I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Headquarters U.S. Air Force
B-1 & B-52 Tinker & Primes
Overview
Colonel Lance B. Reynolds
B-1 & B-52 Sys Prgm Manager
Comm: 405-736-2001
lance.reynolds @us.af.mil
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
Continue to Strengthen AFMC’s
Role in the Nuclear Enterprise
Perform World-Class Test and
Evaluation
Acquire and Support
War-Winning Capabilities
“Cradle-to-Grave”
Advance Today’s & Tomorrow’s
Combat Capabilities through
Leading-Edge Technology
Sustain Air Force Capabilities
through World-Class Depot
Maintenance & Supply
Air Force Materiel Command
Center Mission Areas
2
Support AF-wide Installation
and Expeditionary Combat
Support Activities
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7 3
Fighter/Bomber Snapshot
A-10 (WWA)
F-15 (WWQ)
F-15 Saudi Arabia
(WWQ)
A-29 Afghanistan
(WWB)
FIGHTERS BOMBERS INTERNATIONAL
PARTNERS
A-10 (WWA) F-22 (WWU)
B-1/B-52 (WWD) Dev & Integ (WWB)
B-2 (WWZ) Spec Prgms (WWG)
F-15 (WWQ) Strike Syst (WWS)
F-16 (WWM) *F-35 (WWJ)
39
11F-16 (WWM)
F-22 (WWU)
*F-35 (WWJ)
*OT&E Only
B-1 (WWD)
B-2 (WWZ)
B-52 (WWD)F-16 Iraq
(WWM)
283
20
62
76
212 / 23 / 218
966
186And many more…
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 74
B-1/B-52 System Program Office
~300 person team, 2 locations, executed $1.6B FY16
Mission:
To protect our nation by modernizing and
sustaining the B-1/B-52 fleets, ensuring
continued AF Power Projection
What we do:
Provides life cycle sustainment &
modernization for the B-1/B-52 fleets
How we do it:
Fleet support
Programmed Depot Maintenance (PDM)
Capability Modifications
Repair/sustainment programs
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
B-1• Size: 62
• Flying hours: 24,635
• Combat hours (2015): 14,270
• Avg airframe hrs: 9160
• Avg fleet age: 25
B-52• Size: 76
• Flying hours: 19,220
• Combat hours (2015): 3,192
• Avg airframe hrs: 18,906
• Avg fleet age: 55
Lead MAJCOM: AFGSC
User MAJCOM: AFGSC, AFRC
SPO Data• Personnel: ~300
• Obligation Auth (FY16): $1.6B
• PDM: 29 (FY16)
25 (FY15)
• Acquisition Programs: 1 ACAT I
4 ACAT II
8 ACAT III
• Sustainment partners:
OC-ALC, AFLCMC/WNY, WNA, WNS & HBM
5
Enterprise At-A-Glance
Barksdale AFB
307th BW – 20 B-52s
2d BW – 27 B-52s
Edwards AFB
419th Flight Test Sq
2 B-1s
2 B-52s
Davis-Monthan AFB
AMARG
19 B-1s
12 B-52s
Dyess AFB
7th BW – 32 B-1s
Minot AFB
5th BW – 27 B-52s
HQ AFGSC
Ellsworth AFB
28th BW – 28 B-1sHQ AFMC
AFPEO/FB
Bomber Dev Branch
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 76
B-1 & B-52 In the News!
Coalition Aerial Refueling Initiative
Flight Test
• Refueling with Australian KC-30
• Supports KC-46 Testing
B-1 B-52
97.7% Successful Mission Rate in AOR
since August 2016
• Flew 227 Combat Sorties in 90 days
with no Mx canceled sorties
• Old record 200 sorties over 6 month
period in 2007
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 77
B-1 & B-52 Service Life
B-52 Service Life ~2050B-1 Service Life ~2040
Conducting Full Scale Fatigue Test
Early indication of fleet issues
on both wing & fuselage
Will determine repairs necessary
to achieve service life
B-1 B-52
Full Scale Fatigue Test Completed
Service life based on upper
wing surface fatigue
Stress corrosion cracking is
current concern; solving now
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 78
B-1 Programs
o Combines 3 Programs (FIDL, CITS, VSDU)
o 29 aircraft delivered to date (Feb 17)
o Challenges achieving 218 day workflow
o RCA delivery complete Jul 18, full fleet May 20
IBS Modification
Self-Contained Attitude Indication
o Replaces high fail rate back up to primary
attitude flight instruments
F101 Engine SLEP
o Fully funded in FY18BES/OCOo Improves efficiency/durability, doubles time
on wing
LRASMo Navy funded: B-1 is Threshold Platformo Requires SB-17: fields Jul 18o B-1 fielding 1st then F-18
Full Scale Fatigue Test
o O&M fundedo Provides test demonstrated durability life
(TDDL) of twice the anticipated service life for airworthiness certification
o Program directly supports B-1 ASIP (Aircraft Structural Integrity Program) compliance
Fully Integrated TgtPod
o Replaces temp T-1 mod w/ perm modo Eliminates negative aircrew ergonomics
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 79
B-1 Future Programs
Mode 5/S ADS-B
BRU-56
Radio Crypto Compliance
o Replaces UHF 2/3 with w/NSA cryptomandated compliant ARC-210 Gen 6
