    1

    Contents

    Installation Tools

    Installation Scenarios

    BBU Hardware

    Installation Procedure

    Installing the BBU in the APM30

    Install ing the BBU in the APM30H(Ver.A)

    Installing the BBU in the 19-Inch Rack

    Installing the BBU in the TMC

    Install ing the BBU in the PS4890 Cabinet

    Install ing the BBU in the RRU3004 Rack

    Install ing the IMB03 on the H-Shaped Stand

    Install ing the RRU on the H-Shaped Stand

    Installing the BBU on the Wall

    Install ing the BBU in the APM30H(Ver.B)

    Install ing the BBU in the TMC11H(Ver.B)

    Installing the BBU in the

    APM30H(Ver.B, +24V)

    Installing the BBU in the OMB

    BBU Hardware Installation Checklist

    Powering On the BBU

    Obtaining the ESN

    Appendix

    Change History

    2

    35

    6

    7

    13

    15

    1720

    23

    27

    28

    29

    3337

    39

    41

    47

    47

    48

    48

    56

    Copyright Huawei Technologies Co., Ltd. 2011. All rights reserved.

  • 7/23/2019 BBU3900 Installation Guide 19

    3/58

    2

    Installation Tools

    Measuring tape Phillips screwdriver (M3-M6) Flat-head screwdriver (M3-M6)

    Adjustable wrench Socket wrench Hammer drill

    ESD wrist strap Vacuum cleaner Wire stripper

    Torque wrench Marking pen Level

    RJ-45 crimping tool Multimeter

    Power cable crimping tool Cable cutter ESD gloves

    Rubber Mallet

  • 7/23/2019 BBU3900 Installation Guide 19

    4/58

    3

    Installation Scenarios

    In the APM30/APM30H(Ver.A) In the PS4890

    In the RRU3004 rackIn the TMC

    In the 19-inch rack

    The GTMU in this document is based on the first type of GTMU.

    In the APM30H(Ver.B)

  • 7/23/2019 BBU3900 Installation Guide 19

    5/58

    4

    Installation Scenarios

    In the TMC11H(Ver.B) In the APM30H (Ver.B, +24V)

    On the wall In the OMB

  • 7/23/2019 BBU3900 Installation Guide 19

    6/58

    5

    BBU Hardware

    1. Exterior of the BBU

    2. Configuration Principles of the BBU Boards

    Board Mandatory/Optional

    Full Configuration Instal lat ionSlot

    Remarks

    GTMU Mandatory 1 S5 and S6 Can be installed only in S5 and S6.

    UPEU Mandatory 2 S18 or S19 A single UPEU is preferentially configured

    in the S19 slot.

    FAN Mandatory 1 S16 Can be installed only in the S16 slot.

    UTRP Optional 1 S0 or S4 Preferentially installed in the slot4.

    UELP Optional 2 S0 or S4 A single UELP is preferentially configured

    in the S4 slot.

    UFLP Optional 2 S0 or S4 A single UELP is preferentially configured

    in the S4 slot.

    USCU Optional 1 S0 or S1 Preferentially installed in the S1 slot.

    UEIU Optional 1 S18 Preferentially installed in the S18 slot.

    The UELP and UFLP need to be optionally configured in the BBU or SLPU on site according to the field

    requirements. UTRP is supported in V300R012 and later versions.

    86 mm

    (2U)

    442mm

    310mm

  • 7/23/2019 BBU3900 Installation Guide 19

    7/58

    6

    Installation Procedure

    When the equipment is unpacked, it must be powered on in seven days. The maximum

    duration of the power-off state of the equipment is 48 hours during maintenance.

  • 7/23/2019 BBU3900 Installation Guide 19

    8/58

    7

    Installing the BBU Casea

    Installing the BBU Cablesb

    External power supply

    External alarm device

    Monitoring signal

    cable

    Alarm cable

    E1/T1cable

    CPRI signal cable

    E1/T1 surge protectiontransfer cable

    Power cable

    Cable connections of the BBU

    External monitoring device

    Installing the BBU in the APM30

    BBU

    M6 bolt

    PDU

    1. Install the mounting ears at both sides of

    the BBU reversely.

    2. Slide the BBU case into the cabinet.

    FE/GE cable

    FE/GE surge protectiontransfer cable

  • 7/23/2019 BBU3900 Installation Guide 19

    9/58

    8

    Installing the BBU in the APM30

    Winding pipe

    Installing the BBU Cablesb

    2. Install the CPRI optical cable.

    The TX port on the BBU is connected to the RX port on the RRU.

    The RX port on the BBU is connected to the TX port on the RRU.

    Connect the OT terminal of the power cable to the LOAD3

    terminal of the PDU, and then fix the 3V3 connector of the

    power cable to the PWR port on the BBU.

    1. Install BBU power cable.

    The OT terminals of the power cable is to be made on site.

    Optical module

    Puller

    a. Insert the optical module into the CPRI0,

    CPRI1, CPRI2 CPRI3, CPRI4 or

    CPRI5 port, and then turn outwardsthe puller on the optical module.

    b. Insert one end of the CPRI optical cable

    into the optical module, and then lead

    the CPRI optical cable out of the

    cabinet along the right side of the

    cabinet.

    c. Wrap the fiber tail with the winding pipe.

    LOAD3

    NEG(-)

    RNT(+)

    PWR

    The single-mode optical module is labeled "SM" and multi-mode optical module is labeled "MM.

    If the puller of an optical module is blue, the module is a single-mode optical module. If the puller of an opticalmodule is black or grey, the module is a multi-mode optical module.

    Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the

    GTMU, and connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU.

