![Page 2: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/2.jpg)
…Background
Multi-lane, 1-mile long Collector Road
Southern end of Lake George
Multi-Modal
![Page 3: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/3.jpg)
…Background
Funded for full-depth Reconstruction
Federal, State and Local Funds
Improvements in Drainage and Subbase, Mobility
No Environmental Objectives in Original Scope
![Page 4: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/4.jpg)
…Background
Roadway drains directly to the lake
Impaired Water – Chlorides, Road Pollutants
Silt & Sediment from Urban Runoff & Erosion
![Page 5: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/5.jpg)
Constraints
• Little to no opportunity to obtain ROW
• Virtually flat roadway
• Elevation 4’ above Lake Level
• High Water Table
• Curbed Section
![Page 6: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/6.jpg)
…Proposed
Maintain Existing X-Section
![Page 7: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/7.jpg)
![Page 9: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/9.jpg)
Delta Formation – English Brook – Lake George
Sediment
![Page 10: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/10.jpg)
![Page 11: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/11.jpg)
ROADWAY POLLUTANTS
Photo credit: Jeremy Walker, Science Photo Library
![Page 12: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/12.jpg)
Pollutants and Sources of Highway Runoff
Pollutant Source
Particulates Pavement wear, vehicles, atmospheric deposition, maintenance activities.
Nitrogen, Phosphorus Atmospheric deposition and fertilizer application.
Lead Tire wear.
Zinc Tire wear, motor oil, and grease.
Iron Auto body rust, steel highway structures such as bridges and guardrails, and moving engine parts.
Copper Metal plating, bearing and brush wear, moving engine parts, brake lining wear, fungicides and insecticides.
Cadmium Tire wear and insecticide application.
Chromium Metal plating, moving engine parts, and brake lining wear.
Nickel Diesel fuel and gasoline, lubricating oil, metal plating, bushing wear, brake lining wear, and asphalt paving.
Manganese Moving engine parts.
Cyanide Anti-caking compounds used to keep deicing salts granular.
Sodium, Calcium, Chloride
Deicing salts.
Sulphates Roadway beds, fuel, and deicing salts.
Petroleum Spills, leaks, antifreeze and hydraulic fluids, and asphalt surface leachate.
Trash/Litter Items discarded or fallen out of moving vehicles found alongside roadways (e.g., paper/plastic cups, food containers, etc.)
Source: Stormwater Management Planning Guide for Transportation Projects, NYSDEC, 2005
![Page 13: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/13.jpg)
Targeted Pollutants and Their Sources
Automobile By-Products Chlorides – Salt
![Page 14: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/14.jpg)
Targeted Pollutants and Their Sources
Automobile By-Products
Chlorides - Salt
Sediment
![Page 15: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/15.jpg)
Three Segments of the Corridor
West End
East End
Ponds – No Swales – No Sheet Flow - No Sand Filters – No Rain Gardens – No Green Roofs – No Stormwater Planters – No Infiltration – Yes Proprietary Structures – Yes
NYSDEC
![Page 16: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/16.jpg)
Porous Pavements
• Parking areas, access roads, walkways, driveways, cul-de-sacs, urban and suburban roads, etc.
Porous PCC Porous HMA
![Page 17: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/17.jpg)
Porous Pavements
• Parking areas, access roads, walkways, driveways, cul-de-sacs, urban and suburban roads, etc.
Porous Pavers
![Page 18: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/18.jpg)
If We Can …Where Can We Install
Porous Pavement?
![Page 19: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/19.jpg)
East End
Sediment Formed Delta
NYSDEC Forest Preserve
Off-Site Sand and
Salt
![Page 20: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/20.jpg)
East End Profile
12.75%
5.75%
![Page 21: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/21.jpg)
East End
Sediment Formed Delta
NYSDEC Forest Preserve
Off-Site Sand and
Salt
SWTS
![Page 22: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/22.jpg)
Downstream Defender
![Page 23: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/23.jpg)
Downstream Defender
![Page 24: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/24.jpg)
![Page 25: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/25.jpg)
Downstream Defender 10 ft. Diameter Proprietary Structure – 25 CFS Capacity, 8.5 CY Sediment Storage
– NYSDEC – Says Need 80% TSS Removal & NJDEP Approval – However,…NJDEP Tests at 50% TSS Removal Approved DD => 7 CFS…….(10’ Unit) (8’ unit = 4.4 CFS) – No NJDEP Tests at 80% – WQv Treatment (0.22 ac-ft) for contributing Area = WQv Flow Rate of 4.0 CFS
--->…At 7.0 CFS we have 50% TSS Removal, Then at 4.0 CFS we must have more
Manufacturers Spec’s claim 95% TSS Removal @ 4.0 CFS.
