azerbaycan ing referasn albümü rev02

45
GÖNKA A.S. Azerbaijan References BÝlesuvar Olympic Training Complex GÖNKA

Upload: guestb585ef

Post on 20-Aug-2015

879 views

Category:

Education


3 download

TRANSCRIPT

Page 1: Azerbaycan ing referasn albümü rev02

GÖNKA A.S. Azerbaijan References

BÝle

suva

r O

lym

pic

Tra

inin

g C

om

ple

x

GÖNKA

Page 2: Azerbaycan ing referasn albümü rev02

BÝle

suva

r O

lym

pic

Tra

inin

g C

om

ple

x2

00

8

Bilesuvar Olympic Training Complex

The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA

Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2008

Chiller Air Cooled

Fan Coils Ceiling & Wall Type

Air Handling Units

Boiler Systems

Are used in complex

2/3

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 3: Azerbaycan ing referasn albümü rev02
Page 4: Azerbaycan ing referasn albümü rev02

20

08

Ba

ku T

urk

ish A

na

tolia

n H

igh S

cho

ol

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

4/5

Baku Turkish Anatolian High School

Page 5: Azerbaycan ing referasn albümü rev02

Baku Turkish Anatolian High School

Baku Turkish Anatolian High School T.C. Ministry of Education

and Azerbaijan Respublikasý Study on Nazir February 28, 1992

according to the memorandum of understanding signed on

24.01.1994 was opened.

School, celebration of certain days and weeks, panel,

debate and cinema shows a conference room of 200

people can be made available.

From time to time school teacher who has visited or invited

guests or conferences for students in this hall is carried

out.Understanding of technical systems in conference rooms

with a modern arrangement was.Every moment ready

sound system, computer and projection equipment are

available.

A school in Physics, Biology and Chemistry-A has a Computer

Laboratory. In all three laboratories are in a position to

respond to needs in terms of materials. Physics, Chemistry

and Biology teachers try in this laboratory, as well as have the

ability to make the computer-aided instruction.

Page 6: Azerbaycan ing referasn albümü rev02

20

09

yça

y O

lym

pic

Tra

inin

g C

om

ple

x

Göyçay Olympic Training Complex

The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA

Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2009

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

6/7

Page 7: Azerbaycan ing referasn albümü rev02

Chiller Air Cooled

Fan Coils Ceiling & Wall Type

Air Handling Units

Boiler Systems

Are used in complex

Boiler house, pump station and piping whole mechanical job Ductwork

Page 8: Azerbaycan ing referasn albümü rev02

20

09

vsa

n O

lym

pic

Tra

inin

g C

om

ple

x

Hövsan Olympic Training Complex

The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA

Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2009

Chiller Air Cooled

Fan Coils Ceeling & Wall Type

Air Handling Units

Boiler Systems

Are used in complex

8/9

Page 9: Azerbaycan ing referasn albümü rev02

GONKA Screw compressor air cooled water cooling

groups, with its models in the range of high efficiency and

high capacity, are ideal for cooling operations related to

comfort and industrial purposes.

R22 , R134a or R407c options.

Compressors; Half hermetic screw compressors.

Compressors changing between 1 and 4 according to

cooling capacity.

Condenser; Highly efficient, original condenser situated in V

type and condensation provided through 900 cyclical and

low sound level axial fans situated in the open edge of the

condenser.

Evaporator; Shell- tube evaporator whose cooling liquid

side and water side have one-circuit, multiple transitional,

two mirrored construction.

Refrigerating Circuit;Cooling Circuit; Cooling circuit and

circuit elements entirely independent for every compressor.

Electrical Screen and Control Board; board including

switch and micro-processor controlled module and control

cards as well as elements such as systemic control

elements and fuse, thermic magnetic switch and relay.

Micro-processor based Control System; Full control over all

the cooling circuits. Connections on board through

simplified device failure follow-up and easily recognized

electrical diagram.

Low noise level.

Multiple compressor, multiple cyclical, high efficiency.

%25-%100 continuous modulating capacity control in

every compressor.