  • 7/23/2019 BBU3900 Installation Guide 19

    10/58

    9

    Installing the BBU in the APM30

    b

    4.3. Strip the jacket off the E1/T1 cable near the grounding point at the lower right

    corner of the cabinet to expose the shielding layer

    4.4. Thread the E1/T1 cable through the grounding clip. Then, tighten the screw on the

    grounding clip to make the shielding layer of the E1/T1 cable in full contact with the

    grounding clip. Finally, connect the PGND cable on the grounding clip to the ground bolt

    of the APM30.

    4.2. Fix the DB26 connector of the E1/T1 cable to the OUTSIDE port on the UELP.

    3. Install the E1/T1 surge protection transfer cable.

    4. Install the E1/T1 cable.

    E1/T1 surge protection

    transfer cable

    4.1. Cabling the E1/T1 cable.

    E1/T1cable

    Shielding layer of

    the E1/T1 cable

    Shielding layer of the E1/T1

    cable (25 mm)

    Fix the DB25 connector of the E1/T1 surge protection transfer cable to the INSIDEport on the UELP and the DB26 connector to the E1/T1 port on the GTMU.

    Grounding

    clip

    Installing the BBU Cables

    Before soldering the connectors to the E1/T1 cable, ensure that both ends of the E1 cable aredisconnected from any devices. In addition, all the connectors should be soldered to the cable.

  • 7/23/2019 BBU3900 Installation Guide 19

    11/58

    10

    b

    FE/GE surgeprotection transfer

    cableFE/GE

    cable

    (25 mm)

    Shielding layer

    of the FE/GE

    cable

    Connect one end of the FE/GE surge protection transfer

    cable to the FE0 port near the INSIDE label on the UFLP and

    the other end to the FE0 port on the GTMU.

    5. Install the FE/GE surge protection transfercable (FE/GE transmission mode).

    6. Install the FE/GE cable (FE/GEtransmission mode).

    6.1. Connect one end of the FE/GE cable to the FE0 port near

    the OUTSIDE label on the UFLP. Then, lead the other end out

    of the cabinet along the right side of the cabinet.

    6.2. Thread the FE/GE cable through the grounding clip. Then,

    tighten the screw on the grounding clip to make the shielding

    layer of the FE/GE cable in full contact with the grounding clip.

    Finally, connect the PGND cable on the grounding clip to the

    ground bolt of the APM30.

    Installing the BBU Cables

    Installing the BBU in the APM30

    7. Install the monitor ing

    signal cable between the

    APMI and the BBU.7.1. Fix the RJ45 connector at one end of

    the cable to the MON1 port on the UPEU.7.2. Cut off the RJ45 connector at theother end of the cable on site, and then

    connect the four exposed wires to the RX+,RX-, TX+, and TX- ports on the APMI.

    The shielded straight-through cable must beused as the FE/GE Ethernet cable.

  • 7/23/2019 BBU3900 Installation Guide 19

    12/58

    11

    8. Install the EMUA monitoring signal cable. (The EMUA is configured if there areexternal dry contacts or analog detection is required.)

    Cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the

    four exposed wires to the RX+, RX-, TX+, and TX- ports on the APMI. Fix the DB9connector to the corresponding port on the EMUA.

    Installing the BBU Cablesb

    Installing the BBU in the APM30

    Pin on the RJ45

    Connector

    Pin of the DB9

    Male Connector

    Wire Color Wire Type Port on the

    APMI

    X1.1 X2.3 White Twisted pair TX+

    X1.2 X2.7 Orange Twisted pair TX-

    X1.4 X2.2 Blue Twisted pair RX+

    X1.5 X2.6 White Twisted pair RX-

    EMUA monitoring signal cable

  • 7/23/2019 BBU3900 Installation Guide 19

    13/58

    12

    9. Install the alarm cable.

    Connect one end of the alarm cable to the EXT-ALM port on the UPEU andthe other end to the corresponding alarm device.

    Installing the BBU Cablesb

    Installing the BBU in the APM30

  • 7/23/2019 BBU3900 Installation Guide 19

    14/58

    13

    Installing the BBU in the APM30H(Ver.A)

    No. Cable Installation Position

    One end is connected to... The o ther end is connected to...

    BBU power cable LOAD3 terminal of the PDU PWR port on the BBU

    E1/T1 surge protection

    transfer cableE1/T1 port on the GTMU INSIDE port on the UELP

    E1/T1 cable OUTSIDE port on the UELP External transmission device

    Monitoring signal

    cable

    COM IN port on the HEUA MON1 port on the BBU

    CPRI optical cable CPRI port on the GTMU CPRI port on the RRU

    a BBU Cable Connections

    The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see

    pages 7 to 12. The following figure shows the cable connections of the BBU. For details on how to install the

    monitoring signal cable between the HEUA and the BBU in the APM30H, see page 14.

  • 7/23/2019 BBU3900 Installation Guide 19

    15/58

    14

    Installing the BBU in the APM30H(Ver.A)

    b Installing the Monitor ing Signal Cable Between the HEUA and the BBU

    MON1

    COM IN

    UPEU on the

    BBU

    HEUA

  • 7/23/2019 BBU3900 Installation Guide 19

    16/58

    15

    b Installing the DCDU-03Bc

    When the BBU3900 is installed in the 19-inch cabinet, no space is required on the left and

    right of the BBU3900.

    Installing the BBU in the 19-Inch Rack

    Space Requirementsa

    Installing the BBU Case

  • 7/23/2019 BBU3900 Installation Guide 19

    17/58

    16

    Installing the BBU Cablesd

    Installing the BBU in the 19-Inch Rack

    No. Cable Installation Position

    One end is connected to... The other end is connected to...