o Adds MUOS, SATURN, possibly Iridiumo FY18 New Start
o Safety risk (Class A & C)o Modifies existing CRL to fix linkageo Adds ability to hold GBU-38s/WCMDo FY18 New Start
o FY15 POM was last chance to have any unitsinstalled by 2020 mandate
o Requires IBS aircraft & new CDUo FY18 New Start
ALQ-161 ETU
ALQ-161 JTH
o Enhanced Tracking Unit receiver refurbishment and Jamming Techniques Hardware upgrade improves a/c survivability
Radar UpgradeRMIP Phase 1RMIP Phase 2RMIP Phase 3
o RMIP Phase 1 completeo Hardware supports AESA follow ono AESA Prototype antennae flown in 2015
o RMIP Phase 2 o Replaces video processor/display
o RMIP Phase 3 o Full AESA antenna/capability
GPS M-Code
o Significant GPS jamming resistance &anti-spoofing, direct access to P(Y) code
o Joint DOD effort
o Replaces IBS Link 16 radio terminalo Provides NSA Crypto/FAA Frequency remap o L16 enhanced throughput, multi-netting,
multi-service interoperability – 2025 mandateo FY18 New Start
MIDS JTRS
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 710
B-52 Programs
1760 In Weapons Bay(1760 IWBU)
Combat Networking Comm Tech(CONECT)
o Add’l BLOS comm/data (JREAP-A)
o Enhanced aircrew SA displays
o Provides in-flight retargeting for Standoff Wpns
o 21 of 76 aircraft modified; IOC: 28 Jul 16 FOC: ‘21
o Replacement due to obsolescenceo Unless replaced, no new weapon integrationo Funded in FY16 PBo Risk Reduction Activities on-going
GPS- Interface Unit
(GPS-IU)
o Inc 1.1: 8 x GBU31/38/54
o Interim Inc 1.2: Initial JASSM-ER cape in Jun 17
o Inc 1.2: 8 x JASSM-ER/MALD-J
o Inc 1.1 IOC: 6 Mar 16 Inc 1.2 IOC: ‘20
o Solves reliability & sustainability issueso Working through Cost-Cape Analysiso Risk Reduction activities Started
o Integrates Link-16 into CONECTo B-52 last CAF platform w/o integrated Link-16o Contract Award Fall 2017
Radar Modernization
Program (RMP)
Tactical Data Link (TDL)
Crypto Mod Upgrade
o Provides MUOS/SATURN - NSA crypto mandateso Overcomes UHF saturation and UFO Satellite EOLo Starting Risk Reduction activities
Aircrew Training Devices Upgrade
o Add high fidelity aero-model to WST (A/R, T/O, etc)o Full Distributed Mission Ops capabilityo Fields ‘20
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 711
B-52 Future Programs
Engine Modernization
o Business Case Analysis ongoingo Increase reliability, decrease MX man-hourso >25% increase in range, >130% in loitero Increased power output & ECS performance
o Both capabilities included as bundle o ‘Out’ mode only = compliant, less costo Not compliant w/ FAA and ICAO mandate if not
completed by 1 Jan 2020o New Start in FY18
Auto Dependent Surveillance-
Broadcast(ADS-B) + GPS
M-Code
o Current systems optimized for 70’s era threatso Highest driver of Code 3 aircrafto Expected obsolescence in mid-termo CBA for system upgrades ongoing
Defensive System
Modernization
o Includes AEHF, WGS, Iridiumo Enduring, survivable comms for NC3o High bandwidth for A2/AD, resilience
Global Assured Comms
Long Range Stand Off (LRSO)
Integration
o Follow-on to Air Launch Cruise Missile o Required to defeat improved A2/AD threato B-52 threshold platform
Special Weapons Integration
o Several Demos projected in early 2020s
Tactical Boost Glide (TBG)
o Hypersonic boost glide weapono Prosecute time sensitive targets from safeo standoff rangeso Demo by FY19/20, funded by DARPA/AFRL
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
Service Life w/ Modernization
12
Data provided by ________ and is current as of ___________
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 713
Challenges
Manning
ACAT Programs and Sustainment issues
Testing (Funding, assets, schedules)
DMSMS
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 714
Looking to the Future
Need Innovative Solutions for stream-lined acquisitions
Leverage COTS technology for prototyping
Tailoring documentation on ACAT programs
Establishing Program Bundling for increased synergy
Modernization window is now but narrow
Bundling will yield better operational performance, lower cost,
faster execution, & least AA impact
Exploring Open Architecture opportunities for faster and
cheaper upgrades
Open Mission Systems required to quickly evolve comm sys
Cyber security techniques for one system – translates into cyber
security techniques for all (?)
B r e a k i n g B a r r i e r s … S i n c e 1 9 4 7
Questions ?