Bangladesh Railway, a principle transportation agency of the country, is a Government –owned and Government –managed organization. It covers a length of 2,855 route kilometers employing a total of 34,168 regular employees. As railway is a very important mode of inland transport, linking the entire length and breadth of the country, it’s healthy grow naturally contributes to the economic development of the country.
Till June 2, 1982, the management and development of railway was vested with a Railway Board, comprising of a Chairman and four members. But, for administrative convenience and operational reason the Railway Board was abolished with effect from June 3, 1982 and the function of the Railway Board was vested with the Railway Division of the Ministry of Communications with the Secretary of the Division working of as the Director General of Bangladesh Railway. For the same purpose the Railway bifurcated into two zones, East & West, under the administrative control of two general managers, who are responsible/ accountable to the Director General of Bangladesh Railway. Subsequently on August 12, 1995 the day to day of the Railway was separated from the Ministry and entrusted with director general drawn from the Railway professionals. For policy guidance, a 9(nine) members & Bangladesh Railway authority (BRA) was formed with the Honourable Advisor Ministory of Communications as its Chairman. The Director General is assisted by his Additional Director General and Joint Director General.
The General Managers of the two zones are assisted by various specialized departments who are responsible for operation, maintenance and financial management. Each zone is again divided into two divisions, which form the basic unit of operation. The division is headed by a Divisional Railway Manager, who is assisted by Divisional Officers of various specialized Departments such as Personnel Transportation, Commercial. Finance Mechanical, Way and Works Signaling Electrical, Medical, Nirapatta Bahini etc. Besides there are two workshops Divisions, one in each zone, located at Pahartoli and Syedpur, each being headed by a Divisional Superintendent .Further there is a locomotive workshop headed by Chief Executive at Parbattipur for general overhauling of both BG&MG locomotives .
Railway Management has also got Railway Training Academy headed by a Rector , a planning cell headed by a Chief Planning Officer, safety inspectorate, headed by a Government Inspector of Railway. Store Department headed by a Chief Controller of Stores And Accounts Department headed by an Additional Director General/Finance for coordinating the Accounting and the financial management activities of the two zones.
Vission And Mission
Site Under Construction...
Bangladesh Railway Organogram
.railway.gov.bd
Page Hits: 7
Home | Contact | Information Mirror |
History | Sitemap
Home
About BR
Ticket Fares
Train Schedules
Route Map
Train Schedules (City Wise)
Goods train Schedules
Gallery
Information Mirror
Vission And Mission
Site Under Construction... Dhaka , Chittagong, Sylhet, Khulna , Rajshahi
Feedback / Enquires
Telephone Index
Tender Online
Citizen Charter
Maitree Express Train
List of major Projects
Home | History | Mirror Info | SitemapRailway
Home | History | Mirror Info | Sitemap | Contact | Enquiry
Different kinds of Train
Ticketing System
Service
Seat
Container
Station
Future plane
Previous Train Engine
Other
Home | History | Mirror Info | Sitemap | Contact | Enquiry
Home | History | Mirror Info | Sitemap | Contact | Enquiry © Copyright 2008 Bangladesh Railway
.railway.gov.bd Page Hits: 22 Home | Contact | Information Mirror | History | Sitemap
Home
About BR
Ticket Fares
Train Schedules
Route Map
Train Schedules (City Wise)
Goods train Schedules