    CPRI optical cable CPRI port on the GTMU CPRI port on the RRU

    External powercable

    BEG(-) and RTN(+) on the DCDU-03B External power equipment

    BBU power cablePWR1 on the UPEU LOAD6 on the DCDU-03B

  • 7/23/2019 BBU3900 Installation Guide 19

    18/58

    17

    Installing the BBU in the TMC

    Installing the DCDU-03Ba

    Slide the DCDU-03B into the TMC. Then, tighten the four M6 screws.

    Installing the BBU CasebSlide the BBU into the TMC. Then, tighten the four M6 screws.

  • 7/23/2019 BBU3900 Installation Guide 19

    19/58

    18

    Installing the BBU in the TMC

    Installing the BBU Cablesc

    DCDU-03B input

    power cable

    For details on how to install the TMC alarm cable, see page 19.

    The DCDU-03B input power cable is connected to the external DC power supply system.

    For cable connections of the BBU, see page 7.

  • 7/23/2019 BBU3900 Installation Guide 19

    20/58

    19

    Installing the BBU in the TMC

    Installing the BBU Cablesc

    Procedure for installing theTMC alarm cable: APMI panel

    Door status

    sensor

    b. Connect the two bare

    terminals X1.4 (blue) andX1.5 (white) to the alarm

    wiring terminals of the

    door status sensor.

    c. Connect the two bare

    terminals X1.1 (white)

    and X1.2 (orange) to the

    OUT1+ and OUT1-

    alarm wiring terminals on

    the APMI.

    d. Connect the two bare

    terminals X1.3 (white)

    and X1.6 (green) to the

    alarm wiring terminals of

    the DCDU.

    a. Fix the RJ45 connector

    at one end of the alarm

    cable to the EXT_ALM1

    port on the BBU.

    The white and green bare wire terminals are not distinguished from different wiring terminals.

  • 7/23/2019 BBU3900 Installation Guide 19

    21/58

    20

    Installing the BBU in the PS4890 Cabinet

    Installing the DCDU-03Ba1. Slide the DCDU-03B in to the

    PS4890 cabinet. Then, tighten thefour M6 screws.

    2. Install the DCDU-03B input power cable.

    Connect one end of the power cable in blue to theDC output terminal LOAD2(-) on the power subrack

    and the other end to the DC input terminal NEG(-)

    on the DCDU-03B . Connect one end of the power

    cable in black to the DC output terminal RTN(+) on

    the power subrack and the other end to the DC

    input terminal RTN(+) on the DCDU-03B.

    Install ing the BBU Caseb

    Slide the BBU case into the PS4890 cabinet.

    Then, tighten the four M6 screws.

    DC output

    terminal on

    the power

    subrack

    DC input

    terminal on the

    DCDU-03B

  • 7/23/2019 BBU3900 Installation Guide 19

    22/58

    21

    In addition to the BBU cables installed in the APM30, a monitoring signal cable between the PMU and the BBU needs to

    be installed when the BBU is installed in the PS4890 cabinet. The monitoring signal cable between the APMI and theBBU is not required. For details on how to install the monitoring signal cable between the PMU and the BBU, see page 22.

    Cable connections of the BBU

    Connect the BBU power cable

    to the DC output terminal

    LOAD6 of the DCDU-03B.

    CPRI optical cable BBU power cable E1/T1 cable

    Monitoring signal cable between the PMU

    and the BBU

    BBU alarm cable

    Installing the BBU in the PS4890 Cabinet

    Installing the BBU Cablesc

  • 7/23/2019 BBU3900 Installation Guide 19

    23/58

    22

    Install the monitoring signal cable between the PMU and the BBU.

    Connect one end of the cable to the MON port on the BBU and the other

    end to the RS232/RS422 port on the PMU.

    Monitoring

    signal cable

    between the

    PMU and the

    BBU

    RS232/RS422 port

    Installing the BBU in the PS4890 Cabinet

    Installing the BBU Cablesc

  • 7/23/2019 BBU3900 Installation Guide 19

    24/58

    23

    Installing the BBU in the RRU3004 Rack

    a Marking Anchor Points (Unit: mm)aDrilling Holes and Installing the

    Expansion Bolt Assemblyb

    a Installing the H-shaped Standc

    3. Install the beam.1. Secure the stand. 2. Adjust the level of the

    stand.

    Pre-tightening

    Tightening

    The beam on the other side is

    installed in the same way.

    Bolt M10x60

    Spring washer 12

    Flat washer 12

    Expansion tube

  • 7/23/2019 BBU3900 Installation Guide 19

    25/58

    24

    Installing the BBU in the RRU3004 Rack

    af Installing the Adapting Piecesg

    a Removing the WashersdFitting the Tabs on One Side of the RRU3004

    Rack into the Anchor Slots on the Stande

    h Installing the BBU Case i

    Tighten the

    screws

    Installing the EPS30-4815AF

    (AC Input Power)

    Case 2

    Fixing the Lower Part of theRRU3004 Rack

    Installing the DCDU-03B (48 V

    Input Power)

  • 7/23/2019 BBU3900 Installation Guide 19

    26/58

    25

    DCDU

    48 V input power

    Installing the BBU Cablesj

    Installing the BBU in the RRU3004 Rack

    Cable One End Is Connected to... The Other End Is Connected to...

    CPRI optical cable The end with the optical cable labels 2A and 2B is

    connected to CPRI ports 0 to 5 of the GTMU of theBBU.

    The end with the optical cable labels 1A and

    1B is connected to the CPRI_W port of thecabling cavity of the RRU.