Test Results from NJDEP Testing rated the DD at 70% Removal Efficiency using the following Equation where Q=gpm, D= feet.
Q=502 (D/4) ^2.5 = 11 CFS at 70% TSS Removal
NYSDOT Specifications – ITEM 604.5102nn15 (Serialized by Max Flow Rate)
• 80% TSS Removal for WQv Storm • Pass the Design Year Storm = 10 Year, 24-hour => 13.7 CFS (100 yr = 19.6 CFS) • Use 10’ Diameter Unit = 25 CFS Capacity, Sediment Storage • Manufacturers Specs – 50% TSS Removal at 25 CFS
80% TSS Removal Rate at 15 CFS
![Page 26: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/26.jpg)
Stormwater Treatment Structures
West End
East End
West End
NYSDEC East End
![Page 27: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/27.jpg)
West Brook
![Page 28: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/28.jpg)
West Brook Sediment Formed
Delta
![Page 29: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/29.jpg)
Stream Day-lighting & Sediment Removal
Existing Culvert 225’ Feet Long
![Page 30: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/30.jpg)
West Brook
Proposed Culverts 2 x 70’ Feet Long
![Page 31: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/31.jpg)
Low Flow (90%) Channel High Flow Channel
![Page 32: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/32.jpg)
West Brook
![Page 33: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/33.jpg)
January 14, 2013
West Brook
Looking West
![Page 34: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/34.jpg)
![Page 35: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/35.jpg)
West End - Porous Pavement
West End
NYSDEC
East End
![Page 36: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/36.jpg)
Porous Asphalt Pavement
“The Year of Porous Asphalt: Salem, Oregon Proves Trend -- Water-absorbing Pavement is Vogue in 2012” LANHAM, Md., Oct. 15, 2012 /PRNewswire-USNewswire
“Water Absorbing Porous Asphalt Pavement Use Increases in 2012” – Too many to list
“Pavement That Actually Drinks Water? “ | YNN
“It was all absorbed into the pavement “
![Page 37: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/37.jpg)
• Groundwater recharge augmentation
• Runoff Reduction
• Effective pollutant treatment for solids, metals, nutrients, and hydrocarbons
• Safety Improvements – Glare, Road Spray
• Reduced Hydroplaning – Friction when wet
• Reduced de-icing Materials – Reduced Black Ice
• Less Susceptible to Frost – No Capillary Action
• Noise Reduction
• Little to No Closed Drainage System Needed
Porous Asphalt Pavement
![Page 38: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/38.jpg)
• Typically Parking areas, Low Volume, Low Speed Roads, Driveways
Porous Asphalt Pavement US EPA
Porous Asphalt Pavement
Similar to Open Graded Asphalt Courses used by NYSDOT (10FX) -
Not Successful However, It was not a Porous
Asphalt SYSTEM
![Page 39: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/39.jpg)
University of New Hampshire Model
Choker Course: 4”-8” (10 – 20 cm) minimum thickness of ¾” crushed stone
Pervious pavement: 4-6” (10 - 15 cm) of porous asphalt
Filter Course: 8” - 12” (20 - 30 cm) minimum thickness of subbase (aka. bank run gravel or modified 304.1)
Native materials
Filter Blanket: intermediate setting bed: 3” (8 cm) thickness of 3/8” (1 cm) pea gravel
Reservoir Course: 4” (10 cm) minimum thickness of 3/4” (2 cm) crushed stone for frost protection, 4-6” (10-15 cm) diameter perforated subdrains with 2” cover
Optional-Liner for land uses where infiltration is undesirable (e.g., hazardous materials handling, sole-source aquifer protection)
![Page 40: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/40.jpg)
Research: Maine Pilot Project
• 4-lane arterial in South Portland
• Installed in Fall of 2009 – ARRA Funded
• 20,100 Design AADT, 5% Heavy Trucks (3.0 M ESALS
• Highly developed retail and commercial corridor
• No signs of rutting or deterioration In July, 2012
• Custom mix designed for test section, NAPA, UNH
• Warmer Temperatures than Lake George (5-100 F )
December 2010 – Porous Asphalt Feasibility Study – Warren County, Lake George Association (LGA), County Soil and Water Conservation
![Page 41: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/41.jpg)
Porous Asphalt Pavements
Maine Mall Road (Portland, Maine) Photo Credit: Maine DOT
Maine Mall Road (Portland, Maine) Photo Credit: Maine DOT
New Heavier Duty Applications
![Page 42: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/42.jpg)
Maine Mall Road – Portland Maine
850’ feet Long
60,000 SF of Porous Asphalt
![Page 43: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/43.jpg)
Photo Credit: Maine DOT
The Maine DOT Section
9” Asphalt, 15” Reservoir Course, Variable Sand Layer
60,000 SF of Porous Asphalt
![Page 44: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/44.jpg)
