azerbaycan ing referasn albümü hg

40
GÖNKA A.S. Azerbaijan References BÝlesuvar Olympic Training Complex GÖNKA

Upload: guestb585ef

Post on 07-May-2015

585 views

Category:

Education


6 download

TRANSCRIPT

Page 1: Azerbaycan ing referasn albümü hg

GÖNKA A.S. Azerbaijan References

BÝle

suva

r O

lym

pic

Tra

inin

g C

om

ple

x

GÖNKA

Page 2: Azerbaycan ing referasn albümü hg

BÝle

suva

r O

lym

pic

Tra

inin

g C

om

ple

x2

00

2

Bilesuvar Olympic Training Complex

! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA

! Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2002

Chiller Air Cooled

Fan Coils Ceiling & Wall Type

Air Handling Units

Boiler Systems

Are used in complex

2/3

Page 3: Azerbaycan ing referasn albümü hg
Page 4: Azerbaycan ing referasn albümü hg

20

08

Ba

ku T

urk

ish A

na

tolia

n H

igh S

cho

ol

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

4/5

Page 5: Azerbaycan ing referasn albümü hg

Baku Turkish Anatolian High School

Baku Turkish Anatolian High School T.C. Ministry of Education

and Azerbaijan Respublikasý Study on Nazir February 28, 1992

according to the memorandum of understanding signed on

24.01.1994 was opened.

School, celebration of certain days and weeks, panel,

debate and cinema shows a conference room of 200

people can be made available.

From time to time school teacher who has visited or invited

guests or conferences for students in this hall is carried

out.Understanding of technical systems in conference rooms

with a modern arrangement was.Every moment ready

sound system, computer and projection equipment are

available.

A school in Physics, Biology and Chemistry-A has a Computer

Laboratory. In all three laboratories are in a position to

respond to needs in terms of materials. Physics, Chemistry

and Biology teachers try in this laboratory, as well as have the

ability to make the computer-aided instruction.

Page 6: Azerbaycan ing referasn albümü hg

20

08

yça

y O

lym

pic

Tra

inin

g C

om

ple

x

Göyçay Olympic Training Complex

! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA

! Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2002

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

6/7

Page 7: Azerbaycan ing referasn albümü hg

Chiller Air Cooled

Fan Coils Ceeling & Wall Type

Air Handling Units

Boiler Systems

Are used in complex

Boiler house, pump station and piping whole mechanical job Ductwork

Page 8: Azerbaycan ing referasn albümü hg

20

08

vsa

n O

lym

pic

Tra

inin

g C

om

ple

x

Chiller Air Cooled

Fan Coils Ceeling & Wall Type

Air Handling Units

Boiler Systems

Are used in complex

Hövsan Olympic Training Complex

! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA

! Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2002

8/9

Page 9: Azerbaycan ing referasn albümü hg

GONKA Screw compressor air cooled water cooling

groups, with its models in the range of high efficiency and

high capacity, are ideal for cooling operations related to

comfort and industrial purposes.

R22 , R134a or R407c options.

Compressors; Half hermetic screw compressors.

Compressors changing between 1 and 4 according to

cooling capacity.

Condenser; Highly efficient, original condenser situated in V

type and condensation provided through 900 cyclical and

low sound level axial fans situated in the open edge of the

condenser.

Evaporator; Shell- tube evaporator whose cooling liquid

side and water side have one-circuit, multiple transitional,

two mirrored construction.

Refrigerating Circuit;Cooling Circuit; Cooling circuit and

circuit elements entirely independent for every compressor.

Electrical Screen and Control Board; board including

switch and micro-processor controlled module and control

cards as well as elements such as systemic control

elements and fuse, thermic magnetic switch and relay.

Micro-processor based Control System; Full control over all

the cooling circuits. Connections on board through

simplified device failure follow-up and easily recognized

electrical diagram.

Low noise level.

Multiple compressor, multiple cyclical, high efficiency.

%25-%100 continuous modulating capacity control in

every compressor.

Hardconstruction and long life.

Easy handling, installation and service.

Effortless service.

Compatible with available BMS systems.

Meeting consumer requirements in the most suitable way

through broad accessory and option alternatives.

