Azure Migration: A Phased vs.

All-At-Once Approach

Erik Thomas, Systems Engineering

Gary Grunewald, Pine State Trading Co.

Page 2: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Pine State Trading – 2016 – Business Overview

• Multiple divisions

• 1,000+ employees

• Locations throughout

NE/NY

Page 3: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Cloud Migration #1July 29, 2016

Page 4: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Pine State Trading – 2016 – IT Overview

• Support Staff

• IBM Infrastructure

(AS/400/iSeries/Power Systems)

• VMware/Windows Infrastructure

• Cisco Networking

Page 5: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Evaluation of Migration Options (Assessment)

• SaaS

• Re-host (lift-and-shift)

• Re-architect

Page 6: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Plan, Prep, Test

• Technical Planning & Preparation

• Vendor Coordination

• “The Playbook”

• Staff Communication

• Testing

Page 7: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Migration – “Cut Day”

• Playbook execution

• Day 1 experiences

Page 8: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Cloud Migration #2December 22, 2017

Page 9: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Pine State Trading – Today – Business Overview

• Two divisions

• 400+ employees

• Locations in ME

Page 10: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Evaluation of Migration Options (Assessment)

• SaaS

• Re-host (lift-and-shift)

– IBM limitations

• Re-architect

– Data Transfer Issues

– Latency Issues

Page 11: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Plan, Prep, Test

• Microsoft Dynamics SL

• Design and Build Azure

Environment

• Vendor Coordination

• Testing, Training, Staff

Communication

Page 12: Azure Migration: A Phased vs. All-At-Once Approach€¦ · Azure Migration: A Phased vs. All-At-Once Approach Erik Thomas, Systems Engineering Gary Grunewald, Pine State Trading Co

Get Ahead of IT

Migration – “Cut Day”

• No significant “IT” work

• Day 1 experiences

• Path forward