base schedule

Upload: leafar-aredeca

Post on 06-Jul-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/18/2019 Base Schedule

    1/1

      O  N

      C  O  I  L

     

    CFM (K/w)* (SMBH) (K/w) *USGPM(Deg F)(Deg F)

    ELEC.CHARACTERISTICS

      C  A  P  A  C  I  T  Y

      C  H  W

       F  L  O  W

      S  T  A  G  E  S

      N  O . 

      O  F

      E  L  E  C  T  R  I  C

      H  E  A  T  I  N  G

      C  O  I  L

    CHILLED WATER SIDE

      L  C  W  T

      E  C  W  T

      T  O  T  A  L

      C  A  P  A  C  I  T  Y

      C  A  P  A  C  I  T  Y

      S  E  N  S  I  B  L  E

    COOLING COIL

      AIR SIDE

    DESIGNATION

    SUPPLLY AIR

      O  F  F

      C  O  I  L

     

      P  O  W  E  R  *

      M  O  T  O  R

       E  X  H  A  U  S  T

       A  I  R

    CFM

      S  U  P  P  L  Y

      A  I  R

    AHU-CHARACTERISTICS

      Q  U  A  N  T  I  T  YSERVED AREALOCATION

    AHU

    SCHEDULE OF FRESH AIR HANDLING UNITS OF BURJEEL HOSPITAL

    INCHFDB/FWB

      O  U  T  D  O  O  R

    CFM

      F  I  L  T  E  R

      M  E  R  V -

      7 -

      2  5  %

    AIR FILTRATION

      P  R  E

      F  I  L  T  E  R

      B  A  G

      M  E  R  V -

      1  3 -

      9  0  %

    ORIES

      V  A  R  I  A  B  L  E

      S  P  E  E  D

      D  R  I  V  E

      P  L  E  N  U  M

      B  O  X

      H  E  P  A  F  I  L  T  E  R  S

      L  A  M  P

      (  U  V  )

      U  L  T  R  A

      V  I  O  L  E  T

    S R

    PLATE HEAT EXCHANGER

      T  O  T  A  L

       H  E  A  T

     

      R  E  C  O  V  E  R  Y

    (TMBH)*

      O  N  /  O  F  F

      H  E  A  T

     

    (F DB) (TMBH) *

    OR THERMAL HEAT WHEEL

    REHEATING COILPRE-COOLING

      M  E  R  V

      1  4 -

      1  7

    ACCESS

    (K/w)*

      M  A  X

      S  P  E  E  D

    RPM

    FAN

    RETURN AIR

    FAN

      O  U  T  D  O  O  R

      F  R  E  S  H  A  I  R

       F  R  E  S  H

      T  E  M  P

      P  O  W  E  R  *

      M  O  T  O  R

      S  T  A  T  I  C

      D  R  O  P  *

      E  S  T .  E

      X  T . 

      M  A  X

      S  P  E  E  D

    RPMINCH FDB/FWBFDB/FWB

      T  E  M  P

      T  E  M  P

      P  R  E  S  S  U  R  E

      D  R  O  P

      A  I  R

    INCH S R

    1 3.0 7.5 310.0 145.0 Y Y - NY62.05,500 5,700 115/86 172.0 4.0115/84 0.42 55453360 3027 54/5286/71 YFAHU-R-WM B -WASTE MANAGEMENT

    1 3.0 11.0 597.0 278.0 Y Y 14 NY119.010,700 10,500 115/85

    17

    2.0 9.0115/84 0.42 55453360 3027 54/5285/71FAHU-R-LA B -LAUNDRY

    1 3.0 8.0 440.0 191.0 Y Y 17 NY88.07,500 8,100 115/952.0 8.0115/84 0.42 55453360 3027 54/5295/71FAHU-R-LAB B -LABORATORY

    1 3.0 7.5 290.0 145.0 Y Y 14 NY62.05,500 6,100 115/83 172.0 7.5115/84 0.42 55453360 3027 54/5283/70B-MORTUARY

    ROOF PODIUM4

    FAHU-R-M PODIUM-04

    5,500

    10,700

    7,500

    5,500

      S  A  V  I  N  G

      R  E  C  O  V  E  R  Y

    343.0

    669.0

    445.0

    345.0 Y- HEAT PIPE

    - HEAT PIPE

    - HEAT PIPE

    - HEAT PIPEPODIUM-04

      S  T  A  T  I  C

      D  R  O  P  *

      E  S  T .  E

      X  T . 

      F  L  O  W

     

    ROOF PODIUM4