Gallery
Information Mirror
Maitree Express
Feedback / Enquires
Telephone Index
Tender Online
Citizen Charter
Maitree Express Train
List of major Projects
Home | History | Mirror Info | Sitemap | Contact | Enquiry © Copyright 2008 Bangladesh Railway
List Of Ongoing Projects
Sl No. Name of the Projects Approved Status
1 REHABILITATION OF MAIN LINE SECTIONS OF B.R. (WEST ZONE) (2nd Revised) (01-07-1995 to 30-06-2008) Approved
2 PROCUREMENT OF 47 (41 MG & 6 BG) D.E. LOCOMOTIVE (01-07-1996 to 30-06-2007) Approved
3CONVERSION OF DHAKA-JOYDEBPUR MG SECTION INTO DUAL GAUGE (2nd Revised) (01-07-1999 to 31-12-2009)
Approved
4CONSTRUCTION OF A RAILWAY LINE FROM TARAKANDI TO JAMUNA BRIDGE (2nd Revised) (01-07-1999 to 31-12-2009)
Approved
5MODERNIZATION AND EXPANSION OF 10 STATIONS OF AKHAURA-SYLHET SECTION (1st Revised) (01-07-2000 to 31-12-08)
Approved
6MODERNIZATION OF SIGNALLING & INTERLOCKING SYSTEM OF 12 STATIONS AT AKA-SYT SECTION (1st Revised) (01-07-2004 to 30-06-09)
Approved
7 BANGLADESH RAILWAY SECTOR IMPROVEMENT PROJECT (01-07-2006 to 30-06-2014) Approved
8BANGLADESH RAILWAY SECTOR IMPROVEMENT PROJECT (CONSTRUCTION OF DOUBLE LINE BETWEEN TONGI & BHAIRABBAZAR WITH SIGNALLING SYSTEM (PD : CE/Double Line)(01-07-2006 to 30-06-2011)
Approved
9BANGLADESH RAILWAY SECTOR IMPROVEMENT PROJECT (REFORMS OF BANGLADESH RAILWAY) (01-07-2006 to 30-06-2011)
Approved
10 PROCUREMENT OF 1 BG & MG MIXED UNDER-FLOOR WHEEL LATHE MACHINE (01-07-2006 to 30-06-2009)
11REHABILITATION OF 65 (56 MG & 9 BG) LOCOMOTIVES) (REVISED 45 NOS. - 36 NOS. MG & 9 NOS. BG) LOCO-MOTIVES OF BANGLADESH RAILWAY (01-07-2006 to 30-06-2009
Approved
12REHABILITATION OF FOUZDARHAT-CGPY-SRV-CHITTAGONG SECTIONS IN EAST ZONE OF BR (01-07-2007 to 30-06-2009)
Approved
13CONVERSION OF VACUUM BRAKE SYSTEM TO AIR BRAKE SYSTEM OF 277 MG BC WAGON OF BR (01-07-2007 to 30-06-2009)
Approved
14FEASIBILITY STUDY OF NOAKHALI-CHARBHATA RAILWAY LINE (UPTO STEAMER GHAT) (New) ( 2007-08 to 31-12-2008)
Approved
15REHABILITATION OF RAJSHAHI-ROHANPUR BORDER & AMNURA-CHAPAINAWABGANJ SECTIONS OF BR (01-07-2007 to 30-06-2009)
Approved
16 REHABILITATION OF LALMONIRHAT-BURIMARI SECTIONS OF BR (01-07-2007 to 30-06-2009) Approved
17 REHABILITATION OF DHAKA-NARAYANGANJ SECTION OF BR (2007-08 to 2009-2010) Approved
18 REMODELLING OF KHULNA RAILWAY STATION & YARD AND DEVELOPMENT OF OPERATIONAL FACILITIES OF Approved
BENAPOLE RAILWAY STATION ( 01-07-2007 to 30-06-2009)19 EMERGENCY FLOOD DAMAGE REHABILITATION PROJECT/2007 (01-11-2007 to 30-06-2009) Approved
20 EMERGENCY FLOOD DAMAGE REHABILITATION PROJECT/2007 (01-11-2007 to 30-06-2009) (East Zone) Approved
21 EMERGENCY FLOOD DAMAGE REHABILITATION PROJECT/2007 (01-11-2007 to 30-06-2009) (West Zone) Approved
22PROCUREMENT OF 50 NOS. MG FLAT WAGON (BFCT) & 5 NOS. MG BRAKE VAN WITH AIR BRAKE FOR CARRYING CONTAINER (01-07-2007 to 30-06-2011)
Approved
23 DHAKA-CHITTAGONG RAILWAY DEVELOPMENT PROJECT (01-07-2007 to 30-06-2014) Approved
24DHAKA-CHITTAGONG RAILWAY DEVELOPMENT PROJECT (IMPROVEMENT OF PAHARTALI WORKSHOP) (01-07-2007 to 30-06-2010)
Approved
25DHAKA-CHITTAGONG RAILWAY DEVELOPMENT PROJECT (PROCUREMENT OF 11 NOS. MG LOCOMOTIVES) (01-07-2007 to 30-06-2012)
Approved
26DHAKA-CHITTAGONG RAILWAY DEVELOPMENT PROJECT (CONSULTING ENGINEERING SERVICES FOR DHAKA CHITTAGONG DEVELOPMENT PROJECT & SKILL DEVELOPMENT PROGRAM ( 01-07-2007 to 30-06-2013)
Approved
27DHAKA-CHITTAGONG RAILWAY DEVELOPMENT PROJECT (TRACK DOUBLING BETWEEN LAKSAM AND CHINKI ASTANA) (01-07-2007 to 30-06-2012)
28DHAKA-CHITTAGONG RAILWAY DEVELOPMENT PROJECT (CHITTAGONG STATION YARD REMODELLING) (01-07-2007 to 30-06-2012)
29REHABILITATION OF GOURIPUR-JARIAJHANGAIL AND SHAMGANJ-MOHANGANJ SECTIONS OF BR (01-07-2007 to 30-06-2010)
Approved
