    PUTZMEISTER BOOM PUMPS WORKING ATBANGALORE METRO PROJECT, BANGALORE

    JOB SITE REPORT

    About BMRCL :Bangalore Metro Rail Corporation Ltd (BMRCL) is a jointventure between Govt. of India and Govt. of Karnataka

    sharing the responsibility of implementation of BangaloreMetro Rail Project. It is named as Namma Metro.

    Phase I metro project started(Civil work) in June2007 .Theestimated cost of project is Rs 11609 Cr.

    Namma Metro phase-I network consist of two corridors :East-West and North South.

    Project highlights: Project Routes -East-West Corridor (Purple Line): Baippanahalli station to

    Mysore road Terminal - 18.10 KmsNorth-South Corridor (Green Line): Nagasandra station to

    Puttenahalli - 24.20 KMS

    Total KMS in Phase I: 42.30 KMSElevated section - 33.48 KMSUnder Ground Section - 8.82 KMS

    No. of Station - 40 ( 33 Elevated and 7 under ground)

    PCM JSR1029 12.09.2012/Bangalore Metro/Page 1

  • 7/29/2019 Bengaluru Metro Project

    2/7

    Section Line Route

    Reach-1 East Line Cricket stadium to Baiappanahalli -6.7 kms

    Reach-2 West Line Leprocy hospital to Mysore Road-6.4 kms

    Reach-3 North Line Sampige Road to yeshwantpur -5.1 kms

    Reach -3A First North ext. Line Yeshwantpur to Peenya ind -4.8kms

    Reach -3B Second North ext. Line Peenya Ind to Nagasandra-2.5 kms

    Reach-4 South Line National college to R V Road-4.1 kms

    Reach-4A South Ext. Line R V road to Puttenahalli -3.9 kms

    UG-1 N-S Underground Line Sampige and National College-4 kms

    - - -

    Reach and Routes:

    For the implementation and execution of the project, four elevated stretches are called Reaches

    & are identified so for convenience purpose. Also there are two underground sections are

    connecting Reach -1 and Reach-2 in East-West Corridor and Reach-3 & Reach-4 in North-South

    Corridor respectively. Each Reach has been given to a contractor for execution of the project.

    The details of Reaches are as under.

    JOB SITE REPORT

    .

    PCM JSR1029 12.09.2012/Bangalore Metro/Page2

  • 7/29/2019 Bengaluru Metro Project

    3/7

    BMRCL has distributed the works to select best contractors based on their expertise in execution ofproject -

    1) Building of Elevated structure.2) Building railway station.

    3) Rail tracking construction4) Underground Tunnel construction.

    Methods used for concreting:

    1)Viaduct (Elevated structure): Basically using precast structure for segment, girders, pier cap etc. Eachsegment requires 20 cu.m. concrete and I- girder is required 17 cum.

    2)Station building : Using precast and slab by concreting.3)Under ground tunnel: Using precast for tunnel rings. Tunnel concreting by shotcrete.

    4)Track laying : Concrete is required to make plinth construction and track bed construction insidetunnel.All the above application require high grade concrete: M40,M50,M60

    JOB SITE REPORT

    PCM JSR1029 12.09.2012/Bangalore Metro/Page3

    Market share of Putzmeister Boom

    Pumps is around 70-80 % in this project.

    BMRCL project of R-3A for Elevatedstructure for 5.1 KMS. Putzmeister Boompump model BSF 36.09 is being used for pre-

    casting and concreting piers & piers caps.

    Boom Pump details :Pump commissioned on :19/08/2010

    Pumping hrs : 1092 hrsConcrete done : 45,000 Cu.m.Concrete grade used : M40, M50

    Almost done 1100 segments and 1000 nos.I-Girders by using this machine.

    Each segment will have 20 cum concrete and

    each I-Girder will have 17 cum concrete.

    P&M - Incharge is extremely satisfied withthe performance of the machine and

    completing his project as per stipulatedtimeline.