Hardconstruction and long life.

Easy handling, installation and service.

Effortless service.

Compatible with available BMS systems.

Meeting consumer requirements in the most suitable way

through broad accessory and option alternatives.

Newly improved use of screw compressor with high COP

value.

Trouble-proof operations under high temperatures.

Rational control.

Air cooled liquid chiller

Page 10: Azerbaycan ing referasn albümü rev02

Serin

Ho

tel B

aku

20

06

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

10/11

Serin Hotel Baku

Page 11: Azerbaycan ing referasn albümü rev02

Air cooled liquid chiller

GONKA Screw compressor air cooled water cooling

groups, with its models in the range of high efficiency and

high capacity, are ideal for cooling operations related to

comfort and industrial purposes.

R22 , R134a or R407c options.

Compressors; Half hermetic screw compressors.

Compressors changing between 1 and 4 according to

cooling capacity.

Condenser; Highly efficient, original condenser situated in V

type and condensation provided through 900 cyclical and

low sound level axial fans situated in the open edge of the

condenser.

GONKA Screw compressor air cooled water cooling

groups, with its models in the range of high efficiency and

high capacity, are ideal for cooling operations related to

comfort and industrial purposes.

R22 , R134a or R407c options.

Compressors; Half hermetic screw compressors.

Compressors changing between 1 and 4 according to

cooling capacity.

Condenser; Highly efficient, original condenser situated in V

type and condensation provided through 900 cyclical and

low sound level axial fans situated in the open edge of the

condenser.

GONKA Screw compressor air cooled water cooling

groups, with its models in the range of high efficiency and

high capacity, are ideal for cooling operations related to

comfort and industrial purposes.

R22 , R134a or R407c options.

Compressors; Half hermetic screw compressors.

Compressors changing between 1 and 4 according to

cooling capacity.

Condenser; Highly efficient, original condenser situated in V

type and condensation provided through 900 cyclical and

low sound level axial fans situated in the open edge of the

condenser.

Page 12: Azerbaycan ing referasn albümü rev02

Ba

lake

n O

lym

pic

Tra

inin

g C

om

ple

x2

00

9

Balaken Olympic Training Complex

The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA

Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2009

Chiller Air Cooled

Fan Coils Ceiling & Wall Type

Air Handling Units

Boiler Systems

Are used in complex

12/13

Page 13: Azerbaycan ing referasn albümü rev02

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 14: Azerbaycan ing referasn albümü rev02

Ba

ku A

dm

inis

tra

tion O

f Th

e N

atio

na

l Arc

hiv

e B

uild

ing

20

08

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

14/15

Baku Administration Of The NationalArchive Building

Page 15: Azerbaycan ing referasn albümü rev02

Air handling unit

Optional Accessories;

! GONKA vapor humidifier, standard vapor cylinder, immersion electrodes, stainless vapor distributor and microprocessor control unit.

! Mufflers which are made up of coulisses to provide required sound holding capacity.

! Plate heat exchanger or Heat recovery wheel for recovery of the heat emitted with exhaust air.

! Electrical board.

! Frequency Converter

Standard Series

Application Area: business centers, schools,

hospitals, factories, hotels and restaurants.

! 8 different models which provide required humidity

and temperature by conditioning air volume in the

range of 3000m³/h and 100.000 m³/h.

! The framework which is formed by combination of

aluminum frames, which are connected specially, with

plastic and aluminum comers.

! Boards which are made up of double skilled

galvanized iron in a standard way.

! Polyurethane insulated panels, which are 30 mm in

thickness, for thermal and acoustic insulation in a

standard way.

Standard Accessories;

! Filter Chambers; Chamber design which provides easy mounting and de-mounting in filters and filters with different productivity levels on demand.

! Heating and Cooling Coils; Seamless cooper tubes. In heating coils, 4 options: warm water, vapor, hot water, electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion).

! Dampers; Rigid aluminum frame in multi airfoil structure which is the least resistant against airflow. Rubber gaskets which reduce air leakage through blades to the minimum level.

! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium and high duct pressures,.

Page 16: Azerbaycan ing referasn albümü rev02

Hb

Clin

ique

Ba

ku2

00

7

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

16/17

Hb Clinique Baku

Page 17: Azerbaycan ing referasn albümü rev02

Laminar flow air system

! HEPA filters which clean filtrated air before going into

operating room.

! Mounting situated in ceiling of the operating theatre in

such a way that it should locate over operating table.

! Stainless steel air distribution box, Hepa filters,

transparent air distributor (laminarizator) and pendant

operating table lighting connection.

! Easy maintenance and disinfection because of

transparent air distributor's being pulled down.

Operating theatre lighting system made up of airproof

construction.

! A laminar, vertical air flow from transparent air

distributor through operating table prevents turbulent

air flow in conventional air systems and offers a high

level cleanliness class around the operating table

during the operati

! The system which remove particulates and microbes

from operation part due to laminar flow.

! Special design for operation theatres which require

especially high level sterilization in accordance with

DIN 1946.

! Differential pressure sensors. Easy connection

differential pressure sensors and leakage testing.

! Easy installation to all kinds of ceilings.

Packaged hygienic air conditioner

! Highly efficient filtration of supply and extract air.

! Maximum function control: room temperature and relative humidity control throughout the year.

! Meeting fresh air that surgical operations require

! Quiet and non-vibrating operation that operating theatres require.

! An independent system which is under direct control of authorized health staff.

! Pressure control in aseptic and septic surgical operations.

! Continuous control of room temperature and humidity.

! Quiet and non-vibrating operation.

! Replacing the old installation in available places and generally, because their sizes are small, occupying less room than any time before, however available air canal and water installation could be, easy erection in any type of health institutions.

! In fan part, one or two directly actuated highly static pressurized fans to provide required air volumetric flow rate even when filters are choked.

! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, inverter equipment in supply and extract fans.

! Air Filters; F5 class filter in fresh air input and F9 class filters on the extract side.

! Dx battery;

! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro-process control.

! Compressor; 1 or 2 Scroll Compressors according to the capacity.

! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device.

! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI).

! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.

Page 18: Azerbaycan ing referasn albümü rev02

Ba

ku M

inis

try

Of H

ea

lth T

op

çub

aþo

v H

osp

ital

20

08

Laminar flow air system

! HEPA filters which clean filtrated air before going into

operating room.

! Mounting situated in ceiling of the operating theatre in

such a way that it should locate over operating table.

! Stainless steel air distribution box, Hepa filters,

transparent air distributor (laminarizator) and pendant

operating table lighting connection.

! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.

! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operati

! The system which remove particulates and microbes

from operation part due to laminar flow.

! Special design for operation theatres which require

especially high level sterilization in accordance with

DIN 1946.

! Differential pressure sensors. Easy connection

differential pressure sensors and leakage testing.

! Easy installation to all kinds of ceilings.18/19

Baku Ministry Of Health Topçubaþov Hospital

Page 19: Azerbaycan ing referasn albümü rev02

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Laminar flow air system

Page 20: Azerbaycan ing referasn albümü rev02

Serin

Ho

spita

l Aze

rba

ijan

20

08

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

20/21

Serin Hospital Azerbaijan

Page 21: Azerbaycan ing referasn albümü rev02
Page 22: Azerbaycan ing referasn albümü rev02

Serin

Ho

spita

l Aze

rba

ijan

20

08

Packaged hygienic air conditioner

! Highly efficient filtration of supply and extract air.

! Maximum function control: room temperature and relative humidity control throughout the year.

! Meeting fresh air that surgical operations require

! Quiet and non-vibrating operation that operating theatres require.

! An independent system which is under direct control of authorized health staff.

! Pressure control in aseptic and septic surgical operations.

! Continuous control of room temperature and humidity.

! Quiet and non-vibrating operation.

! Replacing the old installation in available places and generally, because their sizes are small, occupying less room than any time before, however available air canal and water installation could be, easy erection in any type of health institutions.

