basin bridge project: plan set: trueviews in low resolution › assets › projects ›...

21
1826BasinReserve_20130530_VP22 Photosimulation Created Using TrueView TM Technology (Patent No.: US 8,184,906 B2) Provided by www.truescape.com Basin Bridge Project Viewpoint Location Correct Viewing of TrueView Photosimulations NOTES: Viewpoint locations have been precision surveyed by: Opus International Consultants Ltd Level 7, Majestic Centre, 100 Willis St Wellington, New Zealand Heights are above mean sea level. No part of this photosimulation shall be altered in any way. 7B.22.E - Viewpoint 22: Paterson Street, southern footpath next to Tunnel exit - Existing View Easting Position (NZTM): 1749334.1 Northing Position (NZTM): 5426223.5 Elevation of Viewpoint Position (m): 20.5 Height of Camera Above Ground (m): 1.65 Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of View: NW Horizontal Field of View: 124° Vertical Field of View: 55° 7B.22.E Viewpoint 22: Paterson Street, southern footpath next to Tunnel exit Existing View For on-screen display: Scale bar to be 101.6 mm wide Viewing distance 50 cm

Upload: others

Post on 03-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P22

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

Basin Bridge Project

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

7B.22.E - Viewpoint 22: Paterson Street, southern footpath next to Tunnel exit - Existing View

Easting Position (NZTM): 1749334.1

Northing Position (NZTM): 5426223.5

Elevation of Viewpoint Position (m): 20.5

Height of Camera Above Ground (m): 1.65

Date of Photography: 17-May-2012 at 1:10 p.m.

Orientation of View: NW

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.22.E Viewpoint 22:

Paterson Street, southern footpath next to Tunnel exit

Existing View

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 50 cm

Page 2: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P22

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.22.B- Viewpoint 22: Paterson Street, southern footpath next to Tunnel exit - Proposed View without Northern Gateway Building

Easting Position (NZTM): 1749334.1

Northing Position (NZTM): 5426223.5

Elevation of Viewpoint Position (m): 20.5

Height of Camera Above Ground (m): 1.65

Date of Photography: 17-May-2012 at 1:10 p.m.

Orientation of View: NW

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.22.BViewpoint 22:

Paterson Street, southern footpath next to Tunnel exit

Proposed View without Northern

Gateway Building

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 3: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P22

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.22.O - Viewpoint 22: Paterson Street, southern footpath next to Tunnel exit - Proposed View with Northern Gateway Building - 65 metre option

Easting Position (NZTM): 1749334.1

Northing Position (NZTM): 5426223.5

Elevation of Viewpoint Position (m): 20.5

Height of Camera Above Ground (m): 1.65

Date of Photography: 17-May-2012 at 1:10 p.m.

Orientation of View: NW

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.22.O Viewpoint 22:

Paterson Street, southern footpath next to Tunnel exit

Proposed View with Northern Gateway Building - 65 metre option

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 4: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P24

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

Basin Bridge Project

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

7B.24.E - Viewpoint 24: Dufferin Street, Government House entrance gates - Existing View

Easting Position (NZTM): 1749106.8

Northing Position (NZTM): 5426218.5

Elevation of Viewpoint Position (m): 8.7

Height of Camera Above Ground (m): 1.65

Date of Photography: 19-May-2012 at 12:15 p.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.24.EViewpoint 24:

Dufferin Street, Government House entrance gates

Existing View

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 50 cm

Page 5: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P24

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.24.B - Viewpoint 24: Dufferin Street, Government House entrance gates - Proposed View without Northern Gateway Building

Easting Position (NZTM): 1749106.8

Northing Position (NZTM): 5426218.5

Elevation of Viewpoint Position (m): 8.7

Height of Camera Above Ground (m): 1.65

Date of Photography: 19-May-2012 at 12:15 p.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.24.BViewpoint 24:

Dufferin Street, Government House entrance gates

Proposed View without Northern Gateway Building

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 6: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P24

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.24.O - Viewpoint 24: Dufferin Street, Government House entrance gates - Proposed View with Northern Gateway Building - 65 metre option (not visible)

Easting Position (NZTM): 1749106.8

Northing Position (NZTM): 5426218.5

Elevation of Viewpoint Position (m): 8.7

Height of Camera Above Ground (m): 1.65

Date of Photography: 19-May-2012 at 12:15 p.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.24.OViewpoint 24:

Dufferin Street, Government House entrance gates

Proposed View with Northern Gateway Building - 65 metre option (not visible)

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 7: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P26a