  • 7/29/2019 Bengaluru Metro Project

    4/7

    BMRCL project of 3 nos. station in R-3, 3 nos

    station in R-3A, 3 nos. Stations in R-4. PutzmeisterBoom Pump being used basically for building

    Station and for placing concrete at 3 level and fordifferent structure. All station locations are highlycongested due to traffic & placing concrete is a big

    challenge.

    Machine working at Yeshwantpur Station

    JOB SITE REPORT

    Boom pump working for placing concrete at Peenya station.

    Pump commissioned : 2006

    Shifted to this site : March 2009Pumping hrs : 1800 hrs

    Concrete done : 52,000 Cum

    Cumulative (since from purchase) concrete done :above 1,00,000 CUMConcrete Grade used in this project : M40,M50Mostly this machine is being used for placing the

    concrete for station construction.P&M - Head is satisfied with the performance of

    the machine & is confident of completing theproject as per schedule. Also, he has appreciated

    the service support extended during concretingeven at night.

    PCM JSR1029 12.09.2012/Bangalore Metro/Page4

    Putzmeister Boom Pumps working in different phases of Bangalore Metro Project

  • 7/29/2019 Bengaluru Metro Project

    5/7

    BMRCL project of R- 4A in which 4 km elevated structure and 3 nos. stations and R-3B in which 3.8 kmselevated structure and 3 nos. stations. The machine is used for precast application and placing concrete atelevated structures wherever required and to build a station.

    Boom Pump details :

    Pump commissioned on : 5/12/2010Pumping hrs : 1200 hrs

    Concrete done : 45,000 CumConcrete Grade used in this project : M40,M50,M60Casting concrete Grade : M50

    P&M- Head has mentioned that PM machine performance is up to his satisfaction.

    JOB SITE REPORT

    Casting yard done by Putzmeister Boom Pumps

    Machine working for Precast at site

    PCM JSR1029 12.09.2012/Bangalore Metro/Page5

  • 7/29/2019 Bengaluru Metro Project

    6/7

    Underground Tunnel project of total

    length 4.9 KMS. Constructing 4nosunderground stations in East-West

    line. Project has started and almost3KM tunnel has been completed.Brief project details are as under:

    Tunnel length: 4.9 KMS and Tunneldiameter is 5.9 meter.

    Underground depth: 35 meter

    No. of under ground stations: 4 nos.Tunnel Rings : Rings are pre-castedin different segment.

    They are using our boom pump forplacing concrete at tunnel opening,pathways, sidewall construction etc.

    JOB SITE REPORT

    Machine details :1)Model : BSF 32.09

    This machine was shifted from other project.Commissioned on :18.06.2008Concrete done so far :63000 CUM

    Concrete done for this project : 15,000 CUMPumping Hours : 1392 Hrs.

    2) Model :BSF 36.09

    Machine shifted from other project.Machine Commissioned on:12.04.2009Concrete done so far: 40,000 CUM

    Concrete done for this Project: 15000 CUMTotal Pumping Hours done: 1068 hrs.

    Concrete Grade Pumped: M25.M35

    Tunnel insde view.Tunnel near Chinnaswamy stadium station.Boom pump placing concrete

    ac ne wor ng or p ac ng concre ng or unne ng

    PCM JSR1029 12.09.2012/Bangalore Metro/Page6

  • 7/29/2019 Bengaluru Metro Project

    7/7

    Underground Tunnel project of total length4kms Constructing 3 nos. underground

    stations in North-South line. Project hasstarted and Tunnel work not yet started.

    Brief project details are as under.Tunnel length :4.0 KMS & Tunnel diameter

    is 5.9 meter.Underground depth: 35 meter

    No of under ground stations: 3 nos.Tunnel Rings : Rings are pre-casted in

    different segments.They are using Putzmeister boom pump forconcrete placing in tunnel opening,

    pathways, sidewall construction etc.

    JOB SITE REPORT

    Tunneling Site

    Machine details:

    Model :BSF 36.09Machine commissioned on: June 2012

    Concrete done : 500 CUMPumping hrs :12 hrs .

    This pump started using fromSeptember 2012 onwards only

    Full view of Boom Pump.

    PCM JSR1029 12.09.2012/Bangalore Metro/Page7