23 July 2014 Wrap Up and Mini Mock Examination BEAM Pro Training and Examination 1 Mr HK Li BES, MArch(Manitoba); MBA(Toronto) HKIA; AHKIArb; FHKIVM Registered Architect, Authorized Person Value Management Facilitator (List A) BEAM Pro Member of Professional Development Committee, BEAM Society Limited

Upload: others

Post on 08-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

23 July 2014

Wrap Up and Mini Mock Examination

BEAM Pro Training and Examination

1

Mr HK Li BES, MArch(Manitoba); MBA(Toronto)

HKIA; AHKIArb; FHKIVM

Registered Architect, Authorized Person

Value Management Facilitator (List A)

BEAM Pro

Member of Professional Development Committee, BEAM Society Limited

Page 2: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

BEAM Pro are green building professionals

trained by BEAM Society Limited

and accredited by Hong Kong Green Building Council.

BEAM Professionals (BEAM Pro)

2

Page 3: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Welcome to be

BEAM Assessor

A Selection Panel will assess each application. Qualified applicants will be subject to training, professional assessment & interview.

BEAM Assessor

3

Page 4: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

The “Green Building Faculty” (GB Faculty) supports the initiatives of green building and sustainable

environment of the HKGBC and its Green Labelling Committee (GLC),

Industry Standards and Research Committee (ISRC), Communications and Membership Committee (CMC),

as well as Technical Review Committee (TRC) and

Professional Development Committee (PDC) of the BEAM Society (BSL).

Green Building Faculty

4

Page 5: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Technical Review Committee (TRC)

The Technical Review Committee (TRC) conducts all matters related to the BEAM rating tools to specific

building assessments, including:

•manage the development and •upgrade BEAM rating tools,

•manage a team of BEAM Expert Panels, •monitor the quality of assessments.

5

Page 6: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Technical Review Committee (TRC)

Expert Panel

Site Aspects

Expert Panel

Energy Use

Expert Panel

Innovations

and Additions

Expert Panel

Materials

Aspects

Expert Panel

Water Use

Expert Panel

Indoor

Environmental

Quality

Vice Chairperson

Chairperson

6

Page 7: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Technical Review Committee (TRC)

Functions: A. Technical and certification •assign assessors to BEAM Plus project assessments •Endorse Provisional and Final assessments for issuing of certificates by HKGBC •Process credit interpretations •Establish rulings to exceptional cases •Undertake the First Appeal B. Assessor Practices •Monitor and maintain the quality of the assessments by the assessors •Review the performance of assessors C. Development •Collect information and rulings for future development of BEAM Plus •Update the current BEAM Plus and develop new versions

7

Page 8: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

BEAM Pro Training

Candidates will receive the updated training materials by email in about one

week after the training.

Training Materials 8

Page 9: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

BEAM Pro Examination

Hong Kong Examinations & Assessment Authority (HKEAA)

Room 505, 17 Tseuk Luk Street, San Po Kong, Kowloon, Hong Kong

Venue 9

Page 10: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

BEAM Pro Examination

05 / 10 / 15 / 16 / 17 Sept 2014

Dates 10

Page 11: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

BEAM Pro Examination

09:00-11:00 12:00-14:00 15:00-17:00

Time Slots/ Day 11

Page 12: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Test the understanding of green building principles

& the assessment system under BEAM Plus Version 1.2 and

BEAM Plus Interiors Version 1.0

Scope 12

BEAM Pro Examination

Page 13: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Open Book

A set of BEAM Plus NB & EB Version 1.2 and BEAM Plus Interiors Version 1.0

will be provided.

Memorizing the credit points, etc. is NOT required.

13

BEAM Pro Examination

Page 14: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Format

Computer-based, randomly generated 100 multiple choice questions

in English, to be answered within 2 hours

14

BEAM Pro Examination

Page 15: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Result

Passing mark: 75% Pass / Failure notification immediately after exam. Official result in about 4 weeks time after exam.

15

BEAM Pro Examination

Page 16: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Result 16

BEAM Pro Examination

https://www.hkgbc.org.hk/eng/BeamProRegistrationForm.aspx

Page 17: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Registration

Candidates passing the Exam Make formal registration

On HKGBC website www.hkgbc.org.hk/eng/BeamProRegistrationForm.aspx

17

BEAM Pro Examination

Page 18: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Re-take

Take note of announcement of next exam date by BEAM

Retake period – ONE YEAR from the 1st

Examination date

18

BEAM Pro Examination

Page 19: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Appeal

Only Appeal to Exam Process & Procedure is accepted

e.g. delay in admission time, computer glitch, unclear exam instructions

19

BEAM Pro Examination

Page 20: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Appeal

A fee of $500 (non-refundable) BSL will review the case and get back to the Applicants within 20 working days

