baroid system 360 fluids management system

19
The Original Drilling Fluids Company™ SYSTEM 360 Total Fluid Management System

Upload: andrewbilton

Post on 19-May-2015

2.996 views

Category:

Documents


12 download

DESCRIPTION

SYSTEM 360 Drilling Fluids Management Technology - Specifically designed for use in wire-line coring operations to remove low gravity solids and free water from dispersed drilling fluids.

TRANSCRIPT

Page 1: Baroid System 360 Fluids Management System

The Original Drilling Fluids Company™

SYSTEM 360Total Fluid Management

System

Page 2: Baroid System 360 Fluids Management System

Client Challenges

coring - slow ROP (Rate of Penetration)) - coring difficult formations - formation evaluation

working on high quality agricultural land – environmental concerns and perception of landholders

use exploration operations to demonstrate waste management to landholders

re-use of water and drilling fluids solids/waste control - removing cuttings and solids from drilling fluid low gravity solids removal - an effective and reliable system drilling waste management - handle and consolidate waste prior to

disposal high disposal and transport costs – slurry disposal levy increase - $35/t

to $150/t Jan 1st 2012 limited disposal facilities - re-use of drilling fluids environmentally friendly drilling fluids move away from settling pits

Page 3: Baroid System 360 Fluids Management System

Presentation Goals

• Define nature of problem• Define Total Fluids Management

• Engineered fluid solutions customized to maximize borehole value

• Borehole stability• Drilling productivity/sample quality• Water usage

Page 4: Baroid System 360 Fluids Management System

Nature of Problem

• Wire-line coring bits generate very small cuttings• 2-60 µm – clay/silt fraction• Unique to coring operations

• Fine solids accumulate/concentrate in the drill mud leading to:• Increased mud weight/density• Increased viscosity/circulating density• Reduced penetration rates• Increased formation damage • Reduced core recovery in poorly competent ground• Increased potential for mud rings/stuck tube• Increased water consumption to make new mud• Increased cartage/disposal costs for spent mud

Page 5: Baroid System 360 Fluids Management System

Spent mud or slurry is over 90% water and typically contains less than 5-6% solids…..

So why dump it?

Nature of Problem

Page 6: Baroid System 360 Fluids Management System

Nature of Problem (cont’d)

Conventional solids control

• Gravity settling

• Large site foot print, slow, ineffective in mudstone/siltstone geology

• Shale shakers/hydrocyclones• Inefficient for particle size range 2-60 µm

• Centrifuge• high capital cost, labour intensive

Page 7: Baroid System 360 Fluids Management System

Total Fluids ManagementSYSTEM 360

• Patented technology designed specifically for wire-line coring

• Uses both chemical and mechanical solids removal technology

• Increase productive working life of drill mud• Actively manage mud weight by

complete removal of solids from treated fraction

• Overflow returned to active system lowering average mud weight of circulating fluid

• Underflow separated into solids and clear water

Page 8: Baroid System 360 Fluids Management System

Total Fluids ManagementKey Features

• Small operational footprint • Two pallet spaces

• Lightweight modular design • Total dry weight182kg• Transportable by light vehicle or helicopter

Page 9: Baroid System 360 Fluids Management System

Total Fluids ManagementKey Features

• Ease of equipment use• in less than 5 days an unskilled operator can

independently run the unit

• Power options• Petrol, Diesel, Hydraulic

• Standard fittings• Camlock 50mm & 75mm integrates with

existing equipment/hoses

• 4 point Mixing System• high performance mud mixing

Page 10: Baroid System 360 Fluids Management System

Total Fluids ManagementKey Features

• Underflow – complete water/solids separation• Produces clear water• Reduces water consumption• Reduces water haulage costs• Re-use of water:

• mix additional drilling fluid• equipment wash-down• dust suppression

Page 11: Baroid System 360 Fluids Management System

Total Fluids ManagementKey Features

• Removal of flocculated solids • solids collected in draw-string bags for

safe simple waste handling• bagged waste for easy off-site disposal• reduced slurry haulage/disposal costs

Page 12: Baroid System 360 Fluids Management System

Total Fluids ManagementKey Features

• Manage mud weight (SG) = manage solids content• Ideal SG range 1.02-1.06• SG > 1.10 = 6% solids but mud is shot and should be replaced• 6% solids = paying for removal 90%+ water• SYSTEM 360 actively controls circulating mud weight

• Reduce pressure on formation• SG + Pressure loss = Actual pressure exerted on formation• Pressure loss is a function of solids content and viscosity

Page 13: Baroid System 360 Fluids Management System

Total Fluids ManagementKey Features

• Increase penetration rates• Improve bore-hole stability• Improve core recovery

• Reduce loss of matrix and fines by reducing circulating pressures

This? or This?

Page 14: Baroid System 360 Fluids Management System

Owner – Hampton Mining

Contractor – AK Drilling International

Location – Moquegua, Southern Peru

Date – November 2011 to present

• Drilling Challenges• 1500-2000 m HQ holes drilled with generally full returns• Fine grained pyrites causing:

• Increased mud weights >SG 1.05-1.06• Large earth sumps• High spent mud disposal rates• Reduced production• High SG = high solids

= reduced RPM

Case StudyLos Calatos – Copper Exploration Project

Page 15: Baroid System 360 Fluids Management System

• Client Challenge• Water costs running at USD$53.00 per metre drilled• Upwards of 45,000 L water used per day per rig

• Total Fluids Management

– Baroid GOLD line products and SYSTEM 360• Drilling fluid

• Soda Ash, • QUIK-GEL GOLD, • QUIK-TROL GOLD LV, • QUIKMUD GOLD

• Flocculant • SYSTEM FLOC 360

Case StudyLos Calatos – Copper Exploration Project

Page 16: Baroid System 360 Fluids Management System

Case StudyLos Calatos – Copper Exploration Project

• Summary of Results as of Dec 5th, 2011• Water consumption reduced to 15,000 L/day

• 66% reduction in water use

• Sump size reduced by 90%• Mud weight is being maintained at SG 1.02-1.03. • Increased drilling production by average of 20%• Equipment Training

• < 5 days for Peruvian offsiders• Offsiders operating unit independently

Page 17: Baroid System 360 Fluids Management System

Total Fluids ManagementSummary

• Starts at first turn of the bit

• Baroid IDP – we engineer fluid solutions customized to maximise borehole value

• Using Baroid IDP Gold line products, SYSTEM 360 and our engineering services can:• Improve quality and longevity of drill mud• Reduce water consumption• Reduce site footprint• Improve drilling production rates• Reduce per metre costs of exploration drilling• Make a positive contribution to HSE

Page 18: Baroid System 360 Fluids Management System

SYSTEM 350 Video

SYSTEM 350 video presentation

download click here

watch it now!

Page 19: Baroid System 360 Fluids Management System

The Original Drilling Fluids Company™

SYSTEM 360Total Fluid Management

System