bancroft ˜ turner · 2020. 6. 23. · turner substation bancroft substation ake a wha river...

2
The project includes: • Rebuilding approximately 15 miles of transmission line. Company representatives are reviewing route options to rebuild through the city of Nitro as development has significantly increased since the line was originally built. • Supplementing the company's existing easements and/or acquiring new easements. The upgrades: • Increase electric reliability. • Strengthen the transmission system by replacing wooden poles from the 1930s with steel structures. The rebuild begins at Bancroft Substation located off Winfield Road near Shawnee Estates and travels south, crossing the Kanawha River near I-64 before entering the city of Nitro. From there, the power line travels east toward Cross Lanes and ends at a transmission tower located off Route 622 near Institute. WHAT WHY WHERE BANCROFT TURNER TRANSMISSION LINE REBUILD PROJECT Appalachian Power representatives and the utility's affiliate, AEP West Virginia Transmission Company, plan to increase electric reliability by making upgrades in West Virginia. The Bancroft-Turner Transmission Line Rebuild Project involves rebuilding approximately 15 miles of transmission line in Kanawha and Putnam counties. Company representatives expect construction to begin Fall 2021 and conclude by Fall 2023. PROJECT SCHEDULE DATA GATHERING BEGAN June 2019 PROJECT ANNOUNCEMENT AND VIRTUAL OPEN HOUSE June 2020 PROPOSED LINE ROUTE November 2020 RIGHT-OF-WAY ACQUISITION BEGINS Spring 2021 PROJECT IN SERVICE Fall 2023 *Timeline subject to change. *Timeline subject to change. CONSTRUCTION BEGINS Fall 2021 2019 2020 2022 2023 2021 2024

Upload: others

Post on 18-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BANCROFT ˜ TURNER · 2020. 6. 23. · TURNER SUBSTATION BANCROFT SUBSTATION AKE A WHA RIVER APPALACHIAN POWER VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS

The project includes:

• Rebuilding approximately 15 miles of

transmission line. Company representatives

are reviewing route options to rebuild

through the city of Nitro as development has

significantly increased since the line was

originally built.

• Supplementing the company's existing

easements and/or acquiring new

easements.

The upgrades:

• Increase electric reliability.

• Strengthen the transmission system by

replacing wooden poles from the 1930s with

steel structures.

The rebuild begins at Bancroft Substation

located off Winfield Road near Shawnee Estates

and travels south, crossing the Kanawha River

near I-64 before entering the city of Nitro. From

there, the power line travels east toward Cross

Lanes and ends at a transmission tower located

off Route 622 near Institute.

WHAT WHY WHERE

BANCROFT TURNERTRANSMISSION LINE REBUILD PROJECT

Appalachian Power representatives and the utility's affiliate, AEP

West Virginia Transmission Company, plan to increase electric

reliability by making upgrades in West Virginia. The

Bancroft-Turner Transmission Line Rebuild Project involves

rebuilding approximately 15 miles of transmission line in

Kanawha and Putnam counties. Company representatives expect

construction to begin Fall 2021 and conclude by Fall 2023.

PROJECT SCHEDULE

DATA GATHERING BEGANJune 2019

PROJECT ANNOUNCEMENT AND VIRTUAL OPEN HOUSEJune 2020

PROPOSED LINE ROUTENovember 2020

RIGHT-OF-WAY ACQUISITION BEGINSSpring 2021

PROJECT IN SERVICEFall 2023

*Timeline subject to change.*Timeline subject to change.

CONSTRUCTION BEGINSFall 2021

2019 2020 2022 20232021 2024

Page 2: BANCROFT ˜ TURNER · 2020. 6. 23. · TURNER SUBSTATION BANCROFT SUBSTATION AKE A WHA RIVER APPALACHIAN POWER VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS

64

64

60

3534

62

662

622

817

25

62

KANAWHA COUNTY

KANAWHA COUNTYPUTNAM COUNTY

PUTNAM COUNTY

TYLER MOUNTAINTYLER MOUNTAIN

ST ALBANSST ALBANSINSTITUTEINSTITUTE

CROSS LANESCROSS LANES

NITRONITRONITRO HIGH SCHOOLNITRO HIGH SCHOOL

TEAYS VALLEYTEAYS VALLEY

POCAPOCA

AMOSPOWERPLANT

AMOSPOWERPLANT

BANCROFTBANCROFT

SCARYSCARY

MORGANS LANDINGMORGANS LANDING

TURNERSUBSTATION

BANCROFTSUBSTATION

LAKECHAWEVA

LAKECHAWEVA

KANAWHA RIVERKANAWHA RIVER

APPALACHIAN POWER VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

*Exact structure, height and right-of-way requirements may vary

06/17/202006/17/2020

Proposed structures vary depending on the location. Crews plan to rebuild the power line primarily using H-frame poles and lattice towers in rural areas, and single poles in urban areas.

At Appalachian Power, we are committed to meeting the energy needs of customers while protecting the environment and natural beauty of the region.

Existing Structure Height: Approximately 55 feet* Proposed Structure Height: Approximately 85 feet* Right-of-Way Width: Approximately 100 feet*

TYPICAL STRUCTURES

CORTNEY MUSTARDProject Outreach Specialist(833) [email protected]/Bancroft-Turner

BANCROFTTURNER TRANSMISSION LINE REBUILD PROJECT

SUBSTATIONEXISTING TRANSMISSION LINE

STUDY SEGMENTS FOR TRANSMISSION LINE REBUILD (STUDY SEGMENTS ARE ALTERNATIVES TO REVIEW TO DETERMINE A FINAL LINE ROUTE. THE COMPANY DOES NOT BUILD ALL STUDY SEGMENTS; RATHER, IT SELECTS ONE ROUTE TO BUILD BASED ON PUBLIC INPUT AND FEASIBILITY.)

EXISTING TRANSMISSION LINE TO BE REBUILT

H-FRAME LATTICE TOWER SINGLE POLE