT Retaining those Responsible for our Success We believe in recruiting, rewarding and retaining the best, understanding the value of diversity, and providing opportunity through training and developing.

PERFORMANCE Measuring our Success We believe striving for maximum return on investment and best-in-class results by continually attaining our goals.

TEAMWORK Empowering our Success We believe we are strongest when we are united and working together to achieve our mission.

COMMUNITY Sharing our Success We believe in respecting our environment and promoting value to our communities by encouranging volunteerism and active participation.

Page 5: Betta Power Capability Statement 150219

ourcapabilitiesOIL SEARCH LIMITED GAS & OIL FIELDS IN PNG SOUTHERN PROVINCE 11KV OVERHEAD POWERLINE AND OVERHEAD FIBRE OPTIC CABLEREPLACEMENT PROJECT

Design and replace 4.5 kilometres of existing Overhead (OH)11kV Aerial Bundle Cable (ABC)and Fibre Optic Cables with new 22kV ABC and Fibre Optic Cable (ADSS) Oil Search Limited(OSL) powerline.

Recover 4.2km of aged and damaged OH ABC and ADSS cable. Install new 22kV ABC, linehardware and ADSS Cable on 103 poles including new deviation line totalling 4.5 km adjacentto connecting road and gas flow line corridors. Elevation climb of 500m over 4.8 km, from sea level from 920m to a height of 1420m.

Install 2 new UG 75mm 11kV HV UG cable and ADSScable crossings 80 metres and 25 metres. 1 x HV cable joint in 2 km section between terminations and 24 otherHV cable terminations at UG cable points.

Testing works included cable drum tested prior to HV cable installation, cables tested on completion of installation prior to any cable jointing or terminating wascompleted and end to end testing.

Completion Date: 11kV ABC OH Line Works - Nov/Dec 2018ADSS (Fibre) cable - Jan 2019Lines handed over - Jan 2019

BETTA POWER SERVICES CAPABILITY

capabilitiesourPROJECT BREAKDOWN

Principle: Curragh Mine (Wesfarmers)

Betta Power Services Component: $500,000

Completion Date: Ongoing

CURRAGH MINE HIGH VOLTAGE WORKS PROJECTBetta Power Services are the preferred Overhead Powerline Contractors for working at the Curragh Westfarmers Coal Mine at Blackwater. Betta Power Services carried out all routine maintenance of the overhead poles, ABS’s, Transformers on the private Curragh 66kV/22kV Networks.

Betta Power attends any emergency breakdown or forced outages for the site. Betta Power Services also carries out any capital or new project work on the site. 05

BETTA POWER SERVICES CAPABILITY

capabilitiesourPROJECT BREAKDOWN

Principle: Curragh Mine (Wesfarmers)

Betta Power Services Component: $500,000

Completion Date: Ongoing

CURRAGH MINE HIGH VOLTAGE WORKS PROJECTBetta Power Services are the preferred Overhead Powerline Contractors for working at the Curragh Westfarmers Coal Mine at Blackwater. Betta Power Services carried out all routine maintenance of the overhead poles, ABS’s, Transformers on the private Curragh 66kV/22kV Networks.

Betta Power attends any emergency breakdown or forced outages for the site. Betta Power Services also carries out any capital or new project work on the site. 05

Page 6: Betta Power Capability Statement 150219

BETTA POWER SERVICES CAPABILITY

capabilitiesourPROJECT BREAKDOWN

Principle: Curragh Mine (Wesfarmers)

Betta Power Services Component: $500,000

Completion Date: Ongoing

CURRAGH MINE HIGH VOLTAGE WORKS PROJECTBetta Power Services are the preferred Overhead Powerline Contractors for working at the Curragh Westfarmers Coal Mine at Blackwater. Betta Power Services carried out all routine maintenance of the overhead poles, ABS’s, Transformers on the private Curragh 66kV/22kV Networks.

Betta Power attends any emergency breakdown or forced outages for the site. Betta Power Services also carries out any capital or new project work on the site. 05

06

capabilitiesourBETTA POWER SERVICES CAPABILITY

CANOONA ROAD AIRFIELD LIGHTING PROJECTBetta Power Services were engaged by Spotless to carry out installation of lighting for the helicopter landing zones for the Chinook and Appache helicopters for the Singaporean Army.

This included 800m of trenching and cable pulls, installation of the metal lighting standards.

Lighting control for the lights was extremely complicated as each individual light had to be controlled from one location.

Betta Power Services designed and constructed the control system to suit the Client’s requirements.

Betta Power Services completed the project on time, on budget with no LTI’s.

PROJECT BREAKDOWN

Principle: Spotless

Betta Power Services Component: $100,000

Completion Date: February, 2017

BETTA POWER SERVICES CAPABILITY

capabilitiesourPROJECT BREAKDOWN

Principle: Curragh Mine (Wesfarmers)

Betta Power Services Component: $500,000

Completion Date: Ongoing

CURRAGH MINE HIGH VOLTAGE WORKS PROJECTBetta Power Services are the preferred Overhead Powerline Contractors for working at the Curragh Westfarmers Coal Mine at Blackwater. Betta Power Services carried out all routine maintenance of the overhead poles, ABS’s, Transformers on the private Curragh 66kV/22kV Networks.

Betta Power attends any emergency breakdown or forced outages for the site. Betta Power Services also carries out any capital or new project work on the site. 05

Page 7: Betta Power Capability Statement 150219

06

capabilitiesourBETTA POWER SERVICES CAPABILITY

CANOONA ROAD AIRFIELD LIGHTING PROJECTBetta Power Services were engaged by Spotless to carry out installation of lighting for the helicopter landing zones for the Chinook and Appache helicopters for the Singaporean Army.

This included 800m of trenching and cable pulls, installation of the metal lighting standards.

