beaufort county public works stormwater infrastructure ......project #: 2010-164 completed: feb-10...

5
Project Summary: St. Helena Island Vacuum Truck - Site Photographs Joe Capers Road, Polowana Road, Sea Pines Road and Rose Island Road Before Project #: 2010-164 Completed: Feb-10 Narrative Description of Project: Jetted (3) crossline pipes and (5) driveway pipes. Material Cost, Rental Equipment Summary, and Labor Material Unit Cost/Unit Qty Cost Water gallon $0.01 4,650 $46.50 Diesel gallon $2.43 21.1 $51.27 Labor hours 33.5 $1,098.31 Total Cost of Materials, Rental Equip., and Labor $1,196.08 During Note: Labor cost includes the employee's salary plus fringe benefits. Equipment Cost Item Asset Cost/Hour Hrs. Cost Vacuum Truck 22812 $20.30 16.0 $324.80 Total Equipment Cost $324.80 Cost/hour excludes fuel cost. Total Cost: $1,520.88 After Beaufort County Public Works Stormwater Infrastructure Project Summary

Upload: others

Post on 13-Aug-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Beaufort County Public Works Stormwater Infrastructure ......Project #: 2010-164 Completed: Feb-10 Narrative Description of Project: Jetted (3) crossline pipes and (5) driveway pipes

Project Summary: St. Helena Island Vacuum Truck - Site PhotographsJoe Capers Road, Polowana Road, Sea Pines Road and Rose Island Road

BeforeProject #: 2010-164 Completed: Feb-10

Narrative Description of Project: Jetted (3) crossline pipes and (5) driveway pipes.

Material Cost, Rental Equipment Summary, and Labor

Material Unit Cost/Unit Qty CostWater gallon $0.01 4,650 $46.50Diesel gallon $2.43 21.1 $51.27Labor hours 33.5 $1,098.31Total Cost of Materials, Rental Equip., and Labor $1,196.08

DuringNote: Labor cost includes the employee's salary plus fringe benefits. Equipment Cost

Item Asset Cost/Hour Hrs. Cost

Vacuum Truck 22812 $20.30 16.0 $324.80Total Equipment Cost $324.80 Cost/hour excludes fuel cost.

Total Cost: $1,520.88

After

Beaufort County Public WorksStormwater Infrastructure

Project Summary

Page 2: Beaufort County Public Works Stormwater Infrastructure ......Project #: 2010-164 Completed: Feb-10 Narrative Description of Project: Jetted (3) crossline pipes and (5) driveway pipes

JOE CAPERS RD

D/W

SID & LOIS LN

FORTUNE RD

D/W

D/W

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

¬Project: JoeCapers Road

Activity: VacuumTruck

Project #:2010-164

Township: St.Helena Island

Completed:February 2010

0 90 180 270 36045Feet

1 inch equals 123.08 feetPrepared By: BC Stormwater Management UtilityDate Print: 4/16/10File:C:\sethdata\project\projectmap\VacTruck\Joe Capers 2010-164

Jetted (2) driveway pipes.

Page 3: Beaufort County Public Works Stormwater Infrastructure ......Project #: 2010-164 Completed: Feb-10 Narrative Description of Project: Jetted (3) crossline pipes and (5) driveway pipes

D/W

POLO

WA

NA

RD

ARBOR LN

CANOPY LN

OLD POLOWANA RD

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

¬Project: PolowanaRoad

Activity: VacuumTruck

Project #:2010-156

Township: St.Helena Island

Completed:February 2010

0 140 280 420 56070Feet

1 inch equals 178.01 feetPrepared By: BC Stormwater Management UtilityDate Print: 4/16/10File:C:\sethdata\project\projectmap\VacTruck\Polowana Rd 2010-156

Jetted (1) crossline pipe.

Page 4: Beaufort County Public Works Stormwater Infrastructure ......Project #: 2010-164 Completed: Feb-10 Narrative Description of Project: Jetted (3) crossline pipes and (5) driveway pipes

D/W

SEA PINES DR

SIMS R

D

MCTE

ER

DR

D/WD

/W LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

¬Project: SeaPines Drive

Activity: VacuumTruck

Project #:2010-139

Township: St.Helena Island

Completed:February 2010

0 210 420 630 840105Feet

1 inch equals 260.86 feetPrepared By: BC Stormwater Management UtilityDate Print: 4/16/10File:C:\sethdata\project\projectmap\VacTruck\Sea Pines Dr 2010-139

Jetted (1) crossline pipe.

Page 5: Beaufort County Public Works Stormwater Infrastructure ......Project #: 2010-164 Completed: Feb-10 Narrative Description of Project: Jetted (3) crossline pipes and (5) driveway pipes

ROS E ISLAND RD

EDD

ING

S PO

INT

RD

D/W

LOCUST LN

D/W

D/W

D/W

D/W

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

¬Project: RoseIsland Road

Activity: VacuumTruck

Project #:2010-140

Township: St.Helena Island

Completed:February 2010

0 340 680 1,020 1,360170Feet

1 inch equals 441.37 feetPrepared By: BC Stormwater Management UtilityDate Print: 4/16/10File:C:\sethdata\project\projectmap\VacTruck\Rose Is Rd 2010-140

Jetted (3) driveway pipesand (1) crossline pipe.