GÖNKA A.S. Azerbaijan References
BÝle
suva
r O
lym
pic
Tra
inin
g C
om
ple
x
GÖNKA
BÝle
suva
r O
lym
pic
Tra
inin
g C
om
ple
x2
00
8
Bilesuvar Olympic Training Complex
The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA
Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2008
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
2/3
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
20
08
Ba
ku T
urk
ish A
na
tolia
n H
igh S
cho
ol
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
4/5
Baku Turkish Anatolian High School
Baku Turkish Anatolian High School
Baku Turkish Anatolian High School T.C. Ministry of Education
and Azerbaijan Respublikasý Study on Nazir February 28, 1992
according to the memorandum of understanding signed on
24.01.1994 was opened.
School, celebration of certain days and weeks, panel,
debate and cinema shows a conference room of 200
people can be made available.
From time to time school teacher who has visited or invited
guests or conferences for students in this hall is carried
out.Understanding of technical systems in conference rooms
with a modern arrangement was.Every moment ready
sound system, computer and projection equipment are
available.
A school in Physics, Biology and Chemistry-A has a Computer
Laboratory. In all three laboratories are in a position to
respond to needs in terms of materials. Physics, Chemistry
and Biology teachers try in this laboratory, as well as have the
ability to make the computer-aided instruction.
20
09
Gö
yça
y O
lym
pic
Tra
inin
g C
om
ple
x
Göyçay Olympic Training Complex
The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA
Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2009
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
6/7
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
Boiler house, pump station and piping whole mechanical job Ductwork
20
09
Hö
vsa
n O
lym
pic
Tra
inin
g C
om
ple
x
Chiller Air Cooled
Fan Coils Ceeling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
Hövsan Olympic Training Complex
! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA
! Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2009
8/9
GONKA Screw compressor air cooled water cooling
groups, with its models in the range of high efficiency and
high capacity, are ideal for cooling operations related to
comfort and industrial purposes.
R22 , R134a or R407c options.
Compressors; Half hermetic screw compressors.
Compressors changing between 1 and 4 according to
cooling capacity.
Condenser; Highly efficient, original condenser situated in V
type and condensation provided through 900 cyclical and
low sound level axial fans situated in the open edge of the
condenser.
Evaporator; Shell- tube evaporator whose cooling liquid
side and water side have one-circuit, multiple transitional,
two mirrored construction.
Refrigerating Circuit;Cooling Circuit; Cooling circuit and
circuit elements entirely independent for every compressor.
Electrical Screen and Control Board; board including
switch and micro-processor controlled module and control
cards as well as elements such as systemic control
elements and fuse, thermic magnetic switch and relay.
Micro-processor based Control System; Full control over all
the cooling circuits. Connections on board through
simplified device failure follow-up and easily recognized
electrical diagram.
Low noise level.
Multiple compressor, multiple cyclical, high efficiency.
%25-%100 continuous modulating capacity control in
every compressor.
Hardconstruction and long life.
Easy handling, installation and service.
Effortless service.
Compatible with available BMS systems.
Meeting consumer requirements in the most suitable way
through broad accessory and option alternatives.
Newly improved use of screw compressor with high COP
value.
Trouble-proof operations under high temperatures.
Rational control.
Air cooled liquid chiller
Serin
Ho
tel B
aku
20
06
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
10/11
Serin Hotel Baku
Air cooled liquid chiller
GONKA Screw compressor air cooled water cooling
groups, with its models in the range of high efficiency and
high capacity, are ideal for cooling operations related to
comfort and industrial purposes.
R22 , R134a or R407c options.
Compressors; Half hermetic screw compressors.
Compressors changing between 1 and 4 according to
cooling capacity.
Condenser; Highly efficient, original condenser situated in V
type and condensation provided through 900 cyclical and
low sound level axial fans situated in the open edge of the
condenser.
GONKA Screw compressor air cooled water cooling
groups, with its models in the range of high efficiency and
high capacity, are ideal for cooling operations related to
comfort and industrial purposes.
R22 , R134a or R407c options.
Compressors; Half hermetic screw compressors.
Compressors changing between 1 and 4 according to
cooling capacity.
