BC Hydro Net Metering Program December 2016 Alevtina Akbulatova

Upload: others

Post on 27-Feb-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BC Hydro Net Metering Program - Amazon S3

BC HydroNet MeteringProgram

December 2016 Alevtina Akbulatova

Page 2: BC Hydro Net Metering Program - Amazon S3

Solar Map of Canada

2

Insolation

BC = 1,100 kWh/kW

Japan = 1,125 kWh/kW

Germany = 848 kWh/kW

Source: http://www.nrcan.gc.ca/

Page 3: BC Hydro Net Metering Program - Amazon S3

Solar PV – what to expect

• Generate 1,100 kWh per

year, or ~ 200 kWh per 2-

month billing period

• Cost $3,000-4,000 to install

4 solar PV panels = 1 kW (1,000 W)

3

Average BC house consumes 11,000 kWh per year

Page 4: BC Hydro Net Metering Program - Amazon S3

How Net Metering Works?

4

Page 5: BC Hydro Net Metering Program - Amazon S3

Smart Meters

http://www.bchydro.com/energy-in-bc/projects/smart_metering_infrastructure_program.html#how meters work

5

Page 6: BC Hydro Net Metering Program - Amazon S3

• Started in 2004

• Tariff Rate Schedule 1289

• Eligibility:

• Residential and commercial customers

• Up to 100 kW

• Clean and renewable energy source (solar, wind, hydro)

• Open application window – come when you are ready

• Simple process, no cost to interconnect to the grid*

• Requires full load displacement before payment (annual basis)

• Annual excess electricity is paid at a rate of 9.99 cents/kWh

• Technical requirements = DGTIR/100

• Electricity flow is measured by Smart Meter

Net Metering (NM) at BC Hydro

6

Page 7: BC Hydro Net Metering Program - Amazon S3

Net Metering in Numbers

As of December 2016:

875 customers –

~ 5.2 MW installed capacity:

• 847 solar PV (>96%)

• 13 Hydro

• 9 Wind

• 4 Wind & PV

• 1 Biogas

• 1 Hydro & PV

PV90%

Hydro8%

Wind<1%

Wind & PV

< 1%

Biogas<1%

By Installed Capacity

7

Page 8: BC Hydro Net Metering Program - Amazon S3

Solar PV Growth in BC*

8

*connected through BC Hydro Net Metering

0

1,000

2,000

3,000

4,000

5,000

0

100

200

300

400

500

600

700

800

900

2004 2006 2008 2010 2012 2014 2016

kW

Year# of customers capacity, kW

# cust

Page 9: BC Hydro Net Metering Program - Amazon S3

1. Simple NM Application – 1-page application form

2. Electrical Inspection document - FINAL

• Certificate of Electrical Inspection, or

• Electrical Contractor Authorization & Declaration of

Compliance

NM Requirements – Simple

9

Page 11: BC Hydro Net Metering Program - Amazon S3

1. Application:

• Complex Application form

• Single Line Diagram

• Site Plan

• Protection Settings*

2. Electrical Inspection document

3. Field Verification Test ($)*

4. Declaration of Compatibility (DoC)*

5. Payment for Incremental Interconnection costs ($)*

Complex Net Metering

11

Page 12: BC Hydro Net Metering Program - Amazon S3

Top 3 installations by size:

• Alert Bay 67 kW (5 systems)

• Masset 40 kW (2 systems)

• Qualicum Beach 29 kW

Solar Net Metering by Local Governments

37 municipal customers with solar PV + 8 applications

12

Regional Districts:

• Capital District

• Comox Valley

• Cowichan Valley

• Squamish-Lillooet

• Thompson-Nicola

Page 13: BC Hydro Net Metering Program - Amazon S3

Complex Installs: Municipalities

13

City of Kamloops, 24 kW

Little River (Comox), 8 kW

Fire Hall, Qualicum Beach, 29 kW

Page 14: BC Hydro Net Metering Program - Amazon S3

BC Hydro Offers At a Glance

We purchase electricity from small and clean or renewable energy

projects throughout B.C. through the following programs:

14

Page 15: BC Hydro Net Metering Program - Amazon S3

Contact

15

www.bchydro.com/netmetering www.bchydro.com/microsop

[email protected] [email protected]

Alevtina Akbulatova – 604-623-3878