bbs of all pier foundations of mayar

29
____________________ For Contractor (ITD Cementation India Ltd) Page -1 of 29 ____________________ For Client (Reliance Infrastructure Limited) BAR BENDING SCHEDULE OF FOOTING P1 and P8 to P14 Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier. Structure Name.: MAYAR RIVER BRIDGE Drawing No.: REL-SUMPP-TES-311-C-1016 Bar mark Shape of bar 1 1 32 2 14.955 1 2.765 17.720 68 1204.960 6.321 @ 1868 1868 200 C/C 11328 2 2 32 2 17.019 1 2.765 19.784 96 1899.264 6.321 @ 1900 1900 120 C/C 13328 3 3 20 500 2 12.272 1 1.728 14.000 68 952.000 2.469 @ 500 200 11340 C/C 4 4 20 500 500 2 14.272 1 1.728 16.000 58 928.000 2.469 @ 200 13340 C/C 5 5 20 13380 11380 13380 4 49.584 4 1.728 51.312 14 718.368 2.469 100 11380 ### 8 8 25 1836 1836 2 16.794 1 2.160 18.954 96 1819.584 3.858 @ 120 C/C 13207 9 Chair 32 1000 4 5.260 0.000 5.260 90 473.436 6.321 1739 1739 500 500 Total::: Dia of bar (mm) No Of Bent Cutting Length (m) No. of Lap Reqrd Length per Lap (m) Total Cut Length (m) No of bars Total Length (m) Unit Weight (kg/m)

Upload: amanjot-singh

Post on 25-Nov-2014

117 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: BBS of All Pier Foundations of MAYAR

____________________For Contractor(ITD Cementation India Ltd)

Page -1 of 32 ____________________

For Client(Reliance Infrastructure Limited)

BAR BENDING SCHEDULE OF FOOTING P1 and P8 to P14Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

1 1

32 2

14.955 1 2.765 17.720 68 1204.960 6.321@

18

68

18

68

200

C/C 11328

2 2

32 2

17.019 1 2.765 19.784 96 1899.264 6.321@

19

00

19

00

120C/C 13328

3 3

20

50

0

2

12.272 1 1.728 14.000 68 952.000 2.469@

50

0

200 11340C/C

4 4

20

50

0

50

0

2

14.272 1 1.728 16.000 58 928.000 2.469@200

13340C/C

5 5

20

13380

11380

13380

4

49.584 4 1.728 51.312 14 718.368 2.469100

11380 ###

8 8

25

18

36

18

36

2

16.794 1 2.160 18.954 96 1819.584 3.858@

120

C/C 13207

9 Chair

32 1000 4

5.260 0.000 5.260 90 473.436 6.321

17

39

17

39

500 500

Total::::

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

Page 2: BBS of All Pier Foundations of MAYAR

____________________For Contractor(ITD Cementation India Ltd)

Page -2 of 32 ____________________

For Client(Reliance Infrastructure Limited)

BAR BENDING SCHEDULE OF FOOTING P1 and P8 to P14

MAYAR RIVER BRIDGE

Remarks

7.62

12.01

2.35

2.29

1.77

7.02

2.99

36.05 MT

Total weight (MT)

Footing-Raft Main Bottom 2nd Layer

Footing-Raft Main Bottom 1st Layer

Footing-Raft Main TopInner Layer

Footing-Raft Main TopSurface Layer

Footing-Raft Binder/Outer Ring

Footing-Raft Main Bottom 3rd Layer

Footing-Chairs

Page 3: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -3 of 32 For Client(Reliance Infrastructure Limited)

BAR BENDING SCHEDULE OF FOOTING P2 to P7Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

