Best O & M Practices for Sustainable Growth at DTPS Suhas Patil AVP (MTP,O&E) Dahanu TPS

Upload: others

Post on 09-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Best O & M Practices for Sustainable Growth at

DTPS

Suhas Patil

AVP (MTP,O&E) Dahanu TPS

Page 2: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Flow of Presentation

• Company Profile

• DTPS at Glance

• Best O & M Practices

• Modular Maintenance Concept

• Opportunity Based Maintenance

• Efficiency Based O&M

• Energy Management System

• Improvement through Operational Excellence

• Use of Renewable Energy Resources

• Employees Involvement & Team Work

Page 3: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Infrastructure

Generation

EPC

Transmission

Distribution

Trading

R- Infra Emerged as Winner and Voted one of the India's 10 Most

Admired Companies

Company Profile

3

Page 4: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

• Commercially Operating Since 1995-96

• Catering Power to Commercial Capital Mumbai

Commercial Operation

• Best Environmentally Performing Power Plant

• Dahanu Operating in Eco Sensitive Zone and following Stringent Environmental Norms

Environmental Performance

• Winner of More than 100 National &International AwardsAwards &

Recognition

• 1st Company in the World to Achieve Certification of ISO 50001:2011 for Energy Management

• DTPS is also certified for QMS, EMS, OHSAS, ISMS and SA

System Approach

• More than 100% PLF Achieved for Last Consecutive 6 years & Overall 8 times since 2003-04

Performance

DTPS at a Glance

4

Page 5: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Dahanu

Well connected by

Western Railway &

National Highway No. 8

At a distance of 128

Kms from Mumbai

Surrounded by two

natural Creeks -

Savata and Dandi

Surya Dam nearby –

32 kms

DTPS Geographical location

5

Page 6: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 6

Page 7: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Page 8: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 8

Evolution of DTPS

DTPS in 1990

Page 9: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 9

Evolution of DTPS

DTPS Now….

Page 10: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 10

About Dahanu TPS

The setting up of the Plant was approved in 1989 for 2 x 250 MW capacity.

First Synchronization

Unit – I - January 1995

Unit – II - March 1995

Station Commercial operation

- July 1995 / Jan 1996

Till date Running Hours

Unit – I - 1.45 lacs

Unit – II - 1.41 lacs

Page 11: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

1998 Quality Management System ISO 9001

1999 Environment Mangement System ISO 14001

2000 RAMCO ERP Package implementationRBNQA

2001 ISO upgradation SAP ECC

2002 Optic Ground wire (OPGW) & Backbone data highwayISO 27000

2003 SAP & Employee self service implementationSA 8000

2004 British Safety Council Audit

6 Sigma-IIKM, OHSAS

2005 Benchmarking in CII

6 Sigma-I Mercer, CII 2006 Occupational Health and Safety Assessment

Studies OHSAS 18001

2005 Six Sigma Drive IBSC

2006 Knowledge Management2005 HR Mercer study

SAP &

ESS2006 Six Sigma Drive IIOPGW

2007 Social Accountability SA 8000ISO

Upgrade

2008 Integrated Management System (ISO 9001, ISO

14001, OHSAS 18001)RAMCO

2008 Information Security Mangement system ISO 27001ISO 14001

2009 SAP ECC - In place of RAMCO

ISO 9001

2010 Ramkrishna Bajaj National Quality Award

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

EnMS

ISO 50001:2011

2011 Energy Management System s : BS EN

16001:2009 & upgraded to ISO 50001:2011

DTPS Milestones

2013

NABL Accen

Page 12: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

ISO 9001:2008

ISO 14001:2004

ISO/IEC 27001:2005

OHSAS 18001:2007

SA 8000:2008

ISO 50001:2011

Continual improvement is ensured through improvement plans for IMS,

ISMS, SA and EnMS

System Approach

Page 13: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Working Philosophy

CONTROL

MONITOR

OPTIMISE

REVIEW

People Team Work Standardisation

Efficient Economical Clean

Reliable Sustainable

Safe

Page 14: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Best O & M Practices for

Sustainability Improvement

Page 15: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Best O & M Practices for Sustainability

15

� Coal Management

� Overhaul Strategy

� Maintenance Philosophy

� Major Initiatives

Page 16: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 16

Adoption of Imported Coal in DTPS

� DTPS has two units of 250 MW each using coal as primary fuel.

