baton rouge metropolitan airport bonnie garrigan baton rouge metropolitan airport dbe consultant dbe...

14
BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

Upload: jaren-mundine

Post on 31-Mar-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Bonnie GarriganBaton Rouge Metropolitan Airport

DBE Consultant

DBE Program Requirements

Page 2: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

What is a DBE firm?

• Any type of firm can qualify as a DBE firm, from contractors and consultants to suppliers and service providers.

Page 3: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Who Qualifies as a DBE?

• DBE certification is based on:– Size: Small Business Administration small business

standards—less than $22.41 million gross receipts over last 3 years

– Presumed to be disadvantaged: women, Black Americans, Hispanic Americans, Native Americans, Asian-Pacific Americans, Subcontinental Asia Americans

– Ownership and control by person(s) with net worth less than $750,000

– If not presumed disadvantaged—case by case determination of social and economic conditions

Page 4: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Louisiana Unified Certification Program (LAUCP)

• The Airport uses the LAUCP to determine if a firm is a qualifying DBE.– Good for DBE Firms• Enables DBEs to be certified once and then be eligible

to work as a DBE anywhere in Louisiana– Good for Prime Firms• Comprehensive database makes it easy to find DBE

firms for projects.• Visit www.laucp.org for searchable list of

certified DBE Firms.

Page 5: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

DBE Program in Action

• The Airport sets an annual DBE goal for DBE participation on federally funded projects that are anticipated in the upcoming year.

• Throughout the year, the Airport works toward meeting this goal through individual project goals.

Page 6: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Goal Setting Methodology

• BASE GOAL: Proportion of ready, willing and able DBE firms available in BRMA’s market area as compared to total number of firms in the market area. (LAUCP and census websites)

• ADJUSTMENT: Adjust this proportion based on historical performance on past projects and the bidders list.

Page 7: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Bidder/Proposer DBE Requirements

• Make Good Faith Efforts to obtain DBE participation by either: – Meeting or exceeding the goal set for the project ,

OR– Documenting adequate Good Faith Efforts

Page 8: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

What are Good Faith Efforts?• Unbundle project tasks• Advertise potential subcontracting opportunities• Contact local trade organizations to post opportunities• Make efforts to assist DBE firms with bonding, lines of

credit or insurance as required by project• Include supporting documentation of HARD EVIDENCE of

the above mentioned efforts or other efforts to obtain DBE participation including:o Postal correspondenceo E-mailo Faxo Telephone logo Printed advertisements

Page 9: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

New Public Bid Laws

• DBE forms are due by the apparent low bidder within 24 hours of the bid due date. – All other bidders shall be prepared to submit the

following forms upon request and shall have 24 hours from the date of request to submit.

Page 10: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Bid/Proposal Review Process• To be considered responsive, a submittal must

include completely and correctly filled out Schedules A and B and/or a completed Schedule C.– Proposal meets or exceeds the DBE Goal

• Schedule A and B must be submitted.• All participating firms must be listed on Schedule A and all

participating firms must complete a Schedule B.– Proposal does not meet the DBE Goal

• Schedule C shall be included to document good faith efforts.• Prime will carry the burden of convincing the Airport that it is

appropriate to award the contract based on your good faith efforts.

Page 11: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Schedule AContract Participation and DBE Commitment

• List all participating firms and the work to be performed and the level of participation– Dollar value for bid– Participation percentage for RFP/RFQ

• Completed and signed by prime firm• Includes all participating firms including the

prime and indicates which firms are DBE certified

Page 12: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Schedule BRequired Participation Questionnaire

• Provides firm information as required by FAA• Completed by each participating firm• Items that are not applicable should read N/A• Prime firms participating as a Joint Venture

should complete separate forms and indicate JV.

Page 13: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Schedule CCertification of DBE Unavailability

• The Prime should make sincere and aggressive efforts to meet the DBE contract goal, if the prime is unable to meet the contract goal, then the prime must document adequate good faith efforts to meet the goal.

• Supporting documentation MUST be included• Explanation of adequate efforts on company

letterhead encouraged.

Page 14: BATON ROUGE Metropolitan Airport Bonnie Garrigan Baton Rouge Metropolitan Airport DBE Consultant DBE Program Requirements

BATON ROUGE Metropolitan Airport

Questions? Bonnie Garrigan or Audrey Pulitzer

TMG Consulting365 Canal Street, Suite 1170

New Orleans, La 70130

[email protected]@tmg-consulting.net

504-569-9239 ex 29 (Bonnie) or 30 (Audrey)