20

BEAM Pro Examination

Page 21: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

CPD

For details, please visit BEAM Society website:

http://www.beamsociety.org.hk/en_cpd_1.php

21

CPD & Practice 15 hours per year

Page 22: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Mock Exam

22

Page 23: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following is the building environmental assessment tool recognized by the Hong Kong Green Building Council for certifying existing buildings? A.BEAM for Existing Buildings B.BEAM Plus C.BREEAM for EB D.LEED AP

BEAM Pro Mock Exam

01/22 23

Page 24: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following is the building environmental assessment tool recognized by the Hong Kong Green Building Council for certifying existing buildings? A.BEAM for Existing Buildings B.BEAM Plus C.BREEAM for EB D.LEED AP

BEAM Pro Mock Exam

24 01/22

Page 25: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

A retrofit of public housing estate is assessed under BEAM Plus for EB and awarded a Platinum Certificate in 2013. When will the certificate expire? A. 2013 B. 2015 C. 2018 D. 2020

BEAM Pro Mock Exam

25 02/22

Page 26: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

A retrofit of public housing estate is assessed under BEAM Plus for EB and awarded a Platinum Certificate in 2013. When will the certificate expire? A. 2013 B. 2015 C. 2018 D. 2020

BEAM Pro Mock Exam

26 02/22

Page 27: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

What amount of construction & demolition waste reduction will qualify for an additional credit under BEAM Plus NB Innovations and Additions? A. 20% B. 40% C. 50% D. 90%

27

BEAM Pro Mock Exam

03/22

Page 28: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

What amount of construction & demolition waste reduction will qualify for an additional credit under BEAM Plus NB Innovations and Additions? A. 20% B. 40% C. 50% D. 90%

28

BEAM Pro Mock Exam

03/22

Page 29: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Under BEAM Plus NB SA P1, what is the prerequisite for minimum planting area for a three-hectare hostel site with canteen, car parks and activity rooms? A. Not applicable B. 10% C. 20% D. 30%

29

BEAM Pro Mock Exam

04/22

Page 30: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Under BEAM Plus NB SA P1, what is the prerequisite for minimum planting area for a three-hectare hostel site with canteen, car parks and activity rooms? A. Not applicable B. 10% C. 20% D. 30%

30

BEAM Pro Mock Exam

04/22

Page 31: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

How many months of training record of operation & maintenance for responsible staff are required in order to obtain a credit under BEAM Plus EB SA 8 Staff and Resources? A. 3 B. 9 C. 12 D. 36

31

BEAM Pro Mock Exam

05/22

Page 32: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

How many months of training record of operation & maintenance for responsible staff are required in order to obtain a credit under BEAM Plus EB SA 8 Staff and Resources? A. 3 B. 9 C. 12 D. 36

32

BEAM Pro Mock Exam

05/22

Page 33: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following could earn exactly 3 credits under BEAM Plus NB EU 6 Renewable Energy Systems for a building with an annual energy consumption 100,000 kWh and 1,000 m2 building footprint? A.Wind turbines which generate 1,000 kWh monthly B.Solar air conditioning system reducing 25,000 kWh every year C.Geothermal system energy saving equivalent to 300 m2 of PV D.PV covering 550 m2 of roof space plus solar thermal system energy saving equivalent to 50 m2 of PV

33

BEAM Pro Mock Exam

06/22

Page 34: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following could earn exactly 3 credits under BEAM Plus NB EU 6 Renewable Energy Systems for a building with an annual energy consumption 100,000 kWh and 1,000 m2 building footprint? A.Wind turbines which generate 1,000 kWh monthly B.Solar air conditioning system reducing 25,000 kWh every year C.Geothermal system energy saving equivalent to 300 m2 of PV D.PV covering 550 m2 of roof space plus solar thermal system energy saving equivalent to 50 m2 of PV

34

BEAM Pro Mock Exam

06/22

Page 35: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

What is the default occupancy density for an existing building when the number of occupants is not known under BEAM Plus EB Water Use? A. 6 m2/person B. 9 m2/person C. 12 m2/person D. 15 m2/person

35

BEAM Pro Mock Exam

07/22

Page 36: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

What is the default occupancy density for an existing building when the number of occupants is not known under BEAM Plus EB Water Use? A. 6 m2/person B. 9 m2/person C. 12 m2/person D. 15 m2/person

36

BEAM Pro Mock Exam

07/22

Page 37: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

How can a project, which was registered previously under BEAM 4/04 (but not yet completed the certification process), be switched to BEAM Plus? A.Not possible B.Can process both versions simultaneously C.Only if the applicant terminates the project registration of BEAM 4/04 and re-registers the project under BEAM Plus D.None of the above

37

BEAM Pro Mock Exam

08/22

Page 38: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

BEAM Pro Mock Exam

How can a project, which was registered previously under BEAM 4/04 (but not yet completed the certification process), be switched to BEAM Plus? A.Not possible B.Can process both versions simultaneously C.Only if the applicant terminates the project registration of BEAM 4/04 and re-registers the project under BEAM Plus D.None of the above

38

08/22

Page 39: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

(i) The assessment will be undertaken by the assessor anonymously. (ii) The assessor will visit the site to verify certain criteria and conditions. (iii)The applicant must submit all necessary evidence such as documents

or photographic records to demonstrate compliance with relevant criteria to the satisfaction of the assessor.

