b4 b1 - alps power pty ltd

2
BYD Battery-Box Res 2.5-10.0 Installation Short Instruction V2.1 A B C C D B1 B2 B3 B4 +-+-+-+- A.cut the packing belt,remove the carton, Remove the paper angle bead and sponge, Remove the door and put out the accessory in the cabinet. B.Disassemble screws and install cables Breaker To busbar To B-Plus2.5 C.Put the cables into the trunking. PE PE D. Drill 4 holes on the wall, diameter 10mm. install Fastener. Secure the cabinet to the fastener. Install the Ground (PE). Skilled personnel recognized This manual and the tasks and procedures described herein are intended for use by skilled workers only. A skilled worker is defined as a trained and qualified electrician or installer who has all of the following skills and expenence: • Knowledge of the functional principles and operation of on-grid systems. • Knowledge of the dangers and risks associated with installing and using electrical devices and acceptable mitigation methods. • Knowledge of the installation of electrical devices • Knowledge of and adherence to this manual and all safety precautions and best oractices. Tools

Upload: others

Post on 24-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: B4 B1 - ALPS POWER PTY LTD

BYD

Bat

tery

-Box

Res

2.5

-10.

0

Inst

alla

tion

Sho

rt In

stru

ctio

n

V2.

1

A

BC

CD

B1B2

B3B4

+-+-+-+-

A.c

ut t

he p

acki

ng b

elt,r

emov

e th

e ca

rton

, Rem

ove

the

pape

r an

gle

bead

and

spo

nge,

Rem

ove

the

door

and

put

out

the

acc

esso

ry in

the

cab

inet

.

B.D

isas

sem

ble

scre

ws

and

inst

all c

able

s

Brea

ker

To b

usba

r

To B

-Plu

s2.5

C.P

ut t

he c

able

s in

to t

he t

runk

ing.

PEPE

D. D

rill

4 ho

les

on t

he w

all,

diam

eter

10m

m. i

nsta

ll Fa

sten

er. S

ecur

e th

e ca

bine

t to

the

fast

ener

.

Ins

tall

the

Gro

und

(PE)

.

Skill

ed p

erso

nnel

rec

ogni

zed

This

man

ual a

nd t

he t

asks

and

pro

cedu

res

desc

ribe

d he

rein

are

inte

nded

for

use

by s

kille

d w

orke

rs o

nly.

A

ski

lled

wor

ker

is d

efin

ed a

s a

trai

ned

and

qual

ified

ele

ctri

cian

or

inst

alle

r w

ho h

as a

ll of

the

follo

win

g sk

ills

and

expe

nenc

e:•

Know

ledg

e of

the

func

tiona

l pri

ncip

les

and

oper

atio

n of

on-

grid

sys

tem

s.•

Know

ledg

e of

the

dan

gers

and

ris

ks a

ssoc

iate

d w

ith in

stal

ling

and

usin

g el

ectr

ical

dev

ices

and

acc

epta

ble

miti

gatio

n m

etho

ds.

• Kn

owle

dge

of t

he in

stal

latio

n of

ele

ctri

cal d

evic

es•

Know

ledg

e of

and

adh

eren

ce t

o th

is m

anua

l and

all

safe

ty p

reca

utio

ns a

nd b

est

orac

tices

.

Tool

s

Page 2: B4 B1 - ALPS POWER PTY LTD

E GHF

E. In

stal

l the

B-P

lus

2.5

into

the

cab

inet

.

Con

nect

the

B-P

lus

2.5

and

air

switc

h.Ba

tt +

Batt

-

PE CA

N

PE

to

the

door

AD

RR

DIP

AD

RR

DIP

AD

RR

DIP

1111

0100

2201

1010

110

0000

1200

1100

2311

1010

201

0000

1310

1100

2400

0110

311

0000

1401

1100

2510

0110

400

1000

1511

1100

2601

0110

510

1000

1600

0010

2711

0110

601

1000

1710

0010

2800

1110

711

1000

1801

0010

2910

1110

800

0100

1911

0010

3001

1110

910

0100

2000

1010

3111

1110

1001

0100

2110

1010

3200

0001

G. S

et t

he a

ddre

ss. A

ll th

e ad

dres

s m

ust

star

t N

o.1,

And

the

add

ress

mus

t be

con

tinuo

us.

T

he la

st a

ddre

ss b

arre

ry is

con

nect

ed t

o BM

U.

H1.

Cab

inet

in p

aral

lel.

(

All

the

addr

ess

mus

t st

art

No.

1, A

nd t

he a

ddre

ss m

ust

be c

ontin

uous

. The

last

add

ress

bar

rery

is c

onne

cted

to

BMU

. )

H2.

Che

ck t

he c

omm

unic

atio

n af

ter

Inst

alle

d us

e th

e so

ftw

are.

The

corr

ect

boot

ord

er:

1. P

ress

eac

h ba

tter

y sw

itch

to a

ctiv

ate

all

batt

erie

s.2.

Tur

n on

the

air

sw

itch

for

each

bat

tery

.3.

Tur

n on

the

mai

n sw

itch

of t

he c

abin

et.

4. S

tart

the

inve

rter

.