Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual General Meeting 7 th July Historic Manly ferry events this week 28 th April 1872 Culloden wrecked Fundraising Information We need to raise an additional sum of cash in the next couple of months and all donations (or interest free loans even) are very welcome. Donations $2 and above are tax deductible so please consider making a donation to help save this very last original Manly ferry for generations to come. We have 15 boxes of Cadbury fundraiser chocolates (mostly Freddos!) and are looking to our members to take a box or two. These go great in your workplace and sell themselves with no effort at all. Contact us if you can take a box. These are a great little item for us and are ‘easy money’ but we do need our members to get behind this one to make it successful. Committee News Between now and June 30 th new members joining the Association will get membership until the end of June 2013 up to two months free! You can download our new application form at http://www.baragoola.com.au/literature/BPA_Application.pdf Weve recently started advertising on Seek Volunteer, wed been held back from doing this due to an issue with volunteer insurance but now thats sorted were free to place ads. So far weve had (in two weeks) around a dozen expressions of intersest and some of these new people have already joined the Association and started volunteering their very valuable time. Great to see new faces and a full crew on board and well be creating additional, targeted volunteer ads over the coming weeks. The more people

Upload: others

Post on 07-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Baragoola Week Ending 27th April 2013

Upcoming events

Planning and preparation has started for our next open day (date TBA). Annual General Meeting 7th July

Historic Manly ferry events this week

28th April 1872 – Culloden wrecked

Fundraising Information

We need to raise an additional sum of cash in the next couple of months and all donations (or interest

free loans even) are very welcome. Donations $2 and above are tax deductible so please consider

making a donation to help save this very last original Manly ferry for generations to come.

We have 15 boxes of Cadbury fundraiser chocolates (mostly Freddos!) and are looking to our members

to take a box or two. These go great in your workplace and sell themselves with no effort at all. Contact

us if you can take a box. These are a great little item for us and are ‘easy money’ but we do need our

members to get behind this one to make it successful.

Committee News Between now and June 30th new members joining the Association will get membership until the end of

June 2013 – up to two months free! You can download our new application form at

http://www.baragoola.com.au/literature/BPA_Application.pdf

We’ve recently started advertising on Seek Volunteer, we’d been held back from doing this due to an

issue with volunteer insurance but now that’s sorted we’re free to place ads. So far we’ve had (in two

weeks) around a dozen expressions of intersest and some of these new people have already joined the

Association and started volunteering their very valuable time. Great to see new faces and a full crew on

board and we’ll be creating additional, targeted volunteer ads over the coming weeks. The more people

Page 2: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

we have on board the quicker the work can progress and the quicker Baragoola can be returned to a

useful, working life.

AGM packs and renewals will be emailed and posted commencing from the 1st of May

Finances

Our bank balance increased by $110 this week. We’ve just been through a very hefty month of bills which has impacted heavily on our finances so we need to build the cash reserves up again fairly quickly. All donations $2 and above are tax deductible so please consider making a donation.

From the editor

Our postal address: PO Box 374 Crows Nest, NSW, 1585 Please ensure you address any correspondence to this address in future.

Our sites

Have you visited our Facebook page at http://www.facebook.com/ManlyFerry ? It’s updated (sometimes several times a day) and is one of our primary methods of communicating with the public at large. We’ve got over 100 ‘likes’ so far! There’s quite a few videos posted there as well. Our main source of important information is our own site at http://baragoola.com.au For people with an interest in Sydney’s ferries (past and current) we have a sister site at http://www.ferriesofsydney with a very activite community forum.

Souvenir items

Recently we introduced some new promotional items and they are in limited quantities so if you want one you’ll need to get in quickly. For the first time we have caps and indeed we had to refresh the order twice to cope with demand! If you want an item, send your details (name and address and what you want) in an email to [email protected]. Our limited edition Baragoola 2013 desk calendars are now in stock, printed on glossy card these area great last minute gift idea for Xmas! The calendars feature twelve shots (one for each month) of Baragoola throughout her life. Only $15 including postage - hurry and order yours today as stocks are strictly limited!

Page 3: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Prices – Mugs $20 including delivery, key rings $20 including delivery and caps $30 including delivery. A special offer of the PJ&MSS Co mug, cap and keyring can be purchased as a set for $60 for the set.

Page 4: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Keyring (with LED light)

Bellubera and South Steyne

Page 5: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Baragoola in PTC colours

South Steyne

Page 6: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

PJ & MSS logo from the 1920s

This week

A very, very busy week has just passed on board with an enormous amount accomplished (and

planned). Thanks to the very long weekend we saw volunteers on board every day from Thursday to

Saturday – and a few of those were brand new additions to the ship.

We also had several visitors on Saturday which garnered some interest, a donation and a new member –

all most welcome!

This newsletter is a little late – so it’ll actually cover the last three weeks on board – I’ll break down each

area that’s been worked on to make it easier

To start with, a big effort has been put in to the port side of late – this is all prep work for the boarding

stairs that will be going in shortly; I’m pleased to report this should be happening within the next few

weeks and once completed access to Goola will improve out of sight. The work involved included

repairing and restoring the bulwarks, covering the decks and removal of the old loading ramps on the

upper deck – these were replaced in the 80s and have not held out too well at all.