� The allotted quota of raw coal is not adequate, as there is a huge gap

between demand and supply of indigenous coal.

� Shortfalls in domestic coal supply.

� Progressive degradation in coal quality.

Coal Management

Page 17: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 17

Adoption of Imported Coal in DTPS

� DTPS started importing coal since 1998, to bridge the shortfall and to

maintain the reliability of the plant.

� Blending with good quality imported coal helps in reduction of ash

content and improvement in GCV of as fired coal.

� Improves combustion, flame stability and heat release rate by a fuel

that burns substantially as a gaseous mixture when combusted.

Coal Management

Page 18: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Adoption of Imported Coal in DTPS

1995-96

Commercial

operations

F-grade

Coal

1st Phase1999

Indian raw coal +

High GCV

imported coal

Wash coal +

Medium GCV

imported coal

2nd Phase 2001

Wash coal + (Low

GCV+ Medium

GCV) imported

coal

3rd Phase2006

1. Coal quantity reduced

2. Unit Load increased

3. Emission level reduced

4. Aux power reduced

5. Flame stability improved

6. Formation of clinker & soot is minimum

7. Overall performance improved

1. Loading factor improved & PLF achieved more than

100 % consistently

2. Failure of equipments in CHP & AHP reduced

3. Plant Reliability and availability improved by

reduction in tube leakages , equipment break down

4. Environmental parameters improved

5. Aux. power reduced.

LCV coal is generally used as a partial substitute

of Indian wash coal due to acute shortage of

washed coal .

The same level of performance is maintained.

P

E

R

F

O

R

M

A

N

C

E

Coal Management

Page 19: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

19

Equipment OEM Recommendation DTPS Plan

HP Turbine 6 years 6 years

IP Turbine 5 years 4 years

LP Turbine 5 years 2 years

Generator 4 years 2 years

Exciter 4 years 2 years

Boiler 2 years

Power Transformers 7 years 6 years

HT Motors - 4 years

Rolling Plan

Overhauling Strategy

Page 20: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

20

� Benefits

� No surprises – No major defect

� Reduced Spare consumption

� Reduced overhaul time

� Efficient running of plant

� Less resources

� Initial observations

� Many surprises

� LPT - Blade looseness, minor deposits,

rubbing of rotor, sealing fin damages

� Generator - Hot spots, core looseness,

stator core bar cracks, wedge looseness,

H2 leakage from current carrying bolts &

terminal bushings.

� Exciter & PMG damages, oil leakages

Rolling Plan Benefits

Overhauling Strategy

Page 21: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 21

• Modular conceptualization

• HP module - reduced 6 days

• Short shutdown opportunities

• Overhauling of redundant auxiliaries

• Standardized procedure for turbine cooling

• De-coupling of Generator

• Saving of 5 days

Reduction in Overhaul time

Overhauling Strategy

Page 22: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 22

� New technology - Induction heaters,

Quick erect type aluminum boiler

scaffolding, LFET etc.

