Aims & Objectives To reinstate a railway station at Beattock . To increase tourism in the Beattock & Moffat area Environmental - access to the rail network to use the train other than a car & bus. Accessibility of Job & leisure opportunities in the cities. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Beattock Station Action Group
Page 2: Beattock Station Action Group

Aims & Objectives To reinstate a railway station at Beattock .

To increase tourism in the Beattock & Moffat area Environmental - access to the rail network to use

the train other than a car & bus. Accessibility of Job & leisure opportunities in the

cities. To ensure an integrated transport service runs

from Moffat Feasibility of a freight facility at Beattock

Economic regeneration of Beattock & Moffat and surrounding region overarching all of above.

Page 3: Beattock Station Action Group

BSAG is convened on the basis of conviction that having assessed public demand,

Beattock station will re-open and the purpose of the group is to prepare for the opportunity,

when it arises.

Page 4: Beattock Station Action Group

WCML south of Carstairs not part of Scotland Network.

No ScotRail commissioned services (although Lockerbie Station is managed by ScotRail).

Services at Lockerbie Station provided by two franchises:• InterCity West Coast Franchise (Virgin)• TransPennine Franchise (First)

Specified by Department for Transport ScotRail Franchise due for renewal in 2014 More stops at Lockerbie from 2013 by TPE

Page 5: Beattock Station Action Group

POLITICAL STRUCTURE

Transport a devolved function under the

devolution settlement.ScotRail services commissioned by

Scottish Government/ Transport Scotland.

Corresponds with red areas on map.

WCML services commissioned by UK Government/Dept. for

Transport.

Page 6: Beattock Station Action Group

Important to ask the right questions Careful consideration taken Over 500 completed Close this round of research 30th June Prepare full report of findings for October Present information to South West of Scotland

Transport Partnership (Swestrans) Forward update of Atkins Report (2004) Scottish Transport Appraisal Guidance (STAG)

Study – Detailed Business Case – (Must ask the right question! – can only be completed by a Local Authority)

Page 7: Beattock Station Action Group

Examination of railway timetables confirmed that a new local service was feasible

Annual cost of operation £2.375 million (2004) for a local service

Stops at Beattock anticipated at 25 passengers per week

This is below Network Rail (rule of Thumb) 100 per week

Strict economic case is not strong Environmental and safety objectives show positive

returns Wider economic impacts show potential Significant wider benefits not least to stem de-

population Business case not strong enough

Page 8: Beattock Station Action Group

Region Wide Rail Station Strategy Study commissioned by SWestrans 2007 Includes consideration of Potential for a New

Station at Beattock.

Page 9: Beattock Station Action Group

Reduce CO2/Climate change emissions from transport. Compete with / encourage modal shift from domestic

aviation. One hour communing time to cities Achieve faster end-to-end journey times. Make best use of limited capacity. Maximise Benefit/Cost Ratio of £9 billion spent on

WCML upgrade! NEGATIVES to reopening Beattock = Pressure for limited stopping at ALL intermediate

stations. Lockerbie is the lowest demand station on the WCML

route. Increased service from Lockerbie 2013

Page 10: Beattock Station Action Group

Its nearly 10 years since the Atkins Report – business case will have higher profile

Alternate stops for Lockerbie & Beattock Next franchise will be operated by 110mph Class 350 EMUs.

(electric not Diesel) Virgin Pendolinos currently traverse Beattock Summit

northbound (uphill) at 100mph, the new Class 350s will actually be able to keep time with them.

350 EMU’s are capable of accelerating to full speed in about two minutes

To suggest reopening Beattock would lead to a reduction in service frequency is misleading . There is space in the schedule

Any argument about time slots at Glasgow and Edinburgh is again completely misleading. There is no difference to the number of trains arriving at these stations whether they stop at Beattock or not. If a stop at Beattock adds five minutes to the journey, then a different arrival or departure slot is given.

There are no Track or Signal changes needed to reopen Beattock

Page 11: Beattock Station Action Group

Station at Beattock would serve Moffat and surrounds.

More passengers paying fares. But some abstraction from Lockerbie. BUT Costs 5 minutes to stop train. DfT uses a ‘Value of Time’ in £s per passenger. Costs more to stop than revenue added. And trains are at/near capacity anyway.

Local Service on WCML does not meet DfT or TOC objectives.

Would have to be commissioned by Scottish Government/Transport Scotland.

Page 12: Beattock Station Action Group

Station reopened in line with freight facility for Beattock

Revisited timber haulage option with Stobart Rail

Landowner supported but Stobart already heavily invest in Carlisle

Scottish Governments Freight Facility grants can provide up to 75% of costs

No significant partner available to progress

Have not given up on this!

Page 13: Beattock Station Action Group

• Included in Regional Transport Strategy Delivery Plan.• Review recent successes: Borders Rail, Laurencekirk,• Campaign jointly with other existing/potential station

locations.• Political champions at Holyrood.• Scottish Transport Appraisal Guidance (STAG) Study –

Detailed Business Case – (Must ask the right question!)• Complete research to put a business case to Swestrans

to enable a STAG report • Contact TPE to revisit a conversation with its

executives• Continue to fund raise and gather local support