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

Basin Bridge Project

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

7B.26A.E - Viewpoint 26a: Sussex Street, western footpath - Existing View

Easting Position (NZTM): 1748953.1

Northing Position (NZTM): 5426456.3

Elevation of Viewpoint Position (m): 13.9

Height of Camera Above Ground (m): 1.65

Date of Photography: 19-May-2012 at 11:52 a.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.26A.EViewpoint 26a:

Sussex Street, western footpath

Existing View

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 50 cm

Page 8: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P26a

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.26A.B - Viewpoint 26a: Sussex Street, western footpath - Proposed View without Northern Gateway Building

Easting Position (NZTM): 1748953.1

Northing Position (NZTM): 5426456.3

Elevation of Viewpoint Position (m): 13.9

Height of Camera Above Ground (m): 1.65

Date of Photography: 19-May-2012 at 11:52 a.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.26A.BViewpoint 26a:

Sussex Street, western footpath

Proposed View without Northern Gateway Building

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 9: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P26a

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.26A.O - Viewpoint 26a: Sussex Street, western footpath - Proposed View with Northern Gateway Building - 65 metre option (not visible)

Easting Position (NZTM): 1748953.1

Northing Position (NZTM): 5426456.3

Elevation of Viewpoint Position (m): 13.9

Height of Camera Above Ground (m): 1.65

Date of Photography: 19-May-2012 at 11:52 a.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.26A.OViewpoint 26a:

Sussex Street, western footpath

Proposed View with Northern Gateway Building - 65 metre option (not visible)

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 10: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P28a

(1)_

new

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

Basin Bridge Project

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

7B.28A.E - Viewpoint 28a: Buckle Street / Tory Street - Existing View

Easting Position (NZTM): 1748886.1

Northing Position (NZTM): 5426555.8

Elevation of Viewpoint Position (m): 18.3

Height of Camera Above Ground (m): 1.65

Date of Photography: 16-October-2012 at 12:56 p.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.28A.EViewpoint 28a:

Buckle Street / Tory Street

Existing View

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 50 cm

Page 11: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P28a

(1)_

new

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.28A.B - Viewpoint 28a: Buckle Street / Tory Street - Proposed View without Northern Gateway Building

7B.28A.BViewpoint 28a:

Buckle Street / Tory Street

Proposed View without Northern Gateway Building

Easting Position (NZTM): 1748886.1

Northing Position (NZTM): 5426555.8

Elevation of Viewpoint Position (m): 18.3

Height of Camera Above Ground (m): 1.65

Date of Photography: 16-October-2012 at 12:56 p.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 12: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P28a

(1)_

new

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.28A.O - Viewpoint 28a: Buckle Street / Tory Street - Proposed View with Northern Gateway Building - 65 metre option (not visible)

7B.28A.OViewpoint 28a:

Buckle Street / Tory Street

Proposed View with Northern Gateway Building - 65 metre option (not visible)

Easting Position (NZTM): 1748886.1

Northing Position (NZTM): 5426555.8

Elevation of Viewpoint Position (m): 18.3

Height of Camera Above Ground (m): 1.65

Date of Photography: 16-October-2012 at 12:56 p.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 13: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P30

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

Basin Bridge Project

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

7B.30.E - Viewpoint 30: Basin Reserve, southern gate - Existing View

Easting Position (NZTM): 1749000.8

Northing Position (NZTM): 5426308.0

Elevation of Viewpoint Position (m): 7.7

Height of Camera Above Ground (m): 1.65

Date of Photography: 18-May-2012 at 12:02 p.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.30.EViewpoint 30:

Basin Reserve, southern gate

Existing View

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 50 cm

Page 14: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P30

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.30.B - Viewpoint 30: Basin Reserve, southern gate - Proposed View without Northern Gateway Building

Easting Position (NZTM): 1749000.8

Northing Position (NZTM): 5426308.0

Elevation of Viewpoint Position (m): 7.7

Height of Camera Above Ground (m): 1.65

Date of Photography: 18-May-2012 at 12:02 p.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.30.BViewpoint 30:

Basin Reserve, southern gate

Proposed View without Northern Gateway Building

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 15: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P30

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.30.O - Viewpoint 30: Basin Reserve, southern gate - Proposed View with Northern Gateway Building - 65 metre option

Easting Position (NZTM): 1749000.8

Northing Position (NZTM): 5426308.0

Elevation of Viewpoint Position (m): 7.7

Height of Camera Above Ground (m): 1.65

Date of Photography: 18-May-2012 at 12:02 p.m.

