Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Upload: evelyn-dickerson

Post on 13-Dec-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Basis of Estimates Part 1 Introduction

Melissa HollisEngineering Systems Support

State Specifications and Estimates OfficeJune 2012

Page 2: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Basis of Estimates

•Part 1: Introduction to the Basis of Estimates

•Part 2: Selecting Pay Items

•Part 3: Estimating and Review

Page 3: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Part 1: Introduction to the Basis of Estimates

•General Information•BOE Online

•Chapter 1: Updates & Registration•Chapter 2: Units of Measure•Chapter 5: Contact Lists•Chapter 6: Pay Item Requests•Chapter 7: Design Tools•Chapter 8: Forms•Chapter 9: Trnsport & Webgate•Chapter 10: Formatting Items

Page 4: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

General Information: Terminology

•DOT or FDOT: Florida Department of Transportation•BOE: Basis of Estimates•Specs: Specifications, including the Standard Specifications (bound book), Supplemental Specifications (FHWA approved), Special Provisions, Developmental Specifications, and Technical Special Provisions

•Estimates: Pay Item, Quantity, Price•PSE Package

Page 5: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

General Information: Terminology

•Proposal•Bidder•Contract

•Project•Category / Design GroupRoadway, Structures, Signing & Pavement Markings, Lighting, Signals, Landscaping, Utilities, Architectural, Mass Transit

Bridges:One category for

each bridge

Page 6: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

General Information: Terminology

•LRE: Long Range Estimates•Trnsport•PES, CES, LAS, SiteManager, DSS

•Webgate, Designer Interface•WebTrnsport LRE: Anticipated

quantities based on typical section

TRNSPORT: Known quantities based on

plans

Page 7: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

General Information: Terminology

•PPM: Plans Preparation Manual•CPAM: Construction Project Administration Manual

•Standards: Design Standards, Interim Standards, Indexes, Instructions for Design Standards

http://www.dot.state.fl.us/rddesign/ DesignStandards/Standards.shtm

Page 8: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

General Information: Timeline

•Pre-Design•Design•Letting & Bid Review•Award•Construction

Page 9: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

General Information: Timeline

•Pre-Design•Design•Letting & Bid Review•Award•Construction

Page 10: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Part 1: Introduction to the Basis of Estimates

•General Information•BOE Online

•Chapter 1: Updates & Registration•Chapter 2: Units of Measure•Chapter 5: Contact Lists•Chapter 6: Pay Item Requests•Chapter 7: Design Tools•Chapter 8: Forms•Chapter 9: Trnsport & Webgate•Chapter 10: Formatting Items

Page 11: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

BOE Online

•searchable .pdf files•Reader is available from http://www.adobe.com

•Files are located on the Specifications and Estimates web page at http://www.dot.state.fl.us/ specificationsoffice/

Basis of Estimates

Page 12: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

BOE Online

•NOT a contract document•Refer to Chapter 10 for coordinating BOE content with the plans and specifications

Page 13: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

BOE Online

•Complete file is large!•Use online chapter files, whenever possible.

Page 14: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Basis of Estimates- Chapter 1

•Updated Monthly, or as needed•Estimates Bulletins•Registration through Contact Database http://www.dot.state.fl.us/ projectmanagementoffice/ contactdatabase.shtm

Page 15: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 2: Units of Measure

•Abbreviations–ED: Per each, per day (5 items x 5 days= 25 ED)–LO: Location

•Conversion Factors–43,560 ft2/ac

Page 16: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapters 3 and 4

•Chapter 3: Alphabetical ListPipe, Optional vs Optional PipeExcavation, Borrow vs Borrow ExcavationImpact Attenuator vs Crash Cushion

•Chapter 4: Blank for future use

Page 17: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 5: Contact Lists

•Directory of Coordinators•Central Office Pay Item coordinators•Responsible Offices•Listing, by pay item range, of the responsible office and contact person(s)

Page 18: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 5: Contact Lists

Project Specific Issues•Designer coordinates with Project Manager.•Project Manger works with District or Responsible Office, as needed•E-mail, with Designer and Project Manager’s contact information, works well to expedite responses. Carefully select the “cc: group”•Project Number, Letting & Production Dates

Page 19: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 6: Requesting Pay Items

•Opening pay items•Creating new pay items•Pay Item request instructions•Inactive Items•Pay Item reviews•Coordination Team•Management Team•Developmental, Trial, and/or Special Pay Items•Generic Pay Items

Page 20: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 6: Requesting Pay Items

•Opening pay items•Item structure is already in the BOE•Valid/Obsolete dates may apply

•Creating new pay items•Additional Size, shape, etc.•Other operations?•General use, new specs?•Project Specific/Limited use? •Developmental/Experimental?

Page 21: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 6: Requesting Pay Items

•Opening pay items•Creating new pay items•Pay Item request instructions•Inactive Items•Pay Item reviews•Coordination Team•Management Team•Developmental, Trial, and/or Special Pay Items•Generic Pay Items

Page 22: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 6: Requesting Pay Items

•Coordination Team•Representatives from Design, Construction, Maintenance, and other offices•Coordinate the implementation of Pay Items, Specifications, Standards, and other issues

•Management Team•Managers from same offices•Work to resolve issues between offices, policy issues, etc.