Condenser; Highly efficient, original condenser situated in V
type and condensation provided through 900 cyclical and
low sound level axial fans situated in the open edge of the
condenser.
GONKA Screw compressor air cooled water cooling
groups, with its models in the range of high efficiency and
high capacity, are ideal for cooling operations related to
comfort and industrial purposes.
R22 , R134a or R407c options.
Compressors; Half hermetic screw compressors.
Compressors changing between 1 and 4 according to
cooling capacity.
Condenser; Highly efficient, original condenser situated in V
type and condensation provided through 900 cyclical and
low sound level axial fans situated in the open edge of the
condenser.
Ba
lake
n O
lym
pic
Tra
inin
g C
om
ple
x2
00
9
Balaken Olympic Training Complex
The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA
Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2009
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
12/13
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Ba
ku A
dm
inis
tra
tion O
f Th
e N
atio
na
l Arc
hiv
e B
uild
ing
20
08
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
14/15
Baku Administration Of The NationalArchive Building
Air handling unit
Optional Accessories;
! GONKA vapor humidifier, standard vapor cylinder, immersion electrodes, stainless vapor distributor and microprocessor control unit.
! Mufflers which are made up of coulisses to provide required sound holding capacity.
! Plate heat exchanger or Heat recovery wheel for recovery of the heat emitted with exhaust air.
! Electrical board.
! Frequency Converter
Standard Series
Application Area: business centers, schools,
hospitals, factories, hotels and restaurants.
! 8 different models which provide required humidity
and temperature by conditioning air volume in the
range of 3000m³/h and 100.000 m³/h.
! The framework which is formed by combination of
aluminum frames, which are connected specially, with
plastic and aluminum comers.
! Boards which are made up of double skilled
galvanized iron in a standard way.
! Polyurethane insulated panels, which are 30 mm in
thickness, for thermal and acoustic insulation in a
standard way.
Standard Accessories;
! Filter Chambers; Chamber design which provides easy mounting and de-mounting in filters and filters with different productivity levels on demand.
! Heating and Cooling Coils; Seamless cooper tubes. In heating coils, 4 options: warm water, vapor, hot water, electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion).
! Dampers; Rigid aluminum frame in multi airfoil structure which is the least resistant against airflow. Rubber gaskets which reduce air leakage through blades to the minimum level.
! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium and high duct pressures,.
Hb
Clin
ique
Ba
ku2
00
7
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
16/17
Hb Clinique Baku
Laminar flow air system
! HEPA filters which clean filtrated air before going into
operating room.
! Mounting situated in ceiling of the operating theatre in
such a way that it should locate over operating table.
! Stainless steel air distribution box, Hepa filters,
transparent air distributor (laminarizator) and pendant
operating table lighting connection.
! Easy maintenance and disinfection because of
transparent air distributor's being pulled down.
Operating theatre lighting system made up of airproof
construction.
! A laminar, vertical air flow from transparent air
distributor through operating table prevents turbulent
air flow in conventional air systems and offers a high
level cleanliness class around the operating table
during the operati
! The system which remove particulates and microbes
from operation part due to laminar flow.
! Special design for operation theatres which require
especially high level sterilization in accordance with
DIN 1946.
! Differential pressure sensors. Easy connection
differential pressure sensors and leakage testing.
! Easy installation to all kinds of ceilings.
Packaged hygienic air conditioner
! Highly efficient filtration of supply and extract air.
! Maximum function control: room temperature and relative humidity control throughout the year.
! Meeting fresh air that surgical operations require
! Quiet and non-vibrating operation that operating theatres require.
! An independent system which is under direct control of authorized health staff.
! Pressure control in aseptic and septic surgical operations.
! Continuous control of room temperature and humidity.
! Quiet and non-vibrating operation.
! Replacing the old installation in available places and generally, because their sizes are small, occupying less room than any time before, however available air canal and water installation could be, easy erection in any type of health institutions.
! In fan part, one or two directly actuated highly static pressurized fans to provide required air volumetric flow rate even when filters are choked.
! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, inverter equipment in supply and extract fans.