1 16

32 2

16.255 1 2.765 19.020 73 1388.460 6.321 8.78@

20

18

20

18

200

C/C 12328

2 17

32 2

18.319 1 2.765 21.084 96 2024.064 6.321 12.79@

20

50

20

50

130C/C 14328

3 18

205

00

213.272 1 1.728 15.000 58 870.000 2.469 2.15@

50

0

250C/C 12340

4 19

20

50

0

50

0

2

15.272 1 1.728 17.000 50 850.000 2.469 2.10@250C/C 14340

5 20

20

12380

14380

12380

4

53.584 4 1.728 55.312 14 774.368 2.469 1.91100

14380 ###

7 22

25

19

86

19

86

2

18.094 1 2.160 20.254 96 1944.384 3.858 7.50@

130

C/C 14207

9 Chair

32 1000 4

5.560 0.000 5.560 100 556.040 6.321 3.52

18

89

18

89

500 500

Total:::: 38.746

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

Total weight (MT)

Page 4: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -4 of 32 For Client(Reliance Infrastructure Limited)

BAR BENDING SCHEDULE OF FOOTING P2 to P7

MAYAR RIVER BRIDGE

Remarks

MT

Footing-Raft Main Bottom 2nd Layer

Footing-Raft Main Bottom 1st Layer

Footing-Raft Main TopInner Layer

Footing-Raft Main TopSurface Layer

Footing-Raft Binder/Outer Ring

Footing-Raft Main Bottom 3rd Layer

Footing-Chairs

Page 5: BBS of All Pier Foundations of MAYAR

____________________For Contractor(ITD Cementation India Ltd)

Page -5 of 32 ____________________

For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITED

Project Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P1 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 6

32 500 2

13.042 1 2.765 15.807 70 1106.490 6.3211

21

51

500

7 7

10

11.797 0.000 11.797 41 483.683 0.617@

11

59

7.1

42

85

71

42

9

10

0

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

Page 6: BBS of All Pier Foundations of MAYAR

____________________For Contractor(ITD Cementation India Ltd)

Page -6 of 32 ____________________

For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P1 FOOTING

MAYAR RIVER BRIDGE

Remarks

6.99

0.30

7.293 MT

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 7: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -7 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITEDProject Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P2 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 21

32 500 215.614 1 2.765 18.379 105 1929.795 6.321 12.20

14

72

3

500

8 23

10

11.797 0.000 11.797 50 589.857 0.617 0.36@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total:::: 12.562

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

Total weight (MT)

Page 8: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -8 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

BAR BENDING SCHEDULE OF P2 FOOTING

MAYAR RIVER BRIDGE

Remarks

MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 9: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -9 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITEDProject Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P3 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 21

32 500 216.892 1 2.765 19.657 105 2063.985 6.321 13.05

16

00

1

500

8 23

10

11.797 0.000 11.797 54 637.046 0.617 0.39@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total:::: 13.44

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

Total weight (MT)

100

Page 10: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -10 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

BAR BENDING SCHEDULE OF P3 FOOTING

MAYAR RIVER BRIDGE

Remarks

MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Footing-Vertical (Outer Face)

Footing & shaftStirrups

Cem

Page 11: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -11 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITEDProject Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P4 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 21

32 500 2

15.919 1 2.765 18.684 105 1961.820 6.321

15

02

8

500

8 23

10

11.797 0.000 11.797 51 601.654 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 12: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -12 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P4 FOOTING

MAYAR RIVER BRIDGE

Remarks

12.40

0.37

12.772 MT

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Shaft Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 13: BBS of All Pier Foundations of MAYAR

For Contractor (ITD Cementation India Limited)

Page -13 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITEDProject Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P5 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 21

32 500 217.056 1 2.765 19.821 105 2081.205 6.321

16

16

5

500

8 23

10

11.797 0.000 11.797 54 636.928 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 14: BBS of All Pier Foundations of MAYAR

For Contractor (ITD Cementation India Limited)

Page -14 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P5 FOOTING

MAYAR RIVER BRIDGE

Remarks

13.16

0.39

13.548 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 15: BBS of All Pier Foundations of MAYAR

For Contractor (ITD Cementation India Limited)

Page -15 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITEDProject Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P6 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 21

32 500 215.852 1 2.765 18.617 105 1954.785 6.321

14

96

1

500

8 23

10

11.797 0.000 11.797 50 589.582 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 16: BBS of All Pier Foundations of MAYAR

For Contractor (ITD Cementation India Limited)