! In fan part, one or two directly actuated highly static pressurized fans to provide required air volumetric flow rate even when filters are choked.

! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, inverter equipment in supply and extract fans.

! Air Filters; F5 class filter in fresh air input and F9 class filters on the extract side.

! Dx battery;

! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro-process control.

! Compressor; 1 or 2 Scroll Compressors according to the capacity.

! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device.

! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI).

! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.

22/23

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 23: Azerbaycan ing referasn albümü rev02
Page 24: Azerbaycan ing referasn albümü rev02

Serin

Ho

spita

l Aze

rba

ijan

20

08

24/25

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Serin Hospital Azerbaijan

Page 25: Azerbaycan ing referasn albümü rev02
Page 26: Azerbaycan ing referasn albümü rev02

Aze

rba

ijan M

ilita

ry H

osp

ital 3

00

Be

d2

00

7

Laminar flow air system

! HEPA filters which clean filtrated air before going into

operating room.

! Mounting situated in ceiling of the operating theatre in

such a way that it should locate over operating table.

! Stainless steel air distribution box, Hepa filters,

transparent air distributor (laminarizator) and pendant

operating table lighting connection.

! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.

! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operati

! The system which remove particulates and microbes

from operation part due to laminar flow.

! Special design for operation theatres which require

especially high level sterilization in accordance with

DIN 1946.

! Differential pressure sensors. Easy connection

differential pressure sensors and leakage testing.

! Easy installation to all kinds of ceilings.26/27

Azerbaijan Military Hospital 300 Bed

Page 27: Azerbaycan ing referasn albümü rev02

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

!Hvac equipments for operating theatres are supplied by

GONKA

Page 28: Azerbaycan ing referasn albümü rev02

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Ce

ntra

l Ba

nk

of A

zerb

aija

n R

ep

ub

lic2

00

9

28/29

Central Bank of Azerbaijan RepublicHvac equipments periodic maintenance are being

provided bye GONKA

Page 29: Azerbaycan ing referasn albümü rev02

Hvac equipments periodic maintenance are being

provided bye GONKA

Page 30: Azerbaycan ing referasn albümü rev02

Aze

rba

ijan M

c D

ona

ld’s

20

02

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Azerbaijan Mc Donald’s

Centrifugal roof extractsTechnical specification The manufactured centrifugal roof

extract unit has been designed for the effective exhaust. it is

possible to montage in the desired angle with the small

sound Ievel it may be used in for the industrial applications

and kitchens. It has been designed for Iong service Iife

without maintenance. The manufacturing range 500-12.000

m³/h air and 0-50 mmSS pressure.

Body It is designed according to the bat environment

conditions Galvanized stell frame, aluminium upper cover

are used. Moto-fan group Cenrifugal ventilatör is statically

and dynamically balanced.Motor serves 380V/50 Hz 900-

1400d/d as astandard and directly coupled with d-phase

electirical motor.By this way, it works quitely and without

vibration.

Fan has dense f imed, low sound leve l and

highperformance.It is easy to open the fan and clean the fin

at shot notice. By the help aof special protection cover, itwork

many years without any problem. Centrifugal roof extract

units designed as direct extraction or combined with a duct

type.

30/31

Page 31: Azerbaycan ing referasn albümü rev02
Page 32: Azerbaycan ing referasn albümü rev02

Ba

ku S

tate

Univ

ers

ity K

itche

n A

nd

Re

sta

ura

nt

20

08

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

32/33

Baku State University Kitchen And Restaurant

Page 33: Azerbaycan ing referasn albümü rev02

Air handling unit

Optional Accessories;

! GONKA vapor humidifier, standard vapor cylinder, immersion electrodes, stainless vapor distributor and microprocessor control unit.

! Mufflers which are made up of coulisses to provide required sound holding capacity.

! Plate heat exchanger or Heat recovery wheel for recovery of the heat emitted with exhaust air.

! Electrical board.

! Frequency Converter

Standard Series

Application Area: business centers, schools,

hospitals, factories, hotels and restaurants.