� Extra bigger size manhole for boiler

� Project management software

� Round the clock working – 2 shifts

Reduction in Overhaul time

Overhauling Strategy

Page 23: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 23

Reduction in Overhaul time

45

18

1999-2000 2009-2010

Overhaul Days

Additional efficient generation of - 162 Million units /year

Overhauling Strategy

Page 24: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Modular Maintenance concept

“PROMT”Priority on Managing

Performance Trends

maintenance

Efficiency Based Maintenance Concept

Innovative Maintenance Approach

Innovative Maintenance Approach

Energy Monitoring System

Page 25: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Modular Maintenance Concept

� A maintenance procedure that allows the replacement of major

assemblies in a minimum amount of time and expenditure is

called “module” (e.g. HP turbine module, CW debris filter, Primary &

Secondary fans rotor, Boiler feed pump cartridge)

HP Turbine ModuleBFP Cartridge

Page 26: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

� “PROMT”- Priority on Managing Performance Trends maintenance (e.g.

Flue gas duct leakages, HP heaters performance)

Flue Gas duct leakages HP Heaters parting plate leakages

Innovative Maintenance Approach - PROMT

Page 27: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Efficiency based O&M

� Along with preventive and predictive maintenance, scheduled

equipment changeovers focus is shifted to Efficiency based O&M

� Equipments where standby are available, less power consuming or

more efficient kept in service most of the time.

� Reasons for lower efficiency are find out and maintenance is planned

accordingly.

� Coal mill O&M is based on the output and quality of the pulverized coal.

Page 28: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

4-20 mA 4-20 mA

ELAN

SERVER

6.6 KV Swgr

U-1

6.6 KV Swgr

U-2

RS485RS485

LAN

ELAN

VIEW

Single Login

PCR-1

Process parameter

PCR-2

Process parameter

RS485

RS485

FGD

Process parameter

SCANNER

ELAN

VIEW

4-20 mA

Compressor Room

Process parameter

SCANNER

4-20 mA

RS485

SCANNER SCANNER

RS485

24+16 channel 24+16 channel

16 channel16 channel

Total 161 New meters

installed (HT)

Continual Improvement

Energy Monitoring System

Energy Management System

Page 29: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 29

Base Value:

�It Is Decided Based On Average

Value of 1 Year Data

Operating Value:

It includes the

�Effect Of Coal Quality Variation,

�Condenser Vacuum

�Other Seasonal Effects.

�Operators Have To Run Equipment In This

Standardized Operating Range.

Operational Control:

It Includes

�Un-optimized Condition,

�Operation Deviation,

�Valve / Damper Passing,

�Preventive Maintenance Due,

�Set Points At Various Parameters

Average Power

Consumption

Rate As On Date

Maintenance Control:

This control includes

�Detail Analysis Of Problems

�Solution In Terms Of New Alternative

Technology

� Repair or Replacement.

Energy Management System

Daily Equipment Energy Deviation Report

Page 30: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Monthly Building Energy Deviation Report

All Buildings Of Plant Are Covered Under Monitoring

Energy Management System

Page 31: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 31

Short shutdown Boiler tube inspection

APH seal inspection & repair

Flue gas duct inspection & rectification

Opportunity based maintenance

Opportunity Based Maintenance

Defects which affects the efficiency, auxiliary power are given top priority

e.g HP heaters, Condenser, Duct rectification, APH Seals rectification

Page 32: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Air Ducts

Flue Gas DuctBefore and after Fan Kw

Arresting Duct Leakages in Opportunity

Opportunity Based Maintenance

Page 33: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Every 0.01 kg/cm2 change in vacuum causes heat rate loss of 11-12 KCal/kwh.

Condenser Vacuum Improvement

Helium Leak Detection Test

Debris filter maintenance

Dredging at CW inlet

Condenser Vacuum Improvement

Page 34: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Major Initiatives

34

� HP module replacement

� BFP cartridge replacement

� Coal mill liners replacement

� APH basket replacement

� Installation of CEP VFD

� Reduction in startup time

� Reduction in oil consumption

� Reduction in DM make-up

� Smart soot blower operations

Page 35: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

� HP module Replacement

2010 2006

1980

1955

Unit-1 Unit-2

Turbine Heat Rate (Kcal/kwh)

Before After

HP module replacement

Major Initiatives

Page 36: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Boiler Feed Pump Saving Achieved

