Short description Within this project, the motorway M51 was built between the E45 in Sønderjylland (Southern Jutland) and Alssund, in order to create a structureenhancing and efficient connection. For this project, the Kliplev Motorway Group (KMG) assigned a european construction company in a socalled public privatepartnership for the construc tion of the motorway. This newly built motorway was erected between 20112012, has a total length of about 28 km and was realized between Kliplev in the west and Sønderborg in the east. Overall, two lanes on each side were completed. Besides the construction of the motorway, seven interchanges as well as ten crossing municipal connection roads with a total length of 18 km had to be built. Additionally, numerous offsite facilities had to be newly established or modified to the changed structure. Also, eleven roundabouts and one distributor ring were constructed within this project. Due to the high existing complexity and a stipulated construction period of about two years, it was necessary to ensure a troublefree timing and high quality requirements on the structural engineering, the security and the project documentation. To support supervisory tasks and construction supervision the client placed the order with the Ingenieurbuero Dr.Ing. Olaf Schulz. Ingenieurbüro Dr.Ing. Olaf Schulz · Roonstraße 11 · D38102 Braunschweig · www.drolafschulz.de Ingenieurbüro Dr.Ing. Olaf Schulz Beratende Ingenieure Client Kliplev Motorway Group Time Period 2011 bis 2012 Motorway 4lanes (28 km) Municipal Roads 10 crossing roads total length 18 km Cross Sections 7 Interchanges 11 Roundabouts 1 Distributor ring Construction Types 23 Bridges and under passes, bicycle tunnel and openings, rain water retention basin Construction Supervision on the Motorway M51 in Denmark KliplevSønderborg Wastewater Treatment Drainage Area Development Geo and Canal Information Systems Expert Opinions Project Controlling Health and Safety Coordination Road Construction Transportation Surveying Visualization Hydraulic Engineering

Upload: others

Post on 28-Oct-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Beratende Ingenieure Construction Supervision on the ... fileShort description Within this project, the motorway M51 was built between the E45 in Sønderjylland (Southern Jutland)

Short description

Within this project, the motorway M51was built between the E45 inSønderjylland (Southern Jutland) andAlssund, in order to create astructure­enhancing and efficientconnection. For this project, theKliplev Motorway Group (KMG)assigned a european constructioncompany in a so­called public­private­partnership for the construc­tion of the motorway. This newly builtmotorway was erected between2011­2012, has a total length ofabout 28 km and was realizedbetween Kliplev in the west andSønderborg in the east. Overall, twolanes on each side were completed.

Besides the construction of themotorway, seven interchanges aswell as ten crossing municipalconnection roads with a total lengthof 18 km had to be built. Additionally,numerous off­site facilities had to benewly established or modified to thechanged structure. Also, elevenroundabouts and one distributor ringwere constructed within this project.

Due to the high existing complexityand a stipulated construction periodof about two years, it was necessaryto ensure a trouble­free timing andhigh quality requirements on thestructural engineering, the securityand the project documentation.

To support supervisory tasks andconstruction supervision the clientplaced the order with theIngenieurbuero Dr.­Ing. Olaf Schulz.

Ingenieurbüro Dr.­Ing. Olaf Schulz · Roonstraße 11 · D­38102 Braunschweig · www.dr­olaf­schulz.de

Ingenieurbüro Dr.­Ing.Olaf Schulz

Beratende Ingenieure

ClientKliplev MotorwayGroupTime Period2011 bis 2012Motorway4­lanes (28 km)Municipal Roads10 crossing roadstotal length 18 kmCross Sections7 Interchanges11 Roundabouts1 Distributor ringConstruction Types23 Bridges and under­passes, bicycle tunneland openings, rain­water retention basin

Construction Supervision on theMotorway M51 in Denmark ­Kliplev­Sønderborg

WastewaterTreatmentDrainageArea DevelopmentGeo and CanalInformation SystemsExpert OpinionsProject ControllingHealth and SafetyCoordinationRoad ConstructionTransportationSurveyingVisualizationHydraulic Engineering

Page 2: Beratende Ingenieure Construction Supervision on the ... fileShort description Within this project, the motorway M51 was built between the E45 in Sønderjylland (Southern Jutland)

Scope of Services

• supervision of the technical execution• supervision of the organisational completion• supporting health and safety coordination• counterchecking the building documentation• technical preparation of complex approval processes• documentation of imperfections during construction• improving the flow of information to/from the construction supervisor

Ingenieurbüro Dr.­Ing. Olaf Schulz · Roonstraße 11 · D­38102 Braunschweig · www.dr­olaf­schulz.de

Ingenieurbüro Dr.­Ing.Olaf Schulz

Beratende Ingenieure

Project aims

• compliance within the stipulated construction time and securingeconomical project conditions

• enforcing the aims of the internal quality management• minimizing the operating costs for the pavement, buildings and off­site

facilites of the motorway during the concession term of the public privatepartnership

• minimizing the risk of delivery for the operator on expiration of theconcession term

• recovery of the affected municipal road system within the periodstipulated

• handover of technically high­grade and sustainable buildings to themunicipal payers