Newly improved use of screw compressor with high COP

value.

Trouble-proof operations under high temperatures.

Rational control.

Air cooled liquid chiller

Page 10: Azerbaycan ing referasn albümü hg

Serin

Ho

tel B

aku

20

06

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

10/11

Page 11: Azerbaycan ing referasn albümü hg

Air cooled liquid chiller

GONKA Screw compressor air cooled water cooling

groups, with its models in the range of high efficiency and

high capacity, are ideal for cooling operations related to

comfort and industrial purposes.

R22 , R134a or R407c options.

Compressors; Half hermetic screw compressors.

Compressors changing between 1 and 4 according to

cooling capacity.

Condenser; Highly efficient, original condenser situated in V

type and condensation provided through 900 cyclical and

low sound level axial fans situated in the open edge of the

condenser.

GONKA Screw compressor air cooled water cooling

groups, with its models in the range of high efficiency and

high capacity, are ideal for cooling operations related to

comfort and industrial purposes.

R22 , R134a or R407c options.

Compressors; Half hermetic screw compressors.

Compressors changing between 1 and 4 according to

cooling capacity.

Condenser; Highly efficient, original condenser situated in V

type and condensation provided through 900 cyclical and

low sound level axial fans situated in the open edge of the

condenser.

GONKA Screw compressor air cooled water cooling

groups, with its models in the range of high efficiency and

high capacity, are ideal for cooling operations related to

comfort and industrial purposes.

R22 , R134a or R407c options.

Compressors; Half hermetic screw compressors.

Compressors changing between 1 and 4 according to

cooling capacity.

Condenser; Highly efficient, original condenser situated in V

type and condensation provided through 900 cyclical and

low sound level axial fans situated in the open edge of the

condenser.

Page 12: Azerbaycan ing referasn albümü hg

Ba

lake

n O

lym

pic

Tra

inin

g C

om

ple

x2

00

2

Balaken Olympic Training Complex

! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA

! Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2002

Chiller Air Cooled

Fan Coils Ceiling & Wall Type

Air Handling Units

Boiler Systems

Are used in complex12/13

Page 13: Azerbaycan ing referasn albümü hg

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 14: Azerbaycan ing referasn albümü hg

Ba

ku A

dm

inis

tra

tion O

f Th

e N

atio

na

l Arc

hiv

e B

uild

ing

20

02

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

14/15

Page 15: Azerbaycan ing referasn albümü hg

Air handling unit

Optional Accessories;

! GONKA vapor humidifier, standard vapor cylinder, immersion electrodes, stainless vapor distributor and microprocessor control unit.

! Mufflers which are made up of coulisses to provide required sound holding capacity.

! Plate heat exchanger or Heat recovery wheel for recovery of the heat emitted with exhaust air.

! Electrical board.

! Frequency Converter

Standard Series

Application Area: business centers, schools,

hospitals, factories, hotels and restaurants.

! 8 different models which provide required humidity

and temperature by conditioning air volume in the

range of 3000m³/h and 100.000 m³/h.

! The framework which is formed by combination of

aluminum frames, which are connected specially, with

plastic and aluminum comers.

! Boards which are made up of double skilled

galvanized iron in a standard way.

! Polyurethane insulated panels, which are 30 mm in

thickness, for thermal and acoustic insulation in a

standard way.

Standard Accessories;

! Filter Chambers; Chamber design which provides easy mounting and de-mounting in filters and filters with different productivity levels on demand.

! Heating and Cooling Coils; Seamless cooper tubes. In heating coils, 4 options: warm water, vapor, hot water, electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion).

! Dampers; Rigid aluminum frame in multi airfoil structure which is the least resistant against airflow. Rubber gaskets which reduce air leakage through blades to the minimum level.

! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium and high duct pressures,.

Page 16: Azerbaycan ing referasn albümü hg

Hb

Clin

ique

Ba

ku2

00

2

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

16/17

Page 17: Azerbaycan ing referasn albümü hg

Laminar flow air system

! HEPA filters which clean filtrated air before going into

operating room.

! Mounting situated in ceiling of the operating theatre in

such a way that it should locate over operating table.