Page 23: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 6: Requesting Pay Items

•Opening pay items•Creating new pay items•Pay Item request instructions•Inactive Items•Pay Item reviews•Coordination Team•Management Team•Developmental, Trial, and/or Special Pay Items•Generic Pay Items

Page 24: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Generic Pay Items

Format 000-AAA-BBB, where AAA = Design Groups /Categoryand BBB= sequential numbering 1, 2, 3, etc.•000-100-BBB Structures•000-200-BBB Roadway•000-300-BBB Signing/Pavement Marking•000-400-BBB Lighting•000-500-BBB Signals/ITS•000-600-BBB Landscaping

Caution: Read the rules!

Great for single use, but not for testing.

Page 25: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Generic Pay Items

Complete rules in Chapter 6. Here is a brief summary of the rules:• Must not be used if there is an existing pay item.• Must not be used to violate or circumvent standard pay items.• Must not be used to circumvent the approval process on developmental items. (No “testing” without Product Evaluation or Materials Office involvement)• Must not be used as a work-around for a pay item that has been rejected for statewide usage by Central Office. • Must not to be used for sole-sourcing of materials/ methods for items of work.

Page 26: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Generic Pay Items

Complete rules in Chapter 6. •Good Examples:•Utility Items without existing pay items•“Single use, Unique work”- Skyway lighting•“Unusual”- Geotechnical or Structural work

•Remember:•No tracking, no project or cost history•No applicable specs/standards

Page 27: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 7: Design Tools

•Coordination between plans, specs, and pay items•Plan Notes•“T” Flag

Specifications include:Description MaterialsConstruction or Installation requirementsMethod of MeasurementBasis of Payment

Page 28: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 7: Design Tools

•Coordination between plans, specs, and pay items

Specs: Book, SPs, TSPs, Developmental, Supplemental

Plans: Structures, Roadway, Lighting, Signals, etc.

Estimate: Item Number, Description, Units, Prices

Standards:E-book, IDS

Page 29: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 7: Design Tools

•Coordination between plans, specs, and pay items•Plan Notes•“T” Flag

Project Specific Details- good

Duplicating Specs- bad

Page 30: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 7: Design Tools

•Coordination between plans, specs, and pay items•Plan Notes•“T” Flag

When is a Tech Spec needed?

Page 31: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 7: Design Tools

•Coordination between plans, specs, and pay items•Plan Notes•“T” Flag

T Tech Spec/Plan DetailsD Plan Details requiredP Permit requiredM Monitored itemG Generic ItemA Approvals needed

Page 32: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 8: Forms

•CADD (Tabulation forms included in the plans)–Created by the responsible office: Roadway, Structures, Drainage, or other–Maintained by the CADD Office–Instructions in PPM or other handbooks/manuals

•COMP (Computation Book forms)–Created and Maintained by the Construction Office–Master PI List available within Webgate–Instructions in Preparation and Documentation Manual

Page 33: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 9: Webgate and Designer Interface

•RACF Password required•Designer Interface•Trnsport Reports–Project Edit Report–Proposal Summary of Quantities (for use in plans)–Master PI List

•Internet Reports–Item Average Reports

Page 34: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 9: Webgate and Designer Interface

•RACF Password required•Designer Interface•Trnsport Reports–Project Edit Report–Proposal Summary of Quantities (for use in plans)–Master Pay Item List

•Internet Reports

Page 35: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 9: Webgate and Designer Interface

•RACF Password required•Designer Interface•Trnsport Reports–Project Edit Report–Proposal Summary of Quantities (for use in plans)

•Internet Reports

Page 36: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 10: Formatting Pay Items

•Pay Item Description•Unit, Accuracy, Plan Quantity•Important Dates•Detail•Related Items•Documentation•References, Specs, Standards•Plan Detail and/or Tech Spec•Pay Item Structure•Where to Find It

Page 37: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 10: Formatting Pay Items

Page 38: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 10: Formatting Pay Items

•Price vs. Quantity

District XDistrict YDistrict Z

Quantity

$

Page 39: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Question?

•Which is less expensive- concrete or pvc/plastic pipe?

•How can we bid concrete vs PVC?

Page 40: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Answers

•Bid Prices

Materials

Labor

Equipment

Page 41: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 10: Formatting Pay Items

•Pay Item Description•Unit, Accuracy, Plan Quantity•Important Dates•Detail•Related Items•Documentation•References, Specs, Standards•Plan Detail and/or Tech Spec•Pay Item Structure•Where to Find It

Page 42: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Chapter 10: Formatting Pay Items

•Specification Section number•Pay Item Number 123-ABC-DEF

100s General, Earthwork200s Base Courses300s Pavement400s Structures500s Incidental Construction600s Traffic Control Devices700s Signing, Lighting, and Pavement Markings900s Special Items

Page 43: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

BOE Advice

If you don’t see a pay item that you need, please ask.•Existing/available Item•Open an item/existing structure•Create a new item•Developmental Pay Item•Generic Pay Item

Page 44: Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012

Thank you for your time!Melissa HollisBasis of Estimates CoordinatorState Specifications and Estimates [email protected]