! Air Filters; F5 class filter in fresh air input and F9 class filters on the extract side.
! Dx battery;
! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro-process control.
! Compressor; 1 or 2 Scroll Compressors according to the capacity.
! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device.
! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI).
! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.
Ba
ku M
inis
try
Of H
ea
lth T
op
çub
aþo
v H
osp
ital
20
08
Laminar flow air system
! HEPA filters which clean filtrated air before going into
operating room.
! Mounting situated in ceiling of the operating theatre in
such a way that it should locate over operating table.
! Stainless steel air distribution box, Hepa filters,
transparent air distributor (laminarizator) and pendant
operating table lighting connection.
! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.
! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operati
! The system which remove particulates and microbes
from operation part due to laminar flow.
! Special design for operation theatres which require
especially high level sterilization in accordance with
DIN 1946.
! Differential pressure sensors. Easy connection
differential pressure sensors and leakage testing.
! Easy installation to all kinds of ceilings.18/19
Baku Ministry Of Health Topçubaþov Hospital
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Laminar flow air system
Serin
Ho
spita
l Aze
rba
ijan
20
08
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
20/21
Serin Hospital Azerbaijan
Serin
Ho
spita
l Aze
rba
ijan
20
08
Packaged hygienic air conditioner
! Highly efficient filtration of supply and extract air.
! Maximum function control: room temperature and relative humidity control throughout the year.
! Meeting fresh air that surgical operations require
! Quiet and non-vibrating operation that operating theatres require.
! An independent system which is under direct control of authorized health staff.
! Pressure control in aseptic and septic surgical operations.
! Continuous control of room temperature and humidity.
! Quiet and non-vibrating operation.
! Replacing the old installation in available places and generally, because their sizes are small, occupying less room than any time before, however available air canal and water installation could be, easy erection in any type of health institutions.
! In fan part, one or two directly actuated highly static pressurized fans to provide required air volumetric flow rate even when filters are choked.
! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, inverter equipment in supply and extract fans.
! Air Filters; F5 class filter in fresh air input and F9 class filters on the extract side.
! Dx battery;
! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro-process control.
! Compressor; 1 or 2 Scroll Compressors according to the capacity.
! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device.
! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI).
! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.
22/23
Aze
rba
ijan M
ilita
ry H
osp
ital 3
00
Be
d2
00
7
Laminar flow air system
! HEPA filters which clean filtrated air before going into
operating room.
! Mounting situated in ceiling of the operating theatre in
such a way that it should locate over operating table.
! Stainless steel air distribution box, Hepa filters,
transparent air distributor (laminarizator) and pendant
operating table lighting connection.
! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.
! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operati
! The system which remove particulates and microbes
from operation part due to laminar flow.
! Special design for operation theatres which require
especially high level sterilization in accordance with
DIN 1946.
! Differential pressure sensors. Easy connection
differential pressure sensors and leakage testing.
! Easy installation to all kinds of ceilings.24/25
Azerbaijan Military Hospital 300 Bed
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
!Hvac equipments for operating theatres are supplied by
GONKA
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Ce
ntra
l Ba
nk
of A
zerb
aija
n R
ep
ub
lic2
00
9
26/27
Central Bank of Azerbaijan RepublicHvac equipments periodic maintenance are being
provided bye GONKA
Hvac equipments periodic maintenance are being
provided bye GONKA
Aze
rba
ijan M
c D
ona
ld’s
20
02
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Azerbaijan Mc Donald’s
Centrifugal roof extractsTechnical specification The manufactured centrifugal roof
extract unit has been designed for the effective exhaust. it is
possible to montage in the desired angle with the small
sound Ievel it may be used in for the industrial applications
and kitchens. It has been designed for Iong service Iife
without maintenance. The manufacturing range 500-12.000
m³/h air and 0-50 mmSS pressure.
Body It is designed according to the bat environment
conditions Galvanized stell frame, aluminium upper cover
are used. Moto-fan group Cenrifugal ventilatör is statically
and dynamically balanced.Motor serves 380V/50 Hz 900-
1400d/d as astandard and directly coupled with d-phase
electirical motor.By this way, it works quitely and without
vibration.