Lighting control for the lights was extremely complicated as each individual light had to be controlled from one location.

Betta Power Services designed and constructed the control system to suit the Client’s requirements.

Betta Power Services completed the project on time, on budget with no LTI’s.

PROJECT BREAKDOWN

Principle: Spotless

Betta Power Services Component: $100,000

Completion Date: February, 2017

06

capabilitiesourBETTA POWER SERVICES CAPABILITY

CANOONA ROAD AIRFIELD LIGHTING PROJECTBetta Power Services were engaged by Spotless to carry out installation of lighting for the helicopter landing zones for the Chinook and Appache helicopters for the Singaporean Army.

This included 800m of trenching and cable pulls, installation of the metal lighting standards.

Lighting control for the lights was extremely complicated as each individual light had to be controlled from one location.

Betta Power Services designed and constructed the control system to suit the Client’s requirements.

Betta Power Services completed the project on time, on budget with no LTI’s.

PROJECT BREAKDOWN

Principle: Spotless

Betta Power Services Component: $100,000

Completion Date: February, 2017

BETTA POWER SERVICES CAPABILITY

capabilitiesourPROJECT BREAKDOWN

Principle: Curragh Mine (Wesfarmers)

Betta Power Services Component: $500,000

Completion Date: Ongoing

CURRAGH MINE HIGH VOLTAGE WORKS PROJECTBetta Power Services are the preferred Overhead Powerline Contractors for working at the Curragh Westfarmers Coal Mine at Blackwater. Betta Power Services carried out all routine maintenance of the overhead poles, ABS’s, Transformers on the private Curragh 66kV/22kV Networks.

Betta Power attends any emergency breakdown or forced outages for the site. Betta Power Services also carries out any capital or new project work on the site. 05

Page 8: Betta Power Capability Statement 150219

07

BETTA LIFESTYLES CAPABILITY

capabilitiesour

POLE & SWITCHBOARD PROJECTAurizon engaged Betta Power Services to change out 100 power poles and 50 CMP switchboards. The locations of the project varied from Winton in the Central West to Gladstone in the South and Mackay in the North.

The project scope expanded midway through the project life cycle to include HVABS Replacement, Transformer Replacement and Tower Removal.

Betta Power Services completed the project on time, on budget with no LTI’s.

BETTA POWER SERVICES CAPABILITY

PROJECT BREAKDOWN

Principle: Aurizon

Betta Power Services Component: $750,000

Completion Date: August, 2016

Page 9: Betta Power Capability Statement 150219

BETTA LIFESTYLES CAPABILITY

capabilitiesour

SOUTHERN OIL PROJECTBetta Power Services were engaged by Electrix to carry out the HV overhead and underground component for the electrical infrastructure to the new

The scope of work included 2km of overhead pluto conductor and .5km of 400mm triplex underground conduit.

The timeframe for the practical completion of the project was extremely short.

Betta Power Services completed the project on time, on budget with no LTI’s.

BETTA POWER SERVICES CAPABILITY

PROJECT BREAKDOWN

Principle: Electrix

Betta Power Services Component: $350,000

Completion Date: December, 2014

08

Page 10: Betta Power Capability Statement 150219

We carry out major installation and maintenance contract works for a number of predominant Queensland commercial and government customers. In order to deliver projects like these, our approach focuses and delivers on high quality, visability and meeting compliance and standards. This is acheived through our vast industry knowledge, highly

operationalapproachour

Our focus is to create and strengthen customer relationships while delivering work on time and cost. We aim to provide this through:• Delivery of reliable quality service to our

customers• Providing 100% visibility of work and

compliance information in real time• Being oncall 24/7• Deliver of real time reporting on OH&S and

Environmental & Quality compliance•

requirements

BETTA POWER SERVICES CAPABILITY

09

We carry out major installation and maintenance contract works for a number of predominant Queensland commercial and government customers. In order to deliver projects like these, our approach focuses and delivers on high quality, visability and meeting compliance and standards. This is acheived through our vast industry knowledge, highly

operationalapproachour

Our focus is to create and strengthen customer relationships while delivering work on time and cost. We aim to provide this through:• Delivery of reliable quality service to our

customers• Providing 100% visibility of work and

compliance information in real time• Being oncall 24/7• Deliver of real time reporting on OH&S and

Environmental & Quality compliance•

requirements

BETTA POWER SERVICES CAPABILITY

09

Page 11: Betta Power Capability Statement 150219

ACCREDITIATIONSSAI Global AS 4801 Safety Management PlanSAI Global ISO 9001 Quality Management PlanSAI Global ISO 14001 Environmental Management Plan

CERTIFICATIONSElectrical Contractors Licence #65701 Exp 01/05/2021

AFFILIATIONSMaster Electricians Australia Member

PARTNERSHIPSUDSC Consulting - HV Consultants

10

BETTA POWER SERVICES CAPABILITY

Some of our Customers

We carry out major installation and maintenance contract works for a number of predominant Queensland commercial and government customers. In order to deliver projects like these, our approach focuses and delivers on high quality, visability and meeting compliance and standards. This is acheived through our vast industry knowledge, highly

operationalapproachour

Our focus is to create and strengthen customer relationships while delivering work on time and cost. We aim to provide this through:• Delivery of reliable quality service to our

customers• Providing 100% visibility of work and

compliance information in real time• Being oncall 24/7• Deliver of real time reporting on OH&S and

Environmental & Quality compliance•

requirements

BETTA POWER SERVICES CAPABILITY

09

Page 12: Betta Power Capability Statement 150219

11

Page 13: Betta Power Capability Statement 150219

T: 07 4921 1437

E: [email protected]

bettapowerservices.com.au

POWER SERVICESPowerline & Infrastructure Solutions