! Stainless steel air distribution box, Hepa filters,

transparent air distributor (laminarizator) and pendant

operating table lighting connection.

! Easy maintenance and disinfection because of

transparent air distributor's being pulled down.

Operating theatre lighting system made up of airproof

construction.

! A laminar, vertical air flow from transparent air

distributor through operating table prevents turbulent

air flow in conventional air systems and offers a high

level cleanliness class around the operating table

during the operati

! The system which remove particulates and microbes

from operation part due to laminar flow.

! Special design for operation theatres which require

especially high level sterilization in accordance with

DIN 1946.

! Differential pressure sensors. Easy connection

differential pressure sensors and leakage testing.

! Easy installation to all kinds of ceilings.

Packaged hygienic air conditioner

! Highly efficient filtration of supply and extract air.

! Maximum function control: room temperature and relative humidity control throughout the year.

! Meeting fresh air that surgical operations require

! Quiet and non-vibrating operation that operating theatres require.

! An independent system which is under direct control of authorized health staff.

! Pressure control in aseptic and septic surgical operations.

! Continuous control of room temperature and humidity.

! Quiet and non-vibrating operation.

! Replacing the old installation in available places and generally, because their sizes are small, occupying less room than any time before, however available air canal and water installation could be, easy erection in any type of health institutions.

! In fan part, one or two directly actuated highly static pressurized fans to provide required air volumetric flow rate even when filters are choked.

! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, inverter equipment in supply and extract fans.

! Air Filters; F5 class filter in fresh air input and F9 class filters on the extract side.

! Dx battery;

! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro-process control.

! Compressor; 1 or 2 Scroll Compressors according to the capacity.

! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device.

! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI).

! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.

Page 18: Azerbaycan ing referasn albümü hg

Ba

ku M

inis

try

Of H

ea

lth T

op

çub

aþo

v H

osp

ital

20

08

Laminar flow air system

! HEPA filters which clean filtrated air before going into

operating room.

! Mounting situated in ceiling of the operating theatre in

such a way that it should locate over operating table.

! Stainless steel air distribution box, Hepa filters,

transparent air distributor (laminarizator) and pendant

operating table lighting connection.

! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.

! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operati

! The system which remove particulates and microbes

from operation part due to laminar flow.

! Special design for operation theatres which require

especially high level sterilization in accordance with

DIN 1946.

! Differential pressure sensors. Easy connection

differential pressure sensors and leakage testing.

! Easy installation to all kinds of ceilings.18/19

Page 19: Azerbaycan ing referasn albümü hg

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 20: Azerbaycan ing referasn albümü hg

Serin

Ho

spita

l Aze

rba

ijan

20

08

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

20/21

Page 21: Azerbaycan ing referasn albümü hg
Page 22: Azerbaycan ing referasn albümü hg

Serin

Ho

spita

l Aze

rba

ijan

20

08

Packaged hygienic air conditioner

! Highly efficient filtration of supply and extract air.

! Maximum function control: room temperature and relative humidity control throughout the year.

! Meeting fresh air that surgical operations require

! Quiet and non-vibrating operation that operating theatres require.

! An independent system which is under direct control of authorized health staff.

! Pressure control in aseptic and septic surgical operations.

! Continuous control of room temperature and humidity.

! Quiet and non-vibrating operation.

! Replacing the old installation in available places and generally, because their sizes are small, occupying less room than any time before, however available air canal and water installation could be, easy erection in any type of health institutions.

! In fan part, one or two directly actuated highly static pressurized fans to provide required air volumetric flow rate even when filters are choked.

! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, inverter equipment in supply and extract fans.

! Air Filters; F5 class filter in fresh air input and F9 class filters on the extract side.

! Dx battery;

! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro-process control.

! Compressor; 1 or 2 Scroll Compressors according to the capacity.

! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device.

! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI).

! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.

22/23

Page 23: Azerbaycan ing referasn albümü hg
Page 24: Azerbaycan ing referasn albümü hg

Aze

rba

ijan M

ilita

ry H

osp

ital 3

00

Be

d2

00

7

Laminar flow air system

! HEPA filters which clean filtrated air before going into

operating room.

