be prepared for epa’s new emission standards

33
BE PREPARED FOR EPA’S NEW EMISSION STANDARDS www.kpaonline.com (866) 356-1735

Upload: kpadealerwebinars

Post on 15-Jun-2015

32 views

Category:

Business


0 download

DESCRIPTION

Be Prepared for EPA’s New Emission Standards

TRANSCRIPT

Page 1: Be Prepared for EPA’s New Emission Standards

BE PREPARED FOR EPA’S NEW EMISSION STANDARDS

www.kpaonline.com

(866) 356-1735

Page 2: Be Prepared for EPA’s New Emission Standards

BE PREPARED FOR EPA’S NEW EMISSION STANDARDS

www.kpaonline.com

(866) 356-1735

Page 3: Be Prepared for EPA’s New Emission Standards

KPA – Company ProfileKPA – Company Profile

• Nationwide compliance expert on Safety, Environmental, HR

• Colorado Headquarters• 23 Years Experience • 3000 + Clients

– Dealerships, Service, Repair

• 20 Offices Serving 41 States

• Compliance products and services

– OSHA– DOT– EPA– Workers’ Comp– Background checking– Onboarding– Harassment – Red Flags– Onsite inspections– Online and onsite training

and tracking– And many more…

Page 4: Be Prepared for EPA’s New Emission Standards

QuestionsQuestions

• If you have questions during the presentation, please submit them using the “Questions” feature

• Questions will be answered at the end of the webinar

Page 5: Be Prepared for EPA’s New Emission Standards

PRESENTED BYPRESENTED BY

Peter ZaidelKPA Product [email protected]

303-228-2397

Page 6: Be Prepared for EPA’s New Emission Standards

EPA’s New Emission Standards for Collision Centers

40 CFR Part 63, Subpart HHHHHH

“The 6H Rules”

Paint Stripping and Miscellaneous Surface Coating Operations at Area

SourcesNow in Effect!

Page 7: Be Prepared for EPA’s New Emission Standards

Why the Need for this Rule?

CLEAN AIR ACT

Page 8: Be Prepared for EPA’s New Emission Standards

EPA’s New 6H Emission Regulations

Misc. Surface Coating

Paint Stripping

Operations

Auto Body Refinishing

3 Sources

Page 9: Be Prepared for EPA’s New Emission Standards

What are the Requirements?

Notification

Painter Training

Spray Gun Selection

Spray Gun Cleaning

Spray Booths

Re-Notification

Recordkeeping

Page 10: Be Prepared for EPA’s New Emission Standards

Notification

January 11, 2010

Final form is attached

Initial NotificationInitial Notification

Page 11: Be Prepared for EPA’s New Emission Standards

Notification FormNotification Form

Return Receipt Required

Page 12: Be Prepared for EPA’s New Emission Standards

January 11, 2010

Deadline for Initial Notification

January 10, 2011

Must Meet Major Requirements

March 11, 2011

Deadline to Re-Notify

Regulatory Deadlines

Page 13: Be Prepared for EPA’s New Emission Standards

All Painters must complete by January 10, 2011

Renewed Every 5 Years

Available from Multiple SourcesThis webinar does not satisfy all of the requirements

Painter Training Requirements

Page 14: Be Prepared for EPA’s New Emission Standards

Spray gun equipment selection, set up, and operation.

Spray techniques for different types of coatings to improve transfer efficiency and minimize coating

usage and overspray.

Routine spray booth and filter maintenance.

Environmental Compliance Requirements of these Regulations.

Painter Training Requirements

Page 15: Be Prepared for EPA’s New Emission Standards

HVLP or Equivalent Technology

Electrostatic Application, Airless Spray Gun or an Air-Assisted Airless Spray Gun

Written Approval Required from the EPA for Non-HVLP Sprayers

Spray Gun Selection

Page 16: Be Prepared for EPA’s New Emission Standards

If you are spraying solvent through your gun to clean it, you must collect the spray.

The EPA suggests using a fully enclosed spray gun washer, but they do not require it.

Spray Gun Cleaning

Page 17: Be Prepared for EPA’s New Emission Standards

KPA

Half Way There!

Page 18: Be Prepared for EPA’s New Emission Standards

Is a Booth Required Now?

OSHA Regulations Already Requires a Paint Booth

Can be a Prep Station or Mobile Enclosure

Spray Booth Requirements

Page 19: Be Prepared for EPA’s New Emission Standards

98% Removal Efficiency or Higher

Must Be Documented

Change-Out Schedules

Dependent on Specific Shop conditions

Page 20: Be Prepared for EPA’s New Emission Standards

Full Roof

4 Complete Walls or Curtains

Ventilated at Negative Pressure

Whole Vehicles

Page 21: Be Prepared for EPA’s New Emission Standards

Full Roof

3 Complete Walls or Curtains

Ventilation that Draws Air In

Parts or Subassemblies

Page 22: Be Prepared for EPA’s New Emission Standards

For Spot Repairs

Enclosed Enough to Retain All Paint Overspray

Overspray Must Be Directed to the Ventilation System Filters

Mobile Spray Booths

Page 23: Be Prepared for EPA’s New Emission Standards

March 11, 2011 Deadline

Check off that you are now in compliance.

Must sign the form this time.

Re-Notification

Page 24: Be Prepared for EPA’s New Emission Standards

Only required if your information or status changes.

March 1 Deadline

Annual Notification of Changes

Page 25: Be Prepared for EPA’s New Emission Standards

Most Important Step

Must be able to provide required documents.

Maintain for 5 Years

Keep it organized

Recordkeeping

Page 26: Be Prepared for EPA’s New Emission Standards

Copies of all signed notifications you send to the EPA.

All signed receipts from the postal service that proves you sent your notifications.

Certification that each painter has completed the training.

Documentation of your filter efficiency.

Documentation for non-HVLP spray guns.

Records of any deviation from the requirements.

What Records Do you have to Keep?

Page 27: Be Prepared for EPA’s New Emission Standards

Review

Notification

Painter Training

Spray Gun Selection

Spray Gun Cleaning

Spray Booths

Re-Notification

Recordkeeping

Page 28: Be Prepared for EPA’s New Emission Standards

2 Exemptions

Page 29: Be Prepared for EPA’s New Emission Standards

Must ensure that all of your sprayed materials do not contain:

• Cadmium - Cd• Chromium - Cr• Lead - Pb• Nickel - Ni• Manganese - Mn

Do you qualify?(unlikely…)

Page 30: Be Prepared for EPA’s New Emission Standards

What about the Air Brush Exemption?

Up to 3.0 Fluid Oz.

Can’t ever use anything else

Page 31: Be Prepared for EPA’s New Emission Standards

Done!

Page 32: Be Prepared for EPA’s New Emission Standards

QUESTIONS?

Free Consulting Time!

Page 33: Be Prepared for EPA’s New Emission Standards

WWW.KPAONLINE.COM