A. (i) & (ii) only B. (ii) & (iii) only C. (i) & (iii) only D. None of the above

A project will be assessed under BEAM Plus EB. Which of the following statements are correct:

39

BEAM Pro Mock Exam

09/22

Page 40: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

(i) The assessment will be undertaken by the assessor anonymously. (ii) The assessor will visit the site to verify certain criteria and conditions. (iii)The applicant must submit all necessary evidence such as documents

or photographic records to demonstrate compliance with relevant criteria to the satisfaction of the assessor.

A. (i) & (ii) only B. (ii) & (iii) only C. (i) & (iii) only D. None of the above

A project will be assessed under BEAM Plus EB. Which of the following statements are correct:

40

BEAM Pro Mock Exam

09/22

Page 41: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following are defined as non-occupied areas under BEAM Plus NB IEQ 16 Interior Lighting in Normally Occupied Area? A. Janitorial rooms B. Hallways C. Stairwells D. Restrooms

41

BEAM Pro Mock Exam

10/22

Page 42: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following are defined as non-occupied spaces under BEAM Plus NB IEQ 16 Interior Lighting in Normally Occupied Area? A.Janitorial rooms B.Hallways C.Stairwells D.Restrooms

42

BEAM Pro Mock Exam

10/22

Page 43: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Under BEAM Plus NB SA 5 Ecological Impact, which of the following is encouraged in building development? A. Brownfield site B. Greenfield site C. Reclaimed site D. Arable site

43

BEAM Pro Mock Exam

11/22

Page 44: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Under BEAM Plus NB SA 5 Ecological Impact, which of the following is encouraged in building development? A. Brownfield site B. Greenfield site C. Reclaimed site D. Arable site

BEAM Pro Mock Exam

44 11/22

Page 45: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following should be included in the Environmental Guidelines for Tenants? A. Vertical daylight factor on building facades B. List of neighbourhood amenities C. Hazardous waste management D. No. of trees removed during construction

45

BEAM Pro Mock Exam

12/22

Page 46: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following should be included in the Environmental Guidelines for Tenants? A. Vertical daylight factor on building facades B. List of neighbourhood amenities C. Hazardous waste management D. No. of trees removed during construction

46

BEAM Pro Mock Exam

12/22

Page 47: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

An existing school in Wan Chai would like to apply for BEAM Plus Certification. Which of the following is NOT a potential strategy for attaining credit under BEAM Plus EU5 Renewable Energy System? A. Install building integrated photovoltaic panels B. Provide solar hot water systems C. Consider wind turbine installation on the roof D. Construct green roof

47

BEAM Pro Mock Exam

13/22

Page 48: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

An existing school in Wan Chai would like to apply for BEAM Plus Certification. Which of the following is NOT a potential strategy for attaining credit under BEAM Plus EU5 Renewable Energy System? A. Install building integrated photovoltaic panels B. Provide solar hot water systems C. Consider wind turbine installation on the roof D. Construct green roof

48

BEAM Pro Mock Exam

13/22

Page 49: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

What percentage level of compliance of applicable security measures and facilities for a building is required under BEAM Plus NB IEQ 1? A. 65% B. 70% C. 75% D. 80%

BEAM Pro Mock Exam

49 14/22

Page 50: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

What percentage level of compliance of applicable security measures and facilities for a building is required under BEAM Plus NB IEQ 1? A. 65% B. 70% C. 75% D. 80%

50

BEAM Pro Mock Exam

14/22

Page 51: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

The GFA concession for new developments will require BEAM Plus certification issued by HKGBC. What is the minimum rating requirement by BD? A. Gold B. Silver C. Bronze D. None of the above

51

BEAM Pro Mock Exam

15/22

Page 52: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

The GFA concession for new developments will require BEAM Plus certification issued by HKGBC. What is the minimum rating requirement by BD? A. Gold B. Silver C. Bronze D. None of the above

52

BEAM Pro Mock Exam

15/22

Page 53: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following statement is correct of having two BEAM Professionals in one BEAM Plus NB submission? A.This is one of the mandatory requirements according to the BEAM Plus Certification Procedures Manual. B.The assessment period reviewed by BEAM Assessor will be reduced by half. C.Two bonus credits in IA are achieved. D.One credit in IA is achieved.