Performance Based BFP

cartridge Replacement

(serviced cartridge)

BFP-1A = 461 kw

BFP-2A = 656 Kw

BFP-1B = 347 Kw

BFP Cartridge

Boiler Feed Pump

BFP cartridge replacement

Major Initiatives

Page 37: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Mill Liner

Mill Grinding Media

Coal Mill

Before and after Mill Kw

Replacement of liners by Hi-Crome Liner

Major Initiatives

Page 38: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

152 148

130140

Unit-1 Unit-2

Flue Gas Temp At APH Outlet (°C)

Before After

APH basket replacement

Major Initiatives

Page 39: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Total 12 Nos. Of VFD Are Installed In Different Application

Energy

Saving

622 Kw

Before and after CEP Kw

Installation of CEP -VFD

Page 40: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

High Cycle

Time

Standardisation of procedure

Reduction in

Cycle Time

Average 10 hrs

Target7 hrs

Defined Roles and Responsibility

Standardization of Parallel –Sequential Activities

Change in operation Philosophy

Condensate Dumping

Parallel operation of Both CPU

Use of RIM Phones to all

Innovative Approach

Replacement of HFO with LDO

Replacement of Oil ignitors with HEA

Use of Instrument air for OIL atomization

SOP

Review

Reduction In Start up time

Major Initiatives

Page 41: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

11.2

10.3 9.4

11.5

8.58

12.44

10.11

10.29

7.26

8.37

11.52

10.05

5.49

6.23

5.43

6.32

7.38

6.22

4.27

3.57

6.70

4.78

6.27

5.08

5.07

4.60

0

2

4

6

8

10

12

14

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Actual Target Linear (Actual)

Before Project After Project

Target 7 hrs

10.08 Hrs 5.53 Hrs

Mar-06

Reduction In Start up time

Page 42: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Indirect Benefits:

Reduction in

� Auxiliary power consumption

� DM water consumption

� Customer dis-satisfaction

Direct BenefitsPer Warm Start-up

Reduction in Start-up time 4.55 hrs

Reduction in Oil consumption 16 kl

Increase in Generation 1.14 Mus

Reduction In Start up time - Benefits

Page 43: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

High Specific

Oil

Standardisation

of procedure

Reduction in

Specific OIL

Defined Roles and

Responsibility

Standardization of

Parallel – Sequential

Activities

Change in

operation

Philosophy

Change in OIL guns trial

schedule

Monitoring OIL pressure

during Startup

Target < 42 KL –Warm Start-up

Use of SCAPH

Dearator initial heating

Reduction In Oil consumption

Page 44: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

49.91

37.48

31.06

56.78

34.3434.03

55.41

42.58

42.5843.042

37.716

31.59

27.93

0

10

20

30

40

50

60

02-2008 03-2008 05-2008 08-2008 12-2008 12-2008 08-2009 11-2010 02-2011 06-2011 07-2011 08-2011 08-2011

Oil used for Startup Target

Target < 42 KL

Reduction In Oil consumption

Page 45: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Optimization of Soot Blowers operation

SOP for Identification of

Leakages

Optimization of VAM

operation

Reduction in DM water Loss

Fuel switching from HFO to

LDO

Every 1 % increase in DM make up causes heat rate loss of 10 KCal/kwh.

DM makeup reduction

Page 46: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 46

531.88532.69 533.23

534.05535.72 535.89 536.4

3.482.93 2.56

2 0.87 0.75 0.450

5

10

526

531

536

541

2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

MS Temp & Heat Rate Loss

Ms Temperature Heat Rate Loss

534.75 534.47

535.54534.72

535.63 535.81 535.88

1.53 1.720.99

1.550.93 0.81 0.76

0

2

4

6

530.00

531.00

532.00

533.00

534.00

535.00

536.00

537.00

538.00

2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

RH Temp & Heat Rate LossRH Temperature

Heat Rate Loss

Smart soot blower operations - Results

Page 47: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 47

Installation of Magna Drive Coupling

Magna Drive Coupling - Couplings transmits torque

from the motor to the load using the same principles

of operation with NO PHYSICAL CONNECTION of the

driver shaft to load shaft.