! 8 different models which provide required humidity

and temperature by conditioning air volume in the

range of 3000m³/h and 100.000 m³/h.

! The framework which is formed by combination of

aluminum frames, which are connected specially, with

plastic and aluminum comers.

! Boards which are made up of double skilled

galvanized iron in a standard way.

! Polyurethane insulated panels, which are 30 mm in

thickness, for thermal and acoustic insulation in a

standard way.

Standard Accessories;

! Filter Chambers; Chamber design which provides easy mounting and de-mounting in filters and filters with different productivity levels on demand.

! Heating and Cooling Coils; Seamless cooper tubes. In heating coils, 4 options: warm water, vapor, hot water, electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion).

! Dampers; Rigid aluminum frame in multi airfoil structure which is the least resistant against airflow. Rubber gaskets which reduce air leakage through blades to the minimum level.

! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium and high duct pressures,.

Page 34: Azerbaycan ing referasn albümü rev02

Aze

rba

ijan G

ön

ka S

ho

ps

an

d O

ffic

e2

00

9

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

34/35

Azerbaijan Gönka Shops and Office

Page 35: Azerbaycan ing referasn albümü rev02

! The most important feature of decorative type Fan-Coil

units is their use both with casing and without casing

(concealed) in every position. While ceiling cabinet and

cabinet floor types are mounted inside the room,

concealed types are mounted within ceilings or walls.

Unit models which operate both heating and cooling or

only heating are available.

! Low sound level; quality is high level for providing quiet

study environment.

! Ideal acoustic and thermal insulation.

! Functional remote control.

! 2 or 3-way On/ Off or rational control.

! Outer casing; It is made from DKP sheet steel, outside

and inside of the unit are painted with electrostatic

powder paint against rust and external effects.

! Internal frame; Mounting upon originally designed

framework made from galvanized steel together with

battery, fan, motor group, dried pan and dropper.

! Battery; Copper pipe, aluminum fins.

! Fan and engine group; 1 or 2 fans to provide required

capacity in devices in accordance with capacity table.

Fan coil units

Page 36: Azerbaycan ing referasn albümü rev02

Ata

Oku

l Aze

rba

ijan

20

08

36/37

Page 37: Azerbaycan ing referasn albümü rev02

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Ata Okul Azerbaijan

Page 38: Azerbaycan ing referasn albümü rev02

Ha

sano

glu

Furn

iture

Fa

cto

ry2

00

9

38/39

Hasanoglu Furniture Factory

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 39: Azerbaycan ing referasn albümü rev02

Unit heaters with radial fan

GÖNKA GDA series unit heaters are designed to meet the

heating requirements of workshops, warehouses, factories,

stores, garages, sporting halls etc. They are manufactured so

as to be connected either to hot water, superheated water or

steam lines. There are 13 models in order to handle heating

capacities between 4.000-60.000Kcal/h and they are

available in two types; wall mounted and ceiling.

Technical specification Casing Manufactured from

phosphatized steel sheets finished with oven baked

electrostatic paint. Centrifugal fan-motor group As a

standard the centrifugal fans are directly coupled to three-

phase electric motor, which has high starting torque. The fans

are statically and dynamically balanced to ensure vibration

and noise free operation. Air mixing box

In case fresh air intake is necessary, a mixing box is mounted

on the air inlet to provide the required air mixture.Air

discharge louvers In order to direct the airflow to desired

direction adjustable discharge louvers, consisting of parallel

moving flaps and frames, are used. Coil connections

Connection of the coils to the hot water or steam lines is done

easily via coil union stems, manufactured to fit standard

pipes

Page 40: Azerbaycan ing referasn albümü rev02

Sincan Organize Sanayi

Bölgesi Göktürk Cad. No:6

Sincan / ANKARA

Tel :0 312 267 09 90 (pbx)

Fax:0 312 267 09 93

FACTORY and MAIN OFFICE

Nasimi Rayonu,

Suleyman Rustem Mah., 7,

Az1014 BAKÜ / AZERBAYCAN

Tel : (00 994) 12 493 19 29

Fax: (00 994) 12 493 19 29

.

