ÖBB-Infrastruktur AG
Infrastructure initiatives and strategies to support successful cross-border railway services connecting to Austria
Wien, November 2020Mag.a Silvia Angelo, CFO ÖBB Infrastructure AG
![Page 2: ÖBB-Infrastruktur AGpubdocs.worldbank.org/en/701581606261029915/Day1-Silvia... · Mag.a Silvia Angelo, CFO ÖBB Infrastructure AG. We lay the foundation for railway travel. We plan,](https://reader035.vdocuments.mx/reader035/viewer/2022071408/60ffa930ddc5b0488376fc2c/html5/thumbnails/2.jpg)
We lay the foundation for railway travel
![Page 3: ÖBB-Infrastruktur AGpubdocs.worldbank.org/en/701581606261029915/Day1-Silvia... · Mag.a Silvia Angelo, CFO ÖBB Infrastructure AG. We lay the foundation for railway travel. We plan,](https://reader035.vdocuments.mx/reader035/viewer/2022071408/60ffa930ddc5b0488376fc2c/html5/thumbnails/3.jpg)
We plan, build, operate and maintain railway infrastructure
18,700 employees
7 rail freight terminals
57 railway companies on the network
2,9 billion Euroinvestment each year
100 % greenelectricity
1,800 technical apprentices
First railway solar power plant
1/3 electricity of own production
Railway country number 1 in Europe each Austrian covered 1,426 km per year on average
4th place in freight trans-port performance: 22 billion net ton kilometers achieved in Austria
270 million passengers
1,048stations and stops
Green electricityPower from 8 hydroelec-
tric railpower stations
5,000 kilometresrail network
6,700 trains daily156 million
train kilometres per year
![Page 4: ÖBB-Infrastruktur AGpubdocs.worldbank.org/en/701581606261029915/Day1-Silvia... · Mag.a Silvia Angelo, CFO ÖBB Infrastructure AG. We lay the foundation for railway travel. We plan,](https://reader035.vdocuments.mx/reader035/viewer/2022071408/60ffa930ddc5b0488376fc2c/html5/thumbnails/4.jpg)
Rail Freight Corridors (RFCs) map
![Page 5: ÖBB-Infrastruktur AGpubdocs.worldbank.org/en/701581606261029915/Day1-Silvia... · Mag.a Silvia Angelo, CFO ÖBB Infrastructure AG. We lay the foundation for railway travel. We plan,](https://reader035.vdocuments.mx/reader035/viewer/2022071408/60ffa930ddc5b0488376fc2c/html5/thumbnails/5.jpg)
Europe and the Austrian railway network Cross border dialogue
Villach
Klagenfurt
Graz
St. Pölten WienLinz
Salzburg
Innsbruck
Bregenz
Ostesee - Adria KorridorSkandinavian - Mittelmeer KorridorRhein - Donau KorridorOrient/Östliches Mittelmeer KorridorAlpen - Westbalkan Korridor
![Page 6: ÖBB-Infrastruktur AGpubdocs.worldbank.org/en/701581606261029915/Day1-Silvia... · Mag.a Silvia Angelo, CFO ÖBB Infrastructure AG. We lay the foundation for railway travel. We plan,](https://reader035.vdocuments.mx/reader035/viewer/2022071408/60ffa930ddc5b0488376fc2c/html5/thumbnails/6.jpg)
Current framework conditions in Europe
- Different demands on technology and personnel- Various train control systems- Language barriers - Lack of planning security for infrastructure managers
(about 2.500 km air-line distance)
![Page 7: ÖBB-Infrastruktur AGpubdocs.worldbank.org/en/701581606261029915/Day1-Silvia... · Mag.a Silvia Angelo, CFO ÖBB Infrastructure AG. We lay the foundation for railway travel. We plan,](https://reader035.vdocuments.mx/reader035/viewer/2022071408/60ffa930ddc5b0488376fc2c/html5/thumbnails/7.jpg)
Focus: … how we cross our borders …
the future of the railway
- An integrated European railway network is the prerequisite for the competiveness of the overall railway system.
- For an efficient European railway network the implementation of coordinated cross border projects is necessary.
current projects
- Cutting of border stops (Reduction of dwelling times) - Overcoming language barriers - Multisystem lokomotives - Digital automative coupling- TTR Coordination of Capacity Models on the international level
possible measures
- Elimination of bottlenecks (e.g. significant speed limitations, axle load, clearance gauge)- Increase of capacity (e.g. 2-track upgrade)- Line electrification- Complete new cross border lines (e.g. with tunnels, bridges, high-speed lines)