Benefits of Magna Drive Coupling

1. Energy Saving

2.Increased Reliability

3.Reduced Maintenance cost

4. Improve Process Control

Page 48: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Energy Conservation Projects

Saving achieved 3.6 kwh

per ventilator

Total 14 nos.

Solar Water Heater

Total 1100 LPD

1056 Watts (Total 48 nos)

Solar street lighting

2 HP Solar Water Pump

Page 49: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 49

Environment Management

Environmental Initiatives

Page 50: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 50

Action taken to reduce Air

Emission

Electrostatic

Precipitators

with 99.99%

Efficiency

TPM less than

one-third of

statutory limits

(150 mg/Nm3)

by Ammonia

dosing in ESP.

4 Ambient Air

Quality

Monitoring

Stations & AAQM

Mobile Van

Installation of

Flue Gas

desulphurization

Plant (FGD)

Environmental Initiatives

Page 51: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 51

Environmental Parameters

Page 52: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 52

Environmental Performance (Stack Emission)

56.00 56.00 55.00 54.30

29.40

3.94 4.00 3.90 4.10

80.4

8.04

2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

DTPS MPCB

Commissioning of FGD

SOx (T/Day)

Page 53: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 53

Environmental Performance (Stack Emission)

49.00

29.0034.00

39.8034.90 37.30 40.70 42.30 43.90

150

2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

DTPS MPCB

TPM (mg / NM3)

Page 54: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Employees Involvement

&

Team Work

Page 55: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Conductance ‘3L’ Life learning Program

With BEE Paper Presented at O&M Conference

Employees Involvement

Page 56: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Energy Management Cell “Awareness drive“

� Training for all employees

� By Internal faculty

� By External Faculty

� Celebration of Energy Conservation week

� Energy conservation walk involving all

employees

� Create awareness among local school

children about energy conservation through

Film show & competition

� Display of energy conservation posters

� Exhibition on energy conservation

Employees Involvement & Team Work

Page 57: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Improvement plans implemented

� Quality Improvement plans: 767 Nos.

� Environment Improvement plans: 75 Nos.

� Safety Improvement plans: 178 Nos.

� Energy Improvement plan : 58 Nos.

� Total – 1020+ Improvement Plans

57

of

45

Page 58: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Benefits of Monitoring

1st ISO 50001 EnMS certificate to DTPS in world

9th time National Level Energy

Efficiency Award By CII

4th time State Level Energy Efficiency Award to DTPS by

GOM

DTPS only plant from India in Platts power

1st Rank Performance

Awards From GOI

Page 59: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Effectiveness in Reliability & Energy Efficiency Improvement

Heat Rate reduced from 2372 kcal/kwh to 2282 kcal/kwhand sustained below 2300 kcal/kwh since last 9 years

DM water makeup is reduced from 1.41% to 0.30 %

Specific oil consumption is reduced from 1.739 ml/kwh to 0.10 ml/kwh

Auxiliary power consumption reduced from 8.27% to 7.38 % and sustained

Generation loss due to equipment non-availability is less than 0.1% of total generation

59

Page 60: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide 60

Heat rate less than 2300 Kcal/Kwh

Benefits

Availability more than 96 %

Loading factor more than 104 %

PLF more than 100 %

Page 61: Best O & M Practices for Sustainable Growth at DTPS€¦ · Adoption of Imported Coal in DTPS DTPS started importing coal since 1998, to bridge the shortfall and to maintain the reliability

Confidential Slide

Awards & Recognition

Received more than 100 National and

International awards in the category of

Performance

Environment

Safety

Corporate social responsibility