AZERBAIJAN BRANCH OFFICE

GEORGIA BRANCH OFFICE

GÖNKA Azerbaijan References

- Hövsan Olympic Training Complex

- Baku Turkish Anatolian High School

- Göyçay Olympic Training Complex

- Serin Hotel Baku

- Balaken Olympic Structure

- BÝlesuvar Olympic Structure

- Baku Administration Of The National

Archive Building

- Hb Clinique Baku

- Azerbaijan Baku Endos. Hospital

- Azerbaijan Military Hospital 300 Bed

- Karwan Mtk Azerbaijan

- Ata Okul Azerbaijan

- Serin Hospital Azerbaijan

- Baku Ministry Of Health Topçubaþov

Hospital

- Baku State University Kitchen And

Restaurant

Page 41: Azerbaycan ing referasn albümü rev02

Ka

rwa

n M

tk A

zerb

aija

n2

00

2

KARVAN RESIDANS - BAKU

FEBRUARY / 2008

R407C

1 Screw compressor

12/7 ° C

34 °C

GHSC 1V10s

640.4 kW

110 m³/h

380V/50 Hz

Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93

http://www.gonka.com.tre-mail: [email protected]

APRIL / 2008

TSEKTSEK

KAZAKHSTAN

MAX. COMP. CURRENT 440 A

COMPRESSOR TYPE

EVAPORATOR WATERINLET/OUTLET TEMP.

EVAPORATOR WATER FLOW RATE

OUTSIDE AIR TEMP.

REFRIGERANT

MODEL

OPERATING VOLTAGE

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

CAPACITY

SERIAL NO 08/1005

UNIT TYPE AIR COOLED LIQUID CHILLER

JOB NAME

CUSTOMER KARVAN MTK

PRODUCTION DATE

QUALITY CONTROL DATE

FEBRUARY / 2008

APRIL / 2008

GFC400

65

800

9.350

3.110

4.320

220 V MONOPHASE

JOB NAME KARVAN RESIDANS - BAKU

CUSTOMER KARVAN MTK

HIDDEN CEILING TYPE FAN COIL UNITUNIT TYPE

TYPE

PROD. DATE

FLOORWALLCEILING

PIPE CONNECTIONDIRECTION

SERIAL NO

HEATING CAPACITY

COOLING CAPACITY

AIR FLOW RATE

SENSIBLE

TOTAL

VOLTAGE POWER

COOLINGHEATING

STEAM 0,1 ATÜ

HOT WATER 80/60 °C WATER TEMP. 6/10°C

WATER TEMP. 7/12 °C

QUALITY CONTROL DATE

OPERATING CONDITIONS

Sincan Organize Sanayi Bölgesi Göktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93http://www.gonka.com.tre-mail: [email protected] - SOÐUTMA - KLÝMA - HAVALANDIRMA

SUPERHEATEDWATER

130/90 °C

m³/h

W

W

W

W

LEFT

RIGHT

08/1467

26/27

Page 42: Azerbaycan ing referasn albümü rev02

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 43: Azerbaycan ing referasn albümü rev02

Aze

rba

ijan B

aku

En

do

s. H

osp

ita

l2

00

2

TOROSLAR DAÐ TURÝZM LTD. ÞTÝ.- AZERBAYCAN -2002 AZERBAYCAN BAKÜ ENDOS. HASTANESÝKlima santrallarý, Egzost aspiratör, Fan-Coil cihazlarý, Otomatik kontrol malzemeleri

LAZERÝN HASTANESÝ ?

