basement reno presentation
TRANSCRIPT
Sample text here
subtextsubtext
text heading1 text heading2 3
The door of the cellar had to be removed. The bulk head was too low to accommodate the door.
May turn this room into a storage area.
Bathroom Entrance
Third statement here
We decided to keep the builder insulation for the internal walls.
Second text statement positioned here at guide intersection
Exterior Walls – R14
Plumbing for the bathroom.
Drywall
First text statementSecond text statementFinal text statement
Special Waterproof Drywall was installed for the bathroom.
Time fora short break
It’s coming together now.
Statement or caption
Fireplace is installed.
Bathroom Mudding
Shower is installed just below the bulkhead.
Laying out the tile for the bathroom.
The Dri-core Subfloor
The Finished Basement!!