! Mounting situated in ceiling of the operating theatre in

such a way that it should locate over operating table.

! Stainless steel air distribution box, Hepa filters,

transparent air distributor (laminarizator) and pendant

operating table lighting connection.

! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.

! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operati

! The system which remove particulates and microbes

from operation part due to laminar flow.

! Special design for operation theatres which require

especially high level sterilization in accordance with

DIN 1946.

! Differential pressure sensors. Easy connection

differential pressure sensors and leakage testing.

! Easy installation to all kinds of ceilings.24/25

Page 25: Azerbaycan ing referasn albümü hg

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 26: Azerbaycan ing referasn albümü hg

Ka

rwa

n M

tk A

zerb

aija

n2

00

2

KARVAN RESIDANS - BAKU

FEBRUARY / 2008

R407C

1 Screw compressor

12/7 ° C

34 °C

GHSC 1V10s

640.4 kW

110 m³/h

380V/50 Hz

Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93

http://www.gonka.com.tre-mail: [email protected]

APRIL / 2008

TSEKTSEK

KAZAKHSTAN

MAX. COMP. CURRENT 440 A

COMPRESSOR TYPE

EVAPORATOR WATERINLET/OUTLET TEMP.

EVAPORATOR WATER FLOW RATE

OUTSIDE AIR TEMP.

REFRIGERANT

MODEL

OPERATING VOLTAGE

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

CAPACITY

SERIAL NO 08/1005

UNIT TYPE AIR COOLED LIQUID CHILLER

JOB NAME

CUSTOMER KARVAN MTK

PRODUCTION DATE

QUALITY CONTROL DATE

FEBRUARY / 2008

APRIL / 2008

GFC400

65

800

9.350

3.110

4.320

220 V MONOPHASE

JOB NAME KARVAN RESIDANS - BAKU

CUSTOMER KARVAN MTK

HIDDEN CEILING TYPE FAN COIL UNITUNIT TYPE

TYPE

PROD. DATE

FLOORWALLCEILING

PIPE CONNECTIONDIRECTION

SERIAL NO

HEATING CAPACITY

COOLING CAPACITY

AIR FLOW RATE

SENSIBLE

TOTAL

VOLTAGE POWER

COOLINGHEATING

STEAM 0,1 ATÜ

HOT WATER 80/60 °C WATER TEMP. 6/10°C

WATER TEMP. 7/12 °C

QUALITY CONTROL DATE

OPERATING CONDITIONS

Sincan Organize Sanayi Bölgesi Göktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93http://www.gonka.com.tre-mail: [email protected] - SOÐUTMA - KLÝMA - HAVALANDIRMA

SUPERHEATEDWATER

130/90 °C

m³/h

W

W

W

W

LEFT

RIGHT

08/1467

26/27

Page 27: Azerbaycan ing referasn albümü hg

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 28: Azerbaycan ing referasn albümü hg

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Ce

ntra

l Ba

nk

of A

zerb

aija

n R

ep

ub

lic2

00

9

28/29

Page 29: Azerbaycan ing referasn albümü hg
Page 30: Azerbaycan ing referasn albümü hg

Aze

rba

ijan M

c D

ona

ld’s

20

02

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Azerbaijan Mc Donald’s

Centrifugal roof extracts

Technical specification The manufactured centrifugal roof

extract unit has been designed for the effective exhaust. it is

possible to montage in the desired angle with the small

sound Ievel it may be used in for the industrial applications

and kitchens. It has been designed for Iong service Iife

without maintenance. The manufacturing range 500-12.000

m³/h air and 0-50 mmSS pressure.

Body It is designed according to the bat environment

conditions Galvanized stell frame, aluminium upper cover

are used. Moto-fan group Cenrifugal ventilatör is statically

and dynamically balanced.Motor serves 380V/50 Hz 900-

1400d/d as astandard and directly coupled with d-phase

electirical motor.By this way, it works quitely and without

vibration.

Fan has dense f imed, low sound leve l and

highperformance.It is easy to open the fan and clean the fin

at shot notice. By the help aof special protection cover, itwork

many years without any problem. Centrifugal roof extract

units designed as direct extraction or combined with a duct

type.