38/39

Page 44: Azerbaycan ing referasn albümü rev02
Page 45: Azerbaycan ing referasn albümü rev02

PAKET KLÝMA CÝHAZI

TÝP SERÝ NO

CÝHAZ ADI

ÝÞÝN ADI BAKÜ DEVLET ÜNÝVERSÝTESÝ YEMEKHANESÝ

MÜÞ. ADI ELXAN MEHDÝYEV

VANTÝLATÖR DEBÝSÝ

VANTÝLATÖR TOPLAM BASINCI

ASPÝRATÖR DEBÝSÝ

ASPÝRATÖR TOPLAM BASINCI

MOTOR GÜCÜ

MOTOR GÜCÜ

ISITMA KAPASÝTESÝ

SOÐUTMA KAPASÝTESÝ

ÝMAL TARÝHÝ

KALÝTE KONTROL TARÝHÝ

GHP 210 07/1007

ELEKTRÝK BESLEME

Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93

http://www.gonka.com.tre-mail: [email protected]

8.300

7.500

85

62+4

m³/h

m³/h

Pa

kW

1.300

500

2x3

3

EYLÜL 2007

EKÝM 2007

kW

kW

Pa

kW

380V/50 Hz

TSEKTSEK

KAZAKHSTAN

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

ELXAN MEHDÝYEV

BAKÜ DEVLET ÜNÝVERSÝTESÝ YEMEKHANESÝ

ELEKTRÝK BESLEME 380V/3Ph/50 Hz

FAN GÜCÜ

FAN MARKASI

ÝMAL TARÝHÝ

KALÝTE KONTROL TARÝHÝ

3x1.5 kW

YONGAN MHP-800

EYLÜL 2007

EKÝM 2007

Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93

http://www.gonka.com.tre-mail: [email protected]

KONDANSER ÜNÝTESÝ

TÝP GHP 210 SERÝ NO 07/1007

CÝHAZ ADI

ÝÞÝN ADI

MÜÞ. ADI

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

TSEKTSEK

KAZAKHSTAN

BALAKEN OLYMPIC STRUCTURE / BALAKENAZERBAIJAN BAKU ENDOS. HOSPITAL- AZERBAIJAN -2002SURGERY ROOM - AZERBAIJAN - 2006-2007KARWAN MTK-AZERBAIJAN-2008BILAL MENZIL TIKINTI COOPERATIVE-AZERBAIJAN-2008AZVEN LTD.-AZERBAIJAN-2008ATA OKULU -AZERBAIJAN-2008SERIN HOSPITAL-AZERBAIJAN-2008TOPÇUBAÞOV HASTANESÝ AZER. SAÐ. BAKANLIÐI 2008

-RUSYA UFO BUILDING SITE- RUSSIA -1996

-AMERICAN EMBASSY IN MOLDOVA- MOLDOVA -1996

-IRAQ - AL-ROHAA COMPANY- IRAQ -1998

-RUSSIA SAMARA PEPSI-COLA FACTORY- RUSSIA -1999

-RUSSIA EKATERINBURG COCA-COLA FACTORY. - RUSSIA -1999

-RUSSIA VOLGAGRAD COCA-COLA FACTORY.- RUSSIA -1999

-KAZAKHISTAN MINERAL WATER FACTORY- KAZAKHISTAN -1999

- INTERNATIOANL CYPRUS UNIVERSITY- CYPRUS -2000

- MC DONALD'S -GEORGIA -2000

- CINCINATY EXTRUSION JORDAN -2002

-AZERBAIJAN BAKU ENDOS. HOSPITAL- AZERBAIJAN -2002

-BAKU TIFLIS AIRPORT- BAKU -2002

-EAST MEDITERRANEAN UNIVERSITY/ FOREIGN LANGUAGES DEPARTMENT- CYPRUS -2002 -EAST MEDITERRANEAN UNIVERSITY ACTIVITY CENTER- CYPRUS -2002