    Ground cable for the subrack Ground terminal of the RRU3004 rack Ground bar of the stand

    Power cable for the BBU PWR port of the BBU LOAD6 port of the DCDU

    E1/T1 cable E1/T1 port of the BBU GEHUB or HUBBTS

    Power cable for the DCDU RTN (+) and NEG (-) terminals at the DC input end of

    the DCDU

    External power supply system

    External PGND cable Ground bar of the stand External ground busbar

    Equipotential cable for the

    subrack

    Ground terminal of the RRU3004 rack Ground terminal of the RRU3004 rack

    Ground cable for the DCDU Ground terminal of the RRU3004 rack Ground terminal of the DCDU

  • 7/23/2019 BBU3900 Installation Guide 19

    27/58

    26

    4815

    Only two countersunk

    screws are required.

    Installing the BBU Cablesj

    Installing the BBU in the RRU3004 Rack

    220 V input power

    Cable One End Is Connected to... The Other End Is Connected to...

    CPRI optical cable The end with the optical cable labels 2A and

    2B is connected to CPRI ports 0 to 5 of the

    GTMU of the BBU.

    The end with the optical cable labels 1A and

    1B is connected to the CPRI_W port of the

    cabling cavity of the RRU.

    PGND cable for the RRU3004 rack Ground terminal of the RRU3004 rack Ground bar of the stand

    External PGND cable Ground bar of the stand External ground busbar

    Equipotential cable for the rack Ground terminal of the RRU3004 rack Ground terminal of the RRU3004 rack

    Power cable for the BBU PWR port of the BBU LOAD1 port of the 4815

    4815 - BBU monitoring signal cable MON1 port of the BBU RS232/RS485 port of the 4815, close to the

    232 side

    E1/T1 cable E1/T1 port of the BBU GEHUB or HUBBTS

    PGND cable for the 4815 Bolts for the mounting ears of the 4815 Ground terminal of the RRU3004 rack

    Input power cable for the 4815 AC INPUT port of the 4815 Power supply equipment of the customer

    The mounting ears need to be installed in an

    inverse manner during the installation of the4815.

  • 7/23/2019 BBU3900 Installation Guide 19

    28/58

    27

    a Installing the IMB03c Secur ing the IMB03d

    aa Installing the Boltsb

    Insulationpad

    Fitting to the

    mounting

    hole

    3 Nm

    M6x16

    Installing the IMB03 on the H-Shaped Stand

    For details about how to install the BBU

    and DCDU, see page 24.

    Upper

    mounting

    hole for the

    IMB03

    Lower

    mounting

    hole for theIMB03

    Beam

    Installing the Mounting Ears forthe IMB03

    20 mm to 30 mm

    M10x30

    30 Nm

  • 7/23/2019 BBU3900 Installation Guide 19

    29/58

    28

    Installing the RRU on the H-Shaped Stand

    Brackets for

    installing the RRU

    Main bracketAuxiliary Bracket

    Dual-nut bolt

    Only the main bracket is used for installing the

    RRU on the H-shaped stand, and the dual-nutbolt and auxiliary bracket are not used.

    Main bracket

    a Preparing the Installationa Installing the Main Bracketb

    a Installing the RRUc Securing the RRUd

    For details about cable connections, see

    pages 25 and 26.

    When the expansion bolt assemblies are used

    to secure the H-shaped stand, only the boltand spring washer are used, and theexpansion tube and plastic tube are removed.

  • 7/23/2019 BBU3900 Installation Guide 19

    30/58

    29

    a Space Requirements

    A single BBU BBU+DCDU-03B

    Installing the BBU on the Wall

    a Installing the Mount ing Ears for Wall Installationb

    Mounting ears for

    wall installation

    Mounting ears on the

    BBU case

    The DCDU should be installed close to the BBU, but the

    distance between BBU and DCDU must be greater than100 mm.

    Use screws to join the mounting ears for wallinstallation and the mounting ears on the BBU case.

    BBU

    DCDU-03B

    100mm

  • 7/23/2019 BBU3900 Installation Guide 19

    31/58

    30

    Installing the BBU on the Wall

    a Installing the Expansion Boltsd

    Place the BBU against the wall, and then use the marking pen to markthe anchor points.

    ac Determining the Anchor Points on the Wall

    e Fixing the BBU Case on the Wall

    BBU

    Wall

    Bolt M660

    Nut

    Spring washer 6

    Flat washer 6

    Expansion tube

    Flat washer

    Spring washer

  • 7/23/2019 BBU3900 Installation Guide 19

    32/58

    31

    Installing the BBU on the Wall

    Installing the DCDU-03B Case

    Wall

    2 Nm

    M6x12

    1. Installing the mountingears for the DCDU-03B. 2. Place the mounting ears for wallinstallation against the wall, and thenuse the marker to mark the holes of themounting ears for wall installation.

    3. Install the expansion bolt . 4. Install the DCDU-03 on the wall.

    f

    Bolt M660

    Nut

    Spring washer 6

    Flat washer 6

    Expansion tube

  • 7/23/2019 BBU3900 Installation Guide 19

    33/58

    32

    Installing the BBU Cables

    Installing the BBU on the Wall

    External transmission

    equipment

    External monitoring

    equipment

    External power

    equipment

    External ground

    bar

    External ground

    bar

    SN Cable Installation Position

    One End Connected to... The Other End Connected to...

