ballast discharge and stripping while loading - …€¦ · inert gas generator l.p.g. heater air...

15
Stripping through E ductors Ballast Discharge and stripping while Loading

Upload: trinhnhu

Post on 31-Jul-2018

229 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Stripping through Eductors

Ballast Discharge and stripping while Loading

Page 2: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

VENT HEADER

INERT GAS HEADER

CONDENSATE RETURN LINE

LIQUID HEADER

Reliquefaction

VapourCompressor

L.P.G.Vaporizer

Inert Gas Generator

L.P.G.Heater

Air Blower

VAPOUR HEADER

liquid vapour

Cargo Refrigeration / Re-liquefaction at sea

Page 3: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Cargo refrigiration at sea• By reliquefaction plant

• Not to run compressor during heavy rolling

• Condensate is passed through the top sprayes –cooling down the liquid surface (the bulk of the liquid has not been cooled)

• To cool down bulk of the liquid condensate return should be through the bottom connection of the tank to ensure proper circulation

Page 4: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Cargo refrigiration at sea

• Reliquefaction plant run on more than one tank simultaneosly – carefully controled condensate return (to avoid overfilling of any one tank)

Page 5: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

• Draft

• Stress

• Trim

Ballast Management /Exchange

Page 6: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Always follow ballast plan

De-ballast tanks adjacent to tanks being loaded

Always check stress & stability at least hourly

Ballast Management

Page 7: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Pre Discharge line cooling

Page 8: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

VENT HEADER

INERT GAS HEADER

CONDENSATE RETURN LINE

LIQUID HEADER

Reliquefaction

VapourCompressor

L.P.G.Vaporizer

Inert Gas Generator

L.P.G.Heater

Air Blower

VAPOUR HEADER

liquidvapour

Discharge without vapour return

Page 9: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Discharging• Method depend on type of ship, cargo

specification, terminal storage or bunker vesselcapacity.

• Discharge by pressurising the vapour space

–shore vapor suply or vaporiser and compressoron board

• Discharge with or without booster pumps

–discharging limited by pipeline diametar

–booster pump – for long distances or higherlevels

• Discharge via booster pump and cargo heater

–when discharged from refrigirated ship topressurised terminals

Page 10: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

VENT HEADER

INERT GAS HEADER

CONDENSATE RETURN LINE

LIQUID HEADER

Reliquefaction

VapourCompressor

L.P.G.Vaporizer

Inert Gas Generator

L.P.G.Heater

Air Blower

VAPOUR HEADER

liquid vapour

Discharge with vapour return

Page 11: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea
Page 12: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Cryogenic pump flow system & use of inducer

Page 13: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Cryogenic pump

Page 14: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Spray Pump

A vertical, 3560 rpm centrifugal pump, with integral 440 V, 3 Phase, 60 Hz, 2 Pole, submersible 35 kW electrical motor.

The pump is configured, with a balance drum, as a fixed, in-tank, stripping and spray pump.

Page 15: Ballast Discharge and stripping while Loading - …€¦ · Inert Gas Generator L.P.G. Heater Air Blower VAPOUR HEADER liquid vapour Cargo Refrigeration / Re-liquefaction at sea

Start Discharge With Electric Ballast Pump

Discharge valve

Electric motor

Pump

1. Fill pipelines and pump

2. Start motor

3. Slowly open discharge valve