Beach Road Design Considerations • Infiltration Tests – 3”/ hr and up
• Design Traffic Loading 1.05 M ESALS - 8600 AADT, 5% Trucks
• Heavy Duty Pavement System
• Sand Layer – (in UNH and Maine design) May Not Be Feasible
• Frost Penetration With high Water Table and Lake
• Constructability Requirements – Economic Impact to Area
• Targeted Primary Pollutants
• Lake Backflow – Irene and Lee
• Contamination from offsite – Irene and Lee
• Extreme Storm Planning – Irene and Lee
• Redundant Drainage System – FHWA Funded, GIGP Grant
• Parts of Existing Drainage System permanently underwater
![Page 45: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/45.jpg)
Consensus Building
• WORK CLOSELY WITH Owner and Agencies • Warren County and Warren County Board of Town Supervisors
– Lake George Association, Warren County Soil and Water Conservation District, NYSDEC,
– EFC – GIGP, EPA - $415,000 from GIGP Grant
• FHWA involved at the onset – Experimental status, Requested testing and monitoring – Should project not function as intended, repairs will be reimbursed
(prorated) by FHWA during time frame of 8 yrs.
• NYSDOT (Region 1 & Main Office) involved at the onset – Work w/B&L to develop testing and monitoring protocols
• KEY PLAYERS AND STAKEHOLDERS Involved EARLY ON
![Page 46: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/46.jpg)
Design Criteria
• AADT – 8,600
• 5% Trucks
• 30 MPH Speed Limit
• DHV = 800
• Roadway Grade < 5%
• Minimize Traffic Control Devices and abrupt Speed Changes
![Page 47: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/47.jpg)
Beach Road System
![Page 48: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/48.jpg)
Beach Road Section
![Page 49: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/49.jpg)
Beach Road System Safeguards
• Frost Penetration Requirements (FAA Design) Thicker Section
• Minimize contamination from offsite
• Accelerated Ground Stabilization – Sod, High Performance Blankets
• No intermediate Sand Layer
• Flanking Drainage Structures – Irene and Lee
• Regular Vacuuming
• Education – Public and Municipal
• Upgrade or Improve Other Nearby Systems – West Brook
![Page 50: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/50.jpg)
Beach Road System Safeguards
![Page 51: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/51.jpg)
Beach Road System Safeguards
![Page 52: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/52.jpg)
Beach Road System Safeguards
![Page 53: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/53.jpg)
Beach Road System Safeguards
![Page 54: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/54.jpg)
Beach Road System Safeguards
![Page 55: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/55.jpg)
No Sand Layer
Beach Road System Safeguards
![Page 56: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/56.jpg)
VACUUM
Beach Road System Safeguards
![Page 57: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/57.jpg)
VACUUM
Beach Road System Safeguards
![Page 58: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/58.jpg)
Beach Road System Safeguards
Power Wash
![Page 59: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/59.jpg)
Beach Road System Safeguards
Power Wash
![Page 60: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/60.jpg)
Beach Road System Safeguards
Clogging Layer Lost Storage Capacity
![Page 61: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/61.jpg)
Beach Road System Safeguards
Power Wash
![Page 62: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/62.jpg)
Beach Road System Safeguards
Slower Infiltration Maintain Adequate Storage Capacity
![Page 63: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/63.jpg)
Beach Road System Safeguards Offsite Contamination Protection
Flanking Structures
![Page 64: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/64.jpg)
Beach Road System Safeguards
Flanking Structures
72” Existing Pipe
Stormwater Treatment System
![Page 65: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/65.jpg)
Specifications
![Page 66: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/66.jpg)
2.36 mm Typical Top Course - 16% Can pass the #8 Sieve
Typical Top Course - 100% Can pass the ½” Sieve
![Page 67: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/67.jpg)
Beach Road Testing Protocol
![Page 68: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/68.jpg)
Beach Road Testing Protocol
Oxidation of the Binder Hydraulic Scouring /Stripping Improperly Stored or Overheated Binder
![Page 69: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/69.jpg)
Choker Course
No Choker Course
![Page 70: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/70.jpg)
Beach Road Testing Protocol
![Page 71: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/71.jpg)
Beach Road Testing Protocol