    RRU power cable LOAD0 to LOAD5 on the DCDU-03 Power supply socket on the RRU

    CPRI optical cable CPRI port on the BBU CPRI port on the RRU

    E1/T1 cable E1/T1 port on the GTMU GEHUB or HUBBTS

    Monitoring signal

    cable

    MON/ALM port on the BBU External monitoring equipment

    BBU power cable PWR port on the BBU LOAD6 on the DCDU-03

    DCDU power cable DC input port on the DCDU-03 External power equipment

    PGND cable Ground bolt on the equipment External ground bar

    g

  • 7/23/2019 BBU3900 Installation Guide 19

    34/58

    33

    BBU

    EPS 01

    Installing the BBU in the APM30H(Ver.B)

    Installing the BBU Casea

    bBBU Cable Connections

    M6 screws

    Slide the BBU into the 2 U spaceclose to the EPS along the guide rails,

    and then tighten the four M6 screws

    on the BBU panel.

    1. Install ing the BBU Case

    Monitoring signal cable

    Alarm cable

    BBU power cable

    E1/T1 cable

    FE/GE cable

    FE/GE surge protectiontransfer cableE1/T1 surge protection

    transfer cableCPRI optical cable

    Slide the SLPU box into the 1U space abovethe EPS in the cabinet, and then fasten the

    two M6 screws on the panel.

    2. Installing the SLPU Case

    SLPU

    2 Nm

    M6x16

  • 7/23/2019 BBU3900 Installation Guide 19

    35/58

    34

    LOAD1

    Installing the BBU in the APM30H(Ver.B)

    Installing the BBU Cablesc

    2. Install the CPRI optical cable.

    Insert the DLC connectors labeled 2A and 2B at one end of the CPRI optical cable into the

    optical module on the GTMU, and then insert the DLC connectors labeled 1A and 1B at

    the other end into the optical module on the RRU.

    Link the easy power receptacle (pressfit type) connector at one end to the LOAD1 terminal of

    the EPS01, and then link the 3V3 connector at the other end to the -48V port on the BBU.

    1. Install power cable.

    If both ends of the optical cable are the LC

    connectors, the TX and RX ports on the BBU

    are respectively connected to the TX and RXports on the RRU.

    The single-mode optical module is labeled "SM"

    and multi-mode optical module is labeled "MM.

    If the puller of an optical module is blue, the

    module is a single-mode optical module. If the

    puller of an optical module is black or grey, the

    module is a multi-mode optical module.

    Optical module

    Puller

    Winding pipe

    2.1. Turn the puller on the optical module outwards,

    and then insert the optical module to the port CPRI

    0 to CPRI5.

    2.2. Remove the dustproof caps from the optical

    connectors. Insert the optical connector at one end

    of the CPRI optical cable into the optical module.

    Lead the CPRI optical cable out of the cabinet alongthe left side of the cabinet.

    2.3. Wrap the winding pipe at the fiber tails.

  • 7/23/2019 BBU3900 Installation Guide 19

    36/58

    35

    Installing the BBU in the APM30H(Ver.B)

    Installing the BBU Cablesc

    4.2. Fix the DB26 connector of the E1/T1 cable

    to the OUTSIDE port on the UELP.

    3. Install the E1/T1 surge protection transfer cable.

    4. Install the E1/T1 cable.

    4.1. Cabling the E1/T1 cable.

    Fix the DB25 connector of the E1/T1 surgeprotection transfer cable to the INSIDE port on

    the UELP and the DB26 connector to the E1/T1

    port on the GTMU.

    E1/T1 surge

    protection transfer

    cable

    E1/T1

    cable

    Connect one end of the FE/GE surge protection

    transfer cable to the FE0 port near the INSIDE label

    on the UFLP and the other end to the FE0 port on

    the GTMU.

    5. Install the FE/GE surge protectiontransfer cable (FE/GE transmissionmode).

    6. Install the FE/GE cable (FE/GEtransmission mode).

    6.1. Connect one end of the FE/GE cable to the FE0

    port near the OUTSIDE label on the UFLP. Then,

    lead the other end out of the cabinet along the rightside of the cabinet.

    FE/GE surge

    protection transfer

    cable

    FE/GE

    cable

    Before soldering the connectors to the E1/T1cable, ensure that both ends of the E1 cable aredisconnected from any devices. In addition, allthe connectors should be soldered to the cable.

    The shielded straight-through cable must be

    used as the FE/GE Ethernet cable.

  • 7/23/2019 BBU3900 Installation Guide 19

    37/58

    36

    Installing the BBU in the APM30H(Ver.B)

    Installing the BBU Cablesc

    7. Install the monitoring signal cable between the CMUA and the BBU.

    COM_IN

    MON1

  • 7/23/2019 BBU3900 Installation Guide 19

    38/58

    37

    Installing the BBU in the TMC11H(Ver.B)

    Installing the BBUa

    Slide the BBU into the TMC11H along

    guide rails, and then tighten the fourM6 screws on the BBU panel.

    Slide the SLPU into the TMC11H along

    the guide rails, and then tighten thetwo M6 screws on the SLPU panel.

    b Installing the BBU Cable

    LOAD6

    Install the BBU power cable.

    BBU

    DCDU

    2 Nm

    M6x16

    2 Nm

    M6x16

    SLPU

  • 7/23/2019 BBU3900 Installation Guide 19

    39/58

    38

    Installing the BBU in the TMC11H(Ver.B)

    The procedure for installing BBU cables (except the power cable) in the TMC11H cabinet is the same as that

    in the APM30H(Ver.B). For details, see the description on pages 33 to 36.

    For details on the BBU cable connections, see BBUCable Connections on pages 33.

    Installing the BBU Cableb

    Cable Connector Type Connects to

    CPRI optical cable DLC The connectors labeled 2A and 2B are connected to

    the optical module on the port labeled CPRI0 to

    CPRI5 on the GTMU.