Page -16 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P6 FOOTING

MAYAR RIVER BRIDGE

Remarks

12.36

0.36

12.72 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 17: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -17 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITEDProject Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P7 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 21

32 500 2

14.919 1 2.765 17.684 105 1856.820 6.321

14

02

8

500

8 23

10

11.797 0.000 11.797 47 554.466 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 18: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -18 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P7 FOOTING

MAYAR RIVER BRIDGE

Remarks

11.74

0.34

12.079 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 19: BBS of All Pier Foundations of MAYAR

For Contractor (ITD Cementation India Limited)

Page -19 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITED

Project Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P8 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 6a

32 500 2

12.132 1 2.765 14.897 60 893.820 6.321

11

24

1

500

7 7

10

11.797 0.000 11.797 38 448.291 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 20: BBS of All Pier Foundations of MAYAR

For Contractor (ITD Cementation India Limited)

Page -20 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P8 FOOTING

MAYAR RIVER BRIDGE

Remarks

5.65

0.28

5.927 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 21: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -21 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITED

Project Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P9 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 6a

32 500 2

11.280 1 2.765 14.045 60 842.700 6.321

10

38

9

500

7 7

10

11.797 0.000 11.797 35 412.900 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 22: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -22 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P9 FOOTING

MAYAR RIVER BRIDGE

Remarks

5.33

0.26

5.582 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 23: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -23 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITED

Project Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P10 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 6a

32 500 2

10.573 1 2.765 13.338 60 800.280 6.321

96

82

500

7 7

10

11.797 0.000 11.797 33 389.306 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 24: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -24 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P10 FOOTING

MAYAR RIVER BRIDGE

Remarks

5.06

0.24

5.299 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 25: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -25 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITED

Project Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P11 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 6a

32 500 2

9.941 1 2.765 12.706 60 762.360 6.321

90

50

500

7 7

10

11.797 0.000 11.797 31 365.711 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 26: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -26 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P11 FOOTING

MAYAR RIVER BRIDGE

Remarks

4.82

0.23

5.045 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 27: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -27 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITED

Project Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P12 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 6a

32 5002

10.972 1 2.765 13.737 60 824.220 6.321

10

08

1

500

7 7

10

11.797 1 0.864 12.661 34 430.479 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 28: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -28 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P12 FOOTING

MAYAR RIVER BRIDGE

Remarks

5.21

0.27

5.476 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 29: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -29 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITED

Project Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P13 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 6

32 500 2

12.654 1 2.765 15.419 70 1079.330 6.321

11

76

3

500

7 7

10

11.797 0.000 11.797 40 471.886 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm

)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 30: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -30 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P13 FOOTING

MAYAR RIVER BRIDGE

Remarks

6.82

0.29

7.114 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem

Page 31: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -31 of 32 For Client(Reliance Infrastructure Limited)

Client RELIANCE INFRASTRUCTURE LIMITED

Project Name

Contractor ITD Cementation India Limited

BAR BENDING SCHEDULE OF P14 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE

Drawing No.: REL-SUMPP-TES-311-C-1016

Bar mark Shape of bar

6 6

32 500 2

13.023 1 2.765 15.788 70 1105.160 6.321

12

13

2

500

7 7

10

11.797 0.000 11.797 41 483.683 0.617@

11

59

7.1

42

85

71

42

9

300

C/C ###

Total::::

6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Sl.

no.

Dia of

bar (mm)

No Of Bent

Cutting Length

(m)

No. of Lap

Reqrd

Length per Lap (m)

Total Cut Length (m)

No of bars

Total Length (m)

Unit Weight (kg/m)

100

Page 32: BBS of All Pier Foundations of MAYAR

For Contractor(ITD Cementation India Limited)

Page -32 of 32 For Client(Reliance Infrastructure Limited)

RELIANCE INFRASTRUCTURE LIMITED

ITD Cementation India Limited

BAR BENDING SCHEDULE OF P14 FOOTING

MAYAR RIVER BRIDGE

Remarks

6.99

0.30

7.284 MT

CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Total weight (MT)

Footing-Vertical (Outer Face)

Footing & shaft-Stirrups

Cem