Bell Road Loop 101 to Grand Avenue ITS Design. Project Overview. Multi-Agency Project for the design of: 6.5 miles of Fiber Optic Cable Interconnection of 14 traffic signals 6 CCTV camera installations 4 arterial DMS installations. Traffic Signal Interconnect. - PowerPoint PPT PresentationTRANSCRIPT
Bell RoadBell RoadLoop 101 to Grand AvenueLoop 101 to Grand Avenue
ITS DesignITS Design
Project Overview
• Multi-Agency Project for the design of:– 6.5 miles of Fiber Optic Cable– Interconnection of 14 traffic signals– 6 CCTV camera installations– 4 arterial DMS installations
Traffic Signal Interconnect
• 6 City of Surprise traffic signals• 5 MCDOT traffic signals• 3 City of Peoria traffic signals • Benefit:
– Remote monitoring and control of traffic signal timing
– Improved progression across jurisdictions and along the corridor
Traffic Signal Coordination
Traffic Signal Coordination
Traffic Signal Coordination
Traffic Signal Coordination
Traffic Signal Coordination Considerations
• Distance between intersections• Progression speed• Peak hour balancing• Trade-offs between side street delay
and arterial bandwidth
CCTV Cameras• 3 City of Surprise locations
Grand Avenue, R.H. Johnson Blvd, El Mirage Road • 2 MCDOT locations
East of Avenue of the Arts, 99th Avenue
• 1 City of Peoria location91st Avenue
• Benefit: – Remote monitoring of traffic conditions– Incident verification and management
Dynamic Message Signs
• 2 City of Surprise locationsEast of Dysart Road and East of R.H. Johnson Boulevard
• 2 City of Peoria locationsEast of 91st Avenue and East of 84th Avenue
• Benefit: – Inform motorists of incidents, closures and
special events
Future Considerations
• Spare fiber for additional CCTV installations
• Phase 2 ITS Design: Bell Road, Grand Avenue to Loop 303