    DLC The connectors labeled 1A and 1B are connected to

    the optical module on the port labeled CPRI_W on

    the RRU.

    E1/T1 cable DB26 connector OUTSIDE port on the UELP

    The connector needs to

    be made on site according

    to the field requirements.

    Port on the transmission device

    E1/T1 surge protection

    transfer cable

    DB26 connector E1/T1 port on the GTMU

    DB25 connector INSIDE port on the UELP

    FE/GE cable RJ45 connector FE0 port at the OUTSIDE side on the UFLP

    RJ45 connector Port on the transmission device

    FE/GE surge protection

    transfer cable

    RJ45 connector FE0 port at the INSIDE side on the UFLP

    RJ45 connector FE0 port on the GTMU

    Monitoring signal cable

    between the CMUA and

    the BBU

    RJ45 connector MON1 port on the BBU

    RJ45 connector COM_IN port on the CMUA

    BBU power cable 3V3 connector -48V port on the UPEU

    OT terminal LOAD6 port on the DCDU-03B

  • 7/23/2019 BBU3900 Installation Guide 19

    40/58

    39

    Installing the BBU in the APM30H(Ver.B, +24V)

    Installing the BBUa

    Slide the BBU to the APM30H

    (+24V) along guide rails, and thentighten the four M6 screws on the

    BBU panel.

    BBU

    EPS48100D

    2 Nm

    M6x16

    Slide the SLPU to the APM30H (+24V)

    along guide rails, and then tightenthe two M6 screws on the SLPU

    panel.

    Installing BBU Cablesb

    Installing the monitor ing signal cable for the PSU and the in-posit ion signal

    cable for the PSUALM PRESENT

    EXT-ALM1 EXT-ALM0

    2 Nm

    M6x16

  • 7/23/2019 BBU3900 Installation Guide 19

    41/58

    40

    Installing BBU Cablesb

    Installing the BBU in the APM30H(Ver.B, +24V)

    The procedure for installing BBU cables (except the power cable) in the APM30H(+24 V) cabinet is the same asthat in the APM30H(Ver.B). For details, see the description on pages 33 to 36.

    For details on the BBU cable connections, see BBUCable Connections on pages 33.

    Cable Connector Type Connects to

    CPRI optical cable DLC The connectors labeled 2A and 2B are

    connected to the optical module on the port

    labeled CPRI0 to CPRI2 on the GTMU.

    DLC The connectors labeled 1A and 1B areconnected to the optical module on the port

    labeled CPRI_W on the RRU.

    E1/T1 cable DB26 Connector E1/T1 port on the GTMU

    The connector needs to be made on

    site according to the field requirements.

    Port on the transmission device

    E1/T1 Surge

    Protection Transfer

    Cable

    DB26 connector E1/T1 port on the GTMU

    DB25 connector INSIDE port on the UELP

    FE/GE cable RJ45 connector FE0 port on the GTMU

    RJ45 connector Port on the transmission device

    FE/GE Surge

    Protection Transfer

    Cable

    RJ45 connector FE0 port at the INSIDE side on the UFLP

    RJ45 connector FE0 port on the GTMU

    Monitoring signal

    cable between the

    CMUA and the BBU

    RJ45 connector MON1 port on the BBU

    RJ45 connector COM_IN port on the CMUA

    Monitoring signal

    cable for the PSU

    RJ-45 EXT-ALM0 port on the UPEU

    RJ-45 ALM port on the EPS48100D

    In-position signal

    cable for the PSU

    RJ-45 EXT-ALM1 port on the UPEU

    Cord end terminal PRESENT port on the EPS48100D

    BBU power cable 3V3 -48V port on the UPEU

    OT LOAD6 port on the DCDU-03B

  • 7/23/2019 BBU3900 Installation Guide 19

    42/58

    41

    Installing the BBU in the OMB

    Installing the Brackets on the Metal Pole and Mounting Platea

    Use a level to adjust the level of the brackets to ensure that the front and back brackets

    are on the same plane.

    1. Install the brackets on the metal pole.

    255-306 kgfcm

    M10x110

    Flat washerSpring washer

    Bolt

    2. Install the mounting plate.

    255-306 kgfcm

    M10x40

    Flat

    washerSpring

    washer

    Bolt

    Mounting plate

  • 7/23/2019 BBU3900 Installation Guide 19

    43/58

    Installing the BBU in the OMB

    Installing the OMBb

    Slide the BBU case into the OMB

    cabinet gently. Then, tighten the four

    M6 screws.

    cInstalling the BBU Cables

    Grounding bar

    Ensure the FAN is in the bottom when installing the BBU.

    1. Install the PGND cable ofOMB cabinet.

    The procedures for installing the cables as follows in

    the DC OMB and in the AC OMB are the same: PGND cable E1/T1 cable or FE/GE ethernet cable

    optical cable

    If the cable connection scenarios are similar, the

    description is based on the DC cabinet.

    Installing the OMB Cabinet

    b

    Remove the two ground screws on the right side

    of the BBU panel before installing the BBU.

