B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit Prepared by Distribution List 1. Ben Sprigings 2. File Copy REPORT NUMBER 2018/CS/658 CONTACT Naresh Madhavan Highway Associates International House Aviation Park Flint Road Chester CH4 0GZ Tel: 07715109788 Email: [email protected] Web: www.HighwayAssociates.co.uk

Upload: others

Post on 06-Oct-2020

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works

Stage 1&2 Road Safety Audit

Prepared by

Distribution List 1. Ben Sprigings 2. File Copy REPORT NUMBER 2018/CS/658 CONTACT

Naresh Madhavan Highway Associates International House Aviation Park Flint Road Chester CH4 0GZ Tel: 07715109788

Email: [email protected] Web: www.HighwayAssociates.co.uk

Page 2: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

Revision Date Originator Checker Approver Description

FINAL

18/01/18

N Madhavan

R Sawczyn

L Madhavan

For Issue

CONTENTS

1 INTRODUCTION .............................................................................................................. 1

2 ITEMS RAISED BY PREVIOUS AUDITS AND REPORTS ............................................... 3

3 ITEMS RAISED BY THIS AUDIT ...................................................................................... 4

4 AUDIT TEAM STATEMENT .............................................................................................. 7

Appendix A: Drawings and documents provided Appendix B: Plan of items raised by this audit

Issue and revision record

This document is issued for the party which commissioned it and

for specific purposes connected with the above-captioned project

only. It should not be relied upon by any other party or used for any

other purpose.

We accept no responsibility for the consequences of this

document being relied upon by any other party, or being used for

any other purpose, or containing any error or omission which is

due to an error or omission in data supplied to us by other parties.

This document contains confidential information and proprietary

intellectual property. It should not be shown to other parties

without consent from us and from the party which commissioned

it.

Page 3: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

1

1 INTRODUCTION 1.1 This report results from a Stage 1&2 Road Safety Audit carried out relating to proposals to

provide a priority junction via a new right turn pocket as part of a residential development off

B4263 Chapel Hill, Preston. Additional NMU measures in the form of a central refuge island to

facilitate crossing pedestrians and a footway extension / uncontrolled crossing along part of

the development frontage. The audit was carried out during January 2018.

1.2 The audit team consisted of:

Team Leader: Naresh Madhavan MCIHT, MSoRSA EU RSA Cert. Comp

Director

Highway Associates

Team Member: Robin Sawczyn BEng MCIHT MSoRSA

Senior Road Safety Engineer

Highway Associates

1.3 The audit took place at the offices of Highway Associates, Chester. The Road Safety Audit

was undertaken in accordance with the Road Safety Audit Brief provided by Ben Sprigings.

The Road Safety Audit comprised an examination of the documents provided and these are

listed in Appendix A.

The site was visited at the following times/conditions:

Day/Date Time Weather Con Traffic Flow

Mon 15th Jan 2018 13:00 – 14:00hrs Wet/Overcast Ave

1.4 The terms of reference for this audit are as given in HD 19/15, Design Manual for Roads and

Bridges. The scheme has been examined and this report compiled only with regard to the

safety implications for road users of the scheme as presented. It has not been examined or

verified for compliance with any other standards or criteria. However, in order to clearly

explain a safety problem or the recommendation to resolve a problem, the Audit Team may on

occasion have referred to a design standard for information only. Any audit comments should

not be construed as implying that a technical audit has been undertaken in any respect.

Page 4: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

2

1.5 If relevant within this report the generic term “pedestrians” can include walking pedestrians,

wheelchair users, dismounted cyclists, the blind, partially sighted, mobility impaired and

people with prams or pushchairs. Highway Maintenance Operatives are also included within

this term. Where a problem is specific to one or more of these vulnerable groups then

appropriate reference will be made in the report.