-EFES PÝLSEN FACTORY - ALMAATA /KAZAKHISTAN-2002 -EMBASSY OF KAZAKHISTAN- ANKARA-2002

- BÜLENT ECEVÝT REHABILITATION CENTER- CYPRUS -2002 -GEORGIA LÝLO- GEORGIA -2003

-SUDAN AFRA MZK SHOPPING CENTER- SUDAN -2003

- ALMAATA STATE GUESTHOUSE- KAZAKHISTAN -2003

- EAST MEDITERRANEAN UNIVERSITY - CYPRUS -2003

- ATATÜRK CULTURAL CENTER CYPRUS-2003

- YAKINDOÐU UNIVERSITY- CYPRUS -2004

- THE HIGH COURT OF PRESIDENCY BUILDING-ASTANA- 2004 -TROY CONSTRUCTION- RUSSIA-2004

-AMERICAN EMBASSY IN TIFLIS- TIFLIS -2004

-BALAD ANACONDA - IRAQ-2004

-CCC BUSINESS CENTER BUILDING- KAZAKHISTAN -ASTANA - 2004

-PRESIDENT HOTEL ASTANA/KAZAKHISTAN- 2005

-KAZAKHISTAN ALMAATA COCA-COLA FACTORY - 2005

-KRÝSTAL GRASNODAR SHOPPING CENTER - RUSSIA - 2005

-UNITECH INTERNATIONAL PVT. - PAKISTAN - 2005

-NEP ENGINEERING MILITARY HOSPITAL - AZERBAIJAN - 2005

-BREEZE SERVICE - KAZAKHISTAN - 2005

-LVOV HOTEL UKRAINE -2005

-AMSTER BEWERRY EFES PÝLSEN FACTORY - RUSSIA - 2005

-GRAND HOTEL TIEN-SHAN - ALMAATA - KAZAKHISTAN -2005

-AINA BULAK HOTEL - ALMAATA - KAZAKHISTAN -2005

-BAGANASIL LANGUAGE CULTURAL CENTER - KAZAKHISTAN - 2005

-KAZÝNO - ALMAATA - KAZAKHISTAN -2005

-SEMEY - ALMAATA - KAZAKHISTAN -2005

-ANA BRIGADE CONSTRUCTION PROJECT COM. BUILDING - AFGANISTAN - 2005

-HALEEB FOODS - LAHOR - PAKISTAN -2005

-SUDAN AFRA SHOPPING CENTER - SUDAN - 2005

-POWER PLANT WORKSHOPS-I - PAKÝSTAN- 2006

-SURGERY ROOM - AZERBAIJAN - 2006-2007

-PROCREDIT BANK - GEORGIA- 2006

-KAZAKHISTAN HAY UNIVERSITY- KAZAKHISTAN - 2006

-AFGANISTAN KABÝL MAIN MILITARY HOSPITAL - AFGANISTAN - 2006

-TIFLIS AVM - GEORGIA - 2006

-KAZAKHISTAN PRESIDENCY - KAZAKHISTAN - 2006

-DÝPLOMAT HOTEL - KAZAKHISTAN - 2006

-ARGONAUT - EGYPT - 2006

-METÝÞ - LIBYA - 2006

-SERÝN HOTEL I - AZERBAIJAN - 2006

-POWER PLANT WORKSHOPS-II - PAKÝSTAN- 2007

-MINISTRY OF FINANCE - GEORGIA - 2007

-THE ISLAMIC HOSPITAL - JORDAN - 2007

-U.S. ARMY CORPS. - AFGANISTAN - 2007

-DASCO - KUWAIT - 2007

- CONTRACTE INTL.-AFGANISTAN-2008

- KARWAN MTK-AZERBAIJAN-2008

- BILAL MENZIL TIKINTI COOPERATIVE-AZERBAIJAN-2008

- AZVEN LTD.-AZERBAIJAN-2008

- ATA YAPI-AZERBAIJAN-2008

- ÇAÐ TEACHING MANAGEMENT-AZERBAIJAN-2008

- CROSSFOLD CAPITAL-AZERBAIJAN-2008

- SERIN COMPANY-AZERBAIJAN-2008

- ZAFER CONSTRUCTION-AFGANISTAN-2008

- SERIN HOSPITAL-AZERBAIJAN-2008

- M/S PROGRESSIVE BUS.ENTR.-PAKISTAN-2008

- UNITECH-PEPSI CO-PAKISTAN-2008

- UNITECH-NESTLE-PAKISTAN-2008