    42

  • 7/23/2019 BBU3900 Installation Guide 19

    44/58

    43

    Installing the BBU in the OMB

    Installing the BBU Cablesc

    NEG(-)

    RNT (+)

    L N PE

    3. Install the input power cable for the AC OMB.

    2. Install the input power cable for the DC OMB.

  • 7/23/2019 BBU3900 Installation Guide 19

    45/58

    44

    LOAD6

    Installing the BBU in the OMB

    Installing the BBU Cablesc

    DC INPUT

    PWR

    LOAD1

    5. Install the BBU power cable for the AC OMB.

    4. Install the BBU power cable for the DC OMB.

  • 7/23/2019 BBU3900 Installation Guide 19

    46/58

    45

    Installing the BBU in the OMB

    Installing the BBU Cablesc

    6. Install the E1/T1 cable (E1/T1 transmission mode).

    Shielding

    layer

    Shielding layer(25 mm)

    PGND

    INSIDE

    OUTSIDE

    E1/T1

    b

  • 7/23/2019 BBU3900 Installation Guide 19

    47/58

    46

    Installing the BBU in the OMB

    Installing the BBU Cablesc

    7. Install the FE/GE cable

    8. Install the CPRI optical cable.

    Optical module

    Puller

    c

    a

    b

    b

    a

    c

    2. Turn outwards the puller on the optical module.

    1. Insert the optical module into the CPRI0, CPRI1,

    CPRI2, CPRI3, CPRI4 or CPRI5 port.

    3. Remove the dustproof caps from the

    optical connectors.

    4. Insert the optical connector at one end of the CPRI optical cable into the optical module.

    Lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

    The shielded straight-through cable

    must be used as the FE/GE Ethernet

    cable.

    Insert the DLC connectors labeled 2A and 2B at one end of the CPRI optical cable into the

    optical module on the GTMU, and then insert the DLC connectors labeled 1A and 1B at

    the other end into the optical module on the RRU.

    If both ends of the optical cable are the LC

    connectors, the TX and RX ports on the BBU

    are respectively connected to the TX and RX

    ports on the RRU.

    The single-mode optical module is labeled "SM"

    and multi-mode optical module is labeled "MM.

    If the puller of an optical module is blue, the

    module is a single-mode optical module. If the

    puller of an optical module is black or grey, the

    module is a multi-mode optical module.

    (FE/GE transmission mode).

  • 7/23/2019 BBU3900 Installation Guide 19

    48/58

    47

    Powering On the BBU

    BBU Hardware Installation Checklist

    SN Item

    1 All self-made PGND cables are copper-based with the proper wire diameters. No breaking device such as switch

    and fuse is allowed for the electric connection of the grounding system. No short circuit is allowed. Each terminal

    on the ground bar can be connected with only one wiring terminal of the PGND cable.

    2 The redundant part of the power cable or PGND cable is stripped off rather than coiled.

    3 The terminals at both ends of the power cable or PGND cable are securely soldered or crimped.

    4 The bare wires and the terminal handles at the wiring terminals are coated with heat-shrinkable tubes.

    5 The flat washer and the spring washer are well mounted on all OT terminals.

    6 All cables are connected securely and reliably. Pay special attention to the cable connections at the bottom of the

    cabinet.

    7 The cables are neatly and tightly bound. The cable ties are evenly spaced and face the same direction.

    8 The power cable, PGND cable, feeder, optical cable and the E1/T1/FE/GE signal cable are bound separately

    with a spacing of larger than 3 cm.

    9 The cable layout facilitates maintenance and future capacity expansion, and the bending radius of the cables

    meet the requirements.

    10 All the labels at both ends of the cables are legible.

    11 The extra length of each indoor cable tie is cut, and the cut surface is smooth without sharp edges. An extra

    length of 3 mm to 5 mm is reserved for each outdoor cable tie.

    12 The idle connectors of the cables are properly protected.

  • 7/23/2019 BBU3900 Installation Guide 19

    49/58

    48

    Appendix

    Remove the GTMU and UELP from the BBU.

    Setting the DIP Switchesa

    Wear an ESD wrist strap during the operations on theboards to prevent damage to the boards.

    The UELP is optional. Please check the settings of the DIP switches according to the field conditions.

    Obtaining the ESN

    Record the Electronic Serial Number (ESN) shown on the label attached tothe mount ing ear of the BBU, and report the ESN to the engineer for thecommissioning of the base station.

    ESN

  • 7/23/2019 BBU3900 Installation Guide 19

    50/58

    49

    Appendix

    a Setting the DIP Switches

    Settings of the DIP switches on the UELP

    Settings of the DIP switches on the GTMU

    Set the DIP switches of the BBU.

    All the DIP bits of S2 on the GTMU are set to OFF by default in all modes. When four 75-ohm E1/T1 links are faulty, all theDIP bits of S2 should be set to ON so that the faults are rectified.

    75-ohm E1 Mode

    120-ohm E1 Mode

    T1 Mode

    75-ohm E1 Mode

    Other Modes

  • 7/23/2019 BBU3900 Installation Guide 19

    51/58

    50

    Appendix

    a Setting the DIP Switches

    Settings of S4 and S5 on the GTMU

    Reinstall the GTMU and the UELP.

    DIP Switch Setting of DIP Bit Description

    1 2 3 4

    S4 ON ON ON ON The E1 link can be bypassed.

    OFF OFF OFF OFF The E1 link cannot be bypassed.

    Miscellaneous Not available

    DIP

    Switch

    Setting of DIP Bit Description

    1 2 3 4

    S5 ON ON ON ON The E1 link can be bypassed.

    OFF ON ON OFF The E1 link of the Level 1

    cascaded BTS can be bypassed.

    ON OFF ON OFF The E1 link of the Level 2

    cascaded BTS can be bypassed.

    OFF OFF ON OFF The E1 link of the Level 3

    cascaded BTS can be bypassed.

  • 7/23/2019 BBU3900 Installation Guide 19

    52/58

    51

    Appendix

    Setting the DIP Switchesa

    No. Function Operation

    1 to 5 Defining the communication address of

    the PMU

    (1) Switches 1 to 5 correspond to bits

    0 to 4. ON:1; OFF: 0

    For example: to set the address of

    PMU to 3, set switches 3 to 5 as

    OFF.