30/31

Page 31: Azerbaycan ing referasn albümü hg
Page 32: Azerbaycan ing referasn albümü hg

Ata

Oku

l Aze

rba

ijan

20

08

32/33

Page 33: Azerbaycan ing referasn albümü hg

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

Page 34: Azerbaycan ing referasn albümü hg

Ba

ku S

tate

Univ

ers

ity K

itche

n A

nd

Re

sta

ura

nt

20

08

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

34/35

Page 35: Azerbaycan ing referasn albümü hg

Laminar flow air system

! The system which remove particulates and microbes

from operation part due to laminar flow.

! Special design for operation theatres which require

especially high level sterilization in accordance with

DIN 1946.

! Differential pressure sensors. Easy connection

differential pressure sensors and leakage testing.

! Easy installation to all kinds of ceilings.

! HEPA filters which clean filtrated air before going into

operating room.

! Mounting situated in ceiling of the operating theatre in

such a way that it should locate over operating table.

! Stainless steel air distribution box, Hepa filters,

transparent air distributor (laminarizator) and pendant

operating table lighting connection.

! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.

! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operati

Page 36: Azerbaycan ing referasn albümü hg

Aze

rba

ijan G

ön

ka S

ho

ps

an

d O

ffic

e2

00

2

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

36/37

Page 37: Azerbaycan ing referasn albümü hg

GÖNKA ....

! The system which remove particulates and microbes

from operation part due to laminar flow.

! Special design for operation theatres which require

especially high level sterilization in accordance with

DIN 1946.

! Differential pressure sensors. Easy connection

differential pressure sensors and leakage testing.

! Easy installation to all kinds of ceilings.

! HEPA filters which clean filtrated air before going into

operating room.

! Mounting situated in ceiling of the operating theatre in

such a way that it should locate over operating table.

! Stainless steel air distribution box, Hepa filters,

transparent air distributor (laminarizator) and pendant

operating table lighting connection.

! Easy maintenance and disinfection because of transparent air distributor's being pulled down. Operating theatre lighting system made up of airproof construction.

! A laminar, vertical air flow from transparent air distributor through operating table prevents turbulent air flow in conventional air systems and offers a high level cleanliness class around the operating table during the operati

Page 38: Azerbaycan ing referasn albümü hg

Aze

rba

ijan B

aku

En

do

s. H

osp

ita

l2

00

2

TOROSLAR DAÐ TURÝZM LTD. ÞTÝ.- AZERBAYCAN -2002 AZERBAYCAN BAKÜ ENDOS. HASTANESÝKlima santrallarý, Egzost aspiratör, Fan-Coil cihazlarý, Otomatik kontrol malzemeleri

LAZERÝN HASTANESÝ ?

38/39

Page 39: Azerbaycan ing referasn albümü hg
Page 40: Azerbaycan ing referasn albümü hg

Sincan Organize Sanayi

Bölgesi Göktürk Cad. No:6

Sincan / ANKARA

Tel :0 312 267 09 90 (pbx)

Fax:0 312 267 09 93

FACTORY and MAIN OFFICE

Nasimi Rayonu,

Suleyman Rustem Mah., 7,

Az1014 BAKÜ / AZERBAYCAN

Tel : (00 994) 12 493 19 29

Fax: (00 994) 12 493 19 29

.

AZERBAIJAN BRANCH OFFICE

GEORGIA BRANCH OFFICE

GÖNKA Azerbaijan References

- Hövsan Olympic Training Complex

- Baku Turkish Anatolian High School

- Göyçay Olympic Training Complex

- Serin Hotel Baku

- Balaken Olympic Structure

- BÝlesuvar Olympic Structure

- Baku Administration Of The National

Archive Building

- Hb Clinique Baku

- Azerbaijan Baku Endos. Hospital

- Azerbaijan Military Hospital 300 Bed

- Karwan Mtk Azerbaijan

- Ata Okul Azerbaijan

- Serin Hospital Azerbaijan

- Baku Ministry Of Health Topçubaþov

Hospital

- Baku State University Kitchen And

Restaurant