1.6 Any recommendations included within this report should not be regarded as being prescriptive

design solutions to the problems identified. They are intended only to indicate a proportionate

and viable means of eliminating or mitigating the identified problem, in accordance with HD

19/15, and in no way imply that a formal design process has been undertaken. There may be

alternative methods of addressing a problem which would be equally acceptable in achieving

the desired elimination or mitigation and these should be considered when responding to this

report.

1.7 This Road Safety Audit makes allowance for the fact that strategic decisions on matters such

as route choice, junction type, standard of provision and approved Departures from Standards

already reflect an appropriate balance of a number of factors including road safety.

1.8 The Audit Team have not been made aware of any possible geometric departures or

relaxations from standards.

1.9 The reader is reminded that a Road Safety Audit is not limited to the new works alone where

there are features that are considered by the Audit Team to affect the general safety in the

area (HD 19/15 para 2.26 refers). Section 3 of this report lists ‘Problems’ identified from the

drawings and as a result of the site visit relating to the proposed changes to the highway

layout that are directly, or indirectly, related to the area (e.g. features/matters within the

proposed works or immediate surrounds which the Audit Team feel should be brought to the

attention of the Designer or other organisations even though they might not pose an

immediate risk associated with the proposed works), and which are considered by the Audit

Team to warrant attention under the subject proposals, generally by the maintaining authority.

On occasions there are more sensitive issues or issues that fall outside the audit brief but

which are of such a nature that Auditors feel should be specifically brought to the attention of

the authorities - such issues, if they arise, are usually dealt with in detail in separate

correspondence.

Page 5: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

3

2 ITEMS RAISED BY PREVIOUS AUDITS AND REPORTS 2.1 It is understood that no previous road safety audits have been undertaken in relation to this

scheme.

Page 6: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

4

3 ITEMS RAISED BY THIS AUDIT

3.1 General

3.1.1 PROBLEM

LOCATION: Chapel Hill – Proposed central island refuge SUMMARY: Insufficient island conspicuity could result in conflict It was noted during the site visit that there is a vertical crest to the west of the proposed island location. Concern is expressed that due to this drivers may fail to sufficiently appreciate the central island encouraging injudicious overtaking manoeuvres of cyclists, etc resulting in island strikes or loss of control conflicts which may involve pedestrians established within the island or conflicts with turning vehicles. RECOMMENDATION A high level beacon/illuminated keep left arrow signage should be provided on the central island to aid conspicuity.

3.1.2 PROBLEM

LOCATION: Chapel Hill - Junctions adjacent to proposed central refuge island SUMMARY: Insufficient manoeuvring space could result in kerb strikes Concern is expressed that due to the position of the central refuge island, large vehicles such as HGVs may have difficulty manoeuvring into and out of the adjacent side road junctions increasing the potential for island or kerb strikes which could result in loss of control or conflicts with crossing pedestrians. RECOMMENDATION Undertake swept path analysis to determine the exact nature of the problem. If appropriate the island should be relocated to a suitable position to allow for sufficient manoeuvring space for all types of visiting vehicles without risk of kerb strikes.

3.2 Non Motorised Road User Provision

3.2.1 PROBLEM

LOCATION: Chapel Hill - Proposed footway west of junction access SUMMARY: Risk of pedestrian conflicts It is noted that the proposed footway along the south side of Chapel Hill close to the proposed access junction continues west some distance past the uncontrolled crossing point. As the footway discontinues at this point, concern is expressed that visually impaired pedestrians not

Page 7: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

5

familiar with the road layout may be encouraged to continue walking westwards along the adjacent grass verge risking trips and slips or within the live carriageway risking conflicts with passing vehicles. RECOMMENDATION A suitable transverse edging delineator should be provided for the whole width of the footway adjacent to the crossing point to channel pedestrian towards the dedicated crossing facilities provided.