    (2) Default setting before delivery:

    1 (BIT0), ON

    2 (BIT1), ON

    3 (BIT2), OFF

    4 (BIT3), OFF

    5 (BIT4), OFF

    6 Selecting baud rate for communicating

    with the BTS

    Set as ON, indicating that the baud

    rate is 9600. (If it is set as OFF, the

    baud rate is 19200.)

    7 and 8 Reserved and not defined Set as OFF

    Set the DIP switches ofthe PMU.

  • 7/23/2019 BBU3900 Installation Guide 19

    53/58

    52

    Pin Assignment for the BBU Signal Cablesb75-ohm E1 cable

    Appendix

    Pin of the DB26 Male Connector Wire Type Coaxial Series No. Label

    X1.1 Tip 1 RX1+

    X1.2 Ring RX1-

    X1.3 Tip 3 RX2+

    X1.4 Ring RX2-

    X1.5 Tip 5 RX3+

    X1.6 Ring RX3-

    X1.7 Tip 7 RX4+

    X1.8 Ring RX4-

    X1.19 Tip 2 TX1+

    X1.20 Ring TX1-

    X1.21 Tip 4 TX2+

    X1.22 Ring TX2-

    X1.23 Tip 6 TX3+

    X1.24 Ring TX3-

    X1.25 Tip 8 TX4+

    X1.26 Ring TX4-

  • 7/23/2019 BBU3900 Installation Guide 19

    54/58

    53

    Appendix

    Pin Assignment for the BBU Signal Cablesb

    120-ohm E1 cable

    Pin of the DB26 Male Connector Wire Color Wire Type Label

    X1.1 BlueTwisted pair

    RX1+

    X1.2 White RX1-

    X1.3 Orange

    Twisted pair

    RX2+

    X1.4 White RX2-

    X1.5 GreenTwisted pair

    RX3+

    X1.6 White RX3-

    X1.7 BrownTwisted pair

    RX4+

    X1.8 White RX4-

    X1.19 Grey

    Twisted pair

    TX1+

    X1.20 White TX1-

    X1.21 BlueTwisted pair

    TX2+

    X1.22 Red TX2-

    X1.23 Orange

    Twisted pair

    TX3+

    X1.24 Red TX3-

    X1.25 Green

    Twisted pair

    TX4+

    X1.26 Red TX4-

  • 7/23/2019 BBU3900 Installation Guide 19

    55/58

    54

    Appendix

    Pin Assignment for the BBU Signal Cablesb

    Pin of the RJ45

    Connector

    Wire Color Pins of X2,

    X3, X4, and

    X5

    Wire Type Port on the

    APMI

    X1.1 White X2 Twisted pair TX+

    X1.2 Orange X3 Twisted pair TX-

    X1.4 Blue X4 Twisted pair RX+

    X1.5 White X5 Twisted pair RX-

    Monitoring signal cable between the APMI and the BBU

    Pin on the RJ45

    Connector

    Pin of the DB9

    Male Connector

    Wire Color Wire Type Port on the

    APMI

    X1.1 X2.3 White Twisted pair TX+

    X1.2 X2.7 Orange Twisted pair TX-

    X1.4 X2.2 Blue Twisted pair RX+

    X1.5 X2.6 White Twisted pair RX-

    EMUA monitoring signal cable

  • 7/23/2019 BBU3900 Installation Guide 19

    56/58

    55

    Appendix

    Pin Assignment for the BBU Signal Cablesb

    Pin of the RJ45

    Connector

    Pin of the RJ45

    Connector

    Wire Color Wire Type

    X1.1 X2.1 White/orange Twisted pair

    X1.2 X2.2 Orange

    X1.3 X2.3 White/green Twisted pair

    X1.6 X2.6 Green

    X1.5 X2.5 White/blue Twisted pair

    X1.4 X2.4 Blue

    X1.7 X2.7 White/brown Twisted pair

    X1.8 X2.8 Brown

    BBU alarm cable

  • 7/23/2019 BBU3900 Installation Guide 19

    57/58

    56

    Change History

    This describes the changes in the BBU3900 Installation Guide.

    19(2011-01-20)

    This is the ninth commercial release.

    Compared with issue 18(2010-11-30) of V300R008&R009,

    1. Added the description about the difference between single-mode optical

    modules and multi-mode optical modules.

    2. Modified the information about installing an SLPU.

    3. Modified the requirements of the duration for equipment power-on and power-

    off operations.

    18 (2010-11-30)

    This is the eighteenth commercial release.

    Compared with issue 17 (2010-09-03) of V300R008&R009, this issue modified

    some descriptions.

    17 (2010-09-03)

    This is the seventeenth commercial release.

    Compared with issue 16 (2010-07-30) of V300R008&R009, this issue added

    safety information about the FE/GE Ethernet cable.

    16 (2010-07-30)

    This is the sixteenth commercial release.

    Compared with issue 15 (2010-06-30) of V300R008&R009, this issue excludes

    the safety information.

    15 (2010-06-30)

    This is the fifteenth commercial release.

    Compared with issue 14 (2010-04-10) of V300R008&R009, this issue

    incorporates the description about installing the IMB03 on the H-Shaped stand.

    14 (2010-04-10)

    This is the fourteen commercial release.

    Compared with issue 13 (2010-03-15) of V300R008&R009, the UTRP is added.

    13 (2010-03-15)

    This is the thirteenth commercial release.

    Compared with issue 12 (2010-01-30) of V300R008&R009, the procedure for

    obtaining the ESN is added.

  • 7/23/2019 BBU3900 Installation Guide 19