Fan has dense f imed, low sound leve l and
highperformance.It is easy to open the fan and clean the fin
at shot notice. By the help aof special protection cover, itwork
many years without any problem. Centrifugal roof extract
units designed as direct extraction or combined with a duct
type.
28/29
Ba
ku S
tate
Univ
ers
ity K
itche
n A
nd
Re
sta
ura
nt
20
08
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
30/31
Baku State University Kitchen And Restaurant
Air handling unit
Optional Accessories;
! GONKA vapor humidifier, standard vapor cylinder, immersion electrodes, stainless vapor distributor and microprocessor control unit.
! Mufflers which are made up of coulisses to provide required sound holding capacity.
! Plate heat exchanger or Heat recovery wheel for recovery of the heat emitted with exhaust air.
! Electrical board.
! Frequency Converter
Standard Series
Application Area: business centers, schools,
hospitals, factories, hotels and restaurants.
! 8 different models which provide required humidity
and temperature by conditioning air volume in the
range of 3000m³/h and 100.000 m³/h.
! The framework which is formed by combination of
aluminum frames, which are connected specially, with
plastic and aluminum comers.
! Boards which are made up of double skilled
galvanized iron in a standard way.
! Polyurethane insulated panels, which are 30 mm in
thickness, for thermal and acoustic insulation in a
standard way.
Standard Accessories;
! Filter Chambers; Chamber design which provides easy mounting and de-mounting in filters and filters with different productivity levels on demand.
! Heating and Cooling Coils; Seamless cooper tubes. In heating coils, 4 options: warm water, vapor, hot water, electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion).
! Dampers; Rigid aluminum frame in multi airfoil structure which is the least resistant against airflow. Rubber gaskets which reduce air leakage through blades to the minimum level.
! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium and high duct pressures,.
Aze
rba
ijan G
ön
ka S
ho
ps
an
d O
ffic
e2
00
9
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
32/33
Azerbaijan Gönka Shops and Office
! The most important feature of decorative type Fan-Coil
units is their use both with casing and without casing
(concealed) in every position. While ceiling cabinet and
cabinet floor types are mounted inside the room,
concealed types are mounted within ceilings or walls.
Unit models which operate both heating and cooling or
only heating are available.
! Low sound level; quality is high level for providing quiet
study environment.
! Ideal acoustic and thermal insulation.
! Functional remote control.
! 2 or 3-way On/ Off or rational control.
! Outer casing; It is made from DKP sheet steel, outside
and inside of the unit are painted with electrostatic
powder paint against rust and external effects.
! Internal frame; Mounting upon originally designed
framework made from galvanized steel together with
battery, fan, motor group, dried pan and dropper.
! Battery; Copper pipe, aluminum fins.
! Fan and engine group; 1 or 2 fans to provide required
capacity in devices in accordance with capacity table.
Fan coil units
Sincan Organize Sanayi
Bölgesi Göktürk Cad. No:6
Sincan / ANKARA
Tel :0 312 267 09 90 (pbx)
Fax:0 312 267 09 93
FACTORY and MAIN OFFICE
Nasimi Rayonu,
Suleyman Rustem Mah., 7,
Az1014 BAKÜ / AZERBAYCAN
Tel : (00 994) 12 493 19 29
Fax: (00 994) 12 493 19 29
.
AZERBAIJAN BRANCH OFFICE
GEORGIA BRANCH OFFICE
GÖNKA Azerbaijan References
- Hövsan Olympic Training Complex
- Baku Turkish Anatolian High School
- Göyçay Olympic Training Complex
- Serin Hotel Baku
- Balaken Olympic Structure
- BÝlesuvar Olympic Structure
- Baku Administration Of The National
Archive Building
- Hb Clinique Baku
- Azerbaijan Baku Endos. Hospital
- Azerbaijan Military Hospital 300 Bed
- Karwan Mtk Azerbaijan
- Ata Okul Azerbaijan
- Serin Hospital Azerbaijan
- Baku Ministry Of Health Topçubaþov
Hospital
- Baku State University Kitchen And
Restaurant