The bulwarks in particular have been a very fiddly job – every piece of rust needs to be removed and

then taken back to bare metal, once that’s done repairs to the metal needs to be completed, then anti-

rust paint and finally the first of three coats of Warm Stone to return them to their former glory. Hard

work but the effort is well worth it and the midships area is finally starting to scrub up very nicely

indeed. We’ve scheduled some work to the tops of these to replace the steel and then we’ll be able to

install the new handrails, a bit more work to do first though before that happens but it is slowly and

steadily moving to completion.

Page 7: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Rust treated, a section in progress and an untouched area – all phases that the bulwarks go through

A week later, another area is completed and under anti rust paint

Page 8: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Then a little more....

Followed by repairs and the start of the top coating of paint! Note the new deck covers as well.

Page 9: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Outside has also “had the treatment” – a lot trickier as we need to prevent refuse entering the harbour.

As part of the work here nine deck covers were prepared and installed – these work in two ways; they

make the deck safer and they waterproof it thus protecting the internal hull below. As a bonus it looks

neater too.

Prep work for the deck covers

Page 10: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

The other work in this area involves removal of the old loading ramps – they are very, very rotten, look

unsightly and are dangerous. Although Goola is developing a “skeletal” look on this side it’s far better

than the decrepit look these items were fostering. We’ll replace these and the load bearers as well.

These extend along the outside of the fore and aft weather decks so a decision was made to start

removing the rotten timbers on those decks as well – the aft weatherdeck is now off-limits as a result.

Page 11: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

And so we move inside – both staircases have received some attention over the last few weeks, in

particular the aft staircase has gained a final coat of paint and now only needs a few touch-ups and the

second set of treads installed.

Page 12: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual
Page 13: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Now upstairs we travel to the wheelhouse (forward) – work here is once again progressing with some

repairs and painting taking place. We have been trying to paint the outside but poor weather a couple of

weeks in a row stymied this attempt – perhaps now we’re heading towards a drier spell we’ll be able to

do it!

Repaired porthole mount ready to go back up

Page 14: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Jenny applies some undercoat

External tin being remounted (removed for repairs to the underlying timber)

Page 15: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Other work on this deck was also done, mainly on the funnel shroud which went under another coat of

white paint following final repairs to it – it won’t stay this way – everytime the main engines are started

it has a habit of collecting soot – maybe we should have the engineers clean it down after an engine run

In the meantime, it’s blindingly white!

There’s more work required on this deck too, now the rebuild of the forward wheelhouse has

progressed we can start with the interior. It needs to be lined, deck repaired in places and re-plumbed.

Windows need to be refitted and a partition wall between the Master’s Cabin and the wheelhouse

needs to be erected.

Also to be done up here is the restoration of the handrails (Peter has already done a lot of work on their

support structure) and eventually the return of the dodgers – that in itself will make a huge difference to

the appearance of the ship.

The aft wheelhouse hasn’t been ignored either, it has been cleaned out and a lot of rotten timber

removed and props installed. In itself this will be quite a big job as more work is needed to save this

particular area.

Most of the deck is now covered over with new timber and only small sections need to be completed –

this has resulted (along with better drainage) in very, very little rainwater making it through to the decks

below – a huge improvement indeed!

The aft wheelhouse remains a problem area though and it’s the location where most water is getting in

and this has a deleterious effect on the areas below it including the Ladies Saloon which is suffering a bit

– however it does have very clean decks after a storm........

Page 16: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

The upper deck is going through a transformation at the moment with a lot of the poor deckhead at the

forward end now replaced and the removal of other rotten areas progressing rapidly. Very fortunately

this rot doesn’t extend throughout the deck – this is another example of damage caused by the failed

roof above.

Page 17: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

The forward ladder gained a first coat of Warm Stone this week as well – though I’m not sure Ray was

taking the job seriously! Or maybe he was just happy to be there

Work below decks is also proceeding nicely with the guys having reinstalled the original compressor on

the new air tank. This also entailed installing a beefier motor to drive it and fine-tuning it, but now it’s

done we’ll be able to deploy more air tools around the ship which, in turn, means work can be

completed quicker. A very good thing indeed.

Page 18: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

This is one of the areas where we will use replacement materials if needed but will also use the original

fabric. The tank is a replacement (the original was deemed unusable), the motor is new and the

compressor itself is the original one installed in 1960 (it even has the date on it.)

The sound adds to the historical reality too – the original compressor has a different (more uneven)

sound than the modern one we were using temporarily.

Page 19: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

And finally onto the hull which has been getting a lot of attention of late!

Engine room section about to get some attention

Nick and Geoff underneath #1 English Electric

Page 20: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Geoff and Ray about to start working on the hull in the Control Room

After effects – removal of paint and rust under the porthole

Page 21: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

We will be working again next Saturday (the 4th) and there will be a few around during the week – check with us in advance if you want to drop down and lend a hand. A list of the early morning tasks will be sent out with the usual invitation on Wednesday and we welcome new hands on board – hope to see you on Baragoola on Saturday! If you are on Facebook you can follow us at https://www.facebook.com/ManlyFerry For general business you should call our message bank on 02 9294 3168 and leave a message – we’ll return your call pretty quickly as this is checked daily.

Page 22: Baragoola Week Ending 27th April 2013 270413.pdf · Baragoola Week Ending 27th April 2013 Upcoming events Planning and preparation has started for our next open day (date TBA). Annual

Historical Images

Burra Bra

Baragoola, December 1961