BEDWORTH SHOPPING CENTRE‐ VEREENIGING
WORKS DESCRIPTION:
Structural Steelwork for Edilcon as Sub Contractor
VALUE OF WORK R 1 050 000,00 CONTRACT FACTS: Duration: August 2010 to February 2011 ‐Approximately 50 tons of majorily exposed steelwork with canopy and entrance features. ‐Connection of roofs between old and new Centre. ‐Steel columns with brickwork infill and steel truss roof structure complete the work description.
LEM GROUP PARTICIPATION: BRAAM STEEL: Structural Steelwork, sundry steelwork
CONSULTING TEAM: CLIENT: EDILCON JOHANNESBURG ARCHITECT: NOT APPLICABLE STRUCTURAL ENGINEER: L AND S CONSULTING, JOHANNESBURG. QUANTITY SURVEYOR: NORVAL WENTZEL AND STEINBERG, JOHANNESBURG See Work Done schedule / references for more