barc

1
Employed as a TIE I was tasked with the application of various insulation specifications during the construction phase of Barclays World Headquarters , Employer required productivity rates were always met and with high quality standards . James Tumilty

Upload: james-tumilty

Post on 08-Aug-2015

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Barc

Employed as a TIE I was tasked with the application of various insulation specifications during the construction phase of Barclays World Headquarters , Employer required productivity rates were always met and with high quality standards .

James Tumilty