3.3 Road Signs and Markings

3.3.1 PROBLEM

LOCATION: Chapel Hill - East and Westbound approaches to right turn pockets SUMMARY: Road markings could cause confusion Double headed arrows with ahead and right turn arrow heads on have been provided within the through lanes on the approaches to the right turn pockets. This is an errant use of the marking and could confuse drivers as to the true road layout and alignment potentially increasing the risk of sudden weaving type conflicts such as loss of control as drivers believe that a right turn is possible from the through lanes, particularly during poor weather or night time conditions where the alignment is less conspicuous. RECOMMENDATION The road markings should be replaced with the correct straight ahead arrow and be aligned adjacent to the right turn arrow located within the right turn pockets.

3.4 Lighting and Signals

3.4.1 PROBLEM

LOCATION: Chapel Hill - Adjacent to development site access road SUMMARY: Development site street lighting could be a distraction to mainline traffic Whilst street lighting details for the development have not been supplied, concern is expressed that any lighting installed could be distracting to traffic travelling along Chapel Hill within the vicinity of the parallel access road to the west of the site, giving rise to driver confusion that the development site access road is the mainline carriageway leading to loss of control type collisions. The problem could be exacerbated due to the historic nature of the existing system of street lighting installed along Chapel Hill which is likely to offer considerably less luminance than the new road lighting installed within the development site. RECOMMENDATION Ensure suitable screening/landscaping is provided between the two parallel roads so that driver confusion over the alignment of Chapel Hill is unlikely to occur.

Page 8: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

6

3.5 Landscaping

No comments at this stage

3.6 Protective Aids

No comments at this stage

3.7 Surface Characteristics and Drainage

3.7.1 PROBLEM

LOCATION: Chapel Hill adjacent to access junction SUMMARY: Drainage gully location could cause loss of control An existing drainage gulley appears to be located within the channel adjacent to the dropped kerb area of the development site access within the likely wheel-track area of vehicles turning left out of the site access. Due to the inherent lack of skid resistance afforded by cast iron gulleys particularly when wet, concern is expressed that should they be struck particularly by powered or unpowered two wheelers whilst turning, that it may increase the potential for a loss of control. RECOMMENDATION The gulley should be relocated to a suitable position outside of the dropped kerb area.

Page 9: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

4 AUDIT TEAM STATEMENT

We certify that this Audit has been carried out in accordance

AUDIT TEAM LEADER

Naresh Madhavan MCIHT MSoRSADirector Highway Associates International House Aviation Park Flint Road Chester CH4 0GZ AUDIT TEAM MEMBER

Robin Sawczyn BEng MCIHT MSoRSASenior Road Safety EngineerHighway Associates International House Aviation Park Flint Road Chester CH4 0GZ

Highway

7

AUDIT TEAM STATEMENT

that this Audit has been carried out in accordance with the guidelines in HD 19/15

MSoRSA EU RSA Cert. Comp Signed:

Date: 18/01/18

MCIHT MSoRSA Signed: Engineer

Date: 18/01/18

HighwayAssociates

with the guidelines in HD 19/15.

Page 10: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

APPENDIX A

DRAWINGS AND DOCUMENTS PROVIDED

DRAWING NUMBER

OR REFERENCE TITLE DATE

- RSA1&2 Brief 15/01/18

03 J External Works GA Surface Water & Foul

Drainage Sheet 1 29/11/17

04 E External Works GA Surface Water & Foul

Drainage Sheet 2 12/12/17

07 C Highway Sections 21/12/17

0008 C Site Layout Plan as Proposed Dec 11

13 Highway Works S278 GA 18/08/17

14 B Plot Drainage 18/12/17

19 Private Drainage - Hydrobrake 01/12/17

36 United Utilities Dec 17

Page 11: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

APPENDIX B

PLAN OF ITEMS RAISED BY THIS AUDIT

Page 12: B6243 Chapel Hill, Preston - Proposed S278 Priority Junction … · 2018. 5. 22. · B6243 Chapel Hill, Preston - Proposed S278 Priority Junction Works Stage 1&2 Road Safety Audit

HighwayAssociates

3.1.1

3.1.2

3.7.1

3.3.1

3.4.1

3.2.1