53

BEAM Pro Mock Exam

16/22

Page 54: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following statement is correct of having two BEAM Professionals in one BEAM Plus NB submission? A.This is one of the mandatory requirements according to the BEAM Plus Certification Procedures Manual. B.The assessment period reviewed by BEAM Assessor will be reduced by half. C.Two bonus credits in IA are achieved. D.One credit in IA is achieved.

54

BEAM Pro Mock Exam

16/22

Page 55: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following standards is NOT relevant to BEAM Plus NB IEQ 9 Increased Ventilation? A.ASHRAE Standard 62.1-2007 B.ASHRAE Standard 111 C.ASHRAE Standard 140 D.ASTM E741

55

BEAM Pro Mock Exam

17/22

Page 56: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Which of the following standards is NOT relevant to BEAM Plus NB IEQ 9 Increased Ventilation? A.ASHRAE Standard 62.1-2007 B.ASHRAE Standard 111 C.ASHRAE Standard 140 D.ASTM E741

56

BEAM Pro Mock Exam

17/22

Page 57: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

How many credit(s) will be awarded for an existing building which is completely refurbished with all its non-structural partitions demolished and re-installed with new ones for a flexible office layout? A.0 B.1 C.2 D.3

57

BEAM Pro Mock Exam

18/22

Page 58: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

How many credit(s) will be awarded for an existing building which is completely refurbished with all its non-structural partitions demolished and re-installed with new ones for a flexible office layout? A.0 B.1 C.2 D.3

58

BEAM Pro Mock Exam

18/22

Page 59: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

A project will include a tennis court for residents only. A public swimming pool and shaded seating area are within 500m walking distance of the project site. Other services within 500m walking distance of the site include: (i) restaurant A (ii) restaurant B (iii) Automated Teller Machine (iv) a medical clinic (v) pharmacy (vi) a convenience store (vii) post office (viii) school (ix) laundry (x) place of worship. How many credit(s) will the project achieve for BEAM Plus NB SA 3 Neighbourhood Amenities? A.0 B.1 C.2 D.3

59

BEAM Pro Mock Exam

19/22

Page 60: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

A project will include a tennis court for residents only. A public swimming pool and shaded seating area are within 500m walking distance of the project site. Other services within 500m walking distance of the site include: (i) restaurant A (ii) restaurant B (iii) Automated Teller Machine (iv) a medical clinic (v) pharmacy (vi) a convenience store (vii) post office (viii) school (ix) laundry (x) place of worship. How many credit(s) will the project achieve for BEAM Plus NB SA 3 Neighbourhood Amenities? A.0 B.1 C.2 D.3

60

BEAM Pro Mock Exam

19/22

Page 61: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

BEAM Plus Interiors applies to which one of the following types of uses - A. An open carpark B. Revitalisation of an entire industrial building C. Offices, hotels and schools D. The lift lobby of a commercial building

61

BEAM Pro Mock Exam

20/22

Page 62: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

62

BEAM Pro Mock Exam

20/22

BEAM Plus Interiors applies to which one of the following types of uses - A. An open carpark B. Revitalisation of an entire industrial building C. Offices, hotels and schools D. The lift lobby of a commercial building

Page 63: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

BEAM Plus Interiors, under Green Building Attributes (GBA)1, if the building had been certified with Gold grade, the number of credits that can be achieved would be – A. 1 B. 2 C. 3 D. 4

63

BEAM Pro Mock Exam

21/22

Page 64: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

A. 1 B. 2 C. 3 D. 4

64

BEAM Pro Mock Exam

21/22

BEAM Plus Interiors, under Green Building Attributes (GBA)1, if the building had been certified with Gold grade, the number of credits that can be achieved would be –

Page 65: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

BEAM Interiors, under Materials Aspects (MA) 2, if 75% of prior condition walls, glazing, doors, ceiling and flooring are re-used, the number of credits that can be achieved would be - A. 0 B. 1 C. 2 D. 3

65

BEAM Pro Mock Exam

22/22

Page 66: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

66

BEAM Pro Mock Exam

22/22

BEAM Interiors, under Materials Aspects (MA) 2, if 75% of prior condition walls, glazing, doors, ceiling and flooring are re-used, the number of credits that can be achieved would be - A. 0 B. 1 C. 2 D. 3

Page 67: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

Q&A Feedback Form &

Confidentiality Form Please Sign!

67

Page 68: BEAM Pro Training and Examination Wrap Up and Mini Mock ... · Technical Review Committee (TRC) Functions: A. Technical and certification •assign assessors to BEAM Plus project

T +852 3610 5700

F +852 3996 9108