30BALANCE WORK OF REHABILITATION OF MAIN LINE SECTION OF B.R. (EAST ZONE) (01-01-2008 to 30-06-2009)
Approved
31IMPROVEMENT & REMODELLING OF AKHAURA STA-TION, LOCO SHED, YARD INCLUDING SIGNALLING AND INTERLOCKING SYSTEM OF B. RLY. (1ST REVISED) (01-07-2004 to 30-06-09)
Approved
32 MODERNIZATION OF SAID PUR RAILWAY WORKSHOP (01-07-2008 to 30-06-2012) Un-Approved
33REHABILITATION OF KANCHAN-PANCHGARH SECTION OF BANGLADESH RAILWAY (01-07-2008 to 30-06-2012)
Un-Approved
34REHABILITATION OF MYMENSING-JAMALPUR-DEWANGANJ SECTIONS OF BANGLADESH RAILWAY (01-07-2008 to 30-06-2011)
Un-Approved
35PROCUREMENT OF 2 NOS. 60 TON CAPACITY MG & 2 NOS. 80 TON CAPACITY BG CRANES FOR PRESIDENT RELIEF TRAIN (01-07-2008 to 30-06-2011)
Un-Approved
36 TECHNICAL ASSISTANCE FOR INSTITUTIONAL SUPPORT OF BR (01-07-2007 to 30-06-2012) T.A.Approved
37 TECHNICAL ASSISTANCE FOR FEASIBILITY STUDY,SAFEGUARD POLICY STUDY, DETAILED ENGINEERING DESIGN & TENDERING SERVICES FOR PROJECT UNDER WORLD BANK FUNDING FOR BANGLADESH RLY.( 01-
T.A.Approved
07-2007 to 30-06-2010)
38TECHNICAL ASSISTANCE FOR PROJECT PREPARATION TOWARDS IMPLEMENTATION OF "EXPORT INFRAS-TRUCTURE DEVELOPMENT PROJECT" UNDER WORLD BANK (WB) FINANCING. (01-07-2008 to 31-03-2013)
(Spec Recommended)
Home | History | Mirror Info | Sitemap | Contact | Enquiry © Copyright 2008 Bangladesh Railway
UNAPPROVED PA
SL. NO. NAME OF PROJECT IMPLEMENTATION PERIOD SOURCE OF FUND
1 Bangladesh Railway Sector Improvement Project ADB Loan
2 Construction of Dhaka-Laksam chord line. 01-07-2006 to 30-06-2014 ADB Loan
3 Strengthening of Jamuna Bridge for higer excel load 01-07-2007 to 30-06-2010 ADB Loan
4
Line capacity improvementbetween Dhaka and Tongi by introducing intermediate block signallibng.
01-07-2007 to 30-06-2009 ADB Loan
5 Procurement of 100 MG & 50 BG carriages. 01-07-2007 to 30-06-2010 ADB Loan
6 Upgrade signalling in 14 stations between Ishurdi-Darsana. 01-07-2007 to 30-06-2010 ADB Loan
7
Rehabilitation of yards and extension of loops at different stations between Khulna and Parbatipur.
01-07-2007 to 30-06-2009 ADB Loan
8 Construction of MG line from Bogra to Jamtoil. 01-07-2007 to 30-06-2011 ADB Loan
9 Dhaka Chittagong Railway Development Project 01-07-2007 to 30-06-2014 JBIC Loan
10
Procurement of 100 Nos. MG bogie tank wagon and 5nos. MG bogie brake van for carrying jet fuel
01-07-2007 to 30-06-2010 Any Donour Agency
11
Modernization of signaling & Interlocking system in 18 stations between Abdulpur and Parbatipur section of BR
01-07-2007 to 30-06-2009 World Bank
12
Modernization of signaling & Interlocking system in 19 stations between Chittagong – Akhaura section of BR
01-07-2007 to 30-06-2010 World Bank
13 Modernization of Saidpur Carraige & Wagong Workshop 01-07-2007 to 30-06-2010 Korea
14
Construction of 3rd & 4th Line between Dhaka-Tongi and double line between Tongi-Joydevpur & Dhaka-Narayanganj section in order to introduce Computer trains.
01-07-2007 to 30-06-2010 Any Donour Agency
15 Replacement of 101 Nos. (31 BG & 70 MG) locomotives 01-07-2005 to 30-06-2008 Any Donour Agency
16 Feasibility study for construction of Rail link on both end of Padma Bridge 01-07-2007 to 30-06-2009 Any Donour Agency
17
Feasibility study for construction of Underground Rail Line at Dhaka, the Capital City of Bangladesh
01-07-2007 to 30-06-2009 Any Donour Agency
18
Feasibility study for construction of circular Railway line around Dhaka, the capital of Bangladesh.
01-07-2007 to 30-06-2009 Any Donour Agency
19 Feasibility study for construction of Khulna-Mongla Rail link 01-07-2007 to 30-06-2009 Any Donour Agency
20 Feasibility Study for Extension of Railway Line from Noakhali to Char Bhata (Steamer Ghat). 01-07-2007 to 30-06-2009 Any Donour Agency
N.B. : Listed in ADB 2007-08 Book at green pages (page no. - 661 to 663).