Orientation of View: NE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.30.OViewpoint 30:

Basin Reserve, southern gate

Proposed View with Northern Gateway Building - 65 metre option

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 16: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P30a

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

Basin Bridge Project

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

7B.30A.E - Viewpoint 30a: Basin Reserve, walkway on east side - Existing View

Easting Position (NZTM): 1748980.9

Northing Position (NZTM): 5426402.5

Elevation of Viewpoint Position (m): 7.7

Height of Camera Above Ground (m): 1.65

Date of Photography: 18-May-2012 at 1:25 p.m.

Orientation of View: E

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.30A.EViewpoint 30a:

Basin Reserve, walkway on east side

Existing View

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 50 cm

Page 17: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P30a

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.30A.B - Viewpoint 30a: Basin Reserve, walkway on east side - Proposed View without Northern Gateway Building

Easting Position (NZTM): 1748980.9

Northing Position (NZTM): 5426402.5

Elevation of Viewpoint Position (m): 7.7

Height of Camera Above Ground (m): 1.65

Date of Photography: 18-May-2012 at 1:25 p.m.

Orientation of View: E

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.30A.BViewpoint 30a:

Basin Reserve, walkway on east side

Proposed View without Northern Gateway Building

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 18: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P30a

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.30A.O - Viewpoint 30a: Basin Reserve, walkway on east side - Proposed View with Northern Gateway Building - 65 metre option

Easting Position (NZTM): 1748980.9

Northing Position (NZTM): 5426402.5

Elevation of Viewpoint Position (m): 7.7

Height of Camera Above Ground (m): 1.65

Date of Photography: 18-May-2012 at 1:25 p.m.

Orientation of View: E

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.30A.OViewpoint 30a:

Basin Reserve, walkway on east side

Proposed View with Northern Gateway Building - 65 metre option

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 19: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P30c

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

Basin Bridge Project

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

7B.30B.E - Viewpoint 30b: Basin Reserve Grandstand, midpoint - Existing View

Easting Position (NZTM): 1748969.7

Northing Position (NZTM): 5426411.3

Elevation of Viewpoint Position (m): 13.9

Height of Camera Above Ground (m): 1.65

Date of Photography: 18-May-2012 at 1:30 p.m.

Orientation of View: SE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.30B.EViewpoint 30b:

Basin Reserve Grandstand, midpoint

Existing View

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 50 cm

Page 20: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P30c

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.30B.B - Viewpoint 30b: Basin Reserve Grandstand, midpoint - Proposed View without Northern Gateway Building

Easting Position (NZTM): 1748969.7

Northing Position (NZTM): 5426411.3

Elevation of Viewpoint Position (m): 13.9

Height of Camera Above Ground (m): 1.65

Date of Photography: 18-May-2012 at 1:30 p.m.

Orientation of View: SE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.30B.BViewpoint 30b:

Basin Reserve Grandstand, midpoint

Proposed View without Northern Gateway Building

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm

Page 21: Basin Bridge Project: Plan set: Trueviews in low resolution › assets › projects › basin-bridge-application … · Date of Photography: 17-May-2012 at 1:10 p.m. Orientation of

1826

Bas

inRe

serv

e_20

1305

30_V

P30c

Photosimulation Created UsingTrueViewTM Technology

(Patent No.: US 8,184,906 B2)

Provided by

www.truescape.com

NOTES: Viewpoint locations have been precision surveyed by:

Opus International Consultants LtdLevel 7, Majestic Centre, 100 Willis St Wellington, New Zealand

Heights are above mean sea level.

No part of this photosimulation shall be altered in any way.

‘National War Memorial Park and Buckle Street Undergrounding Project Draft indicative and being designed by others’

Basin Bridge Project

Indicative National War Memorial Park and Buckle Street Underground Project

Proposed Bridge, Road Re-Alignment and Landscaping

Viewpoint Location

Correct Viewing of TrueViewTM Photosimulations

7B.30B.O - Viewpoint 30b: Basin Reserve Grandstand, midpoint - Proposed View with Northern Gateway Building - 65 metre option

Easting Position (NZTM): 1748969.7

Northing Position (NZTM): 5426411.3

Elevation of Viewpoint Position (m): 13.9

Height of Camera Above Ground (m): 1.65

Date of Photography: 18-May-2012 at 1:30 p.m.

Orientation of View: SE

Horizontal Field of View: 124°

Vertical Field of View: 55°

7B.30B.OViewpoint 30b:

Basin Reserve Grandstand, midpoint

Proposed View with Northern Gateway Building - 65 metre option

For on-screen display:Scale bar to be 101.6 mm wideViewing distance 19.7 inches 50 cm