![Page 72: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/72.jpg)
Demonstration
![Page 73: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/73.jpg)
Beach Road Testing Protocol
![Page 74: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/74.jpg)
![Page 75: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/75.jpg)
Sample Cores
![Page 76: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/76.jpg)
![Page 77: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/77.jpg)
![Page 78: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/78.jpg)
![Page 79: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/79.jpg)
BASE or Binder Course
BASE COURSE
![Page 80: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/80.jpg)
Top Course TOP COURSE
![Page 81: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/81.jpg)
Demonstration
![Page 82: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/82.jpg)
Demonstration
![Page 83: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/83.jpg)
Demonstration
![Page 84: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/84.jpg)
Water Quality
• Redevelopment Project with reduction in impervious
– From 94% impervious to 50% impervious
– WQv treatment and Water Quantity not actually required Since Greater than 25% reduction in Impervious
• Installing 3 Proprietary SWTS to treat runoff
• Biological activity within the asphalt layers – 98%
“Oil bio-degradation in permeable pavements by microbial
Communities” , A.P. Newman, C.J. Pratt, S.J. Coupe and
N. Cresswell
![Page 85: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/85.jpg)
Water Quality
• Reduced Chlorides by Using Less UNHSC concludes that de-icing materials can be reduced by approximately 50%
• Metal Removal - Zinc, Lead, Copper, Cadmium
• Suspended Solids - Typically Sand, Metals Attached
• Digestion of Hydrocarbons by Aerobic Bacteria Oil bio-degradation in permeable pavements by microbial
Communities” , A.P. Newman, C.J. Pratt, S.J. Coupe and N. Cresswell
Franklin Institute
![Page 86: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/86.jpg)
PDH Questions
• Of the following Roadway Grades, which would be considered acceptable for Porous Pavement Applications?
– 10%
– 2%
– 0%
– 0.5%
![Page 87: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/87.jpg)
PDH Questions
• A Porous Asphalt roadway system Should NOT be described as:
– A Green Infrastructure practice
– An Infiltration Practice
– An Absorbent Roadway
– Part of a Recharge System
– All of the Above
![Page 88: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/88.jpg)
PDH Questions
• A Porous Asphalt roadway system may not be advisable when:
– It is Adjacent to a “Brownfield” or contaminated soil site
– Operating Speeds are over 45 mph
– Proposed for use at a fueling station
– Installed along an Ocean Frontage Road
– All of the Above
![Page 89: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/89.jpg)
PDH Questions
• True or False
– Quality Control throughout the project construction is of Paramount Importance?
![Page 90: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/90.jpg)
PDH Questions
• At what ambient air temperature range is it recommended to place and finish Porous Asphalt?
– 75 to 90 degrees Fahrenheit
– 30 to 40 degrees Fahrenheit
– 867 5309 degrees Kelvin
– 98.6 degrees Celsius
– 50 to 70 degrees Fahrenheit
![Page 91: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/91.jpg)
PDH Questions
• Applying a Choker Course Can help you accomplish which of the following:
– Get Arrested
– Win the WWF Wrestling Championship
– Keep your dog from biting your neighbor
– Stabilize the larger stone course or courses
![Page 92: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/92.jpg)
Maintenance
Expect Continued Improvements in Maintenance Options and
Equipment
• Design Offsite Protection Systems into your project
• Maintain Vegetated Areas
• Vacuum 2 - 3 X / Year
• Slope Vegetated Areas Away from Roadway
• Use Sod to Establish Turf
• Education – Public and Municipal
• Deep Clean Promptly if Accident Occurs
![Page 93: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/93.jpg)
Maintenance
![Page 94: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/94.jpg)
Why is the Beach Road Project Significant ?
Higher Traffic and Traffic Loading Applications
Standardized Specifications – NYSDOT
Standardizes Protocols and Quality Control
Opens up the Practice to Thousands of miles of Roadways & where HD Pavement is Needed
High Water Table Application Next to a Lake
![Page 95: Beach Road, Porous Pavement and Then Some](https://reader031.vdocuments.mx/reader031/viewer/2022020720/55544fa5b4c905b7428b4ebc/html5/thumbnails/95.jpg)
Thomas Baird, PE, CPESC
Barton & Loguidice
10 Airline Drive Suite 200
Albany, NY 12205 (518) 218-1801